Page 1 ADDENDUM # 1 June 25, 2014 ADDENDUM #1 June 25, 2014 Re: Harrisburg Area Community College Lancaster Welcome Center Renovations Solicitation # RFB15-01 From: Eastern PCM, LLC Construction Manager – HACC 645 N. 12 th Street, Suite 200 Lemoyne, PA 17043 To: All Planholders This Addendum is hereby made part of the Plans and Project Manual dated June 14, 2014 for the above referenced project. The provisions of this Addendum are intended to supplement the provisions of the Plans and Project Manual and/or supersede them where contradictory thereto. This Addendum contains changes to the requirements of the Plans and Project Manual. Such changes shall be incorporated into the Plans and Project Manual and shall apply to work with the same meaning and force as if they had been included in the original Plans and Project Manual. Where this Addendum modifies a portion of a paragraph or phrase of the Project Manual, the remaining unmodified portion of the paragraph or phrase shall remain in force. The conditions and terms of the Plans and Project Manual shall govern work described in this Addendum. Whenever the conditions of work, or the quality or quantity of materials or workmanship are not fully described in this Addendum, the conditions of work etc. included in the Plans and Project Manual for similar items of work shall apply to the work described in this Addendum. If no similar items of work are included in the Plans and Project Manual, the quality of material and workmanship shall be subject to the written acceptance of the Architect. 1.1 PRE-BID MEETING MINUTES Meeting minutes from the Pre-Bid Meeting held on June 17, 2014 are attached and are a part of this Addendum. In the event of a conflict between the information contained in the Pre-Bid Meeting Notes and the Drawings, Specifications and responses to questions contained in this Addendum, the latter shall take precedence. 1.2 SECOND SITE VISIT A second opportunity for a site visit and tour will be available on June 26, 2014 at 9:00 am. The walk through will begin in the Lobby of the Main Building, adjacent to the existing Welcome Center. This will be an informal site visit. Questions raised will need to be submitted in writing to EPCM.
16
Embed
ADDENDUM #1 June 25, 2014...Page 3 ADDENDUM # 1 June 25, 2014 1.4 ATTACHMENTS A. Pre-Bid Meeting Minutes dated June 17, 2014. B. SK-A030.01: Overall Plan – Demolition dated June
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1 ADDENDUM # 1
June 25, 2014
ADDENDUM #1
June 25, 2014
Re: Harrisburg Area Community College Lancaster Welcome Center Renovations
Solicitation # RFB15-01
From: Eastern PCM, LLC Construction Manager – HACC 645 N. 12th Street, Suite 200 Lemoyne, PA 17043
To: All Planholders
This Addendum is hereby made part of the Plans and Project Manual dated June 14, 2014 for the above referenced project. The provisions of this Addendum are intended to supplement the provisions of the Plans and Project Manual and/or supersede them where contradictory thereto.
This Addendum contains changes to the requirements of the Plans and Project Manual. Such changes shall be incorporated into the Plans and Project Manual and shall apply to work with the same meaning and force as if they had been included in the original Plans and Project Manual. Where this Addendum modifies a portion of a paragraph or phrase of the Project Manual, the remaining unmodified portion of the paragraph or phrase shall remain in force.
The conditions and terms of the Plans and Project Manual shall govern work described in this Addendum. Whenever the conditions of work, or the quality or quantity of materials or workmanship are not fully described in this Addendum, the conditions of work etc. included in the Plans and Project Manual for similar items of work shall apply to the work described in this Addendum. If no similar items of work are included in the Plans and Project Manual, the quality of material and workmanship shall be subject to the written acceptance of the Architect.
1.1 PRE-BID MEETING MINUTES
Meeting minutes from the Pre-Bid Meeting held on June 17, 2014 are attached and are a part of this Addendum. In the event of a conflict between the information contained in the Pre-Bid Meeting Notes and the Drawings, Specifications and responses to questions contained in this Addendum, the latter shall take precedence.
1.2 SECOND SITE VISIT
A second opportunity for a site visit and tour will be available on June 26, 2014 at 9:00 am. The walk through will begin in the Lobby of the Main Building, adjacent to the existing Welcome Center. This will be an informal site visit. Questions raised will need to be submitted in writing to EPCM.
