FILE: CONDOCS.DWG
SCALE: AS NOTED
DWG NO.
PROJ MGR. MR
CHECKED BY OT
DRAWN BY LL
SEAL & SIGNATURE PROJ NO. 10295.00
DRAWINGTITLE
NEW YORK, NEW YORK
3ST FLOOR
750 THIRD AVENUE
JOB TITLE SL GREEN REALTYCORPORATION
NO. DATE ISSUE/REVISION BY
- 11.20.15 ISSUE FOR BID OT
T-000.00
NEW YORK, NEW YORK750 THIRD AVENUE
31ST FLOORSL GREEN REALTY CORPORATION
TITLE SHEET
M/E/P/S ENGINEER
ARCHITECTURAL DRAWINGS M/E/P/S ENGINEERING DRAWINGSDM-001.00 DEMOLITION PLAN M-001.00 MECHANICAL LEGENDS, NOTES, ABBREVIATIONS AND DRAWING LIST E-802.00 ELECTRICAL SPECIFICATIONS SHEET #2
A-002.00 CONSTRUCTION PLAN M-101.00 31ST FLOOR MECHANICAL PLANS E-803.00 ELECTRICAL SPECIFICATIONS SHEET #3
A-003.00 POWER/TELEPHONE PLAN M-201.00 31ST FLOOR MECHANICAL PIPING PLAN EN-001.00 ENERGY ANALYSIS COMPLIANCE SHEET
A-004.00 REFLECTED CEILING PLAN M-501.00 MECHANICAL DETAILS 1 OF 3 EN-002.00 ENERGY CODE SUPPORTIVE DOCUMENT
A-005.00 FINISH PLAN M-502.00 MECHANICAL DETAILS 2 OF 3 FA-101.00 31ST FLOOR FIRE ALARM PLAN
A-006.00 FURNITURE PLAN M-503.00 MECHANICAL DETAILS 3 OF 3 FA-601.00 FIRE ALARM NOTES, SYMBOLS LIST AND RISER DIAGRAM
A-007.00 PARTITION TYPES M-801.00 MECHANICAL SPECIFICATIONS 1 OF 3 P-001.00 PLUMBING NOTES, DETAILS AND DRAWING LIST
A-008.00 DOOR & HARDWARE SCHEDULE M-802.00 MECHANICAL SPECIFICATIONS 2 OF 3 P-101.00 31ST FLOOR PLUMBING PLAN AND RISER DIAGRAMS
A-009.00 PANTRY DETAILS M-803.00 MECHANICAL SPECIFICATIONS 3 OF 3 P-801.00 PLUMBING SPECIFICATIONS
A-010.00 CORE BATHROOM ELEVATIONS M-901.00 31ST FLOOR MECHANICAL DEMOLITION PLAN SP-001.00 SPRINKLER NOTES, LEGENDS, DRAWING LIST AND PLOT PLAN
A-011.00 MILLWORK ELEVATIONS E-001.00 ELECTRICAL NOTES AND DRAWING LIST SP-101.00 31ST FLOOR SPRINKLER PLAN
E-002.00 ELECTRICAL SYMBOLS LIST SP-501.00 SPRINKLER DETAILS
E-101.00 31ST FLOOR ELECTRICAL LIGHTING PLAN SP-601.00 SPRINKLER RISER DIAGRAM
E-201.00 31ST FLOOR ELECTRICAL POWER PLAN SP-801.00 SPRINKLER SPECIFICATIONS
E-301.00 31ST FLOOR MECHANICAL POWER PLAN SP-901.00 31ST FLOOR SPRINKLER DEMOLITION PLAN AND TEMP LOOP
E-501.00 ELECTRICAL DETAILS SHEET #1
E-502.00 ELECTRICAL DETAILS SHEET #2
E-503.00 ELECTRICAL DETAILS SHEET #3
E-504.00 ELECTRICAL DETAILS SHEET #4
E-601.00 ELECTRICAL RISER DIAGRAM
E-701.00 PANEL SCHEDULES
E-801.00 ELECTRICAL SPECIFICATIONS SHEET #1
AARP NEW YORK STATE OFFICE
MG ENGINEERING, P.C.116 W. 32ND STREET, 12TH FLOORNEW YORK, N.Y. 10001P. 212.643.9055F. 212.643.0503CONTACT: BRIAN BATEMAN
FILE: CONDOCS.DWG
SCALE: AS NOTED
DWG NO.
PROJ MGR. MR
CHECKED BY OT
DRAWN BY LL
SEAL & SIGNATURE PROJ NO. 10295.00
DRAWINGTITLE
NEW YORK, NEW YORK
3ST FLOOR
750 THIRD AVENUE
JOB TITLE SL GREEN REALTYCORPORATION
NO. DATE ISSUE/REVISION BY
- 11.20.15 ISSUE FOR BID OT
GENERAL REQUIREMENTSPART 1 GENERAL
1.01 GENERAL
A. EXAMINE PREMISES CAREFULLY AND REPORT IN WRITING ANY DISCREPANCIES TOTHE ARCHITECT BEFORE PROCEEDING WITH ANY WORK.
B. THE GENERAL CONDITIONS OF THE CONTRACT, THE AMERICAN INSTITUTE OF ARCHITECTS STANDARD DOCUMENT #A201 "GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION," APRIL 1987 EDITION OR MOST CURRENT PUBLISHED EDITION, 14 ARTICLES, 24 PAGES AND THE FOLLOWING SUPPLEMENTARYREQUIREMENTS APPLY TO ALL SECTIONS OF THIS SPECIFICATION.
C. WHERE "GENERAL AND SUPPLEMENTARY CONDITIONS" SPECIFIED IN THESE DOCUMENTS MODIFY THE AIA GENERAL CONDITIONS, THEY SHALL TAKE PRECEDENCE.
D. WHERE "GENERAL AND SUPPLEMENTARY CONDITIONS" CLAUSES ARE REPEATED, ITSHALL BE UNDERSTOOD AS CALLING SPECIAL ATTENTION TO THEM OR AS A FURTHER QUALIFICATION, AND SHALL NOT BE ASSUMED AS OMITTING ANY FURTHERCLAUSE OF THE GENERAL CONDITIONS.
E. MAINTAIN ADEQUATE PROTECTION OF THE WORK FROM DAMAGE AND PROTECTTHE OWNER'S PROPERTY AND THE PUBLIC FROM INJURY OR LOSS ARISING IN CONNECTION WITH THIS WORK. MAKE GOOD ANY SUCH DAMAGE, INJURY ORLOSS, AND ACCEPT EXCLUSIVE LIABILITY AND HOLD HARMLESS THE OWNER ANDARCHITECT AGAINST INJURIES OR CLAIMS THEREFORE OF ALL PERSONS AND ANYALLEGED DAMAGE TO PROPERTY IN CONNECTION WITH THE WORK. ERECT ANDMAINTAIN AT ALL TIMES, AS REQUIRED BY THE CONDITIONS AND PROGRESS OF THEWORK, ALL NECESSARY SAFEGUARDS FOR THE PROTECTION OF THE WORKMENAND THE PUBLIC.
F. ALL WORK AND MATERIALS SHALL BE IN FULL ACCORDANCE WITH THE LATEST RULES AND REGULATIONS OF ALL MUNICIPAL CODES AND STATE LAWS OR REGULATIONS. NOTHING IN THESE PLANS OR SPECIFICATIONS IS TO BE CONSTRUEDTO PERMIT WORK NOT CONFORMING TO THESE CODES. IN CASES WHERE CODEREQUIREMENTS DIFFER, THE MORE STRINGENT CODE SHALL TAKE PRECEDENCE.
G. INDEMNITYPROVISION MUST BE MADE TO INSURE THE "HOLD HARMLESS AGREEMENT" WHICHREADS AS FOLLOWS:
1. THE CONTRACTOR HEREBY AGREES TO INDEMNIFY AND SAVE HARMLESS THE OWNER, BUILDING MANAGEMENT AND ARCHITECT FROM AND AGAINST ALL LIABILITY CLAIMS AND DEMANDS ON ACCOUNT OF INJURY TO PERSONS INCLUDING DEATH RESULTING THEREFROM AND DAMAGE TO PROPERTY ARISING OUT OF THE PERFORMANCE OF THESE CONTRACT DOCUMENTS BY THECONTRACTOR'S PROPERTY. THE CONTRACTOR SHALL, AT HIS OR ITS OWN EXPENSE, DEFEND ANY AND ALL ACTIONS AT LAW BROUGHT AGAINST THE OWNERAND THE SAME OWNER'S REPRESENTATIVE ABOVE AND SHALL PAY ALL ATTORNEY'SFEES AND ALL EXPENSES, AND PROMPTLY DISCHARGE ANY JUDGMENTS ARISINGTHEREFROM. THESE CONDITIONS SHALL ALSO APPLY TO ANY SUBCONTRACTEDOPERATIONS.
2. THE CONTRACTOR SHALL SECURE AND PROTECT THE WORK AND SHALL BEAR ANDBE LIABLE FOR, AND SHALL REPAIR AND REPLACE ALL LOSS AND DAMAGE OF ANYKIND WHICH MAY HAPPEN TO THE WORK AT ANY TIME PRIOR TO THE FINAL COMPLETION AND ACCEPTANCE THEREOF FROM ANY CAUSE WHATSOEVER, ANDTHE OWNER AND ARCHITECT WILL NOT, IN ANY MANNER, BE ANSWERABLE OR RESPONSIBLE FOR ANY LOSS OR DAMAGE THAT SHALL HAPPEN TO THE WORK ORANY PART THEREOF, NOR FOR ANY MATERIALS, EQUIPMENT, TOOLS, PLANT, FACILITIES OR OTHER THINGS THAT MAY BE EMPLOYED THEREIN OR PLACED UPONTHE PREMISES BY THE CONTRACTOR, THE LATTER BEING SOLELY RESPONSIBLE THEREFORE UNTIL THE WORK HAS BEEN FULLY ACCEPTED BY THE OWNER.
3. THE CONTRACTOR HEREBY AGREES, TO THE EXTENT PERMITTED BY LAW, TO ASSUMETHE ENTIRE RESPONSIBILITY AND LIABILITY FOR AND DEFENSE OF AND TO PAY ANDINDEMNIFY THE OWNER AND THE ARCHITECT (COLLECTIVELY THE "INDEMNITIES")AGAINST ANY LOSS, EXPENSE OR LIABILITY AND WILL HOLD EACH OF THEM HARMLESS FROM ANY PAY, ANY LOSS, DAMAGE, COST OR EXPENSE (INCLUDINGWITHOUT LIMITATION, JUDGMENTS, ATTORNEY'S FEES, COURT COSTS AND THE COSTOF APPELLATE PROCEEDINGS), WHICH THE INDEMNITIES (COLLECTIVELY OR INDIVIDUALLY) INCUR BECAUSE OF INJURY TO OR DEATH OF ANY PERSON OR ONACCOUNT OF DAMAGE TO PROPERTY, INCLUDING LOSS OF USE THEREOF, OR ANYOTHER CLAIM ARISING OUT OF, IN CONNECTION WITH OR AS A CONSEQUENCEOF THE PERFORMANCE OF THE WORK, AND/OR ANY ACT OR OMISSION OF THECONTRACTOR OR ANY OF ITS SUBCONTRACTORS, OFFICERS, DIRECTORS, EMPLOYEES, AGENTS OR ANYONE DIRECTLY OR INDIRECTLY EMPLOYED BY THECONTRACTOR OR ANYONE WHOSE ACTS THE CONTRACTOR MAY BE LIABLE AS ITRELATES TO THE SCOPE OF THIS CONTRACT. HOWEVER, NOTHING HEREIN CONTAINED SHALL REQUIRE THE CONTRACTOR TO PROVIDE INDEMNIFICATIONAGAINST THE PROPORTION OF ANY LIABILITY FOR CLAIMS WHICH ARE PROVEN TOHAVE ARISEN FROM THE NEGLIGENCE OF THE PARTY ASKED TO BE DEFENDED, INDEMNIFIED OR HELD HARMLESS. CONTRACTOR WILL PURCHASE AND MAINTAINSUCH INSURANCE AS WILL PROTECT IT FROM ANY COSTS AND EXPENSES RELATINGTO THE FOREGOING, INCLUDING, WITHOUT LIMITATION, CONTRACTUAL COVERAGE COVERING THE FOREGOING INDEMNITY, AND SHALL PROVIDE THEOWNER WITH CERTIFICATES EVIDENCING SAME IN THE FORM ANNEXED HERETO.
H. INSURANCE TO BE PROVIDED BY THE CONTRACTOR
1. THE CONTRACTOR SHALL, THROUGH AGENTS AND IN AMOUNTS AND BY COMPANIES TO BE APPROVED BY THE OWNER, OBTAIN, MAINTAIN IN FORCE DURING THE PERIOD COVERED BY THE CONTRACT AND PAY FOR SUCH INSURANCE AS REQUIRED HEREIN. IF THE CONTRACTOR SHALL FAIL TO DELIVERCERTIFICATES FOR ITS INSURANCE OR THE INSURANCE OF ITS SUBCONTRACTORSTO THE OWNER WITHIN FORTY-EIGHT (48) HOURS AFTER DEMAND, AND IN ANY EVENT, PRIOR TO COMMENCEMENT OF THE WORK ON THE PROJECT, THE OWNERMAY OBTAIN SUCH INSURANCE FOR THE CONTRACTOR AND PAY PREMIUMS THEREON, AND THE CONTRACTOR SHALL REPAY THE OWNER, ON DEMAND, ANYSUM OR SUMS PAID THEREFORE, TOGETHER WITH INTEREST THEREON, OR THE OWNER,MAY DEDUCT SUCH SUM OR SUMS, TOGETHER WITH INTEREST THEREIN, FROM ANY MONEY DUE OR TO BECOME DUE TO THE CONTRACTOR UNDER THISCONTRACT. AS PROVIDED BELOW, EVERY POLICY OF INSURANCE REQUIRED HEREUNDER SHALL NAME THE INDEMNITIES AS ADDITIONAL INSURED AND SHALLPROVIDE FOR GIVING THE OWNER AND THE OTHER INDEMNITIES IF SO REQUESTEDIN WRITING THIRTY (30) DAYS' PRIOR WRITTEN NOTICE OF THE CANCELLATION THEREOF.
2. ANY POLICY OF INSURANCE COVERING THE CONTRACTOR'S OWN TOOLS, PLANTAND FACILITIES AGAINST LOSS BY PHYSICAL DAMAGE SHALL INCLUDE AN ENDORSEMENT PROVIDING THAT THE UNDERWRITERS WAIVE THEIR RIGHTS OF SUBROGATION AGAINST THE OWNER.
3. THE CONTRACTOR SHALL NOT COMMENCE WORK UNDER THIS CONTRACT UNTIL ITHAS OBTAINED ALL OF THE INSURANCE REFERRED TO HEREIN AND THE CONTRACTOR AND/OR SUBCONTRACTOR SHALL BE REQUIRED TO MAINTAIN THEFOLLOWING INSURANCE IN AMOUNTS NOT LESS THAN THOSE SPECIFIED BELOW:
a. WORKERS COMPENSATION IN ACCORDANCE WITH THE LAWS OF THE STATE WITHJURISDICTION.
b. EMPLOYER'S LIABILITY INSURANCE IN AN AMOUNT NOT LESS THAN $100,000.
c. COMPREHENSIVE GENERAL LIABILITY/UMBRELLA LIABILITY FOR:
(1) BODILY INJURY LIABILITY INSURANCE
(2) PROPERTY DAMAGE LIABILITY WITH LIMITS IN THE AMOUNTS PER BUILDING MANAGEMENT OR AT AMOUNTS REQUESTED BY THE CLIENT FOR SINGLE LIMIT EACH OCCURRENCE, INCLUDING, BUT NOT LIMITED TO, COMPREHENSIVE FORMPREMISES - OPERATIONS, EXPLOSION AND COLLAPSE HAZARD, PRODUCTS/COMPLETED OPERATIONS HAZARD (2) YEARS' EXTENSION BEYOND COMPLETION OF PROJECT), CONTRACTUAL COVERAGE (INCLUDING COVERAGEFOR THE INDEMNITY CLAUSES PROVIDED UNDER THIS CONTRACT), BROAD FORMPROPERTY DAMAGE, INDEPENDENT CONTRACTORS, PERSONAL INJURY (EMPLOYEES EXCLUSION DELETED) AND 'X,' 'C' AND 'U' EXCLUSIONS DELETED.
