YOU ARE DOWNLOADING DOCUMENT

Please tick the box to continue:

Transcript
Page 1: LOW CARBON INDUSTRY - IGES · low carbon industry robotic & automate 29.32 acres medical device 71.49 acres aerospace & logistic 118.49 acres digital 26.42 acres commercial

LOW CARBON INDUSTRY

ROBOTIC & AUTOMATE 29.32 Acres

MEDICAL DEVICE 71.49 Acres

AEROSPACE & LOGISTIC 118.49 Acres

DIGITAL 26.42 Acres

COMMERCIAL

FACILITY

POND

59.51 Acres

50.31 Acres

Page 2: LOW CARBON INDUSTRY - IGES · low carbon industry robotic & automate 29.32 acres medical device 71.49 acres aerospace & logistic 118.49 acres digital 26.42 acres commercial

U-Ta Pao International Airport Map Ta Phut Port

SATTAHIP COMMERCIAL PORT

LAEMCHABANG PORT

PATTAYA CITY

SUVARNABHUMI AIRPORT

SUKHUMVIT ROAD NO. 3

HIGHWAY NO. 331

HIGHWAY NO. 334

HIGHWAY NO. 36

MOTORWAY NO. 7

DOUBLE - TRACK RAILWAY

SMART PARK

Page 3: LOW CARBON INDUSTRY - IGES · low carbon industry robotic & automate 29.32 acres medical device 71.49 acres aerospace & logistic 118.49 acres digital 26.42 acres commercial

Control & separate

staff from visitor

Page 4: LOW CARBON INDUSTRY - IGES · low carbon industry robotic & automate 29.32 acres medical device 71.49 acres aerospace & logistic 118.49 acres digital 26.42 acres commercial

District cooling plant

District cooling plant

Page 5: LOW CARBON INDUSTRY - IGES · low carbon industry robotic & automate 29.32 acres medical device 71.49 acres aerospace & logistic 118.49 acres digital 26.42 acres commercial

Solar PV floating pond B Solar PV floating

pond A

Solar PV Roof-top

( 70 MWp Approx. ) Solar PV

Floating ( 8 MWp )

TREES Silver level

above

Page 6: LOW CARBON INDUSTRY - IGES · low carbon industry robotic & automate 29.32 acres medical device 71.49 acres aerospace & logistic 118.49 acres digital 26.42 acres commercial
Page 7: LOW CARBON INDUSTRY - IGES · low carbon industry robotic & automate 29.32 acres medical device 71.49 acres aerospace & logistic 118.49 acres digital 26.42 acres commercial

Smart Park Project Timeline

EIA Approval February 2020

Declaration of Smart Park I.E. boundary June 2020

Construction (36 Months) October 2020

– September 2023

Ready for operation October 2023


Related Documents