Page 2 ADDENDUM # 1
June 25, 2014
1.3 CHANGES TO THE DRAWINGS
A. A030: Overall Plan – Demolition
1. REVISE Demolition Note 16 to read:
“Remove floor trough drain and cap drain line. Infill opening to match existing. Refer toPlumbing Demolition Plan for locations of all floor openings to be infilled.”
2. REVISE Demolition Note 18 to read:
“Remove quarry tile floor as required so that there is a minimum ¼’’ below the existing adjacentconcrete subfloor at corridor near the elevator and stairwell. Due to the slope of the floor, someareas may not have to be disturbed if already at or below ¼’’ minimum requirement to theexisting adjacent concrete subfloor. Clean and prime subfloor (or existing tile) as recommendedper manufacturer’s warranty. Pour a minimum ¼’’ thick self leveling concrete to match existingadjacent subfloor level at corridor near the elevator and stairwell.”
3. REVISE Detail 1: Overall Plan – Demolition per SK-A030.01.
B. A101: Enlarged Plans
1. REVISE Detail 1: Enlarged Floor Plan per SK-A101.01.
2. ADD Detail 5: Structural Framing Plan per SK-A101.01.
3. ADD Detail A per SK-A101.02.
4. ADD Detail B per SK-A101.02.
C. A301: Interior Elevations
1. REPLACE A301: Interior Elevations in its entirety.
D. M002: Overall Plan – Demolition
1. REPLACE drawing M002: Overall Plan in its entirety.
E. ID – 1: Floor Plan
1. REPLACE ID – 1: Floor Plan in its entirety.
F. ID – 2: Flooring Pattern & Layout
1. REPLACE ID – 2: Flooring Pattern & Layout in its entirety.
G. ID – 4: Elevations
1. REPLACE ID – 4: Elevations in its entirety.
H. S – 001: Structural Specifications
1. ADD S – 001: Structural Specifications in its entirety.
Page 3 ADDENDUM # 1
June 25, 2014
1.4 ATTACHMENTS
A. Pre-Bid Meeting Minutes dated June 17, 2014.
B. SK-A030.01: Overall Plan – Demolition dated June 20, 2014.
C. SK-A101.01: Enlarged Plans dated June 20, 2014.
D. SK-A101.02: Enlarged Plans dated June 20, 2014.
E. A301: Interior Elevations dated June 12, 2014.
F. M002: Overall Plan – Demolition dated June 12, 2014.
G. ID-1: Floor Plan dated June 20, 2014.
H. ID-2: Flooring Pattern & Layout dated June 20, 2014.
I. ID-4: Elevations dated June 20, 2014.
J. S-001: Structural Specifications dated June 20, 2014.
END OF ADDENDUM
Page 4 ADDENDUM # 1
June 25, 2014
Please sign and return this page, via fax, to Eastern PCM, LLC at (717) 233-1666 indicating receipt of this Addendum.
Lancaster Welcome Center SOLICITATION # RFB15-01
Addendum # 1 has been received.
Company:Print Company Name
Received By: Print Name Signature
Date:
Please check one:
We are bidding as a prime contractor We are not bidding We are a sub-contractor
HACC, Central Pennsylvania’s Community College Lancaster Campus
Lancaster Welcome Center Renovations
Pre-Bid Meeting
June 17, 2014 9:00 am
Meeting Minutes
Attendees Jackie Bareuther – HACC Tom Davis – JEM Group Dan Mahan – HACC Claire McNally – JEM Group Dan Hoffman – Beers and Hoffmen Ltd., Architects Shawn Kingsley – New Age Development Greg Lamay – Eastern PCM Dexter Lanigan – New Age Development Peter Shkuda – Eastern PCM Deron Henise – High Construction Bill Zuck – Dorgan & Zuck Michel Gibeault – High Construction Matthew Hartman – Dorgan & Zuck Brett Lazicki – Silvertip, Inc. Jeff Heindel – Hogg Construction Steve Scholl – Silvertip, Inc. Bob Eppley – East Coast Contracting Mike Peachey – Poole Anderson Bill Raves – Titan Construction Chris Evans – Horst Construction Shawn Rose – Titan Construction DJ Risk – Paul Risk Associates
1.0 Team Introductions
i. Owner HACC, Central Pennsylvania’s Community College Lancaster Campus
Eleanor Bosserman – Business Director, Lebanon/Lancaster (Not Present)
Jackie Bareuther – Campus Dean – Student Affairs Dan Mahan – Campus Facilities Director
ii. Architect Beers and Hoffman Ltd., Architects Scott Shonk – Partner Architect (Not Present) Dan Hoffman – CADD Technician
iii. Construction Eastern PCM, LLC Manager Bill Morgan – Project Executive (Not Present)
1.1 Mr. Lamay noted that the Bid Form is made up of four to five pages, all of which must be filled out
completely. A Bid Security is required in the amount of 10% of the bid plus consent of surety to provide a Performance and Payment Bond. A Non-Collusion Affidavit and a MBE/WBE Utilization Form are also required.