(3) COMPREHENSIVE AUTOMOBILE LIABILITY COMPREHENSIVE, OWNED, HIRED, NON-OWNED WITH LIMITS $500,000 COMBINED SINGLE LIMIT EACH OCCURRENCE.
(4) THE CONTRACTOR SHALL VERIFY THAT THESE REQUIREMENTS ARE ACCEPTABLE TOTHE OWNER. IF NOT, THEY SHALL OBTAIN INSURANCE COVERAGE IN ACCORDANCE WITH THEIR REQUIREMENTS.
4. THE ABOVE INSURANCE SHALL, WITHOUT LIABILITY ON THE PART OF THE OWNER
FOR PREMIUMS THEREOF, INCLUDE THE FOLLOWING:
a. ENDORSEMENT AS ADDITIONAL INSURERS OF:
(1) OWNER, ARCHITECT AND THEIR PARTNERS, DIRECTORS, OFFICERS, EMPLOYEES,AGENTS AND REPRESENTATIVES; AND
(2) ALL OTHER INDEMNITIES NAMED IN THE CONTRACT.
b. THIRTY (30) DAY PRIOR NOTICE OF CANCELLATION TO EACH NAME INSURED; AND
c. WAIVER OF SUBROGATION
5. THE ABOVE POLICIES SHALL BE ENDORSED TO CONTAIN THE FOLLOWING WORDING VERBATIM:
"OWNER IS INTERESTED IN THE MAINTENANCE OF THIS INSURANCE AND IT IS AGREED THAT THIS INSURANCE WILL NOT BE CANCELED, MATERIALLY CHANGEDOR NOT RENEWED WITHOUT AT LEAST THIRTY (30) DAYS' ADVANCE WRITTEN NOTICE TO THE OWNER AND THE OTHER ADDITIONAL INSURERS AS SO REQUESTED IN WRITING. THE CONTRACTOR HEREBY AGREES, TO THE EXTENT PERMITTED BY LAW, TO ASSUME THE ENTIRE RESPONSIBILITY AND LIABILITY FOR ANDDEFENSE OF AND TO PAY AND INDEMNIFY THE OWNER FOR THE PROJECT AND THEARCHITECT (COLLECTIVELY THE "INDEMNITIES") AGAINST ANY LOSS, EXPENSE ORLIABILITY AND WILL HOLD EACH OF THEM HARMLESS FROM ANY PAY, ANY LOSS,JUDGMENTS, ATTORNEY'S FEES, COURT COSTS AND THE COST OF APPELLATE PROCEEDINGS), WHICH THE INDEMNITIES (COLLECTIVELY OR INDIVIDUALLY) INCURBECAUSE OF INJURY TO OR DEATH OF ANY PERSON OR ON ACCOUNT OF DAMAGE TO PROPERTY, INCLUDING LOSS OF USE THEREOF, OR ANY OTHER CLAIMARISING OUT OF, IN CONNECTION WITH OR AS A CONSEQUENCE OF THE PERFORMANCE OF THE WORK, AND/OR ANY ACT OR OMISSION OF THE CONTRACTOR OR ANY OF ITS SUBCONTRACTORS, OFFICERS, DIRECTORS, EMPLOYEES, AGENTS OR ANYONE DIRECTLY OR INDIRECTLY EMPLOYED BY THECONTRACTOR OR ANYONE WHOSE ACTS THE CONTRACTOR MAY BE LIABLE AS ITRELATES TO THE SCOPE OF THIS CONTRACT. HOWEVER, NOTHING HEREIN CONTAINED SHALL REQUIRE THE CONTRACTOR TO PROVIDE INDEMNIFICATIONAGAINST THE PROPORTION OF ANY LIABILITY FOR CLAIMS WHICH ARE PROVEN TOHAVE ARISEN FROM THE NEGLIGENCE OF THE PARTY ASKED TO BE DEFENDED, INDEMNIFIED OR HELD HARMLESS. CONTRACTOR WILL PURCHASE AND MAINTAINSUCH INSURANCE AS WILL PROTECT IT FROM ANY COSTS AND EXPENSES RELATINGTO THE FOREGOING, INCLUDING, WITHOUT LIMITATION, CONTRACTUAL COVERAGE COVERING THE FOREGOING INDEMNITY, AND SHALL PROVIDE THEOWNER WITH CERTIFICATES EVIDENCING SAME."
1.02 SUMMARY OF WORK
A. THE CONSTRUCTION SCHEDULE AND OPERATIONS SHALL BE SUBJECT TO APPROVAL OF THE OWNER AND THE BUILDING MANAGEMENT.
B. CONTRACTOR'S USE OF PREMISES1. CONTRACTOR SHALL LIMIT HIS USE OF THE PREMISES FOR WORK AND FOR
STORAGE TO THE AREA DESIGNATED BY BUILDING MANAGEMENT.
2. EACH CONTRACTOR ASSUMES RESPONSIBILITY FOR THE PROTECTION AND SAFEKEEPING OF HIS MATERIALS STORED AT THE SITE.
3. THE CONTRACTOR IS ADVISED THAT LIMITED STORAGE SPACE IS AVAILABLE IN THESPACE TO BE RENOVATED.
C. WORK RELATED REQUIREMENTS1. MOVEMENT OF WORKMEN AND MATERIALS INTO THE BUILDING WILL BE ALONG
ROUTES AND AT TIMES AS DIRECTED AND RESTRICTED BY THE BUILDING MANAGEMENT.
2. WORK IN THE BUILDING WILL BE PERMITTED DURING THE HOURS AND DAYS ESTABLISHED BY THE BUILDING MANAGEMENT AND OTHER ALTERNATE HOURS ASARRANGED WITH AND APPROVED BY THE BUILDING MANAGEMENT.
3. THE CONTRACTOR SHALL SCHEDULE DELIVERY OF MATERIALS AND REMOVALS OFDEBRIS WITH THE BUILDING MANAGEMENT. CONTRACTOR SHALL GIVE ADEQUATE NOTICE OF REQUIREMENTS.
4. THE CONTRACTOR SHALL NOT ERECT SIGNS.
5. TEMPORARY FIELD OFFICE SPACE IN THE CONSTRUCTION AREA SHALL BE PROVIDED BY THE CONTRACTOR. CONTRACTOR SHALL PROVIDE HIS OWN FURNITURE. THE CONTRACTOR SHALL PROVIDE A TELEPHONE FOR COMMUNICATIONS AND SUBCONTRACTORS' USE.
6. THE CONTRACTOR SHALL ARRANGE WITH THE BUILDING MANAGEMENT FOR HISOWN UTILITY SERVICES INCLUDING ELECTRICAL POWER, WATER AND LIGHTING.THE COST OF HOOK_UP AND DISTRIBUTION SHALL ALSO BE PAID FOR BY THE CONTRACTOR. SERVICES NOT AVAILABLE FROM THE BUILDING SHALL BE PROVIDED BY THE CONTRACTOR AT HIS OWN EXPENSE.
7. THE CONTRACTOR AND HIS PERSONNEL MAY USE EXISTING TOILET FACILITIES FORHIS EMPLOYEES. HOWEVER, THE CONTRACTOR IS RESPONSIBLE FOR PROTECTINGTHE EXISTING TOILET FACILITY AND RESTORING IT TO ITS ORIGINAL CONDITION UPON COMPLETION OF THE JOB.
8. WHERE DISAGREEMENTS OCCUR BETWEEN THE DRAWINGS AND THE SPECIFICATIONS, OR WITHIN EITHER DOCUMENT ITSELF OR BETWEEN THE SPECIFICATIONS AND THE BUILDING RULES AND STANDARDS, THE ITEM OR ARRANGEMENT OF BETTER QUALITY, GREATER QUANTITY OR HIGHER COST SHALLBE INCLUDED IN THE CONTRACT.
9. CONTRACTORS SHALL VERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS ANDCONDITIONS ON THE JOB AND THE ARCHITECT'S OFFICE MUST BE NOTIFIED OF ANYVARIATIONS FROM THE DIMENSIONS AND CONDITIONS SHOWN BY THESE DRAWINGS.
10. ALL CONSTRUCTION, DIMENSIONS AND DETAILS SHALL CONCUR WITH AND BE DETERMINED FROM THESE DRAWINGS ONLY.
11. ALL MATERIALS, ASSEMBLIES, FORMS AND METHODS OF CONSTRUCTIONS ANDSERVICE EQUIPMENT TO BE INCORPORATED IN THE WORK SHALL BE IN STRICT ACCORDANCE WITH THE LATEST EDITION OF THE ASTM SPECIFICATIONS APPLICABLE, AND TO CONFORM TO THE STANDARDS AND RECOMMENDATIONSOF THE VARIOUS TRADE INSTITUTES (ACI, AIBC, ETC.), WHERE APPLICABLE. ALL MATERIALS INCORPORATED INTO THE WORK SHALL BE NEW AND SHALL COMPLYWITH THE LOCAL CODE REQUIREMENTS.
12. CONTRACTORS SHALL BE RESPONSIBLE FOR ADEQUATELY BRACING AND PROTECTING ALL WORK DURING CONSTRUCTION AGAINST DAMAGE, BREAKAGES,COLLAPSE, DISTORTIONS AND OFF-ALIGNMENT ACCORDING TO APPLICABLE CODES, STANDARDS AND GOOD PRACTICE.
13. CONSTRUCTION SHALL COMPLY WITH ALL FEDERAL, STATE AND LOCAL CODES,ORDINANCES, RULES AND REGULATIONS PERTAINING TO LABOR AND MATERIALS.
14. ALL NOTES HEREIN MENTIONED WITH THOSE OF THE VARIOUS DRAWINGS SHALLAPPLY TO ALL DRAWINGS AND FORM PART OF THE CONTRACT.
15. EACH CONTRACTOR WILL BE HELD STRICTLY RESPONSIBLE FOR HIS WORK. ANYDISCREPANCIES IN THE PLANS OR DETAILS SHALL BE CALLED TO THE ATTENTION OFTHE ARCHITECT.
16. ALL MATERIALS, ASSEMBLIES, FORMS AND METHODS OF CONSTRUCTION AND SERVICE EQUIPMENT SHALL MEET THE FOLLOWING REQUIREMENTS:
a. IT SHALL HAVE BEEN ACCEPTED PRIOR TO THE EFFECTIVE DATE OF THE CODE.
b. IT SHALL HAVE BEEN ACCEPTED FOR USE UNDER THE PRESCRIBED CODE TEST METHODS BY THE COMMISSIONER, OR
c. IT SHALL HAVE BEEN APPROVED BY THE BOARD OF STANDARDS AND APPEALS.
17. ALL MATERIALS OR ASSEMBLIES REQUIRED TO HAVE A FIRE RESISTANCE RATINGSHALL COMPLY WITH LOCAL CODES AND REQUIREMENTS.
18. ALL EXITS SHALL BE KEPT READILY ACCESSIBLE AND UNOBSTRUCTED AT ALL TIMES.
19. FINISH FLOORING IN ALL EXITS SHALL BE OF NON-COMBUSTIBLE MATERIALS.
20. THE MEANS OF EGRESS ILLUMINATION LEVEL SHALL NOT BE LESS THAN 2 FOOT-CANDLES AT THE FLOOR LEVEL IN EXITS, AT EXIT DISCHARGES, AND IN PUBLICCORRIDORS AND SHALL NOT BE LESS THAN 1 FOOT-CANDLE AT THE FLOOR LEVELIN EXIT ACCESS COMPONENTS OTHER THAN PUBLIC CORRIDORS..
21. EXIT LIGHTING SHALL BE ON CIRCUITS THAT ARE SEPARATE FROM ANY OTHER CIRCUITS, TAKEN OFF AHEAD OF THE MAIN SWITCH.
22. WHERE REQUIRED, LOCATION OF EVERY EXIT SHALL BE CLEARLY INDICATED BY EXITSIGNS, PLACED, IF REQUIRED, AT AN ANGLE WITH THE EXIT OPENING. INSTALL DIRECTIONAL SIGNS TO SERVE AS GUIDE FROM ALL PORTIONS OF THE CORRIDOROR FLOOR, SIGNS SHALL BE ON SEPARATE CIRCUITS, TAKEN OFF AHEAD OF THEMAIN SWITCH.
23. EXIT SIGNS SHALL BE INTERNALLY LIGHTED, HAVING AN INITIAL BRIGHTNESS OF THELETTERS OF AT LEAST 25' LAMBERT. LETTERS SHALL BE BLOCK LETTERING, AT LEAST 8"HIGH, WITH 9/16" STROKES.
24. CORRIDORS AND EXIT PASSAGEWAYS SHALL HAVE A MINIMUM CLEAR HEIGHT OF7'-6" FOR AT LEAST 75% OF THE FLOOR AREA WITH NO POINT LESS THAN 7'-0" IN HEIGHT. PROJECTION BELOW THE CEILING SHALL NOT OBSTRUCT FULL VIEW OF EXITSIGNS.
25. CONDUITS IN FIRE-RATED PARTITIONS WILL NOT EXCEED 3/4" DIAMETER. OUTLETS INPARTITIONS SHALL BE BACKED UP WITH APPROVED MATERIALS.
26. NO CONDUITS, PIPES, MEDICINE CABINETS, ETC. SHALL ENCROACH UPON FIRE-RATED PARTITIONS ENCLOSING PUBLIC CORRIDORS, STAIRS, ELEVATOR SHAFTS OR VENT SHAFTS.
27. EXIT DOORS SHALL BE READILY OPERABLE AT ALL TIMES FROM THE SIDE FROM WHICH EGRESS IS TO BE MADE. DOORS OPENING INTO INTERIOR ENCLOSED STAIRSHALL NOT BE LOCKED FROM EITHER SIDE EXCEPT THAT DOORS MAY BE LOCKEDTO PREVENT ACCESS TO THE STAIRS FROM THE OUTDOORS AT THE STREET LEVEL.
28. PIPE SPACE AND WALL FURRINGS SHALL CONSIST OF METAL CHANNELS AND 5/8"GYPSUM WALLBOARD, EXCEPT AS OTHERWISE SHOWN.
29. ALL COMBUSTIBLE FLOORING TO HAVE FLAME SPREAD RATING IN ACCORDANCEWITH BOCA '93.
30. THE BATHROOM SIDE OF PARTITIONS SHALL BE 5/8" WATER RESISTANT GYPSUM WALLBOARD OR BACKER BOARD, IF ROOM IS TO RECEIVE TILE OR STONE.
31. VENTILATION SHAFT WALLS SHALL BE AS FOLLOWS: ONE LAYER OF 5/8" FIRE CODEGYPSUM WALL BOARD EACH SIDE OVER 1" GYPSUM COREBOARD; TOTAL WIDTHTO BE 2-1/4". INSTALLATION AS RECOMMENDED BY MANUFACTURER.
32. ALL DUCT SHAFTS OFFSETS SHALL BE ENCASED WITH 2-HOUR FIRE RATED MATERIAL.
33. ALL PERMITS ISSUED BY THE NYC DEPARTMENT OF BUILDINGS SHALL BE POSTED IN ACONSPICUOUS PLACE OPEN FOR PUBLIC INSPECTION FOR THE ENTIRE TIME OF THECONSTRUCTION AND THE USE AND OPERATION OF THE EQUIPMENT OR UNTIL THEEXPIRATION OF THE PERMIT.
34. WRITTEN DIMENSIONS ON THESE DRAWINGS SHALL HAVE PRECEDENCE OVER SCALED DIMENSIONS. DRAWINGS ARE NOT TO BE SCALED. ALL WORK SHALL BELAID OUT BY DIMENSIONS. LAYOUT TO BE APPROVED BY ARCHITECT PRIOR TO PROCEEDING WITH THE WORK.
35. FURNISH AND INSTALL ADEQUATE TEMPORARY LIGHTING THROUGHOUT THE ENTIRESPACE AS WELL AS ANY ANCILLARY FACILITIES AFFECTED OR SERVED BY THE SPACE.
