Page 1: Six Sigma Project Management - Bizagi · In the first phase of a Six Sigma project: Define, the Six Sigma Team answers the question: What is wrong with the way things are?. The team

www.bizagi.com

Six Sigma Project Management Bizagi Process Modeler

Page 2: Six Sigma Project Management - Bizagi · In the first phase of a Six Sigma project: Define, the Six Sigma Team answers the question: What is wrong with the way things are?. The team

www.bizagi.com

Table of Contents

1 SIX SIGMA PROJECT MANAGEMENT ................................................................................................................. 4 1.1 SIX SIGMA PROJECT MANAGEMENT .................................................................................................................. 10

1.1.1 Process Elements .................................................................................................................................. 10

1.1.1.1 Project Charter ........................................................................................................................ 10

1.1.1.2 Define .......................................................................................................................................... 12

1.1.1.3 Measure ...................................................................................................................................... 13

1.1.1.4 Analyze ........................................................................................................................................ 13

1.1.1.5 Improve....................................................................................................................................... 13

1.1.1.6 Control ........................................................................................................................................ 14

1.1.1.7 Modify Project ........................................................................................................................ 14

1.1.1.8 Abort Project ............................................................................................................................ 16

1.1.1.9 Minutes ....................................................................................................................................... 17

1.1.1.10 Is the Project Finished? ....................................................................................................... 18

1.1.1.11 Next Phase ................................................................................................................................ 18

1.1.1.12 Is The Project valid ? ............................................................................................................ 18

1.1.1.13 Can The project continue? ................................................................................................ 19

2 PHASE .............................................................................................................................................................................. 20 2.1 PHASE ....................................................................................................................................................................... 20

2.1.1 Process Elements .................................................................................................................................. 21

2.1.1.1 Set Phase Details .................................................................................................................... 21

2.1.1.2 Create Deliverable ................................................................................................................. 23

2.1.1.3 Finalize Phase ......................................................................................................................... 23

3 CREATE DELIVERABLE ............................................................................................................................................. 25 3.1 CREATE DELIVERABLE ............................................................................................................................................ 25

Page 3: Six Sigma Project Management - Bizagi · In the first phase of a Six Sigma project: Define, the Six Sigma Team answers the question: What is wrong with the way things are?. The team

www.bizagi.com

3 Confidential

3.1.1 Process Elements .................................................................................................................................. 26

3.1.1.1 Create Deliverable ................................................................................................................. 26

3.1.1.2 Approve Deliverable ............................................................................................................ 27

3.1.1.3 Deliverable Approved? ....................................................................................................... 28

3.1.1.4 Other Approval? ..................................................................................................................... 28

3.1.1.5 Finalize Deliverable ............................................................................................................... 29

4 PERFORMERS ............................................................................................................................................................... 30

Page 4: Six Sigma Project Management - Bizagi · In the first phase of a Six Sigma project: Define, the Six Sigma Team answers the question: What is wrong with the way things are?. The team

www.bizagi.com

4 Confidential

1 Six Sigma Project Management Version: 1.0

Author: Bizagi Process Modeler.

Description

Successful companies are always searching for new and better ways to do things. Some have found

in the Six Sigma methodology, an excellent way to improve their processes.

Six Sigma uses statistical tools to measure processes in terms of defects and variation, transforming

them into opportunities for business growth. A company that uses Six Sigma is a company whose

main priority is the customer’s satisfaction.

Six Sigma uses five phases (DMAIC) to improve the process:

The first phase is Define, where a project is chosen and its goal, scope, and deliverables

are established.

The second phase is Measure where the current state of the process is measured.

In the third phase, Analyze, the root causes of the problems and defects are determined.

The fourth phase is to Improve the process, thus a solution is proposed.

The last phase is to Control the performance of the process.

Implementing a conventional Six Sigma project is usually time-consuming whereby a lot of manual

work is required and results are presented in an old fashioned way.

