MESA and PUMA Status of deployment, User support and warranty
Monitoring for Environment and Security in Africa (MESA)
11
Présentation © 2016 – Telespazio France
IMAGINE… A SPACE APPLICATION
REVOLUTION…
IMAGINE… A SPACE APPLICATION
REVOLUTION…
Philippe RIERA
12th EUMETSAT User forum - 13/09/2016 - Kigali
Supply Contract highlights
MESA AND PUMA STATUS OF DEPLOYMENT, USER SUPPORT AND WARRANTY
22
Présentation © 2016 – Telespazio France
MESA AND PUMA STATUS OF DEPLOYMENT, USER SUPPORT AND WARRANTY
� Telespazio France:
� Supply Contract Management
� System Design & Validation
� Hardware integration & PHST (Logistics)
� Installation management and monitoring
� Thales Alenia Space:
Supply Contract highlights
33
Présentation © 2016 – Telespazio France
� Thales Alenia Space:
� System Design
� eStation2 integration (from JRC)
� Meteo France International:
� Synergie upgrade & integration
� Deployment Teams:
� On-site deployments
� On-site training
Deployment teams
MESA AND PUMA STATUS OF DEPLOYMENT, USER SUPPORT AND WARRANTY
� ECOWAS : Etienne KENNE (Cameroon)
� IGAD : Peter MUTAI (Kenya)
� SADC : Abay ASSEFA (Ethiopia)
Supply Contract highlights
44
Présentation © 2016 – Telespazio France
� SADC : Abay ASSEFA (Ethiopia)
� CEMAC : Freddy FALANGA (DR Congo)
� IOC : Telespazio France
MESA AND PUMA STATUS OF DEPLOYMENT, USER SUPPORT AND WARRANTY
Figures and challenges:
• 178 stations: 116 MESA (full & partial) and 58 PUMA + 4 training centres
• 600 PCs to integrate, configure and test
Supply Contract highlights
55
Présentation © 2016 – Telespazio France
• 600 PCs to integrate, configure and test
• 50 tons of equipment to pack and ship
• 49 countries meaning 49 different situations in terms of administrative processes, shipment, packing, export control, customs, transit agent, etc.
Supply Contract highlights
MESA AND PUMA STATUS OF DEPLOYMENT, USER SUPPORT AND WARRANTY
MESA Supply Contract (2015)
STATIONS UPGRADE NEW STATIONS
66
Présentation © 2016 – Telespazio France
PUMA2010 to PUMA2015
49 stations
AMESD to MESA
55 stations
PUMA2015
9 stations
MESA
61 stations
PUMA/MESA Training
Centres
4 centres
Supply Contract highlights
MESA AND PUMA STATUS OF DEPLOYMENT, USER SUPPORT AND WARRANTY
Project Milestones
Name Duration Scheduled DateReal
DateDetail
T0 13/05/2015 13/05/2015 Contract signature
KOM 3 weeks 03/06/2015 18/06/2015Review of activity, infrastructure
documentation, function and specification
Design validation and starting of
77
Présentation © 2016 – Telespazio France
FAT 4 months 1/2 27/09/2015 11/12/2015Design validation and starting of
deploiement of 7 references station
VGF start 8 months 13/01/2016 20/06/2016Starting of validation of 7 references
station with ISO 1.0,.3 version
VGF end 1 month 13/02/2016 20/07/2016End validation of 7 references station and
sending of the VGF report
FPA 18 months 13/11/2016 Full Provisionall Aceptance
End SW
warrantly30 months 13/11/2017 End of software warrantly
End HW
warrantly36 months 13/11/2019 End of hardware warrantly
Deployment status - TULEAP
MESA AND PUMA STATUS OF DEPLOYMENT, USER SUPPORT AND WARRANTY
88
Présentation © 2016 – Telespazio France
Pending issues
MESA AND PUMA STATUS OF DEPLOYMENT, USER SUPPORT AND WARRANTY
� Tax exemption and Customs clearance:
� Average time = 40 days
99
Présentation © 2016 – Telespazio France
� Average time = 40 days
� Niger, Angola, Benin, South Africa…
Pending issues
MESA AND PUMA STATUS OF DEPLOYMENT, USER SUPPORT AND WARRANTY
� Site surveys : 13 % missing
RIC RETURNED PENDING TOTAL % Completed
MOI 11 2 13 85%
1010
Présentation © 2016 – Telespazio France
MOI 11 2 13 85%
UoG 22 2 24 92%
ICPAC 26 4 30 87%
CICOS 18 3 21 86%
AGRHYMET 31 10 41 76%
BDMS-CSC 36 2 38 95%
ACMAD 4 0 4 100%
TOTAL 148 23 171 87%
Pending issues
MESA AND PUMA STATUS OF DEPLOYMENT, USER SUPPORT AND WARRANTY
� Antenna slabs : 57 % not built !
