MINISTRY OF ENERGY AND MINERAL RESOURCESDIRECTORATE GENERAL OF OIL AND GASDIRECTORATE GENERAL OF OIL AND GAS
DEEP-WATER EXPLORATION
& DEVELOPMENT IN INDONESIA& DEVELOPMENT IN INDONESIA
by:Yunan Muzaffar
HEAD OF EXPLORATION DIVISION
Subsea ConferenceOctober 3rd, 2012
AGENDAAGENDA
SHIFTINGSHIFTING PARADIGMPARADIGM WITHINWITHIN OILOIL &&GASGAS SECTORSECTORGASGAS SECTORSECTOR
DEEPDEEP WATERWATER BLOCKSBLOCKS ININ INDONESIAINDONESIA
INDONESIAINDONESIA DEEPDEEP WATERWATEREXPLORATIONEXPLORATION && DEVELOPMENTDEVELOPMENT
CHALLENGESCHALLENGES ANDAND OPPORTUNITIESOPPORTUNITIESCHALLENGESCHALLENGES ANDAND OPPORTUNITIESOPPORTUNITIES
© DJMIGAS 03102012
SHIFTING PARADIGM WITHIN OIL & SHIFTING PARADIGM WITHIN OIL & GAS SECTORGAS SECTOR
© DJMIGAS 03102012
FROM REVENUE TOFROM REVENUE TOECONOMIC GROWTH MACHINE (FEEDSTOCKECONOMIC GROWTH MACHINE (FEEDSTOCK--FUELFUEL))
ROLE OF OIL AND GAS INDUSTRIESROLE OF OIL AND GAS INDUSTRIES
OIL AND GAS OIL AND GAS INDUSTRYINDUSTRY
OIL AND GAS OIL AND GAS INDUSTRYINDUSTRY INDUSTRIAL
DOMESTIC
FEEDSTOCK
High RiskHigh Risk SUSTAINABLE
NATIONAL
DOMESTIC FUEL
SOURCE OF High High CostCost DEVELOPMENT
SOURCE OF STATE
REVENUE
High TechnologyHigh Technology MULTYPLIEREFFECTS
© DJMIGAS 03102012
FROM WEST TO FROM WEST TO EASTEASTM f d d l ti ti iti dMore reserves found and exploration activities occureed
in the eastern part of Indonesia mainly deepwater projectdeepwater project
Mostly TertieryDiscoveries in Jurrasic Plays 1998-2008
Western part Eastern part
Deep Water Area
Eastern part
9 98
10
EASTERN INDONESIA CONTRACT SIGNED
Deep Water Area
2 23
0 0
5
0
2
4
6
8
© DJMIGAS 03102012
02003 2004 2005 2006 2007 2008 2009 2010
EASTERN INDONESIA CONTRACT SIGNED
Most of bidding acreage located in eastern side of Indonesia
INCREASED OF DOMESTIC GAS ALLOCATIONINCREASED OF DOMESTIC GAS ALLOCATIONBASED ON CONTRACTS/ GSA BASED ON CONTRACTS/ GSA
Comparison of Accumulation Volume Contract Domestic vs. Exports
status Nov 2011
EXPORT6,11 TCF
24%Comparison of Accumulation Volume ContractDomestic vs. Exports During 2001 – Nov 2011
TCF
DOMESTIC 20
25
30 TCF
DOMESTIC19,52 TCF
76% 10
15
20
‐
5
2003 2004 2005 2006 2007 2008 2009 2010 2011
© DJMIGAS 03102012
domestik ekspor
DEEP WATER SPECULATIVE SURVEY OF INDONESIADEEP WATER SPECULATIVE SURVEY OF INDONESIA
The distance between seismic line relatively far 20-50 km ideally for O&G bidding 5 km
© DJMIGAS 03102012
The distance between seismic line relatively far 20-50 km ideally for O&G bidding 5 km
INDONESIA DEEEPWATERINDONESIA DEEEPWATEREXPLORATION & DEVELOPMENTEXPLORATION & DEVELOPMENT
© DJMIGAS 03102012
DRILLING ACTIVITIES INDRILLING ACTIVITIES IN DEEP WATER BLOCKS OF DEEP WATER BLOCKS OF INDONESIAINDONESIA
No. Block Drilling Rig
1 Lhokseumawe Plan to Drill 1 well on 2012 Ocean Monarch
• Almost Seismic Commitment Fulfilled at whole deep Water Area
