PROJECT BRIEF
For the construction of
Taman Mewah
SS16 Persiaran Kemajuan, 47500 Subang Jaya, Selangor
Prepared by:
FNBE 0115 Students
Tutor: Ms Ann See Peng
Group Members:
Lew Quo Ming ( 0322884 )
Lim Win Kee ( 0322790 )
Liew Cherng Qing ( 0322613 )
Koo Jian Xiang ( 0322975 )
�1
CONTENT
�2
Index Title Page
Cover 1
Content 2
1 Introduction to Project 3
1.1 Project Description 3
1.2 Site Analysis 3
1.3 Project Concept 7
1.4 Project Background 8
1.5 Project Summary 8
1.6 Visuals 10
1.6.1 Bubble Diagram of Proposed Site 10
1.6.2 Master Plan of Proposed Site 10
1.7 Project Objectives 11
1.8 Project Benefits 11
1.9 Success Criteria 11
2 Project Specifications 12
2.1 Schedules 12
2.1.1 Schedule of Preliminary Stage 12
2.1.2 Schedule of Construction Stage 13
2.2 Constraints 14
2.2.1 Time 14
2.2.2 Financial 14
2.2.3 Resources 14
2.3 Assumptions 16
3 Project Organisation 17
3.1 Overview 17
3.2 Project Management Team 17
3.3 Team Objective 17
3.4 Tasks 17
4 Stakeholders 22
1. INTRODUCTION TO PROJECT
1.1 PROJECT DESCRIPTION
This is the final project for this module.
For this project, we are assigned to
locate a piece of land to construct
something which is beneficial to the
society. Therefore, the name of our
project is “ Taman Mewah”. It involves
the construction of a recreational area with parks for the residences around the area, running
pathway & tracks for joggers, gazebo and pergolas. The project is on the open area of a 50m x
70m ( 3500m2 ) site just located in front of the Subang Jaya LRT Station and above Subang
Parade. The site is currently not in use and it is a missed opportunity to develop a beautiful
location.
The agreement of the project brief is estimated to be signed on 15 June 2015. The whole
construction process is approximately 4 months.
1.2 SITE ANALYSIS
Photos of the site:
�3
Location Plan
This site has been a large vacant space since 200* without any construction or renovation. Hence,
most areas of the site is covered with grass and soil. A site analysis shows that the site is ideal for
the construction plan due to the following reasons:
1. Large enough to occupy large amount of residences.
2. Easily accessible. Residences can take LRT or buses to reach the location.
3. Has good ventilation due to large open space.
4. Has a lot of un utilised space available for new development.
5. Able to provide a healthy and beautiful scenery for the residences around.
6. The topography of the land is flat and smooth.
7. The land is firm with soil but it is muddy sometimes when rain occurs.
8. The microclimate of the sun rises at the east side of the land and sets at the west side of
the land.
9. There is no other recreational area such as open parks nearby the area.
Major buildings around the site:
�4
AEON BIG SUBANG PARADE
SAUJANA RESIDENCY E-Tiara Apartment
Other findings:
1. Residence nearby always access to AEON BIG, Subang Parade or Subang Avenue for
shopping and spending leisure time.
2. There are a few residency around the suggested site such as Saujana Residency, Subang
Avenue, E-Tiara & Casa Tiara Condominium.
3. Large carpark in front of Subang Parade.
4. Low frequency of traffic jam will occur on the roads at the location of the site.
Transportation:
1. Transportation around the other site that can be used is Subang Jaya KTM which is located right
behind AEON BIG and Subang Parade.
2. There is also a bus stop in front of AEON BIG .
�5
Proposed by:
Koo Jian Xiang 0322975
FNBE JAN15 Intake
Introduction to the Construction Industry
[ QSB30105 ]
Tutor: Ms. Jaqurliyn Ann See Peng
�6
1.3 PROJECT CONCEPT
The project team explored a variety of possible ideas and concepts that could be incorporated in
this construction project after conducting the site analysis. The finished project will be function as a
recreational park and rest area.
The following concepts are combined in this project:
Parks with jogging pathway
A park is an area of open space provided for recreational use. It can be in its natural or semi-
natural state, or planted, and it is set aside for human enjoyment or for the protection of wildlife or
natural habitats. It may consist of rocks, soil, water, flora and fauna and grass areas, but may also
contain buildings and other artifacts such as play grounds and gazebos.
