Page 1: 02nd July 2008 - Vienna, Austria

02nd July 2008 - Vienna, Austria

FP7 Information & Partnering Day

HOLISTIC OPTIMISATION LEADING TO INTEGRATION OF SUSTAINABLE TECHNOLOGIES IN COMMUNITIES

Page 2: 02nd July 2008 - Vienna, Austria

HOLISTIC - consortiumHOLISTIC - consortium

Source: Planair

Page 3: 02nd July 2008 - Vienna, Austria

Anticipated resultsAnticipated results

In five years of project duration…

• 10% energy savings.

• 15% renewables.

• 11% Emission savings per year.

Source: Solar4you

Page 4: 02nd July 2008 - Vienna, Austria

Retrofitting public buildingsRetrofitting public buildings

Target app. 12,000 m² in Mödling

- Status analysis- Bidding- Measures - Energy perfor-mance certificate

HOLISTIC – requirement <= 75 kWh/m² a

Page 5: 02nd July 2008 - Vienna, Austria

2008 2009

Budgetary allocated in 2008:

1. LITSCHAUERHOF, Eisentorgasse 12. HAYDNGASSE, Haydngasse 19-213. HYRTLPARK, Hyrtlgasse 24. LERCHENGASSE, Lerchengasse 175. SPECHTGASSE, Spechtgasse 41

Retrofitting public buildingsRetrofitting public buildings

Foreseen for 2008 app. 4,300 m²

Followed by:

7. Mödling Wohnen, Kirchengasse8. Mödling Wohnen, Untere Bachgasse 39. Volksschule, Babenbergergasse 2010.Karl Stingl - Volksschule, Pfandlbrunngasse 2

Page 6: 02nd July 2008 - Vienna, Austria

Target app. 10,000 m² in Mödling

- Status analysis- Bidding- Measures - Energy perfor-mance certificate

HOLISTIC – requirement <= 45 - 60 kWh/m²*a

Retrofitting private buildingsRetrofitting private buildings

Page 7: 02nd July 2008 - Vienna, Austria

2008 2009

Planned construction of a social housing company in Mödling:

• Payergasse 36-38• Neusiedlerstraße 47 (5 Stiegen)

Foreseen for 2008 app. 4.650 m²

31.42 - 33.21

Retrofitting private buildingsRetrofitting private buildings

Page 8: 02nd July 2008 - Vienna, Austria

New ecobuildingsNew ecobuildings

Source: Solar4you

Target app. 10,000 m² in Mödling

- Concept- Allowance solicitation- Measures - Energy perfor-mance certificate

HOLISTIC – requirement <= 18 kWh/m²* a

Page 9: 02nd July 2008 - Vienna, Austria

2008 2009

Budgetary allocated in 2008:

• Mödlingbach

Foreseen for 2008 app. 1,900 m²

11

New ecobuildingsNew ecobuildings

Page 10: 02nd July 2008 - Vienna, Austria

Renewable EnergyRenewable Energy

Target app. 15% in Mödling‘s HOLISTIC zone

- Concepts- Co-financing models- Allowance solicitation - Realisation- Evaluation

Page 11: 02nd July 2008 - Vienna, Austria

2008 2009

Planned realisation in 2008: 1. Drinking water hybrid storage.2. Local funding programme for

renewables3. Holistic concept for the foreseen

CHP plants4. Feasibility study of the “cool peak“

system in supermarkets

Foreseen for 2008 Pilot plants, coherent local Funding programme, holistic realisation concept

Renewable EnergyRenewable Energy

Page 12: 02nd July 2008 - Vienna, Austria

Promotion campaignPromotion campaign

Adhoc-fora

Eco-Marketing

Civil participation

Information events

Workshops

Building checks

Community Steering Group