36. DEFINITIONS
a. INDICATED: SHOWN ON DRAWINGS BY NOTES, GRAPHICS OR SCHEDULES, ORWRITTEN INTO OTHER PORTIONS OF CONTRACT DOCUMENTS. TERMS SUCH AS "SHOWN," "NOTED," "SCHEDULED" AND "SPECIFIED" HAVE SAME MEANING AS "INDICATED," AND ARE USED TO ASSIST THE READER IN LOCATING PARTICULAR INFORMATION.
b. DIRECTED, REQUESTED, APPROVED, ACCEPTED, ETC.: THESE TERMS IMPLY "BY THEARCHITECT" UNLESS OTHERWISE INDICATED.
c. REVIEWED BY ARCHITECT: IN NO CASE RELEASES CONTRACTOR FROM RESPONSIBILITY TO FULFILL REQUIREMENTS OF CONTRACT DOCUMENTS.
d. PROJECT SITE: SPACE AVAILABLE TO CONTRACTOR AT LOCATION OF PROJECT,EITHER EXCLUSIVELY OR TO BE SHARED WITH SEPARATE CONTRACTORS, FOR PERFORMANCE OF WORK.
e. FURNISH: SUPPLY AND DELIVER TO PROJECT SITE, READY FOR UNLOADING, UNPACKING, ASSEMBLY INSTALLATION AND SIMILAR SUBSEQUENT REQUIREMENTS.
f. INSTALL: OPERATIONS AT PROJECT SITE, INCLUDING UNLOADING, UNPACKING,ASSEMBLY, ERECTION, PLACING, ANCHORING, APPLYING, WORKING TO DIMENSION, FINISHING, CURING, PROTECTING, CLEANING AND SIMILAR OPERATIONS.
g. PROVIDE: FURNISH AND INSTALL, COMPLETE AND READY FOR INTENDED USE.
h. INSTALLER: ENTITY (FIRM OR PERSON) ENGAGED TO INSTALL WORK, BY CONTRACTOR, SUBCONTRACTOR OR SUB-SUBCONTRACTOR. INSTALLERS ARE REQUIRED TO BE SKILLED EXPERTS IN WORK THEY ARE ENGAGED TO INSTALL.
i. OVERLAPPING/CONFLICTING REQUIREMENTS: MOST STRINGENT (GENERALLY MOST COSTLY) APPLIES AND WILL BE ENFORCED, UNLESS MORE DETAILED LANGUAGE WRITTEN DIRECTLY INTO CONTRACT DOCUMENTS CLEARLY INDICATES THAT A LESS STRINGENT REQUIREMENT IS ACCEPTABLE. REFER UNCERTAINTIES TO ARCHITECT FOR DECISION BEFORE PROCEEDING.
j. ABBREVIATIONS, PLURAL WORDS: ABBREVIATIONS, WHERE NOT DEFINED IN CONTRACT DOCUMENTS, WILL BE INTERPRETED TO MEAN THE NORMAL CONSTRUCTION INDUSTRY TERMINOLOGY, DETERMINED BY RECOGNIZED GRAMMATICAL RULES, BY THE ARCHITECT. PLURAL WORDS WILL BE INTERPRETEDAS SINGULAR AND SINGULAR WORDS WILL BE INTERPRETED AS PLURAL WHERE APPLICABLE FOR CONTEXT OF CONTRACT DOCUMENTS.
k. CONTRACT DOCUMENTS: REQUIREMENTS OF THE WORK ARE CONTAINED IN THECONTRACT DOCUMENTS AND INCLUDE CROSS-REFERENCE THEREIN TO PUBLISHINFORMATION, WHICH IS NOT NECESSARILY BOUND THEREWITH.
1.03 PROJECT COORDINATION
A. THE CONTRACTOR SHALL:1. COORDINATE WORK OF HIS OWN EMPLOYEES.
2. EXPEDITE HIS WORK TO ENSURE COMPLIANCE WITH SCHEDULES.
3. COORDINATE AND SCHEDULE HIS WORK WITH THAT OF OTHER CONTRACTORSAND WITH WORK BY THE OWNER.
4. NOT RESTRICT ACCESS TO THE BUILDING DURING HOURS OF OPERATION. PROVIDEADEQUATE PROTECTION OF THE PUBLIC FROM CONSTRUCTION ACTIVITIES. MAINTAIN PEDESTRIAN RIGHT_OF_WAY ON PUBLIC SIDEWALKS.
B. CONSTRUCTION ORGANIZATION AND START UPTHE ARCHITECT SHALL ESTABLISH ON_SITE LINES OF AUTHORITY AND COMMUNICATIONS, INCLUDING THE FOLLOWING:
1. SCHEDULING AND CONDUCTING A PRE_CONSTRUCTION MEETING AND PROGRESS MEETINGS.
2. ESTABLISHING PROCEDURES FOR TRANSMITTAL OF INTRA_PROJECT COMMUNICATIONS.
3. INTERPRETING CONTRACT DOCUMENTS AND ASSISTING IN RESOLUTION OF QUESTIONS OR CONFLICTS WHICH MAY ARISE.
1.04 SUBMITTALS
A. GENERAL: SUBMIT SHOP DRAWINGS, PRODUCT DATA AND SAMPLES AS REQUIREDBY THE CONTRACT DOCUMENTS.
B. SHOP DRAWINGS: DRAWINGS SHALL BE PRESENTED IN A CLEAR AND THOROUGHMANNER. DETAILS SHALL BE IDENTIFIED BY REFERENCE TO DETAILS SHOWN ON THECONTRACT DRAWINGS.
C. PRODUCT DATA: EACH COPY SHALL BE CLEARLY MARKED TO:1. IDENTIFY PERTINENT PRODUCTS.
2. SHOW PERFORMANCE CHARACTERISTICS AND CAPACITIES.
3. SHOW DIMENSIONS AND REQUIRED CLEARANCES.
D. SAMPLES: SAMPLES SHALL BE OF SUFFICIENT SIZE AND QUANTITY TO CLEARLY ILLUSTRATE:
1. FUNCTIONAL CHARACTERISTICS OF THE PRODUCT.
2. FULL RANGE OF COLOR, TEXTURE AND PATTERN.
E. SUBMISSION REQUIREMENTS1. MAKE SUBMITTALS PROMPTLY IN ACCORDANCE WITH APPROVED SCHEDULE AND
IN SUCH SEQUENCE AS TO CAUSE NO DELAY IN THE WORK OR IN THE WORK OFANY OTHER CONTRACTOR.
2. NUMBER OF REQUIRED SUBMITTALS
a. SHOP DRAWINGS: SUBMIT THREE (3) OPAQUE REPRODUCTIONS AND ONE (1) SEPIA REPRODUCIBLE.
b. PRODUCT DATA: SUBMIT THREE (3) COPIES OF DATA.
c. SAMPLES: SUBMIT THE NUMBER STATED IN EACH SPECIFICATION SECTION. IF NOTSTATED, PROVIDE TWO (2) SETS OF EACH SAMPLE REQUESTED.
3. SUBMITTAL INFORMATION
a. THE DATE OF SUBMISSION AND THE DATES OF ANY PREVIOUS SUBMISSIONS.
b. THE PROJECT TITLE AND NUMBER.
c. THE NAME OF THE:
(1) ARCHITECT
(2) CONTRACTOR
(3) MANUFACTURER
(4) MANUFACTURER'S REPRESENTATIVE
d. IDENTIFICATION OF THE PRODUCT, WITH THE APPROPRIATE SPECIFICATION SECTION NUMBER.
e. INDICATION OF LOCATION WHERE ITEM IS TO BE INSTALLED.
f. FIELD DIMENSIONS, IF REQUIRED, CLEARLY IDENTIFIED AS SUCH.
g. IDENTIFICATION OF DEVIATIONS FROM CONTRACT DOCUMENTS.
h. IDENTIFICATION OR REVISIONS ON RESUBMITTALS.
i. AN 8" X 3" BLANK SPACE FOR ARCHITECT'S STAMP.
F. RESUBMISSION REQUIREMENTS1. SHOP DRAWINGS AND PRODUCT DATA
a. REVISE INITIAL DRAWINGS OR DATA AND RESUBMIT AS SPECIFIED FOR THE INITIALSUBMITTAL.
b. INDICATE ANY CHANGES WHICH HAVE BEEN MADE.
2. SUBMIT NEW SAMPLES AS REQUIRED FOR INITIAL SUBMITTAL.
1.05 SECURITY
A. PROTECT OPERATIONS AT THE SITE AND BE RESPONSIBLE FOR THEFT, VANDALISMOR DAMAGE RESULTING FROM CONTRACTOR'S WORK OR EMPLOYEES.
B. COMPLY WITH SECURITY REQUIREMENTS OF THE BUILDING MANAGEMENT.C. MAINTAIN A CURRENT LIST OF APPROVED PERSONS AND SUBMIT A COPY OF THE
LIST TO THE BUILDING MANAGER.D. ONLY PERSONNEL PROPERLY IDENTIFIED WILL BE PERMITTED ON THE SITE.1.06 MATERIAL AND EQUIPMENT
A. DELIVERY AND HANDLING1. ARRANGE DELIVERIES OF PRODUCTS IN ACCORDANCE WITH CONSTRUCTION
SCHEDULES TO AVOID CONFLICT WITH WORK AND CONDITIONS AT THE SITE.
a. DELIVER PRODUCTS IN UNDAMAGED CONDITION, IN MANUFACTURER'S ORIGINAL CONTAINERS OR PACKAGING, WITH IDENTIFYING LABELS INTACT AND LEGIBLE.
b. IMMEDIATELY ON DELIVERY, INSPECT SHIPMENTS TO ENSURE COMPLIANCE WITHREQUIREMENTS OF CONTRACT DOCUMENTS AND APPROVED SUBMITTALS ANDTHAT PRODUCTS ARE PROPERLY PROTECTED AND UNDAMAGED.
2. PROVIDE EQUIPMENT AND PERSONNEL TO HANDLE PRODUCTS BY METHODS WHICH PREVENT SOILING AND DAMAGE.
B. STORAGE AND PROTECTION1. STORE PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS, WITH
SEALS AND LABELS INTACT AND LEGIBLE. THE CONTRACTOR SHALL PROVIDE ADDITIONAL OFF SITE STORAGE SPACE AS REQUIRED.
2. ARRANGE STORAGE IN A MANNER TO PROVIDE EASY ACCESS FOR INSPECTION.MAKE PERIODIC INSPECTIONS OF STORED PRODUCTS TO ENSURE THAT PRODUCTS ARE MAINTAINED UNDER SPECIFIED CONDITIONS AND FREE FROM DAMAGE OR DETERIORATION.
3. PROVIDE SUBSTANTIAL COVERINGS AS NECESSARY TO PROTECT INSTALLED PRODUCTS FROM DAMAGE FROM TRAFFIC AND SUBSEQUENT CONSTRUCTIONOPERATIONS. REMOVE WHEN INSTRUCTED BY THE ARCHITECT.
C. SUBSTITUTIONS AND PRODUCT OPTIONS1. PRODUCT LIST: WITHIN TEN (10) DAYS AFTER CONTRACT DATE, SUBMIT TO THE
ARCHITECT A COMPLETE LIST OF MAJOR PRODUCTS PROPOSED TO BE USED, WITHTHE NAME OF THE MANUFACTURER AND THE INSTALLING SUBCONTRACTOR.
2. PRODUCT OPTIONS
a. FOR PRODUCTS SPECIFIED BY NAMING SEVERAL PRODUCTS OR MANUFACTURERS,SELECT ANY ONE OF THE PRODUCTS OR MANUFACTURERS NAMED WHICH COMPLIES WITH THE SPECIFICATIONS.
b. FOR PRODUCTS SPECIFIED BY NAMING ONE OR MORE PRODUCTS OR MANUFACTURERS AND "OR EQUAL," CONTRACTOR SHALL SUBMIT A REQUEST FORSUBSTITUTION FOR ANY PRODUCT OR MANUFACTURER NOT SPECIFICALLY NAMED.
c. FOR PRODUCTS SPECIFIED BY NAMING ONLY ONE PRODUCT AND MANUFACTURER, THERE IS NO OPTION.
3. SUBSTITUTIONS
a. FOR A PERIOD OF FIFTEEN (15) DAYS AFTER CONTRACT DATE, THE ARCHITECT WILLCONSIDER WRITTEN REQUESTS FROM CONTRACTOR FOR SUBSTITUTION OF PRODUCTS.
b. SUBMIT A SEPARATE REQUEST FOR EACH PRODUCT COMPLETE WITH SUPPORTINGDOCUMENTATION AND WITH SAMPLES AS APPROPRIATE, INCLUDING:
(1) COMPARISON OF THE QUALITIES OF THE PROPOSED SUBSTITUTION WITH THAT SPECIFIED.
(2) CHANGES REQUIRED IN OTHER ELEMENTS OF THE WORK BECAUSE OF THE SUBSTITUTION.
(3) EFFECT ON THE CONSTRUCTION SCHEDULE.
(4) COST DATA COMPARING THE PROPOSED SUBSTITUTION WITH THE PRODUCT SPECIFIED.
(5) SOURCE OF REPLACEMENT MATERIALS.
c. THE ARCHITECT SHALL BE THE JUDGE OF THE ACCEPTABILITY OF THE PROPOSEDSUBSTITUTION.
4. A REQUEST FOR A SUBSTITUTION CONSTITUTES A REPRESENTATION THAT CONTRACTOR:
a. HAS INVESTIGATED THE PROPOSED PRODUCT AND DETERMINED THAT IT IS EQUALTO OR SUPERIOR IN ALL RESPECTS TO THAT SPECIFIED.
b. WILL PROVIDE THE SAME WARRANTIES FOR THE SUBSTITUTION AS FOR THE PRODUCTSPECIFIED.
c. WAIVES ALL CLAIMS FOR ADDITIONAL COSTS, UNDER HIS RESPONSIBILITY, WHICHMAY SUBSEQUENTLY BECOME APPARENT.
5. THE ARCHITECT WILL REVIEW REQUESTS FOR SUBSTITUTIONS WITH REASONABLE PROMPTNESS AND NOTIFY CONTRACTOR, IN WRITING, OF THE DECISION TO ACCEPT OR REJECT THE REQUESTED SUBSTITUTION.
1.07 CLEANING
A. GENERAL1. EXECUTE CLEANING, DURING PROGRESS OF THE WORK AND AT COMPLETION OF
THE WORK, AS REQUIRED BY GENERAL CONDITIONS.
2. CONDUCT CLEANING AND DISPOSAL OPERATIONS TO COMPLY WITH CODES, ORDINANCES AND REGULATIONS.
B. MATERIALS1. USE ONLY THOSE CLEANING MATERIALS AND METHODS RECOMMENDED BY THE
MANUFACTURER OF THE SURFACE MATERIAL TO BE CLEANED.
2. USE CLEANING MATERIALS ONLY ON SURFACES RECOMMENDED BY THE CLEANING MATERIAL MANUFACTURER.
C. DURING CONSTRUCTION1. THE CONTRACTOR SHALL KEEP THE WORK FREE FROM ACCUMULATIONS OF WASTE
MATERIALS AND RUBBISH RESULTING FROM CONSTRUCTION OPERATIONS ON ADAILY BASIS.
2. THE WORK SHALL BE PROTECTED AND CLEANED AT THE END OF EACH WORK DAY.
D. FINAL CLEANING1. REMOVE GREASE, MASTIC, ADHESIVES, DUST, DIRT, STAINS, FINGERPRINTS, LABELS
AND OTHER FOREIGN MATERIALS FROM SIGHT_EXPOSED SURFACES INCLUDINGNEW GLASS ENTRANCE DOORS.
2. PRIOR TO FINAL ACCEPTANCE, CONTRACTOR, ARCHITECT AND OWNER'S REPRESENTATIVE SHALL CONDUCT AN INSPECTION OF SIGHT_EXPOSED INTERIORSURFACES AND ALL WORK AREAS, TO VERIFY THAT THE ENTIRE WORK IS CLEAN.
1.08 MAINTENANCE DATA
A. COMPILE AND PRODUCE DATA AND RELATED INFORMATION APPROPRIATE FOROWNER'S MAINTENANCE OF PRODUCTS FURNISHED UNDER CONTRACT.
B. PREPARE MAINTENANCE DATA IN AN ORGANIZED MANNER AND AS REFERENCEDIN OTHER PERTINENT SECTIONS OF THESE SPECIFICATIONS.
C. INSTRUCT OWNER'S PERSONNEL IN MAINTENANCE OF PRODUCTS.
G-100.00
GENERAL REQUIREMENTS
EXISTING SINK TO BEREMOVED, CUT PLUMBINGBACK TO SOURCE
EXISTING FINISHES/ CEILING& LIGHT FIXTURES TO BEREMOVED THROUGHOUT .LIGHT FIXTURES TO BESALVAGED, STORED &PROTECTED FOR POTENTIALREUSE
EXISTINGELECTRICAL PANEL
TO REMAIN
REMOVE EXISTING STALLS,MILLWORK, FLOORING, WALL
TILE, LIGHTING, SWITCHES,CEILING, FIXTURES ETC.