Gazebo
Gazebos are freestanding elements that can be found in park. It is roofed, and open on all sides.
They provide shade, shelter, ornamental features in a landscape, and it is also a place to rest.
Some gazebos in public parks are large enough to serve as bandstands or rain shelters.
3. A small water feature will be built in the middle section of the suggested area, in order
to provide enjoyment and some relaxing scenery for the residents.
4. A service centre will be built and function both as reception counter and a convenient
store for the residents around.
5. Garden lamps and benches will be added along the jogging pathway.
�9
1.6 VISUALS
1.6.1 Bubble Diagram of Proposed Site
1.6.2 Master Plan of Proposed Site
�10
SITE
PLANTATION
JOGGINGPATHWAY PERGOLA
WATER FEATURE
GAZEBO
SHRUBS
FLOWERS
WOODEN BENCH
STONES
WATER FOUNTAIN
TAIWANGRASS
TILESSHRUBSSH
STONE BENCH
GARDENTABLE
WOODENBENCH
1.7 PROJECT OBJECTIVES
• Provide a conducive environment and green space for the residents to relax and work
out.
• Improve the standard of living of the residents nearby the area.
• Transform most softscape in the site to hardscape.
• Create more interactive spaces and awareness about self- sustainable living.
1.8 PROJECT BENEFITS
• Residents and pedestrain can maintain their mental health by relieving stress in that
area.
• The aesthetic value of the site is enhanced.
• The space of the site is fully utilised to the commercial.
1.9 SUCCESS CRITERIA
• The gazebo, pergola, water feature are built within the estimated time.
• The land is grassified and paved within the estimated time.
• The area of the land will be cover with new taiwan grass.
• The decorations and facilities are builded within the estimated time and controlled cost.
• The whole project should be done within the estimated time and budget.
• The water feature is well maintained.
• Taman Mewah is fully occupied by residents and recognised by people around Subang
Jaya because of it’s well known design of the park layouts due to its comfortable
ambience and relaxing environment.
�11
2. PROJECT SPECIFICATIONS
2.1 SCHEDULES
2.1.1 Schedule of Preliminary Stage
No. Tasks June 2015 July 2015
1 Site Analysisccccccccas
2 Meeting and Negotiation with Subang Jaya Local Authorities ( MPSJ ) ————————
3 Preparation of Outline Proposal zzzczxczc
4 Produce Order of Cost and Estimate zzzczxczc
5 Approval of Design by Subang Jaya Local Authorities ( MPSJ ) asdasdasdasdasdd
6 Deposit of Application for Approval of Building Plans to MPSJ fsdfsdfsdfssdfsf
7 Deposit of Forms to Board of Architects and Engineers Malaysia cccccccccccc
8 Obtain Landscape Approval asdasdasdasdasa
9 Obtain Building Plan Approval asdasdasdasdasa
10 Tender Documentation and Tender Action asdsdasdasd
11 Contractors Bid for Project asdasdasdas
12 Selection of Contractor asdasdasdasda
13 Hiring of Working Team jasdasdasdas
�12
2.1.2 Schedule of Construction Stage
No. Tasks August 2015 September 2015
1 Clearance of destroyed rocks and stones in that area
asasdda
2 Demolition of certain large rocks asdasddd
3 Soil digs evenly to form a flat land asdasdasdd
4 Soil digging for water drainage system asdasdasdas
5 Construction of water pipes for water drainage system asdasdasdasd
6 Supply and Installation of Granular Base asasdasddddd
7 Construction of reinforced concreate walls of Gazebo asdasdasd
8 Drilling Cavities asdasddddsss
9 Filling Cavities with Loam Soil asdasdasdddd
10 Installation of Underground Electrical Supply casasdasddddddd
11 Planting Taiwan Grass on soil asdasdadsdsddsdsdd
12 Installation of Tile, Concrete, Smooth Granite and Flooring
asdasdasdasdasdas
13 Installation of Verticle Metal Wires asdasdasdasdasdd
14 Installation of Water Pumping and Circulation System for the water feature
aassdsdsdsddd
15 Installation of Piping asdddasdad
16 Construction of concrete jogging pathways asdasdads
17 Installation of Outdoor Lightings asdasdad
18 Installation of Pergolas asdasddd
19 Flower and shrubs plantation sssssssasddddd
�13
2.2 CONSTRAINTS
2.2.1 TIME
2.2.2 Financial
2.2.3 Resources
Tasks Milestone
Approval from local authority obtained 20th June 2015
Project planning and design completed 15th July 2015
Execution 1st August 2015
Completion 31st September 2015
Constraint Details
Minimum wages Workers have minimum wage of RM900.00
Funding from local authorities RM 180,000.00
Human Resources
Working Hours All workers can only work for maximum 8 hours, any extra overtime is decided on worker’s own will
Requirements Only workers with minimum working experience of 2 years and able to speak fluently in English or Malay or Chinese are hired
Equipment
Usage time of electric power tool, chain or circular saw, gas or air compressor, hammer, pliers and any other impacting or grinding equipment
Monday to Friday: Before 7am and after 8pm
Weekends and public holidays: Before 9am and after 8pm
Placing of materials Materials shall be placed only within the site and not exceeding 5m from site
Electrical equipment Plugs of equipment are switched off when not in use to prevent wastage.