RIC Slab ReadySlab Not
ReadyTOTAL % Completed
MOI 0 0 0 0%
UoG 11 8 19 58%
1111
Présentation © 2016 – Telespazio France
UoG 11 8 19 58%
ICPAC 2 7 9 22%
CICOS 2 5 7 29%
AGRHYMET 1 5 6 17%
BDMS-CSC 8 8 16 50%
ACMAD 2 1 3 67%
TOTAL 26 34 60 43%
Status of Deployments
MESA AND PUMA STATUS OF DEPLOYMENT, USER SUPPORT AND WARRANTY
1212
Présentation © 2016 – Telespazio France
Deployment Schedule vs initial planning
MESA AND PUMA STATUS OF DEPLOYMENT, USER SUPPORT AND WARRANTY
1313
Présentation © 2016 – Telespazio France
MESA AND PUMA STATUS OF DEPLOYMENT, USER SUPPORT AND WARRANTY
Deployment schedule : September
� Cameroon (continued)
� DRC (continued)
Schedule
�Rwanda�Sao Tomé�Sudan
1414
Présentation © 2016 – Telespazio France
� Equatorial Guinea
� Ethiopia (Continued)
� Gambia
� Ghana
� Guinée Conakry
� Kenya (continued)
� Namibia
�Sudan�Swaziland�Tanzania
MESA AND PUMA STATUS OF DEPLOYMENT, USER SUPPORT AND WARRANTY
Deployment schedule : October
� Benin
� Burkina Faso
� Chad
Schedule
�Mauritania�Nigeria�RCA
1515
Présentation © 2016 – Telespazio France
� Chad
� Comoros
� Djibouti
� Ivory Coast
� Lesotho
� Malawi
� Madagascar
�RCA�Senegal�South Africa�South Sudan�Zimbabwe�Sierra Leone �Guinee Bissau
MESA AND PUMA STATUS OF DEPLOYMENT, USER SUPPORT AND WARRANTY
Deployment schedule : November
� Angola
� Eritrea
� Gabon
� Liberia
Schedule
1616
Présentation © 2016 – Telespazio France
� Liberia
� Mozambique
� Seychelles
� Somalia
� Uganda
Users support -Tuleap
MESA AND PUMA STATUS OF DEPLOYMENT, USER SUPPORT AND WARRANTY
� One single Point of Contact :
EUMETSAT Helpdesk by email at [email protected] or by phone at +49 6151 807 3660/3770
1717
Présentation © 2016 – Telespazio France
� One single source of information:
TULEAP at https://tuleap.telespazio.fr
Users support -Tuleap
MESA AND PUMA STATUS OF DEPLOYMENT, USER SUPPORT AND WARRANTY
Tuleap is an Open Source Suite for Application Lifecycle Management tailored to follow-up MESA status for :
�Documentation
1818
Présentation © 2016 – Telespazio France
�Anomalies
�MESA/PUMA2015 Stations status and configuration
�Deployment Schedule
Users support -Tuleap
MESA AND PUMA STATUS OF DEPLOYMENT, USER SUPPORT AND WARRANTY
Users Accounts :
Account Type Occurrences
EO Focal Point 58
Eumetsat 4
Government and Ministers 8
1919
Présentation © 2016 – Telespazio France
Government and Ministers 8
other 139
REC Focal Point 2
RIC Focal Point 16
STATION ADMIN 18
STATION FOCAL POINT 10
STATION USER 2
TA representative 7
TA Thematic Expert 44
Trainer 9
UA representative 36
Users support -Tuleap
MESA AND PUMA STATUS OF DEPLOYMENT, USER SUPPORT AND WARRANTY
2020
Présentation © 2016 – Telespazio France
Follow and update Station information
MESA AND PUMA STATUS OF DEPLOYMENT, USER SUPPORT AND WARRANTY
Users support -Tuleap
2121
Présentation © 2016 – Telespazio France
Users support -Tuleap
MESA AND PUMA STATUS OF DEPLOYMENT, USER SUPPORT AND WARRANTY
2222
Présentation © 2016 – Telespazio France
NCR creation and follow-up
MESA AND PUMA STATUS OF DEPLOYMENT, USER SUPPORT AND WARRANTY
Users support -Tuleap
2323
Présentation © 2016 – Telespazio France
MESA AND PUMA STATUS OF DEPLOYMENT, USER SUPPORT AND WARRANTY
Users support -Tuleap
2424
Présentation © 2016 – Telespazio France
Warranty
MESA AND PUMA STATUS OF DEPLOYMENT, USER SUPPORT AND WARRANTY
1 year Software warranty covering:
� Sending of security updates (dissemination)
� NCRs fixing
3 years Hardware warranty covering:
� Support to diagnostic
2525
Présentation © 2016 – Telespazio France
� Support to diagnostic
� Handling of local repair when feasible
� Replacement of failing device if local repair is not possible
2626Présentation © 2016 – Telespazio France