2 Surumana Block Drilled 1 well (Rangkong-1) West Aquarius
3 South East Ganal I Plan to Drill 1 well (2013) Ocean Monarch
Area
• Worldwide Deep Water Drilling Rig Availability is Limited
4 Pasangkayu Drilled 4 Well (Bravo-1, Romeo-1, Romeo-B1, Romeo-C1)
GSF Explorer
5 Kuma Drilled 1 well (Kaluku-1) GSF Explorer
6 Karama Drilled 2 Well ( Gatotkaca 1 & Anoman 1) GSF Explorer
g y
• Regional Autonomy should support & be partner in maintaining the investment for6 Karama Drilled 2 Well ( Gatotkaca-1 & Anoman-1) GSF Explorer
7 Mandar Drilled 3 well (Sultan-1,Kris-1 & Kris-1 St) West Aquarius
8 West Sageri Plan to Drill 1 well (2013) Ocean Monarch
maintaining the investment for regional area of Indonesia
• More Petroleum system Studies
9 Sageri Drilled 1 well (Lempuk-1) GSF Explorer
10 Kofiau Plan to Drill 1 well (2013) Ocean Monarch
in deep water are needed to determine potential estimates
• Successful exploration will11 West Papua IV Plan to Drill 1 well (2013) Ocean Monarch
• Successful exploration will require additional rig time to appraise discoveries
© DJMIGAS 03102012
MAKASSAR STRAITMAKASSAR STRAIT DEEP WATER DRILLING PROGRAM DEEP WATER DRILLING PROGRAM
D t Ri
Business Opportunity The downside to all
Deepwater Rigs(GSF Esplorer)
The 7 companies have a combined 12deepwater well commitments in the Makassar Straits
Total drilling investment of over US$700MM
of this interest
g $Barrier:
Rig availability, contract length and day rates
Solution:7 companies working together with one rigtogether, with one rig
© DJMIGAS 03102012
JAMBU AYE UTARA FIELD KRUENG MANE BLOCK
DISCOVERIES IN DEEP WATER AREAS DISCOVERIES IN DEEP WATER AREAS OF INDONESIAOF INDONESIA
JAMBU AYE UTARA FIELD, KRUENG MANE BLOCK
POD I : 2012Water Depth : 600 – 650 MGas Rate : 100 MMSCFD,
plateau 3 yearsOn Stream : 2014
POD I : 2008
GENDALO & GEHEM FIELDS, UNITIZATION OF GANAL & RAPAK BLOCKS
Water Depth : 1000 - 2000 M
Gas Rate : 120 - 600 MMSCFD
On Stream : 2013
UPCOMING DEEEP WATER PROJECT (ABADI FIELD, MASELA BLOCK)
POD I : 2010Water Depth : 300 – 1000 MGas Rate : first stage 2.5 MTPA
© DJMIGAS 03102012
gequal to 130 MMSCFD
On Stream : 2018
EXISTING DEEP WATER DEVELOPMENT IN INDONESIAEXISTING DEEP WATER DEVELOPMENT IN INDONESIA
© DJMIGAS 03102012
ONGOING INDONESIA ONGOING INDONESIA DEEP WATER DEVELOPMENT DEEP WATER DEVELOPMENT
G 16 ”
Kapasitas 150 mmscfdCurrent prod ’n 60-70 mmscfd
Pada 2013 app. 20 mmscfdG 16 ”
Capacity 150 mmscfdCurrent prod’ n 60-70 mmscfd
2013 app. 20 mmscfd
The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.
120 mmscfd
Gas 20 ”Cond ’t 8”
Gas 16 ”Cond ’t 8”
pp79 Km
85 Km60 Km
The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.
120 mmscfd
Gas 20 ”Cond ’t 8”
Gas 16 ”Cond ’t 8”
pp79 Km
85 Km60 Km
RANGGAS(~ 5,200 ’ WD)
The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.