1.2 Bid Documents can be obtained from Eastern PCM. The Project Manual and Plans are dated June 12, 2014.
1.3 The schedule of the project is as follows:
a) Bid Date: Thursday, July 10, 2014, 2:00 PM EST at the Purchasing Office in the Ted Lick Administration Building – Harrisburg Campus.
b) Contract Award: August 5, 2014 c) Notice to Proceed: August 18, 2014; Subject to receipt of all required supporting Contract
Documentation. d) Substantial Completion: March 15, 2015
1.4 A public bid opening will be held immediately following Bid receipt.
1.5 Working Hours will be 9:00 pm – 7:00 am, Monday night through Friday morning; (4) 10 hour shifts. Phasing Requirements
a) HACC will remain an active campus throughout the construction. Classes are held during the daytime, evening, and weekends. Contractors are to schedule work so as not to impact Owner activities.
b) The Contractor may begin work in the conference room and two kitchen areas on August 18, 2014. The Contractor may not begin work in Career Services and existing Welcome Center until September 2, 2014.
1.6 All questions are to be directed to the office of the Construction Manager in writing via fax or e-mail
(attn.: Greg Lamay): Fax (717) 233-1666, E-mail: [email protected]. The last day for questions is July 3, 2014 by end of business.
1.7 Addenda are expected to be issued via fax or UPS (depending on size) on the following dates subject to number and substance of questions received:
i. Addendum No. 1 – Expected June 20, 2014; Including Meeting Minutes from the Pre-Bid Meeting
ii. Addendum No. 2 – To be determined, if needed
1.8 This is a prevailing wage project. Refer to specifications for rate determination.
1.9 The building permit will be obtained and paid for by the Owner. Any trade specific permits (i.e. Electrical, Plumbing, etc.) are to be obtained and paid for by applicable contractors in accordance with jurisdictional requirements
1.10 Project Overview – Scope of Work a) The work will be performed under Single Prime Contract and consists of the renovation of
approximately 15,000 sq. ft. of the first floor of the main building at the HACC – Lancaster
Campus. The work includes selective demolition, construction of interior partitions and aluminum & glass wall systems, modifications to the electrical, plumbing, fire protection, and HVAC systems (including controls) and other related improvements to accommodate the planned renovations. Finishes include carpet, VCT, and ceramic tile.
1.11 Contractors are to schedule site visits through Eastern PCM. Any questions answered during site visits are not official. Official questions must be submitted in writing.
1.12 Contractor parking and the dumpster location will be located at the loading dock in the back of the building.
1.13 The Contractor is responsible for temporary utilities and temporary toilet facilities.
1.14 Mr. Lamay noted that the new window penetrations in the back of the building may be used for a trash disposal.
1.15 Site Tour & Questions
Q: Will there be Liquidated Damages on this project? A: Yes
Q: Will the Contractor have access to the first floor under the existing kitchen for utility access? A: Access will be coordinated through the College.
Q: Will the spray-on fire protection need to be replaced when adding new hangers in the mechanical room?
A: This will be answered in an Addendum if not already addressed in the Bid Documents.
Respectfully Submitted, Peter J. Shkuda, Eastern PCM, LLC
The above summations are the interpretation of the author as to the items discussed and the decisions reached. Corrections or additions to these minutes are to be made in writing and sent to the attention of the writer no later than 5 days after receipt; otherwise, these minutes will stand as written.