REMOVE EX. GYP. BD. ATBATHROOM WALLS. MODIFY
ROUGHING AS REQUIRED FORBATHROOM LAYOUT. REFER
TO A-002.
FILE: CONDOCS.DWG
SCALE: AS NOTED
DWG NO.
PROJ MGR. MR
CHECKED BY OT
DRAWN BY LL
SEAL & SIGNATURE PROJ NO. 10295.00
DRAWINGTITLE
NEW YORK, NEW YORK
3ST FLOOR
750 THIRD AVENUE
JOB TITLE SL GREEN REALTYCORPORATION
NO. DATE ISSUE/REVISION BY
- 11.20.15 ISSUE FOR BID OT
DEMOLITION PLAN - 31ST FLOORSCALE: 1/8" = 1'-0"
1
DM-001.00
DEMOLITION PLAN31ST FLOOR
1. CONSTRUCTION WORK WILL BE CONFINED TO THE INTERIOR SPACE ANDWILL NOT CREATE DUST, DIRT OR OTHER SUCH INCONVENIENCES TO OTHERBUILDING TENANTS.
2. CONSTRUCTION WORK WILL NOT BLOCK HALLWAYS OR MEANS OF EGRESSFOR TENANTS OF THE BUILDING.
3. CONSTRUCTION WORK WILL NOT INVOLVE INTERRUPTION OF HEATING,WATER OR ELECTRIC SERVICES TO OTHER TENANTS OF THE BUILDING.
4. CONSTRUCTION WORK WILL BE CONFINED TO NORMAL WORKING HRS. 8AM TO 5 PM, MON. THRU FRI., EXCEPT LEGAL HOLIDAYS AND/OR ASREQUIRED BY BUILDING MANAGEMENT.
5. EXISTING FIRE ALARM & CLASS "E" SYSTEM & WIRING TO BE COILED &SUPPORTED IN CEILING FOR RELOCATION.
6. CLASS "E" SYSTEM & ALARMS MUST REMAIN ACTIVE AT ALL TIMES7. PROVIDE FIRE WATCH AT ALL TIMES REQ'D BY BUILDING RULES AND
REGULATIONS AND APPLICABLE CODES.
TENANT SAFETY NOTES
LEGEND/NOTESDEMO PLAN
EXISTING DOOR AND FRAME TO BE
EXISTING DOOR TO REMAIN
EXISTING PARTITION TO REMAIN
REMOVED
EXISTING PARTITION TO BE REMOVED
1. NO WORK TO BE DONE IN SPACES MARKED EXISTING EXCEPT WHERE NOTED2. REMOVE, CLEAN AND REINSTALL EXISTING WINDOW TREATMENTS IN PERIMETEROFFICES U.O.N.3. CLEAN, REPAINT, REPAIR ALL CONVECTOR COVERS. F&I CONVECTOR COVERSTO MATCH EXT. AS REQ'D U.O.N.4. REMOVE CARPET & RELATED MATERIALS THROUGHOUT. GC TO SURVEYCONDITION OF EXISTING SLAB AND PROVIDE SCRAPING OF FLOOR AS REQUIREDTO PROVIDE A CLEAN SURFACE FOR INSTALLATION OF SPECIFIED FLOORING.SCORE WALL ABOVE BASE PRIOR TO REMOVAL. SKIM COAT AND PATCH WALL ASREQ'D FOR INSTALLATION OF NEW BASE.5. REMOVE WALLCOVERING FROM ALL REMAINING SURFACES & PREP WALLSFOR SPECIFIED FINISHES6. LOWER ELEVATOR CALL BUTTONS TO 42" AFF U.O.N.7. PREP ELEVATOR DOORS & FRAMES FOR ELECTROSTATIC PAINTING.8. SAVE AND INSTALL ALL FLOOR STOPS UNLESS OTHERWISE SPECIFIED DURINGCARPET REMOVAL.9. REMOVE ALL PARTITIONS, CEILINGS, LIGHTING, POWER, VOICE DATA,MILLWORK. FLOORING & FINISHES AS REQ'D TO COMPLETE WORK INDICATED ONTHE CONTRACT DOCUMENTS.10. ALL DEMOLITION TO BE PERFORMED ON OVERTIME. COORDINATE WITHBUILDING RULES AND REGULATIONS.11. ALL OUTLETS ON WALLS TO BE DEMOLISHED TO BE REMOVED TO SOURCE(INCLUDING WIRING AND CONDUIT AS REQ'D UON). ALL OUTLETS IN EXISTINGPARTITIONS ARE TO REMAIN. GC TO TRACE WIRING AS REQ'D AND SEPARATE ASREQ'D TO MAINTAIN POWER TO EXISTING DEVICES.12. REFER TO ENGINEERING DRAWINGS PRIOR TO REMOVAL OF ALL MEPS ITEMS.13. PROVIDE TEMPORARY BARRICADE AND/OR PARTITIONS AT OPENINGS INFLOORS AND CEILINGS14. ALL DISCONNECTS AT BUILDING CORE TO BE RECONNECTED.
PLOT PLAN
N
AREA OF WORK: 31ST FLNO CHANGE IN USE,OCCUPANCY OR EGRESS
BOROUGH: MANHATTANBLOCK: 1301LOT: 33ADDRESS, ZIP CODE: 750 THIRD AVENUE, 10017LOT AREA: 38, 225 SFDISTANCE TO CORNER INTERSECTION: 0LOT FRONTAGE(DIMENSIONS OF BUILDING): 200.83 FTLOT DEPTH(DIMENSIONS OF BUILDING): 230.5 FTNUMBER OF BUILDINGS: 1NUMBER OF FLOORS: 34ZONING USE GROUP: C5-3 COMMERCIALBUILDING OCCUPANCY GROUP: EZONING MAP #: 08DCONSTRUCTION CLASSIFICATION: CLASS 1AREA OF WORK: 24TH FLOOR
OFFICE3117
WELLNESS RM3103
CLOSET3104
OFFICE3106
OFFICE3107
OFFICE3108
OFFICE3109
OFFICE3110
3109
OFFICE3111
TEAM ROOM3113
OPEN AREA3112
OFFICE3114
BREAK OUT3115
STORAGE3102
RECEPTION3101
OPEN AREA3134
MEN'S RM3132A
AV/IT3132
ADA BATHROOM3130
PANTRY3120
STORAGE3121
OFFICE3123
OFFICE3124
OFFICE3125
OFFICE3126
CONF. ROOM3127
OFFICE3128
STORAGE3129
OPEN AREA3131
OFFICE3105
OFFICE3119
OFFICE3118
CONF. ROOM3116
4
2
4 4 4 4
2 2 2 2
2
22
2
2
1
2
2
2 2 2 2 2
4
44 4 4 4 2
2
2
4
11
1
1
1
2
4
4
2
42
24
4
42
2
1
1
1
1
1
3
1
3
4
5
6
7
8 9 10 11 12
13
14
15
16
19
17
18
20
21
2324252627
29
30
3132
28
22
33
??????? ?????? ?????? ?????? ?????? ???????
??????
???????
8'-4
"47
'-3"
11'-2
"9'
-8"
12'-4"8'-8"9'-0"9'-0"8'-8"
11'-2
"16'
-2"
8'-8
"
12'-2"
25'-7"
11'-8"11
'-1"
4'-8
"
34
STORAGE3103A
7'-0
"
7'-3
"
35
1
1
15'-11"
4
8'-7"
13'-0"
8'-6
"8'
-11"
8'-1
1"
6'-11"
10'-4
"
1
11'-8"
8'-2"
5'-6
"
6'-1"
7'-9
"
12'-6"
31'-8"
18'-4
"
5
SLIDING GLASS DOOR OFFICE FRONT SYSTEMBY TAG WALL OR EQUAL.. PROVIDEBLOCKING AT GYP. BD HEADER. HEADERNEED NOT EXTEND SHEETROCK TO SLABABOVE - LEAVE OPEN FOR RETURN AIR (TYP.AT OFFICE FRONTS).
MANUALLY OPERATED MODERN FOLDPARTITION W/ FABRIC PANELS. PROVIDE STEELINFRASTRUCTURE AT SLAB FOR HANGINGPANEL SYSTEM. PROVIDE ACOUSTIC BARRIERABOVE CEILING BETWEEN ROOMS.
2 A-007-
?????????????????????????????????????????HIGH) AT ALL WALLS ADJACENT TO OFFICE
DESKS, TYP. FOR UPPER CABINETS AT ALLOFFICES. BLOCKING MOUNTING HEIGHT TBD.
BY TENANT
F&I (5) PLASTIC LAMINATE 24" DEEPADJUSTABLE SHELVES ON DUAL SLOT HEAVYDUTY STANDARDS & BRACKETS. PROVIDE INWALL BLOCKING AS REQUIRED.
PLASTIC LAMINATE UPPER AND LOWER CABINETSWITH PLASTIC LAMINATE COUTNERTOP. PROVIDE
BLOCKING AS REQUIRED.
AT CONFERENCE ROOM 3116 PROVIDESUPPLEMENTAL A.C. UNIT FOR SCHEDULEDHEAT LOAD. PROVIDE RE-HEAT CAPABILITIESFOR WINTER USE.
2
2
2
1
1
2
F&I 12x24 LOUVER@ DOOR
A-0081
A-0072
ALIGN
1
2
2
2
OPEN STORAGE3133
WOMEN'S RM3131A
36
38
37
39
34
40
1'-0
"HO
LD
34" AFF
36" AFF
F&I (1) PLASTIC LAMINATE 18" DEEP ADJUSTABLESHELF ON DUAL SLOT HEAVY DUTY STANDARDS &
FULL HEIGHT BRACKETS. PROVIDE IN WALLBLOCKING AS REQUIRED.
LANDLORD TO F&I 18"VERTICAL GRAB-BAR AT
EXISTING ADA BATHROOM PROVIDE ALTERNATE FOR ADA BATHROOM UPGRADE. PROVIDE LINE ITEM PRICING FOR TILE
WORK, PLUMBING FIXTURES, CEILING/LIGHTING.
CORE RESTROOMS TO RECEIVE FULL BUILDING STANDARD COSMETIC UPGRADES INCLUDINGCEILINGS, LIGHTING, FULL HEIGHT WALL TILE, FLOOR TILE, PLUMBING FIXTURES ON EXISTING
ROUGHING, ACCESSORIES, ST. ST. PARTITIONS, ETC. - BY LANDLORD.
2
3
4
OFFICE3122
CORNER BEADS
1" x 2" RECTANGULARTUBE ALUMINUM EXTRUSION
SCREWED TO METAL STUD
1/4" THK. CLOSED CELLNEOPRENE COMPRESSEDTO 1/8"
5/8" GYPSUM BOARDCAULK AT CONVECTOR
1"x2" RECTANGULAR TUBE ALUMINUMEXTRUSION CEMENTED WITH CAULK ATMULLION AND AT CONVECTOR
FACE OF CONVECTOR
PARTITION (AS SPECIFIED)
(BOTH SIDES)
1" THK. U.S.G.THERMAFIBER 'SAFB'MINERAL WOOL (AT ALL EDGES)
EXISTING WINDOW
2" MAX. CLEARANCE
4"
1" x 2" RECTANGULARTUBE ALUMINUM EXTRUSION
SCREWED TO METAL STUD
5/8" GYPSUM BOARDCAULK AT CONVECTOR
1"x2" RECTANGULAR TUBE ALUMINUMEXTRUSION CEMENTED WITH CAULK ATMULLION AND AT CONVECTOR
FACE OF CONVECTOR
PARTITION (AS SPECIFIED)(BOTH SIDES)
1" THK. U.S.G.THERMAFIBER 'SAFB'MINERAL WOOL
EXISTING WINDOW
1'-0" CLEARANCEFROM FACE OF CONVECTOR
4"
2" MAX
1/4" THK. CLOSED CELLNEOPRENE COMPRESSEDTO 1/8"
FILE: CONDOCS.DWG
SCALE: AS NOTED
DWG NO.
PROJ MGR. MR
CHECKED BY OT
DRAWN BY LL
SEAL & SIGNATURE PROJ NO. 10295.00
DRAWINGTITLE
NEW YORK, NEW YORK
3ST FLOOR
750 THIRD AVENUE
JOB TITLE SL GREEN REALTYCORPORATION
NO. DATE ISSUE/REVISION BY
- 11.20.15 ISSUE FOR BID OT
CONSTRUCTION PLAN - 31ST FLOORSCALE: 1/8" = 1'-0" N
1
A-002.00
CONSTRUCTION PLAN31ST FLOOR
LEGEND/NOTESCONSTRUCTION PLAN
DETAIL SYMBOL
SECTION SYMBOL
ELEVATION SYMBOL
DETAIL #
SECTION #
DRAWING #
DRAWING #
DRAWING #
XX
ROOM NAME
ROOM NUMBER
F&I GYPSUM BOARD PARTITION, SEE PARTITION TYPES FOR DETAILS
PARTITION TYPE REFERENCE
ELEVATION #s
ELEVATION #
DOOR NUMBER
EXISTING PARTITION & BUILDING CORE TO REMAIN
MILLWORK
TYP.DIM. FROM INSIDEBUCK TO PARTITION
DRAWING #
1. G.C. TO LAY OUT PARTITIONS FOR ARCHITECT APPROVAL PRIOR TOCONSTRUCTION2. G.C. TO NOTIFY ARCHITECT AS TO ANY DEVIATIONS IN THE LAYOUT PRIOR TO THEERECTION OF STUDS.3. ALL DIMENSIONS ARE TO BE HELD WITHIN 1"4. DOOR HANDLES SHALL BE LEVER-TYPE CONSISTENT WITH THE REQUIREMENTS OFANSI A117.1-1986 (TYP.)5. G.C. TO REVIEW ALL MECHANICAL ACCESS POINTS WITH BASE BUILDINGMANAGEMENT. PROVIDE AND INSTALL ACCESS DOORS AS REQUIRED.6. FLASH PATCH & LEVEL EXISTING FLOORS AS REQ'D FOR SPECIFIED FLOORING.PROVIDE MIN. 4'-0" OF FLASHING AT ELEVATOR LOBBIES7. ALL PARTITIONS ARE TYPE 1 U.O.N.8. GC TO PATCH ALL WALLS WHERE BASE BUILDING DEVICES, SUCH AS FIREWARDEN STATION, ARE BEING LOWERED,REMOVED OR RELOCATED.9. THE FOLLOWING CONTROLLED INSPECTIONS ARE REQUIRED AND ARE TO BECOMPLETED BY THE CONTRACTOR AND/OR THIRD PARTY????????????????????????????????????????????????????????????????????FIRE ALARM, FIRESTOPPING, AND FINAL INSPECTION . ? IT IS THE RESPONSIBILITY OFTHE OWNER TO HIRE A THIRD PARTY INSPECTOR TO PERFORM AND COMPLETE ALLMECHANICAL, SPRINKLER CONTROLLED INSPECTIONS AND FINAL INSPECTION ASREQUIRED IT IS THE RESPONSIBILITY OF THE CONTRACTOR AND/ORSUBCONTRACTOR TO COORDINATE AND PROVIDE ALL REQUIRED TESTS FOR ALLINSPECTIONS & ASSOCIATED PAPERWORK FOR FILING AND SIGN OFF OF THEWORK INDICATED IN THE CONSTRUCTION DOCUMENTS WITH THE APPROPRIATELOCAL AGENCY AND/OR DEPARTMENT OF BUILDINGS.10. GC TO COORDINATE PARTITION DIMENSIONS AS APPROVED BY THEARCHITECTS AT THE SITE WITH ALL SHOP DRAWINGS.11. LAMINATE ALL UNFINISHED EXPOSED SURFACES W/ 5/8" GYPSUM BOARD.PATCH/REPAIR ALL EXPOSED UNFINISHED SURFACES U.O.N.12. G.C. TO PATCH & PREPARE ALL WALLS AS REQ'D. FOR SPECIFIED FINISH. GC TOCOORD W/MFGR OF FINISHES FOR RECOMMENDED PREPARATION.13. F&I 4'X8' F.R. PLYWOOD PANEL 3/4" THK MOUNTED ON WOOD STUDS FORTELEPHONE HUB CONNECTIONS. CONFIRM LOCATION WITH ARCHITECT IN FIELD.NOT TO BE PAINTED. FIRE RATING TO BE EXPOSED.14. GC TO PUT LASER LINE ON FLOOR & ADVISE ARCHITECT OF DEVIATION OFFLOOR SLAB. GC TO DETERMINE BENCH MARK & ADVISE ARCHITECT ON ALL AREASAFFECTED PRIOR TO RELEASING TRADES AND ORDERING MATERIALS15. ALL PENETRATIONS THROUGH FIRE RATED WALLS, FLOORS, OR PARTITIONSSHALL BE FIRE STOPPED AND SEALED. THE FIRE RATING OF THE SEAL SHALL BE ATLEAST THAT OF THE FLOOR OR WALL INTO WHICH IT IS INSTALLED.16. F&I TYPE 'ABC' FIRE EXT. PER 3,000 SQUARE FEET IN SPRINKLERED BUILDING.MAX. TRAVEL DIST. BETWEEN EXTINGUISHERS TO BE 75 FT. F & I POTTER ROEMERALTA SERIES 7000 RECESSED WHITE FIRE EXTINGUISHER CABINET WITH DUO VERTICALPANEL & 1/8" CLEAR ACRYLIC GLAZING W/ 3010 EXTINGUISHER OR APPROVEDEQUAL. MOUNT 48" AFF TO HANDLE. REFER TO PLANS.17. AT ALL LOCATIONS WHERE AN INSULATED PARTITION (NEW OR EXISTING) MEETSA CONVECTOR, PROVIDE "BEAN BAG" INSULATION IN CONVECTOR AS REQ'D TOOBTAIN THE STC RATING OF THE PARTITION.18. ALL WORK INDICATED IN THE BUILDING RULES & REGULATIONS IS TO BEINCLUDED IN CONTRACTORS SCOPE19. GC TO PROVIDE BUILDING DEPARTMENT SIGN-OFFS & FULL SETS OF AS BUILTDWG'S (HARD COPIES AND ELECTRONIC FORMAT) FOR ALL TRADES PRIOR TOCLIENTS RELEASE OF FINAL PAYMENT.20. SKIMCOAT ALL WALLS WHERE WALLCOVERING WAS REMOVED AND AT AREASNOTED ON PLAN.21. ALL WALLS AT CONFERENCE ROOMS AND RECEPTION AREAS TO BE SKIMCOATED PRIOR TO SPECIFIED FINISH22. GC TO PROVIDE CONTROLLED INSPECTION OF EXISTING FIREPROOFING PERLOCAL LAW 26. GC TO SUBMIT UNIT PRICING FOR ADDITIONAL FIREPROOFING ASREQUIRED. PROOF OF DOB SIGN OFF OF CONTROLLED INSPECTIONS MUST BESUBMITTED PRIOR TO CLIENTS RELEASE OF FINAL PAYMENT.23. CONTRACTOR TO FURNISH AND INSTALL TRUBRO INSULATION AT ALL EXPOSEDPIPING AT BATHROOM AND PANTRIES.
