YOU ARE DOWNLOADING DOCUMENT

Please tick the box to continue:

Transcript
Page 1: WALL GRAPHICS KWIK ZIP FRAME MEASURING PROTOCOL · WALL GRAPHICS KWIK ZIP FRAME MEASURING PROTOCOL Mark indicating where you started and ended each measurement Complete in Feet, Inches

INDOOR

DO YOU REQUIRE INSTALLATION

OUTDOORYES YES

YES NO

DOES THE WALL AREA HAVE OBJECTS SUCH AS?

YES NO

ELECTRICAL OUTLETS

ELECTRICAL SWITCHES

A/C SWITCHES

OTHERS _____________________

WALL INFORMATION

MEASUREMENTS & INSTALLATIONSOFFICE (702)614-1000 • FAX (702)614-9900

E-MAIL: [email protected]

Once the measurements are completed, please fax or email to:

COMPANY NAME:

PHONE:

CITY:

CELL:

SALES ORDER OR QUOTE #

STATE: ZIP CODE:ADDRESS:

EMAIL: MEASURED BY:

CONTACT:

KWIK ZIP FRAME MEASURING PROTOCOLWALL GRAPHICS

Mark indicating where you started and ended each measurement

Complete in Feet, Inches and Fractions to the 1/8”

INSTRUCTIONS

Did you Find Studs in Wall? if YES, please mark.

WALL TYPEDRYWALLCONCRETE WALLCINDER BLOCKSTUCCO WALLOTHER: ____________

ONE PICTURE IS WORTH A THOUSAND WORDSPlease email them to us for a better understanding:Email: [email protected]

You will need 3 inches clearance outside your final trace, on the bottom & left right for tension purpose.

3”

3”

CINDERBLOCK

STUCCOWALL

DRYWALL

CONCRETE