02nd July 2008 - Vienna, Austria FP7 Information & Partnering Day HOLISTIC OPTIMISATION LEADING TO INTEGRATION OF SUSTAINABLE TECHNOLOGIES IN COMMUNITIES
Dec 30, 2015
02nd July 2008 - Vienna, Austria
FP7 Information & Partnering Day
HOLISTIC OPTIMISATION LEADING TO INTEGRATION OF SUSTAINABLE TECHNOLOGIES IN COMMUNITIES
HOLISTIC - consortiumHOLISTIC - consortium
Source: Planair
Anticipated resultsAnticipated results
In five years of project duration…
• 10% energy savings.
• 15% renewables.
• 11% Emission savings per year.
Source: Solar4you
Retrofitting public buildingsRetrofitting public buildings
Target app. 12,000 m² in Mödling
- Status analysis- Bidding- Measures - Energy perfor-mance certificate
HOLISTIC – requirement <= 75 kWh/m² a
2008 2009
Budgetary allocated in 2008:
1. LITSCHAUERHOF, Eisentorgasse 12. HAYDNGASSE, Haydngasse 19-213. HYRTLPARK, Hyrtlgasse 24. LERCHENGASSE, Lerchengasse 175. SPECHTGASSE, Spechtgasse 41
Retrofitting public buildingsRetrofitting public buildings
Foreseen for 2008 app. 4,300 m²
Followed by:
7. Mödling Wohnen, Kirchengasse8. Mödling Wohnen, Untere Bachgasse 39. Volksschule, Babenbergergasse 2010.Karl Stingl - Volksschule, Pfandlbrunngasse 2
Target app. 10,000 m² in Mödling
- Status analysis- Bidding- Measures - Energy perfor-mance certificate
HOLISTIC – requirement <= 45 - 60 kWh/m²*a
Retrofitting private buildingsRetrofitting private buildings
2008 2009
Planned construction of a social housing company in Mödling:
• Payergasse 36-38• Neusiedlerstraße 47 (5 Stiegen)
Foreseen for 2008 app. 4.650 m²
31.42 - 33.21
Retrofitting private buildingsRetrofitting private buildings
New ecobuildingsNew ecobuildings
Source: Solar4you
Target app. 10,000 m² in Mödling
- Concept- Allowance solicitation- Measures - Energy perfor-mance certificate
HOLISTIC – requirement <= 18 kWh/m²* a
2008 2009
Budgetary allocated in 2008:
• Mödlingbach
Foreseen for 2008 app. 1,900 m²
11
New ecobuildingsNew ecobuildings
Renewable EnergyRenewable Energy
Target app. 15% in Mödling‘s HOLISTIC zone
- Concepts- Co-financing models- Allowance solicitation - Realisation- Evaluation
2008 2009
Planned realisation in 2008: 1. Drinking water hybrid storage.2. Local funding programme for
renewables3. Holistic concept for the foreseen
CHP plants4. Feasibility study of the “cool peak“
system in supermarkets
Foreseen for 2008 Pilot plants, coherent local Funding programme, holistic realisation concept
Renewable EnergyRenewable Energy
Promotion campaignPromotion campaign
Adhoc-fora
Eco-Marketing
Civil participation
Information events
Workshops
Building checks
Community Steering Group