MULTIPLE ELEVATIONS
XXX
A-00X1
XXX
GENERAL NOTES:
1. ALL DIMENSIONS AND CONDITIONS ARE APPROXIMATE ANDSUBJECT TO FIELD VERIFICATION.
2. ALL EXISTING CORE WALLS AND COLUMNS TO BE LAMINATEDFOR SMOOTH, LEVEL FINISH TO FINISHED CEILING AND PREPPEDFOR SPECIFIED FINISH. FURR WALLS AS REQ'D FOR INSTALLATIONOF DEVICES - COORD. W/ POWER/TEL PLAN, TYP.
3. ALL FIRE ALARM DEVICES TO BE WHITE. INSTALL PER CODE.
4. SWINGING DOOR HARDWARE TO BE SCHLAGE ATHENS, BRUSHEDCHROME FINISH, PASSAGE FUNCTION THROUGHOUT, U.O.N.SERVER ROOM DOOR TO BE STOREROOM FUNCTION.
5. NOTE: DOORS TO IT ROOM, WELLNESS ROOM AND STORAGEROOMS TO HAVE LOCKSETS OF VARYING FUNCTIONALITY. TO BECONFIRMED BY TENANT
6. F&I FIRE RATED PLYWOOD AT IT ROOM
TYP. DETAIL @ MULLION/PARTITION NTS
TYP. DETAIL @ WALL JOGNTS
OFFICE3117
WELLNESS RM3103
CLOSET3104
OFFICE3106
OFFICE3107
OFFICE3108
OFFICE3109
OFFICE3110
3109
OFFICE3111
TEAM ROOM3113
OPEN AREA3112
OFFICE3114
BREAK OUT3115
STORAGE3102
RECEPTION3101
OPEN AREA3134
MEN'S RM3132A
AV/IT3132
ADA BATHROOM3130
PANTRY3120
STORAGE3121
OFFICE3123
OFFICE3124
OFFICE3125
OFFICE3126
CONF. ROOM3127
OFFICE3128
STORAGE3129
OPEN AREA3131
OFFICE3105
OFFICE3119
OFFICE3118
CONF. ROOM3116
J J
J J
1
7
2
3
KP
42" 42" 42" 42"
42"42"
42"42"
DC
DC
5
R
R
EM
STORAGE3103A
42"42" 8
PROVIDE 2" CONDUIT ABOVECEILING FROM TELECOM BUILDING
CLOSET TO IT ROOM
PROVIDE DEDICATED 2 AWG WIRE TOBUILDING GROUND BAR AND #6
INSIDE RUN TO LAN ROOM BUS BAR
38"38"
CO
PIER
48"
42"42"
38"
48"
2
6
26
WBK
W
B
K
OPEN STORAGE3133
WOMEN'S RM3131A
42"GFI
42"GFI
OFFICE3122
FILE: CONDOCS.DWG
SCALE: AS NOTED
DWG NO.
PROJ MGR. MR
CHECKED BY OT
DRAWN BY LL
SEAL & SIGNATURE PROJ NO. 10295.00
DRAWINGTITLE
NEW YORK, NEW YORK
3ST FLOOR
750 THIRD AVENUE
JOB TITLE SL GREEN REALTYCORPORATION
NO. DATE ISSUE/REVISION BY
- 11.20.15 ISSUE FOR BID OT
POWER/TELEPHONE PLAN - 31ST FLOORSCALE: 1/8" = 1'-0" N
1
EQUIPMENT LIST SPECIFICATION F.B.T. F.B.C.
FULL HEIGHT REFRIGERATOR GE #GTZ21GCESS, ST. ST. FINISH, W/ ICE MAKER. GCTO F&I WATER LINE AS REQ'D.
MICROWAVE GE PROFILE MODEL #PEM31SFSS, ST. ST. FINISH
COFFEE MAKER FURNISHED BY TENANT. GC TO PROVIDE WATERLINE.
NOT USED
COPY MACHINE SPEC TBD BY TENANT
PRINTER SPEC TBD BY TENANT
DISHWASHER AVANTI ADA HEIGHT ST. ST. DISHWASHER
WATER COOLER F&I BY CONTRACTOR WITH ASSOCIATED WATER LINE,SPEC. TBD.
F.B.T. - FURNISHED BY TENANTF.B.C. - FURNISHED BY CONTRACTORNOTE: GC TO COORD ALL REQ'D OUTLET LOCATIONS W/ MFG. SPEC
NOTE: FURNITURE SHOWN FOR REFERENCE PURPOSES ONLY. EXACT LOCATIONS TO BE VERIFIED WITH TENANTFURNITURE VENDOR PRICE TO POWER/BACKBOX INSTALLATION. FURNITURE SYSTEMS TO BE 2+2 SYSTEM; GCRESPONSIBLE FOR FINAL WHIP CONNECTION.
1
2
3
4
5
6
7
A-003.00
POWER TELEPHONE PLAN31ST FLOOR
LEGEND/NOTESPOWER TELEPHONE PLAN
RECESSED WALL-MTD DUPLEX OUTLET BOX AND STUB-UP
RECESSED WALL-MTD QUAD OUTLET BOX AND STUB-UP
CIRCUIT. REFER TO ENGINEERING DRAWINGS FOR DETAILSRECESSED WALL-MOUNTED OUTLET BOX AND STUB-UP ON SEPARATE
RECESSED OUTLET BOX AND STUB-UP FOR V/D COMBINATION
RECESSED WALL HUNG PHONE OUTLET BOX/STUB-UP 48" AFF
RELEASE BUTTON GC TO PROVIDE BACKBOXES AT WALL LOCATIONS
1. ALL OUTLETS TO BE MTD VERTICALLY CENTERLINE 18" ABOVE FINISHED FLOORU.O.N.2. ALL OUTLETS TO BE LEVITON 'DECORA': COLOR-WHITE3. CONTRACTOR TO TAG ALL OUTLETS4. DIMENSIONS FOR POWER AT PERIMETER OFFICE IS OFF OF THE CONVECTORU.O.N.5. CONTRACTOR TO MODIFY CONVECTORS AS REQUIRED TO F&I CORRECTPOWER, DATA, AND TELEPHONE OUTLETS6. PROVIDE ALL REQ'D. CONNECTIONS FROM ELECTRIFIED DEVICES TO THEASSOCIATED CONTROLS-GC TO COORDINATE W/ CLIENTS' VENDORS AS REQ'D.7. PROVIDE MULTIPLE GANG COVER PLATES FOR ALL ADJACENT OUTLETS &SWITCHES.8. ALL FIRE ALARM DEVICES TO BE WHITE.9. PROVIDE ACOUSTICAL SEALANT AT ALL BACKBOXES IN INSULATED WALLS.10. ALL OUTLETS IN PANTRIES & BATHROOMS AND OTHER WET AREAS TO BE GFITYPE U.O.N.11. GC TO PROVIDE CONDUIT, STUB-UPS, BACK BOXES, AND POWER AS REQ'D.FOR ALL SECURITY DEVICES12. SECURITY VENDOR TO PROVIDE ALL WIRING AND DEVICES NECESSARY TOIMPLEMENT DESIGN INTENT.13. ALL OUTLET DEVICES NOTED FOR COMPUTER TO BE TAGGED, COVER PLATESTO MATCH ALL OTHER PLATES IN COLOR.14. ALL OUTLET DEVICES AND COVERPLATES IN MILLWORK OR ON ACCENT WALLSTO MATCH COLOR OF WALL UON. SUBMIT SAMPLE FOR ARCHITECT APPROVAL.15. COORDINATE OUTLET DEVICE HEIGHTS WITH ELEVATIONS. AT PANTRYCOORDINATE DEVICE LOCATION WITH MANUFACTURER SPECIFICATIONS.16. ALL OUTLETS THAT SHOW FOR LCD TVS TO BE CLOCK OUTLETS17. ALL A/V CONDUIT TO BE 2" DIAMETER UON.18. GC TO PROVIDE GROUNDING FOR SERVER ROOMS WITH STATIC DISSIPATIVETILES, COORD. WITH ENGINEER AND FINISH PLANS19. BOXES IN RATED WALLS TO BE SEALED WITH 3M BARRIER PUDDY OR APPROVEDEQUAL TO MAINTAIN RATING. COORDINATE WITH PARTITION TYPES20. ALL ELECTRIFIED SECURITY DEVICES TO BE TIED INTO CLASS E SYSTEM
MODULAR RACEWAY POWER/VOICE/DATA SYSTEM COORDRECEPTACLES W/ EQUIPMENT AND ENGINEERING DRAWINGS. GCTO PROVIDE ALL CONNECTIONS FOR POWER AND DATA AS REQ'D.
INDICATES EQUIPMENT ONLY SEE ENGINEERING DWGS FORSEPARATE CIRCUITS OR SPECIAL OUTLET REQUIREMENTS.
POWER JUNCTION BOX - LOCATION TO BE DETERMINED IN FIELDW/ FURN. VENDOR
V/D JUNCTION BOX - LOCATION TO BE DETERMINED IN FIELDW/ FURN. VENDOR
CIRCUIT. REFER TO ENGINEERING DRAWINGS FOR DETAILSRECESSED WALL-MOUNTED OUTLET BOX AND STUB-UP ON SEPARATE
8
CORE DRILL FOR POWER/DATA/AV. COORDINATEREQUIREMENTS W/ CONFERENCE TABLE BOX SPECIFICATIONS
CORE DRILL FOR FURNITURE IN-FEED POWER/DATA
KEY PAD - PROVIDE BACKBOX AND STUB-UP
ELECTRIC MAGNETIC LOCK TIE INTO BUILDING CLASS 'E' SYSTEM
DOOR CONTACT. ( BY TENANT SELECTED VENDOR)
OFFICE3117
WELLNESS RM3103
CLOSET3104
OFFICE3106
OFFICE3107
OFFICE3108
OFFICE3109
OFFICE3110
3109
OFFICE3111
TEAM ROOM3113
OPEN AREA3112
OFFICE3114
BREAK OUT3115
STORAGE3102
RECEPTION3101
OPEN AREA3134
MEN'S RM3132A
AV/IT3132
ADA BATHROOM3130
PANTRY3120
STORAGE3121
OFFICE3123
OFFICE3124
OFFICE3125
OFFICE3126
CONF. ROOM3127
OFFICE3128
STORAGE3129
OPEN AREA3131
OFFICE3105
OFFICE3119
OFFICE3118
CONF. ROOM3116
VS
VS
VS
VS
SVS
VS
SVS
S
VS
VS
SVS
SVS
VS
VS
VS
VS
VS
VS
SVS
SSVS
S
SMAIN
L4L4L4L4L4
L4L4L4L4L4
VS
VS
VS
SVS
SM
9'-0"
L2a
VSVS
L2
SDb
9'-0"9'-0"
9'-0"
9'-0" 9'-0"
9'-0"
9'-0"
9'-0"
L7
9'-0"
9'-0"9'-0" 9'-0" 9'-0"9'-0"
8'-2"
9'-0"
9'-0"
8'-2"
8'-2"
8'-2"
8'-2"8'-2"
8'-2"
8'-2"
8'-2"
8'-2"
8'-2"8'-2"8'-2"
8'-2"
L4b
(A)
3Db
L4b L4b
L4b
L4b
L4b
L4b
L4b
L4b
L4b L4b
L4b
L4b
L4b
L4b
L4b
L4b
9'-0"
9'-0"
L2a L2a L2a
L2aL2a
L2a L2a L2a
L2aL2aL2a
L1 L1 L1L1L1L1
L1L1
L1L1L1
S3Da S3Db
L2L2
L2
L2 L2
L2 L2
L2 L2
L2
L2 L2
L2L2
L2
L2L2
L2L2
L2
L2
L2 L2
L2L2
L2 L2
L2
L2
L1L1
L1 L1
L1L1L1L1L1
L1
L1
L1L1
L1
L1
L2L2 L2
L2L2
L2L2
L7
L1
L8L8
STORAGE3103A
3Da
L7 L7 L7L7L7
L4 L4
L4 L4
L4
L4
L4
L4
L4 L4
L4
L5
L6
L6
L6
L1
L4
L1
L4
L1 L1 L1L1
L1
L1
L1
L1 L1
L1 L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L4
L4
L4
L4
L4
L4
L4
L7
L4
L4
L4
L4
L4
PROVIDE 350 CFM VARIABLE SPEEDEXHAUST FAN TIED TO THERMOSTAT
A-003A
L4
PROVIDE JUNCTION BOX FORRECESSED ELECTRIFIED PROJECTORSCREEN
VS
VS
OPEN STORAGE3133
WOMEN'S RM3131A
L1L1L1
L1
L1L1
OFFICE3122
EXTEND SOFFIT DOWN TOCONCEAL EXISTING
DUCTWORK AT LOUVERPENETRATIONS (2), VIF
L9
L9
L9
L9 L1S
TEMP. SENSOR
LC
STROBESPEAKER
THERMOSTAT/
DIMMERSWITCH/
T
38" AFF C
48" AFF TO TOP
80" AFF C
COORDINATE LOCATION OF ALL F.A.SPEAKERS AND STROBES WITHARCHITECT AND ENGINEER PRIOR TOINSTALLATION
NOTE: MODIFY CONDUIT FEEDS TO ALLOW
STACKED INSTALLATION
6"
ACOUSTICAL PANEL CEILINGALIGN
METAL STUD TRACK
GYPSUM BOARD
REFERTO RCP
SHADOW MOLDING
SUSPENSION SYSTEM
HANGER ROD
CARRYING CHANNEL
METAL STUD
CORNER BEAD
REFER TORCP
?????