cc: All Attendees Eleanor Bosserman Scott Shonk Bill Morgan
NOTE: DRAWING REPRESENTS FINISH TYPES & LOCATIONS ONLY.REFER TO ARCHITECTURAL SET FOR ALL OTHER SPECIFICATONSAND DIMENSIONS
PNT -6
7'-0
"
CT-3a
NOTE: DRAWING REPRESENTS FINISH TYPES & LOCATIONS ONLY.REFER TO ARCHITECTURAL SET FOR ALL OTHER SPECIFICATONSAND DIMENSIONS
BY MEGANITENAVARRA STONE 507
MAPLE WOOD SPECIESPL-1 PL-1
PNT-4
PNT-4
PNT-8
WB-2 WB-1
WITH LIGHT STAIN COLOR TO MATCH CT-2
PNT-4
NOTE: BEGIN 8'-0" WIDEPLAM SHEET IN CENTER OFWALL LENGTH. EVERY 4'-0"A 1" WIDE BY 2" THICK TRIMMOULDING STRIP SHALL BEADDED VERTICALLY. ALLSEAMS OCCURING AT 8'-0"WIDTHS SHALL BE COVEREDBY THIS TRIM PIECE. TRIMPIECE SHALL BE MAPLEWOOD STAINED TO MATCHCT-1.
NOTE: DRAWING REPRESENTS FINISH TYPES & LOCATIONS ONLY.REFER TO ARCHITECTURAL SET FOR ALL OTHER SPECIFICATONSAND DIMENSIONS
OPENTO
BEYOND
PNT-4 (UNDERSIDE)
PNT-4ALL SIDESPNT-4
ALL SIDES
OPEN TO BEYOND
PNT-4 ALLSIDES
PNT-4 ALLSIDES
PNT-3
PNT-8
WB-1
MAINLOBBY
CORRIDORPSECU
PNT-1
PNT-8
PNT-1
PNT-2a
PNT-2a
GLASS CURTAIN WALL
TILE ON COLUMNS. REFERTO DETAIL THIS SHEET
PNT-1DECORATIVEPENDANT LIGHT
PNT-1
PNT-4
PNT-4
WB-1
NOTE: DRAWING REPRESENTS FINISH TYPES & LOCATIONS ONLY.REFER TO ARCHITECTURAL SET FOR ALL OTHER SPECIFICATONSAND DIMENSIONS
1 11
9'-0
"
2'-1
1"6"
EQ6"
EQ6"
CT-4 - ON DIAGONAL CENTERED ONCOLUMN
CT-4 - ON DIAGONAL
3 STACKED ROWS OF MUSKMATTONCINO ES32996
3 STACKED ROWS OF MUSKMATTONCINO ES32996
FINISH TOP EXPOSED EDGE OF TILEWITH SCHLUTER RONDEC - SATINNICKEL - ALL SIDES
CENTER ROW OF TILES SHALL BECENTERED RIGHT TO LEFT TOCENTERLINE OF COLUMN ON ALLSIDES
TILE ACCENT BANDS ALL SIDES OFCOLUMN
3 STACKED ROWS OF MUSKMATTONCINO ES32996
CT-4 - ON DIAGONAL
NOTE: DRAWING REPRESENTS FINISH TYPES & LOCATIONS ONLY.REFER TO ARCHITECTURAL SET FOR ALL OTHER SPECIFICATONSAND DIMENSIONS
PNT-4SOFFIT
PNT-4 SOFFIT
MAPLE WOODSPECIES WITH LIGHTSTAIN COLOR TOMATCH CT-2
MAPLE WOODSPECIES WITH LIGHTSTAIN COLOR TOMATCH CT-2
PNT-2 ALLSIDES
PNT-2ALL SIDES
WB-2
PL-4TB-1
PNT-4
PL-3
PNT-2
PL-11
3" RECESSED TOE KICK -BLACK MATTE LAMINATE
(PNT-2)
(PNT-2)
NOTE: DRAWING REPRESENTS FINISH TYPES & LOCATIONS ONLY.REFER TO ARCHITECTURAL SET FOR ALL OTHER SPECIFICATONSAND DIMENSIONS
PNT-1
PNT-4
WALL BASEWB-1
CHAIR RAILWP-1
3'-4
" AFF
NOTE: DRAWING REPRESENTS FINISH TYPES & LOCATIONS ONLY.REFER TO ARCHITECTURAL SET FOR ALL OTHER SPECIFICATONSAND DIMENSIONS
RECEPTION
(5) EQUAL WIDTH PANELS
HEIGHT OF WALL PANELSHALL BE TO UNDERSIDEOF WINDOWS
INSTALL AT TOP OFWALL BASE
4"
NOTE: DRAWING REPRESENTS FINISH TYPES & LOCATIONS ONLY.REFER TO ARCHITECTURAL SET FOR ALL OTHER SPECIFICATONSAND DIMENSIONS