MINISTRY OF ENERGY AND MINERAL RESOURCESDIRECTORATE GENERAL OF OIL AND GASDIRECTORATE GENERAL OF OIL AND GAS
DEEP-WATER EXPLORATION
& DEVELOPMENT IN INDONESIA& DEVELOPMENT IN INDONESIA
ONGOING INDONESIA ONGOING INDONESIA DEEP WATER DEVELOPMENT DEEP WATER DEVELOPMENT
G 16 ”
Kapasitas 150 mmscfdCurrent prod ’n 60-70 mmscfd
Pada 2013 app. 20 mmscfdG 16 ”
Capacity 150 mmscfdCurrent prod’ n 60-70 mmscfd
2013 app. 20 mmscfd
The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.
120 mmscfd
Gas 20 ”Cond ’t 8”
Gas 16 ”Cond ’t 8”
pp79 Km
85 Km60 Km
The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.
120 mmscfd
Gas 20 ”Cond ’t 8”
Gas 16 ”Cond ’t 8”
pp79 Km
85 Km60 Km
RANGGAS(~ 5,200 ’ WD)
The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.
700 mmscfd
The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.
420 mmscfd30,000 bcpd
110 Km
RANGGAS(~ 5,200 ’ WD)RANGGAS
(~ 5,200 ’ WD)The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.
700 mmscfd
The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.
420 mmscfd30,000 bcpd
110 Km
Bangka Field (tie in Existing West Seno FPU)00 sc d25,000 bcpd00 sc d
25,000 bcpdg ( g )
To delivery 150 mmscfd and 2,880 bcpd.Facility built consist of Subsea wellhead and Umbilical Risser and Flow Lines (SURF) tie in to West Seno FPU
Gehem HubTo delivery 420 mmscfd and 27,000 bcpd.Facility built consist of Subsea wellhead and Umbilical Risser and Flow Lines (SURF) and Floating Production Unit (FPU), Export P/L
Gendalo, Gadang, Maha Field (Gendalo Hub)To delivery 700 mmscfd and 20,000 bcpd.Facility built consist of Subsea wellhead and Umbilical Risser and Flow
Facility built consist of Subsea wellhead and Umbilical Risser and Flow Lines (SURF) and Floating Production Unit (FPU), Export P/L
INDONESIA DEEPWATER DEVELOPMENTINDONESIA DEEPWATER DEVELOPMENTSUMMARY OVERVIEWSUMMARY OVERVIEW
At 6 000 water depth in the Gehem Field IDD has the deepest
Ganal PSC : Contract Signed February 24 th, 1998Rapak PSC : Contract Signed Desember 4th 1997
At 6,000 water depth in the Gehem Field, IDD has the deepestShip-shaped floating structureSubsea production treesSuction pile installationFlowline installationFlowline installationExport pipeline and SCR
Largest offshore natural gas processing facility (700 mmcf/d)Largest single subsea umbilical orderLongest mooring lines - 2 4 mi (3 9 km)Longest mooring lines 2.4 mi (3.9 km)Heaviest SCR load on a deepwater floating facility at 650 tons (590 metric tons)
Front End Engineering and Design (FEED)– Contract for Floating Production Unit to PT Technip IndonesiaContract for Floating Production Unit to PT Technip Indonesia– Contract for subsea and flowline system to PT Worley Parsons Indonesia– Contract for export pipelines to PT Worley Parsons Indonesia– Contract for onshore receiving facility to PT. Singgar Mulia
Engineering, Procurement, Construction, and Istalation (EPCI)After FEED, project team is still doing some scope and cost optimizations to address EPCI costescalation – potential for unfavorable market conditions
Technical aspects: (water depth, slope rugosity, high pressure,( p p g y g ppeculiar geological conditions)
Commercial aspects: more time from discovery to first commercialCommercial aspects: more time from discovery to first commercialproduction (8-10 years)
Worldwide Deep Water Drilling Rig Availability is Limited (serviceWorldwide Deep Water Drilling Rig Availability is Limited (serviceavailability)
Regional Autonomy should support & be partner in maintaining theRegional Autonomy should support & be partner in maintaining theinvestment for regional area of Indonesia
M P l S di i d d dMore Petroleum system Studies in deep water are needed todetermine potential estimates