REFER TO RCP
(TYPICAL)
2-1/2" METAL STUDSAND RUNNERS
5/8" GYP. BD.
EXISTING SLAB
EXTRUDED METALWINDOW POCKET
EXISTING WINDOW
ALIGN W/ CONVECTOR BELOW
????
EXISTING FIREPROOFINGPATCH AS REQUIRED
FINISH CEILING
ALIGN
BOTTOM OF MULION
WT/01
WT/02 ADDITIONAL BLACKOUT SHADE ALT. AT CONF.
RM. 3215 ON LIP
N
FILE: CONDOCS.DWG
SCALE: AS NOTED
DWG NO.
PROJ MGR. MR
CHECKED BY OT
DRAWN BY LL
SEAL & SIGNATURE PROJ NO. 10295.00
DRAWINGTITLE
NEW YORK, NEW YORK
3ST FLOOR
750 THIRD AVENUE
JOB TITLE SL GREEN REALTYCORPORATION
NO. DATE ISSUE/REVISION BY
- 11.20.15 ISSUE FOR BID OT
REFLECTED CEILING PLAN - 31ST FLOORSCALE: 1/8" = 1'-0" SCALE: NTS
TYPICAL ELEV.1 2
A-004.00
REFLECTED CEILING PLAN31ST FLOOR
LEGEND/NOTESREFLECTED CEILING PLAN
GC TO FURNISH AND INSTALL ACOUSTICALLY LINED TILES TO
LIGHT SWITCH, SUBSCRIPT INDICATES CIRCUIT
DIMMER SWITCH3 WAY LIGHT SWITCHS3
S#
SD
1. ALL CLGS TO BE ACOUSTICAL TILE U.O.N.2. ALL LIGHT SWITCH CENTERLINE HEIGHTS TO BE 38" A.F.F. U.O.N.3. ALL SWITCHES AND DIMMERS TO BE LEVITON 'DECORA' COLOR: WHITEVACANCY SENSORS TO BE LEVITON PIR/MULTI TECH OR APPROVED EQUAL.COORDINATE WITH ENGINEERS DRAWINGS4. ALL INCANDESCENT LIGHTS TO BE ON DIMMERS.5. COORDINATE EXIT SIGN LOCATIONS W/ ARCHITECT IN FIELD6. V.A.V. BOXES SHALL NOT BE PLACED IN GYP. BD. CLGS.7. PROVIDE CUT OUTS IN CEILING AS REQ'D FOR ALL PAGING AND SECURITYDEVICES.8. REFER TO ENGINEERING DWGS FOR EMERGENCY LIGHTING AND NIGHT LIGHTS9. TIMECLOCK SWITCH TO COORDINATED WITH ENGINEERING DRAWINGS10. CEILING CONTRACTOR TO INCLUDE SCOPE OF WORK INVOLVING REMOVALAND REINSTALLATION OF EXISTING CEILINGS AS REQ'D TO COMPLETE WORKINDICATED ON ALL CONTRACT DOCUMENTS11. GC TO SUBMIT ALL LIGHT CUTS, STEEL SHOPS & ALL OTHER ITEMS THE ARE TO BEINSTALLED ABOVE CEILING TO HVAC SKETCHER. ALL ITEMS & CONFLICTS TO BECLEARLY IDENTIFIED TO THE ARCHITECT & ENGINEER IN SHOP DRAWINGS FORCOORDINATION PRIOR TO FABRICATION AND INSTALLATION12.F&I INTEX FORMS-INTEX A-PANEL FIBERGLASS ACCESS PANELS AS REQ'D G.C.TO COORD. W/ ARCH. & ENGINEERING DWGS. FOR LOCATION & SIZE13. CEILING CONTRACTOR TO COORD. SCOPE OF WORK INVOLVING FLOORBELOW W/ ELECTRICIAN & ALL OTHER TRADES BIDS. TO INCLUDE ALL NECESSARYPATCHING & MODIFICATION TO FLOOR BELOW ON OVERTIME.14. ALL GYPSUM BOARD CEILINGS AT CONFERENCE ROOMS AND RECEPTIONAREAS TO BE SKIM COATED PRIOR TO SPECIFIED FINISH15. MODIFY EXISTING WINDOW POCKET AS REQUIRED TO ACCOMMODATECEILING HEIGHT AS NOTED ON REFLECTED CEILING PLAN. PROVIDE CONTINUOUSMETAL PAN TO CONNECT EXISTING POCKET FACE TO CEILING. PATCH LENGTH OFPOCKET AS REQUIRED FOR CONTINUOUS HORIZONTAL RUN AT POCKET.16. ANY EXPOSED DUCTWORK FOR FRESH AIR INTAKE CANNOT BE INTERIOR LINED.LINING MUST BE ON EXTERIOR (PAINTED) TO MATCH. COORDINATE WITHENGINEERS.17. ARCHITECT TO BE NOTIFIED IF ACOUSTICAL TILES WILL BE LESS THAN 4" CUTS18. ALL CUT EDGES OF CEILING TILE TO BE PAINTED TO MATCH TILE COLOR
GYPSUM BOARD CEILING
SMAINMAIN SWITCH BANK WITH TIMECLOCK FOR RECEPTION, OPENAREA AND CORRIDOR LTG. REFER TO ENGINEERING DWGS.FOR QUANTITY.
GRID SPEC: ARMSTRONG SUPRAFINE EXPOSED TEE 9/16" GRID
2' x 2' ACOUSTICAL CEILING TILE SPEC: ARMSTRONG ULTIMA 1912
MATCH SPECIFIED TILES AT OFFICES ADJACENT TOMECHANICAL ROOMS, REFER TO PLANS
SVS
CEILING MOUNTED VACANCY SENSOR TIED TO WALL SWITCH
2'X2' CENTER BASKET RECESSED FLUORESCENT FIXTURE: ZENITHSERIES ZBS: ZBS-22G-317-BIAX-ELB-FLXL12'X4' CENTER BASKET RECESSED FLUORESCENT FIXTURE: ZENITH ISERIES ZBS: ZBS-24G-232-OCT-ELB-FLXL2
CEILING RECESSED DOWN LIGHTLIGHTOLIER, 4X4 1000 LUMEN C4XC4L10DL, 40K CL, OR EQUIV.L4
L5 CEILING RECESSED WALLWASHERLIGHTOLIER, 4X4 1000 LUMEN, FRAME: C4X4L10NUVBZ10V, TRIM:C4X4L10DL35KCLWVB
L6 PENDANT LIGHT, TBD. PROVIDE ALLOWANCE OF $550/FIXTURE
CONTINUOUS UNDERCABINET LIGHTING - ALKCO "ARIS" LEDLIGHT - FIXTURES TO BE MTD END TO END AS REQ'D. REFER TOPLAN FOR RUN LENGTH, ARIS-[PER PLAN]-2700-120-PRL-HWC
L8
EXIT SIGN: ATLITE LED EDGE LIT EXIT SERIES - MARATHON (BATTERYBACK UP)- CLEAR BACKGROUND. LETTER COLOR: RED.
LIGHT SWITCH VACANCY SENSOR, TYP. REFER TO ENG. DWGSFOR SPECIFICATIONS
SUBSCRIPT INDICATES MOTORIZED SCREEN SWITCHSM
CEILING TRANSITION SCALE: 3" = 1'-0"
A
ASSUME 70% 2X4 FIXTURES INDICATED TO BE SALVAGED FROMEXISTING BUILD-OUT. GC TO RE-LAMP FIXTURES
ALTERNATE: PROVIDE ALTERNATE PRICING TO F & I NEWBUILDING STANDARD 2X4 BASKET FIXTURES TO MATCH 2X2FIXTURES IN LIEU OF SALVAGING & RE-USE.
CEILING RECESSED LINEAR FLUOR. LIGHT, REFER TO PLAN FORLENGTH, CORONET, LSR4-4FT-2-T8-(VOLT)- FLAMP: (2) DOWN, 3500K
L7
WINDOW POCKET DETAIL (TYP.)
MARK LIGHTING MP - SERIES #MP-120-EBB-2T8-32W LAMPFIXTURE. CUSTOM LENGTH - VERIFIY IN FIELDL9
OFFICE3117
WELLNESS RM3103
CLOSET3104
OFFICE3106
OFFICE3107
OFFICE3108
OFFICE3109
OFFICE3110
3109
OFFICE3111
TEAM ROOM3113
OPEN AREA3112
OFFICE3114
BREAK OUT3115
STORAGE3102
RECEPTION3101
OPEN AREA3134
MEN'S RM3132A
AV/IT3132
ADA BATHROOM3130
PANTRY3120
STORAGE3121
OFFICE3123
OFFICE3124
OFFICE3125
OFFICE3126
CONF. ROOM3127
OFFICE3128
STORAGE3129
OPEN AREA3131
OFFICE3105
OFFICE3119
OFFICE3118
CONF. ROOM3116
01PT
CP01
LV-02
CP-01
RB01
01PT
RB01
01PT
RB01
01PT
RB01
01PT
RB01
01PT
RB01
01PT RB
01
RB01
01PT RB
01
01PT RB
01
01PT
RB01
01PT
RB01
01PT
RB01
01PT
RB01
01PT
RB01
01PT
RB02
01PT
VT01
RB03
01PT RB
01
01PT
VT01
RB03
01PT
VT01
RB03
01PT CP
01RB
01
CP01
CP01
01PT
VT01
RB03
RB01
01PT
01PT
CP01
RB01
LV-02
CP-01
CP-01
LV-02
L
V
-
0
2
C
P
-
0
1
C
P
-
0
1
V
T
-
0
1
C
P
-
0
1
V
T
-
0
1
VT-01
CP-01
LV01
RB02
01PT
LV-01
CP-01
CP-01
LV-01
VT-01
CP-01
CP02
01PT RB
02LV
01
04PT
01WP
03PT
04PT RB
02LV
01
CP01
CP01
CP01
CP01
CP01
CP01
CP02
CP01
CP01
CP01
CP01
CP01
CP01
CP01
02PT
STORAGE3103A
03PT
02PT
02PT
02PT
02PT
02PT
02PT
02PT
02PT
02PT
02PT
02PT
02PT
02PT
04PT
04PT
02PT
01PT RB
01CP
01
02PT
01PT RB
01CP
01
02PT
04PT
01WP
05PT
05PT
06PT
01WP
01PT
VT01
RB03
V
T
-
0
1
C
P
-
0
1
C
P
-
0
1
V
T
-
0
1
01PT
VT01
RB03
CO
PIER
01PT
VT01
RB03
OPEN STORAGE3133
WOMEN'S RM3131A
CP-
01
PS-0
1
02PS
01ST
03PS
PS01
02PS
03PSPS
01
01ST
02PS
03PSPS
01
02PS
03PSPS
01
CP-
01
PS-0
1
01PTPS
01
CP-
01
PS-0
1
PROVIDE 6"COVE BASE ATJ.C. TO MATCHFLOORING
OFFICE3122
N
FILE: CONDOCS.DWG
SCALE: AS NOTED
DWG NO.
PROJ MGR. MR
CHECKED BY OT
DRAWN BY LL
SEAL & SIGNATURE PROJ NO. 10295.00
DRAWINGTITLE
NEW YORK, NEW YORK
3ST FLOOR
750 THIRD AVENUE
JOB TITLE SL GREEN REALTYCORPORATION
NO. DATE ISSUE/REVISION BY
- 11.20.15 ISSUE FOR BID OT
FINISH PLAN - 31ST FLOORSCALE: 1/8" = 1'-0"
1
A-005.00
FINISH PLAN31ST FLOOR
5
LEGEND/NOTESFINISH PLAN
1. NOT USED2. ALL CLOSET FLOORING TO BE SAME AS ADJACENT AREA U.O.N.3. VINYL BASE THROUGHOUT SPACE U.O.N. ALL VINYLBASE TO BE ROLL GOODS U.O.N.
4. ALL AREAS TO BE U.O.N.
5. WALLS TO BE IN EGGSHELL, DOORS & FRAMES IN SEMI-GLOSS6. ALL PAINT GRADE WOOD TO BE POPLAR (U.O.N.)7. PROVIDE REDUCER STRIPS AS NECESSARY8. FLASH PATCH ALL FLOORS AND PREP FOR SPECIFIED FINISH9. ELEVATOR DOORS TO BE SANDED, BONDO'D & PREPPED TO RECEIVE ROLL ONPAINT10. VINYL BASE OVER 4" HIGH IS TO BE 1/8" THICK-TYP. INSTALLER TO INSPECT WALLS& FLOORS 3 DAYS PRIOR TO INSTALLATION AND CONFIRM ACCEPTABILITYTHROUGHOUT11. SEAMING DIAGRAMS MUST BE SUBMITTED TO ARCHITECT & APPROVED PRIORTO INSTALLATION OF CARPET12. ALL GYP BOARD CEILINGS AND WINDOW POCKETS TO BE PAINTED13. PROVIDE TRACKS FOR ALL BLACK OUT SHADES14. PROVIDE FASCIA/VALENCE FOR ALL WINDOW TREATMENTS15. SKIMCOAT ALL WALLS WHERE WALLCOVERING IS REMOVED AND AS NOTED ONPLAN.16. PAINT ALL EXPOSED RADIATORS AND RADIATOR PIPING WHITE17. PAINT ALL EXPOSED CONDUIT, SPRINKLERS AND DUCTWORK WHITE.18. GC TO PROVIDE 5% ATTIC STOCK UON FOR SPECIFIED FINISHES INCLUDINGPAINT, CARPET, BASE, WALLCOVERING AND ACOUSTICAL CEILING TILE.COORDINATE WITH ARCHITECT19. F & I STATIC DISSIPATIVE VINYL TILE AT COMPUTER ROOMS. REFER TO PLANSAND SPECIFICATIONS20. EXISTING WINDOW TREATMENT TO REMAIN. REMOVE, CLEAN AND RE-INSTALLTHROUGHOUT. PROVIDE NEW SHADES TO MATCH EXISTING AS REQUIRED DUE TONEW WALL LOCATIONS.2Q. ALL COLOR SELECTIONS SUBJECT TO TENANT APPROVAL.21. ALL EXISTING CONVECTOR COVERS SHALL BE PAINTED PER BUILDINGSTANDARD4. ALL HM DOOR AND FRAMES SHALL BE PAINTED, COLOR: TBD5. ALL SOFFIT AND GYP. BD. CEILINGS, WINDOW POCKETS TO BE PAINTED FLATWHITE5. ALL WALLS TO BE EGGSHELL. HM DOORS, FRAMES & CONVECTOR COVERS TOBE SEMI-GLOSS. ALL CEILINGS TO BE FLAT6. ELEVATOR DOORS TO RECEIVE STANDARD PREP AND ROLLED PAINT
PAINT - SHERWIN WILLIAMS TBD
PAINT - SHERWIN WILLIAMS TBD
CARPET - BOLYU - SHIFT, 24 X 24, SHF57 COMMAND
CARPET - BOLYU - CUSTOM, 24 X 24, HV84-1
01PT
CP01
02PT
CP02
PAINT - SHERWIN WILLIAMS TBD03PT
PAINT - SHERWIN WILLIAMS TBD04PT
PAINT - SHERWIN WILLIAMS TBD, EGGSHELL AT WALLS05PT
PAINT - SHERWIN WILLIAMS IDEA PAINT TBD EGGSHELL ATWALLS, SEMI GLOSS AT TRIMS06
PT
WALL PANEL - CARNEGIE XOREL - HAVANA 6249 01WP
01PL PLASTIC LAMINATE (PANTRY): ABET LAMINATI, 1385 GROOVE,
RAILROADED
01LB FULL HEIGHT LAMINATE BACKSPLASH (PANTRY): SPEC. TBD
LUXURY VINYL TILE - KARNDEAN FLOORING - SYLVA WP417(PANTRY, ELEVATOR LOBBY AND RECEPTION)
LV01
VINYL TILE - ARMSTRONG STRIATIONS -12X24 T308 WARM GREYPOLISHED (STORAGE ROOMS AND IT)
VT01
RB01
RB02
RB03
PAINT - BENJAMIN MOORE MURESCO - WHITE. FINISH: FLAT ALLSHEETROCK CEILINGS, PIPING, SOFFITS AND WINDOW POCKETS.07
PT
PAINT AT ELEVATOR DOORS AND FRAMES - BENJAMIN MOORE,ROLLED APPLICATION, COLOR TBD.08
PT
FLOOR TILE: DALTILE D014: 2" X 2" DESERT GRAY - UNGLAZEDMATTE. GROUT COLOR: 1/8" LATICRETE SPECTRALOCK PRO SILVERSHADOW (CORE BATHROOMS)
WALL TILE: DALTILE D014: DESERT GRAY: 2" X 2" - WITH COVEBASE. GLAZED. (CORE BATHROOMS) (FULL HEIGHT). GROUT: 1/8"LATICRETE SPECTRALOCK PRO SILVER SHADOW
BORDER TILE: BORDER TILE (2 COURSES LOCATED 34 COURSESABOVE TILED FLOOR): DALTILE D182: 2" X 2" SUEDE GRAY - GLAZED.GROUT: 1/8" LATICRETE SPECTRALOCK PRO SILVER SHADOW
STONE TOP - BIANCO ROMANO POLISHED GRANITE,3/4" THICK (VANITY FINISH @ CORE BATHROOMS).