700 mmscfd
The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.
420 mmscfd30,000 bcpd
110 Km
RANGGAS(~ 5,200 ’ WD)RANGGAS
(~ 5,200 ’ WD)The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.
700 mmscfd
The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.
420 mmscfd30,000 bcpd
110 Km
Bangka Field (tie in Existing West Seno FPU)00 sc d25,000 bcpd00 sc d
25,000 bcpdg ( g )
To delivery 150 mmscfd and 2,880 bcpd.Facility built consist of Subsea wellhead and Umbilical Risser and Flow Lines (SURF) tie in to West Seno FPU
Gehem HubTo delivery 420 mmscfd and 27,000 bcpd.Facility built consist of Subsea wellhead and Umbilical Risser and Flow Lines (SURF) and Floating Production Unit (FPU), Export P/L
Gendalo, Gadang, Maha Field (Gendalo Hub)To delivery 700 mmscfd and 20,000 bcpd.Facility built consist of Subsea wellhead and Umbilical Risser and Flow
© DJMIGAS 03102012
Facility built consist of Subsea wellhead and Umbilical Risser and Flow Lines (SURF) and Floating Production Unit (FPU), Export P/L
INDONESIA DEEPWATER DEVELOPMENTINDONESIA DEEPWATER DEVELOPMENTSUMMARY OVERVIEWSUMMARY OVERVIEW
At 6 000 water depth in the Gehem Field IDD has the deepest
Ganal PSC : Contract Signed February 24 th, 1998Rapak PSC : Contract Signed Desember 4th 1997
At 6,000 water depth in the Gehem Field, IDD has the deepestShip-shaped floating structureSubsea production treesSuction pile installationFlowline installationFlowline installationExport pipeline and SCR
Largest offshore natural gas processing facility (700 mmcf/d)Largest single subsea umbilical orderLongest mooring lines - 2 4 mi (3 9 km)Longest mooring lines 2.4 mi (3.9 km)Heaviest SCR load on a deepwater floating facility at 650 tons (590 metric tons)
Front End Engineering and Design (FEED)– Contract for Floating Production Unit to PT Technip IndonesiaContract for Floating Production Unit to PT Technip Indonesia– Contract for subsea and flowline system to PT Worley Parsons Indonesia– Contract for export pipelines to PT Worley Parsons Indonesia– Contract for onshore receiving facility to PT. Singgar Mulia
Engineering, Procurement, Construction, and Istalation (EPCI)After FEED, project team is still doing some scope and cost optimizations to address EPCI costescalation – potential for unfavorable market conditions
© DJMIGAS 03102012
Final Investment Decision (FID) : Juni 2013
CHALLENGES INOFFSHORE & DEEPWATER ACTIVITIES
Technical aspects: (water depth, slope rugosity, high pressure,( p p g y g ppeculiar geological conditions)
Commercial aspects: more time from discovery to first commercialCommercial aspects: more time from discovery to first commercialproduction (8-10 years)
Worldwide Deep Water Drilling Rig Availability is Limited (serviceWorldwide Deep Water Drilling Rig Availability is Limited (serviceavailability)
Regional Autonomy should support & be partner in maintaining theRegional Autonomy should support & be partner in maintaining theinvestment for regional area of Indonesia
M P l S di i d d dMore Petroleum system Studies in deep water are needed todetermine potential estimates
© DJMIGAS 03102012
OPPORTUNITIES INOFFSHORE & DEEPWATER ACTIVITIES
BIG BIG UPSIDE POTENTIALSUPSIDE POTENTIALS
STRONG GOVERNMENT SUPPORTSTRONG GOVERNMENT SUPPORTSTRONG GOVERNMENT SUPPORTSTRONG GOVERNMENT SUPPORT
better PSC split for high risk block 65/35 (oil) and 60/40 (gas)better PSC split for high risk block 65/35 (oil) and 60/40 (gas)
no exploration well in the firm commitmentno exploration well in the firm commitment
exemption of import dutyexemption of import duty
LESS COMPETITIONLESS COMPETITION
© DJMIGAS 03102012