�14
Materials
Transportation of materials to site Vehicles carrying construction materials to site can only stop beside the site not far from 5 meters away. The materials are then carried by workers to the construction site.
Placing of construction materials All materials are carried to a specific 5m x 5m site nearby the construction site.
Placing of waste materials All waste materials are to be placed at a specific 10m x 10m area in the site compound. Waste materials must be cleared from the area before completion.
�15
2.3 ASSUMPTIONS
Assumption Confidence Impact Priority
Approvals from the local authorities are obtained
High High High
Project sponsor will fund construction
High High High
Sufficient skilled human resources will be provided
Medium Medium Low
Project milestones are reached in time
Medium Medium Low
Materials selected and bought are suitable and correct
Medium High Medium
Suppier will supply material and equipment
High High High
Materials and equipment can be delivered on schedule
Medium High Medium
All accidents are prevented during construction
Medium Medium High
Worker is availabe when required
High Medium Low
All foreign workers during construction are fluent in English, Malay & Chinese
High Medium Low
Final cost of construction does not exceed given budget
Medium Low Medium
�16
3. Project Organisation
3.1 OVERVIEW
3.2 TEAM OBJECTIVE
To completely understand the needs of residents in PJS 16 and fully utilise the land to plan,
design, and build Taman Mewah.
3.3 TASKS
ARCHITECT
• Translate site requirements, compact form concepts, compartmentalised concepts
and low profile concepts of Taman Mewah to reality.
• Coordinate with certain environmental and engineering service such as electrical
wiring and water supply to construct Taman Mewah.
• Conduct site analysis before proceeding to the design stage.
• Consider the requirements of local authorities , which includes construction methods,
timing, construction strategy, cost, selection of materials and aesthetic value.
• Provide a design plan that is functional and has high aesthetic value that satisfies the
needs of client.
Project Requestor Subang Jaya Local Authorities ( MPSJ )
Project Sponsor Subang Jaya Local Authorities ( MPSJ )
Project Owner Subang Jaya Local Authorities ( MPSJ )
Project Manager Ar. Koo Jian Xiang
Team Members Lead Architect- Ar. Koo Jian XiangLandscape Architect- Ar. Liew Cherng QingQuantity Surveyor- Sr. Lew Quo MingCivil and Structural Engineer- Mdm. Lim Win KeeMechanical and Electrical Engineer- Mr. Justin LeeContractor- Mr. Soo Yon LiPlumbing Sub ContractorSupplier
�17
• Submit drawing to authorities for approval.
• Award tenders and contract administration to contractors.
• Mediating between client and contractor.
• Prepare an outline proposal of Taman Mewah.
• Prepare a project timeline for the whole construction process of Taman Mewah.
• Supervise progress of construction of Taman Mewah to ensure that site work will
meet specifications of construction documents when the construction have
completed.
• Submit modification of the design of Taman Mewah during construction to contractor.
• Recommend alternative solutions to resolve any variations to original budgets.
• Conduct an assessment of Taman Mewah to Subang Jaya Local Authorities.
• Make recommendations for maintenance for Taman Mewah.
• Ensure the Park is completed before deadline.
• Continuously follow up the progress of the construction.
• Meeting with client for feedbacks and suggestion.
LANDSCAPE ARCHITECT
• Oversee the design of Taman Mewah, including urban regeneration schemes and
reviving the natural characteristics of the given site.
• Establish general landscape requirements with clients to implement Taman Mewah.
• Conduct preliminary assessment and site analysis of the site for Taman Mewah.