LEGEND/NOTESCORE BATHROOM FINISHES
01SS SOLID SURFACE COUNTERTOP (PANTRY): ICE STONE, COLOR:
SNOW FLURRY
RUBBER WALL BASE - JOHNSONITE 4" RUBBER BASE. COLOR TBD.PROVIDE STRAIGHT AT CARPET AND COVE AT VCT/TILE.
RUBBER WALL BASE - JOHNSONITE 4" RUBBER BASE. COLOR TBD.PROVIDE STRAIGHT AT CARPET AND COVE AT VCT/TILE.
RUBBER WALL BASE - JOHNSONITE 4" RUBBER BASE. COLOR TBD.PROVIDE STRAIGHT AT CARPET AND COVE AT VCT/TILE.
ADD/ALTERNATE: IN LIEU OF REGULAR 4" BASE, PROVIDEJOHNSONITE MILLWORK REVEAL MW-4" BASE- COLOR: TBD.MITERED AT CORNERS- INSTALLED PER MANUFACTURERRECOMMENDATIONS (ALL AREAS U.O.N)
LEGEND/NOTES CONT.FINISH PLAN
INDICATES FLOORING TRANSITION:- AT CARPET/VCT OR CARPET/EXISTING BASE BUILDING, F&IRUBBER REDUCER STRIP, COLOR TO MATCH CARPET- AT TILE TO CARPET OR TILE/EXISTING BASE BUILDING, F&I ST.ST. SCHLUTER TRANSITION STRIP OR RENO RAMP AS REQ'D.
02PL PLASTIC LAMINATE (STORAGE 3121 & ADJUSTABLE SHELVING):
TBD
OFFICE3117
WELLNESS RM3103
CLOSET3104
OFFICE3106
OFFICE3107
OFFICE3108
OFFICE3109
OFFICE3110
3109
OFFICE3111
TEAM ROOM3113
OPEN AREA3112
OFFICE3114
BREAK OUT3115
STORAGE3102
RECEPTION3101
OPEN AREA3134
MEN'S RM3132A
AV/IT3132
ADA BATHROOM3130
PANTRY3120
STORAGE3121
OFFICE3123
OFFICE3124
OFFICE3125
OFFICE3126
CONF. ROOM3127
OFFICE3128
STORAGE3129
OPEN AREA3131
OFFICE3105
OFFICE3119
OFFICE3118
CONF. ROOM3116
STORAGE3103A
CO
PIER
2
6
26
WBK
W
B
K
OPEN STORAGE3133
WOMEN'S RM3131A
OFFICE3122
N
FILE: CONDOCS.DWG
SCALE: AS NOTED
DWG NO.
PROJ MGR. MR
CHECKED BY OT
DRAWN BY LL
SEAL & SIGNATURE PROJ NO. 10295.00
DRAWINGTITLE
NEW YORK, NEW YORK
3ST FLOOR
750 THIRD AVENUE
JOB TITLE SL GREEN REALTYCORPORATION
NO. DATE ISSUE/REVISION BY
- 11.20.15 ISSUE FOR BID OT
FURNITURE PLAN - 31ST FLOORSCALE: 1/8" = 1'-0"
1
A-006.00
FURNITURE PLAN31ST FLOOR
6
FURNITURE IS FOR REFERENCE PURPOSES. G.C. RESPONSIBLE FOR ALL FINALELECTRICAL CONNECTIONS FOR FURNITURE SYSTEMS, TABLE BOXES, ETC. COOR'DBLOCKING REQUIREMENTS FOR FURNITURE RELATED ITEMS WITH VENDOR PRIORTO INSTALLATION. COOR'D ELECTRICAL LOCATIONS WITH FURNITURE VENDORPRIOR TO INSTALLATION.
LEGEND/NOTESFURNITURE PLAN
AS
NO
TED
334"
BASE AS PERFINISH PLAN
EXISTING SLAB PROVIDE SEALANTAT BOTH SIDESOF PARTITION
6"
EXISTING SLABBRACE TO SLAB
AS REQ'D.
SUSPENDED CEILING
1 LAYER5/8" THK. GYP. BD.
(TYPE X)
2-1/2" METALSTUDS PLACED
16" O.C.
NOTE: ALL METAL STUDSTO BE 25 GA. U.O.N.
AS
NO
TED
334"
BASE AS PERFINISH PLAN
EXISTING SLAB PROVIDE SEALANTAT BOTH SIDESOF PARTITION
EXISTING SLABBRACE TO SLAB
AS REQ'D.
SUSPENDED CEILING
1 LAYER5/8" THK. GYP. BD.
(TYPE X)2-1/2" METAL
STUDS PLACED16" O.C.
PROVIDE SEALANTAT BOTH SIDESOF PARTITION
PROVIDE SEALANTAT BOTH SIDESOF PARTITION
2" SAFB INSULATION
VARIES
CHECK CLEARANCES
SUSPENDED CEILING SUSPENDED CEILING
VA
RIES
EXISTING SLABBRACE TO SLAB
AS REQ'D.
5/8" THK.CEMENT BD.
2-1/2" METALSTUDS PLACED
16" O.C.
2-1/2" METALSTUDS PLACED
16" O.C.
PROVIDE SEALANTAT BOTH SIDESOF PARTITION
PROVIDE SEALANTAT BOTH SIDESOF PARTITION
EXISTING SLAB
PROVIDE SEALANTAT BOTH SIDESOF PARTITION
PROVIDE SEALANTAT BOTH SIDESOF PARTITION
5/8" THK. CEMENT BD.
WATERPROOFMEMBRANE
FLOOR FIN. VARIESWATERPROOF
MEMBRANE
FLOOR FIN. VARIES
WATERPROOFMEMBRANE
BASE AS PERFINISH PLAN
EXISTING SLAB
EXISTING SLAB
SUSPENDED CEILING
1 LAYER5/8" THK. GREEN BD.
FLOOR FIN. VARIES
PROVIDE SEALANT
VA
RIES
FINISHED FLOOR
3 34"
EXISTING SLAB
AS REQUIREDBRACE TO SLAB
5/8" THICKGYPSUM BOARD
GC TO PROVIDELEVEL FLOOR PERMANUFACTURERSRECOMMENDEDTOLERANCES FORINSTALL OF GLASSWALL SYSTEM.
OFFICE SIDECORRIDOR SIDE
5/8" THK.GYPSUM BOARD
TAG WALLSYSTEM BY GC.
CONTINUOUSBLOCKING ASREQ'D.
6"
SUSPENDED CEILING
C
FINISHED CEILING
L
F&I REMOVABLE POLEON ESCUTCHEONSAT ADA HEIGHT
EQ. EQ.
4'-0
"
5'-6
"
A-008E
GYP. BOARD FASCIA
H.M. FRAME
2'-2" MIN.
1'-0"
STAINED 3/4" BIRCH
POLISHED CHROME POLEON ESCUTCHEON
4'-0
"
5'-6
"
DOORSEE SCHEDULE
ADDITIONAL SET OF CLEATSFOR SHELF & ESCUTCHEON FOR
POLE TO BE INSTALLED @HANDICAP HT. FOR FUTURE USE
INSTALL DIVIDER PANEL INCLOSETS EXCEEDING 4'-0"
WIDTH. F&I (1) POLE AT ADAAPPROVED HT. ON (1) SIDE
OF DIVIDER. OTHERS AT 5'-6".
FILE: CONDOCS.DWG
SCALE: AS NOTED
DWG NO.
PROJ MGR. MR
CHECKED BY OT
DRAWN BY LL
SEAL & SIGNATURE PROJ NO. 10295.00
DRAWINGTITLE
NEW YORK, NEW YORK
3ST FLOOR
750 THIRD AVENUE
JOB TITLE SL GREEN REALTYCORPORATION
NO. DATE ISSUE/REVISION BY
- 11.20.15 ISSUE FOR BID OT
PARTITION TYPE 1
PARTITION TYPESSCALE: 1-1/2" = 1'-0"
PARTITION TYPE 2 PARTITION TYPE 3 PARTITION TYPE 4 PARTITION TYPE 5
1. IN WALLS THAT HAVE SIGNAGE, SHELVING, COUNTERS, CHAIR RAILS,CABINETS, CROWN MOULDINGS, BASE MOULDING, LIGHT FIXTURES,HEAVY MIRRORS, ETC... PROVIDE WOOD BLOCKING.
2. ALL WALLS GREATER THAN 12'-6" TO BE 20 GAUGE WITHCONTINUOUS METAL STRAPPING EVERY 4'-0" HORIZONTALLY. GC TONOTIFY ARCHITECT PRIOR TO INSTALLATION AND LAYOUT APPROVALFOR EXACT STUD SIZE
3. ALL METAL STUDS TO BE 25 GAUGE, U.O.N.
NOTES
1
A-007.00
PARTITION TYPES
TAG WALL GLASS PARTITION
CLOSET ELEVATIONSCALE: 1" = 1'-0"
CLOSET SECTIONSCALE: 1" = 1'-0"
3'-2
"
3'-2
"
A B C D
7'-1
0"
8'-0
"
8'-0
"
TAGWALLSYSTEM SLIDINGGLASS DOOR
12" TEMPERED
GLASS
CRL TOP AND BOTTOM PATCHFITTINGS
TAGWALLSTANDARDLADDER PULL
3'-2
"
4'-0
" EQ
.4'
-0" E
Q.
12" TEMPERED
GLASS
4" TOP AND BOTTOMST. STL. RAILS
E
4'-0
" EQ
.4'
-0" E
Q.
CHOP FLOOR AS REQUIREDFOR FLOOR CLOSERS, TYP
DEADBOLTS &DUSTPROOF STRIKES
3'-2
"
F&I LOUVERPAINTED TO MATCHDOOR
7'-1
0"
F
FLOOR TILE
SLAB
CARPET PER PLANS
EXISTING WATERPROOFING
PER FINISH PLAN
MUD SET
1/4" MAX
BUILDING STANDARD WHITECARRERA MARBLE SADDLE
FLASH PATCH AND FEATHERFLOOR AS REQUIRED
FOR LEVEL TRANSITION
DOOR JAMB
DOOR TYPESNTS
FILE: CONDOCS.DWG
SCALE: AS NOTED
DWG NO.
PROJ MGR. MR
CHECKED BY OT
DRAWN BY LL
SEAL & SIGNATURE PROJ NO. 10295.00
DRAWINGTITLE
NEW YORK, NEW YORK
3ST FLOOR
750 THIRD AVENUE
JOB TITLE SL GREEN REALTYCORPORATION
NO. DATE ISSUE/REVISION BY
- 11.20.15 ISSUE FOR BID OT
NOTES
1
DOOR SCHEDULEDOOR FRAME HARD
WARESET
SADDLEREMARKSFL. NO. TYPE SIZE MAT. JAMB HEAD MAT. TYPE MAT.
FLO
OR
31
1 - EXISTING - - - - - - - SAND, BONDO & REPAINT
2 - EXISTING - - - - - - - SAND, BONDO & REPAINT
3 - EXISTING - - - - 1 - - SAND, BONDO & REPAINT
4 A 3'-0" x 7'-10" HM A B HM 2 - - -
5 B (2) 2'-6" x 8'-0" HM - - - 3 - - FRAMELESS CLOSET DOORS
6 C TAGWALL DOOR - - - - - - - -
7 D 3'-0" x 8'-0" GL - - - 4 - - -
8 C TAGWALL DOOR - - - - - - - -
9 C TAGWALL DOOR - - - - - - - -
10 C TAGWALL DOOR - - - - - - - -
11 C TAGWALL DOOR - - - - - - - -
12 C TAGWALL DOOR - - - - - - - -
13 C TAGWALL DOOR - - - - - - - -
14 C TAGWALL DOOR - - - - - - - -
15 D 3'-0" x 8'-0" GL - - - 4 - - -
16 D 3'-0" x 8'-0" GL - - - 4 - - -
17 C TAGWALL DOOR - - - - - - - -
18 C TAGWALL DOOR - - - - - - - -
19 D 3'-0" x 8'-0" GL - - - - - - -
20 C TAGWALL DOOR - - - - - - - -
21 D 3'-0" x 8'-0" GL - - - - - - -
22 - 3'-0" x 8'-0" - C C HM - - - F & I HM FRAME FOR TRIMMED OPENING
23 C TAGWALL DOOR - - - - - - - -
24 C TAGWALL DOOR - - - - - - - -
25 C TAGWALL DOOR - - - - - - - -
26 C TAGWALL DOOR - - - - - - - -
27 C TAGWALL DOOR - - - - - - - -
28 F 3'-0" x 7'-10" HM A B HM - - - -
29 D 3'-0" x 8'-0" GL - - - - - - -
30 C TAGWALL DOOR - - - - - - - -
31 A 3'-0" x 7'-10" HM A B HM 2 - - -
32 - EXISTING - - - - - - - SAND, BONDO, & REPAINT
33 A 3'-0" x 7'-10" HM A B HM 2 - - -
34 - EXISTING - - - - - - - SAND, BONDO, & REPAINT
35 E (2) 3'-0" x 7'-10" GL - - - 5 - - -
36 - EXISTING - - - - - E MBL MEN'S RESTROOM DOOR: SAND, BONDO, & PAINT
37 - EXISTING - - - - - - - MEN'S VESTIBULE DOOR: SAND, BOND, & PAINT
38 - EXISTING - - - - - E MBL WOMEN'S RESTROOM DOOR: SAND, BONDO, & PAINT
39 - EXISTING - - - - - - - WOMEN'S VESTIBULE DOOR: SAND, BONDO, & PAINT-
40 - EXISTING - - - - - E MBL SAND, BOND, & REPAINT
HARDWARE SCHEDULE
A-008.00
DOOR & HARDWARE SCHEDULEFLOOR XX
FRAME DETAILNTS
KNOCK-DOWN
12"
VARIES
VARIES
A= 1-9/16" STD. FOR A 1-3/8" DOORA= 1-15/16" STD. FOR A 1-3/4" DOOR
VARIESA
DOOR
5 8"
2" M
ATC
HEX
ISTIN
G
2" M
ATC
HEX
ISTIN
G
BONDO AND FINISH ALL SEAMS AT DOOR
2"(or 1.5"
if specified)
A= 1-9/16" STD. FOR A 1-3/8" DOORA= 1-15/16" STD. FOR A 1-3/4" DOOR
2"
1 2"1 2"
A
58"
VA
RIES
DOOR
VA
RIES
VA
RIES
CARPET
REDUCER STRIP, COLOR: TBD
VINYL TILE
VINYL CARPET
DOOR
JAMB
TRIMMED OPENINGNTS
NTS
FINISH & STYLE:1. ALL WOOD DOORS TO BE SOLID CORE WITH BIRCH VENEER STAINED TOMATCH EXISTING. PLAIN SLICED VENEER 15% OPENNESS.2. ALL HARDWARE FINISHES TO BE US26D AND/OR 626 U.O.N.3. ALL LEVERS TO BE SCHLAGE ATHENS SERIES U.O.N.4. ALL HOLLOW METAL DOOR FINISHES TO BE: PAINTED SEMIGLOSS TO MATCHWALL (IF WALL NOT PAINTED, PAINT PT-01 U.O.N.)
NOTES:1. USE 3 HINGES PER LEAF FOR DOORS 7'-6" OR LESS. USE 4 HINGES PER LEAFFOR DOORS 7'-6" OR HIGHER.2. ALL RATED DOORS TO HAVE AUTOMATIC CLOSERS WITH "NO-HOLD OPEN."& WELDED FRAMES3. ALL HARDWARE SETS SHALL BE MTD. @ 3'-2"4. CONTRACTOR TO KEY PREMISES TO BUILDING MASTER SYSTEM. PROVIDEBITTING LIST UPON COMPLETION OF PROJECT KEYING. PROVIDE 2 KEYS PERLOCK. KEYS ARE TO BE LABELED BY ROOM/DOOR NUMBER. GC TOCOORDINATE MASTER KEYING REQUIREMENTS WITH BUILDING MANAGEMENTAND TENANT.5. ALL HM FRAMES TO BE KNOCK DOWN UON6. ALL WOOD DOORS TO BE SOLID CORE 1-3/4" UON7. ALL HOLLOW METAL DOORS TO TO BE SEAMLESS WITH ROLLED EDGES. ALLHOLLOW METAL FRAMES TO BE WELDED UNLESS OTHERWISE NOTED INSCHEDULE.8. GC TO PROVIDE ENTRY DOOR MASTER KEY, OFFICE DOOR MASTER KEY, ITDOOR MASTER KEY AND GRAND MASTER. ALL LOCKS TO BE KEYED TOBUILDING MASTER - COORD. W/ BUILDING AS REQ'D PRIOR TO ORDERING.9. ALL ASTRAGALS PAINTED TO MATCH DOOR10. ALL SIDELITES 18" OR LESS TO BE 3/8", ALL GLASS PANLES GREATER THAN 18"WIDE TO BE 12" CLEAR TEMPERED GLASS.11. G.C. TO VERIFY ALL THROAT SIZES AT EXISTING & SCHEDULED PARTITIONS12. ALL GLASS DOORS OR GLASS PANES WIDER THAN 20" SHALL HAVEDISTRACTION STRIPS (BY OTHERS) ACROSS FULL WIDTH AT 33" AND 66" A.F.F.DISTRACTION STRIPS TO BE 1-1/2" TALL ADHESIVE FILM BANDS, 3M ORAPPROVED EQUAL.
DOOR BUCKNTS
KNOCK-DOWN
TYP. CARPET-LVTTRANSITION
NTS
TYP. CARPET-LVTTRANSITION
ROCKWOOD RM 3300 (5'-0" LENGTH) - BRUSHED ST. ST.
TOP & BOTTOM PIVOT
PULLS
1 PAIR
SET
# 4
SET
# 2
SILENCERS
HINGES
LOCKSETFLOOR STOP
SCHLAGE ATHENS D SERIES-STOREROOM FUNCTION
GLYNN JOHNSON #GJ 64 3IVES #438
2 PAIR
11
CHOP FLOOR AS REQUIRED
STANLEY #CB191 5 KNUCKLE FULL MORTISE HINGESCONCEALED BEARING
1 PAIR
ALL KEYING TO BE ON GRANDMASTERKEY/ CORE- COORDINATE W/ PROPERTY MANAGEMENT
DORMA #BTS SERIES (WITH CLOSER, 90 DEGREEHOLD OPEN)
SET
# 1
SILENCERS
HINGES
LOCKSETFLOOR STOP
KABA / SIMPLEX - 5021XSWL
GLYNN JOHNSON #GJ 64 3IVES #438
2 PAIR
11
STANLEY #CB191 5 KNUCKLE FULL MORTISE HINGESCONCEALED BEARING
CLOSER 1 DORMA 8900 NO HOLD OPENDEADBOLT 1 SCHLAGE B571 W/ VACANCY INDICATOR
DUMMY TRIMPIVOTS 2 PAIR
2
SET
# 3
OVERHEAD STOP 2SCHLAGE ATHENS D SERIES-DUMMY TRIMIVES
MAGNETIC CATCH 2 IVES #327 SUPER MIGHT HEAVY DUTY MAGNET
RIXON TOP & BOTTOM PIVOT HINGES
CONCEALED
CR LAURENCE TOP & BOTTOM PATCH FITTINGSPATCH FITTINGS 1 PAIR
SET
# 1
CRL BOTTOM RAIL LOCKS WITH THUMBTURN ON INSIDE
TOP & BOTTOM PIVOT 2 PAIR CHOP FLOOR AS REQUIREDDORMA #BTS SERIES (WITH CLOSER, 90 DEGREEHOLD OPEN)DYNALOCK 2280 SERIES SLIM LINE 1200 LLBS DOUBLEMAGLOCK AT TYPE B AND SINGLE AT TYPE C.COORDINATE WITH DOOR SWINGS AND SECURITYVENDOR OR LOCKNETICS M400 SERIES WITH BRUSHEDCHROME COVER
ELECTRIC MAGLOCKSLIMLINE COORDINATE MAGLOCK WITH WEIGHT OFDOORS. INCLUDE CLASS 'E' TIE-IN
1 PAIR
ROCKWOOD RM 3300 (5'-0" LENGTH) - BRUSHED ST. ST.PULLS 2 PAIR
TOP & BOTTOM RAILS CRL 4" TOP AND BOTTOM RAILS2 PAIR
CR LAURENCE OVERHEAD ANGLE STOP 1
CR LAURENCE OVERHEAD ANGLE STOP 1 PAIR
BOTTOM LOCKS WITHDUSTRPOOF STRIKES
1 PAIR
EQ.EQ.??????COORD. W/
MANUF.SPECIFICATIONS
??????
CO
ORD
INA
TE W
/M
AN
UFA
CTU
RER
SPE
ALIGN
??????
30" MIN INOPEN POSITION
??????COORD. W/
MANUF.SPECIFICATIONS
??????
4"
??????
??????
2 EQ. PANELS
3'-0
"2'
-10"
2'-0
"
???????COORD. W/ MANUF.
SPECIFICATIONS
??????
????????????
???????????2 EQ. PANELS
????????????2 EQ. PANELS
?????? ??????
N
FILE: CONDOCS.DWG
SCALE: AS NOTED
DWG NO.
PROJ MGR. MR
CHECKED BY OT
DRAWN BY LL
SEAL & SIGNATURE PROJ NO. 10295.00
DRAWINGTITLE
NEW YORK, NEW YORK
3ST FLOOR
750 THIRD AVENUE
JOB TITLE SL GREEN REALTYCORPORATION
NO. DATE ISSUE/REVISION BY
- 11.20.15 ISSUE FOR BID OT
A-009.00
PANTRY DETAILS
PANTRY ELEVATIONSCALE: 1/2" = 1'-0"
PANTRY SECTION SCALE: 1" = 1'-0"
SCALE: 1" = 1'-0"SCALE: 1" = 1'-0"
PANTRY SECTION PANTRY SECTION
PANTRY SECTION SCALE: 1" = 1'-0"SCALE: 1" = 1'-0"
PANTRY SECTION
87
6
9
2
53
8
6
A-010
2
4
A-010
6
A-010
6
A-010
4
42"GFI
42"GFI
S
4'-0
"
4" SIDE SPLASH
A-011A
COVE BASE (TYP).
4" SIDE SPLASH
S.S. URINALPARTITION
TYP. ON VESTIBULEWALLS
A-011A
TYP. ON VESTIBULEWALLS
5'-0
3 4"
5'-0
3 4"
2'-3
1/2
"
1'-6
"
5'-0"
5'-0
3 4"
4'-6"
4'-2
"
4'-6"
5'-0
3 4"
1'-0"
2'-3
1/2
"
1'-6
"5'-0"
2'-1
0"
14" MIRROR LAMINATED TO 14" PLYWOOD
SUPPORTED ON WOOD CLEATS TO BEFULL WIDTH OF COUNTER. EXTEND FROM
BACKSPLASH TO FINISHED CEILING.PROVIDE SILCONE ALONG ALL EDGES
STONE TOP - BIANCO ROMANOPOLISHED GRANITE, 3/4" THICK
STONE BACKSPLASH - BIANCO ROMANOPOLISHED GRANITE, 3/4" THICK
2'-1"
4"
6"
6"2'
-4"
8" 1'-2" 4"
1'-0
"
4" SIDESPLASHAT WALLS ONLY
34" PLAYWOOD FASTENED
TO STUDS
CAULK, GASKET, SECURESINK AS REQUIRED
STEEL CHANNEL SUPPORT ATCOUNTERTOP. PROVIDEBLOCKING IN WALLS AS
REQ'D
N
FILE: CONDOCS.DWG
SCALE: AS NOTED
DWG NO.
PROJ MGR. MR
CHECKED BY OT
DRAWN BY LL
SEAL & SIGNATURE PROJ NO. 10295.00
DRAWINGTITLE
NEW YORK, NEW YORK
3ST FLOOR
750 THIRD AVENUE
JOB TITLE SL GREEN REALTYCORPORATION
NO. DATE ISSUE/REVISION BY
- 11.20.15 ISSUE FOR BID OT
A-010.00
CORE BATHROOMELEVATIONS
PLAN AT CORE BATHROOMSNTS
WOMEN'S ROOM ELEVATIONNTS
WOMEN'S ROOM ELEVATIONNTS
WOMEN'S ROOM ELEVATION1/2" = 1'-0"
WOMEN'S ROOM ELEVATION1/2" = 1'-0"
MEN'S ROOM ELEVATION1/2" = 1'-0"
MEN'S ROOM ELEVATION1/2" = 1'-0"
MEN'S ROOM ELEVATION1/2" = 1'-0"
MEN'S ROOM ELEVATION1/2" = 1'-0"
SECTION AT COUNTERTOP1/2" = 1'-0"
1
2
3
4
5
6
7
9
TOILET ACCESSORIES
TOILET - FLOOR MTD
URINAL
LAVATORY
SOAP DISPENSER
GRAB BAR
ANCHOR PLATE
SANITARY NAPKIN DISPENSER
TOWEL DISPENSER/DISPOSAL
I.D. TYPE SPECIFICATION REMARKSSLOAN - WETS2020.1201-1.28 SOLIS
BOBRICK B-822
BOBRICK
BOBRICK B-2800-25
BOBRICK B-38032
BOBRICK 256 SERIES
SLOAN -WEUS-1005.1401-0.5 G2
KOHLER - CAXTONUNDERCOUNTER -K-2210SLOAN EBF-85
FLUSH OMETER:SLOAN #8111 - SATINCHROME
SLOAN #8111
FAUCET
PROVIDE (1) PER SINK
MOUNTED 2'-10" AFFCONCEALED MOUNT
SECURE TO STUDS
SURFACE MOUNTED
SEMI RECESSEDMOUNTED @ 59 34" AFF(ADA)
MEN'S BATH
TOILET PARTITIONSROOM PARTITION
S.S TOILETPARTITION
S.S URINALPARTITION
WOMAN'SBATH
MFGKNICKERBOCKER'NEW YORKER'STAINLESS STEEL
REMARKSFLOOR MTD.PROVIDE ADA COMPLIANTHARDWARE. SEE MFG INSTALLGUIDE FOR ELEV'S & DETAILS
KNICKERBOCKERSTAINLESS STEEL
STAINLESS STEEL #4 FINISH
FLOOR MTD.PROVIDE ADA COMPLIANTHARDWARE. SEE MFG INSTALLGUIDE FOR ELEV'S & DETAILS
10 BOBRICK - B-2888 SURFACE MOUNTED2'-3" TO TOP OFDISPENSER
8 TOILET SEAT COVERDISPENSER
BOBRICK B-221 SURFACE MOUNTED48" MAX AFF
TOLIET PAPER DISPENSER
F & I WATERPROOFING MEMBRANE AT FLOOR: LATICRETE#9235 INSTALL AS PER ANSIO A118.10 (TURN UP WALL 6")
S.S TOILETPARTITION
KNICKERBOCKER'NEW YORKER'STAINLESS STEEL
CORE BATHROOM FINISHES
PROVIDE (1) #160 COAT HOOK PER STALL
FLOOR TILE: DALTILE D014: 2" X 2" DESERT GRAY - UNGLAZEDMATTE. GROUT COLOR: 1/8" LATICRETE SPECTRALOCK PRO SILVERSHADOW (CORE BATHROOMS)
WALL TILE: DALTILE D014: DESERT GRAY: 2" X 2" - WITH COVEBASE. GLAZED. (CORE BATHROOMS) (FULL HEIGHT). GROUT: 1/8"LATICRETE SPECTRALOCK PRO SILVER SHADOW
BORDER TILE: BORDER TILE (2 COURSES LOCATED 34 COURSESABOVE TILED FLOOR): DALTILE D182: 2" X 2" SUEDE GRAY - GLAZED.GROUT: 1/8" LATICRETE SPECTRALOCK PRO SILVER SHADOW
STONE TOP - BIANCO ROMANO POLISHED GRANITE,3/4" THICK (VANITY FINISH @ CORE BATHROOMS).
8'-2
"
8'-2
"
2'-1
0"A
DA
CO
UNTE
R
3'-0
"2'
-0"
3'-0
"
3'-0
"2'
-0"
3'-0
"
????????????(12) EQ. SPACES
????????????
3'-0
"2'
-0"
3'-0
"
2'-8" 1'-0"
HOLD
(13) EQ. SPACES
PLASTIC LAMINATEUPPER AND LOWERCABINETS
PLASTIC LAMINATECOUNTERTOP AND 4" HIGHBACKSPLASH
PLASTIC LAMINATEUPPER AND LOWERCABINETS
PLASTIC LAMINATECOUNTERTOP AND 4" HIGHBACKSPLASH
HAFELE PULLS, TYP. 1" FILLERPANELS, TYP.1" FILLER PANELS, TYP.
2'-1"2'-8"
1'-6"1'-6"
(2) ADJUSTABLESHELVES PERCABINET, TYP.
(2) ADJUSTABLESHELVES PERCABINET, TYP.
4" H x 3" DTOE KICK,TYP.
4" H X 3" DTOE KICK, TYP.
8'-2
"
2'-1
0"A
DA
CO
UNTE
R
6'-0"
(2) EQ. SPACES 2'-8"
3'-0
"2'
-0"
3'-0
"
ALI
GN
FINISHED ENDPANELS, TYP.
PLASTIC LAMINATEUPPER AND LOWERCABINETS
PLASTIC LAMINATECOUNTERTOP AND 4" HIGH
BACKSPLASH
CONTINUEBACKSPLASH OVER
ADA COUNTERHEIGHT
1" FILLER PANELS, TYP.
4" H X 3" DTOE KICK, TYP.
N
FILE: CONDOCS.DWG
SCALE: AS NOTED
DWG NO.
PROJ MGR. MR
CHECKED BY OT
DRAWN BY LL
SEAL & SIGNATURE PROJ NO. 10295.00
DRAWINGTITLE
NEW YORK, NEW YORK
3ST FLOOR
750 THIRD AVENUE
JOB TITLE SL GREEN REALTYCORPORATION
NO. DATE ISSUE/REVISION BY
- 11.20.15 ISSUE FOR BID OT
A-011.00
MILLWORK ELEVATIONS
ELEVATIONSCALE: 1/2" = 1'-0"
1ELEVATIONSCALE: 1/2" = 1'-0"
2
ELEVATIONSCALE: 1/2" = 1'-0"
3
SLG-750 3rd Ave-31st Fl-Arch IFB_112015MEPS Combined384854M001-Layout1.pdf384854M101-Layout1.pdf384854M201-Layout1.pdf384854M501-Layout1.pdf384854M502-Layout1.pdf384854M503-Layout1.pdf384854M801-Layout1.pdf384854M802-Layout1.pdf384854M803-Layout1.pdf384854M901-Layout1.pdf384854E001-Layout1.pdf384854E002-Layout1.pdf384854E101-Layout1.pdf384854E201-Layout1.pdf384854E301-Layout1.pdf384854E501-Layout1.pdf384854E502-Layout1.pdf384854E503-Layout1.pdf384854E504-Layout1.pdf384854E601-Layout1.pdf384854E701-Layout1.pdf384854E801-Layout1.pdf384854E802-Layout1.pdf384854E803-Layout1.pdf384854EN001-Layout1.pdf384854EN002-Layout1.pdf384854FA101-36X24.pdf384854FA601-Layout1.pdf384854P001-Layout1.pdf384854P101-Layout1.pdf384854P801-Layout1.pdf384854SP001-Layout1.pdf384854SP101-Layout1.pdf384854SP501-Layout1.pdf384854SP601-Layout1.pdf384854SP801-Layout1.pdf384854SP901-Layout1.pdf