Page 5: Six Sigma Project Management - Bizagi · In the first phase of a Six Sigma project: Define, the Six Sigma Team answers the question: What is wrong with the way things are?. The team

www.bizagi.com

5 Confidential

With Bizagi’s Six Sigma Project Management process , companies can perform their projects more

effectively. Bizagi´s Six Sigma Project Management guides you easily through the DMAIC phases,

reduces the task assignment time by assigning activities to the appropriate person in the right time,

improves the manner in which information is collected and the project is presented through

complete case summaries data and ensures the information availability at all times.

Objectives

The process covers:

Presenting the project information

Suggesting the deliverables for each DMAIC phases.

Assigning the various project tasks to team members

Approving or requesting changes to the deliverables

Scope

Bizagi’s Six Sigma Project Management process is designed to implement and control a Six Sigma

Project. It helps to meet the project’s goals minimizing effort and resources.

The Project Management also requests the necessary information to perform each step of the

DMAIC cycle.

Global Forms

1. Name: Global Form

Description: Global Form

Prototype:

Page 6: Six Sigma Project Management - Bizagi · In the first phase of a Six Sigma project: Define, the Six Sigma Team answers the question: What is wrong with the way things are?. The team

www.bizagi.com

6 Confidential

Summary forms

1. Name: PhaseSummaryForm

Prototype:

2. Name: DeliverableSummaryForm

Prototype:

Page 7: Six Sigma Project Management - Bizagi · In the first phase of a Six Sigma project: Define, the Six Sigma Team answers the question: What is wrong with the way things are?. The team

www.bizagi.com

7 Confidential

Tabs

1. Name: Project History

Description: The tab holds the project information.

Prototype:

2. Name: Comments history

Description: All comments made throughout the process are shown on the form.

Prototype:

Page 8: Six Sigma Project Management - Bizagi · In the first phase of a Six Sigma project: Define, the Six Sigma Team answers the question: What is wrong with the way things are?. The team

www.bizagi.com

8 Confidential

3. Name: Phase

Description: The phase information is shown.

Prototype:

4. Name: Project Charter

Description: The tab includes the project charter information

Prototype:

Page 9: Six Sigma Project Management - Bizagi · In the first phase of a Six Sigma project: Define, the Six Sigma Team answers the question: What is wrong with the way things are?. The team

www.bizagi.com

9 Confidential

Page 10: Six Sigma Project Management - Bizagi · In the first phase of a Six Sigma project: Define, the Six Sigma Team answers the question: What is wrong with the way things are?. The team

www.bizagi.com

10 Confidential

1.1 Six Sigma Project Management

1.1.1 Process Elements

1.1.1.1 Project Charter

Description

Six Sigma Project Management starts with the Project Charter task. It is performed by the Project

Sponsor. The Sponsor is the person who owns the process or can allocate resources to the project.

The Project Charter must be completed for each project, and should include the project

justification, deliverables, project objectives, etc.

Performers

Sponsor

Allocations

Condition Description

Case Creator The case creator must be the project sponsor

Notify assignment

Si

Forms

1. Name: frm_Project_Charter

Description: Principal Activity Form

Page 11: Six Sigma Project Management - Bizagi · In the first phase of a Six Sigma project: Define, the Six Sigma Team answers the question: What is wrong with the way things are?. The team

www.bizagi.com

11 Confidential

Prototype:

Page 12: Six Sigma Project Management - Bizagi · In the first phase of a Six Sigma project: Define, the Six Sigma Team answers the question: What is wrong with the way things are?. The team

www.bizagi.com

12 Confidential

2. Name: Add Team Member

Prototype:

Forms behaviors

Description

The form contains a grid validation, it is necessary to include at least one member of the team.

Actions

Type Description

On Enter Add the deliverables related to the phase

On Exit Set the initial phase, Define

Set the Actual Start Date

Validate that the finish date is after the start date

Validate that the finish date from each phase is

after the start date of the phase

1.1.1.2 Define

Description

In the first phase of a Six Sigma project: Define, the Six Sigma Team answers the question: What is

wrong with the way things are?. The team defines the problem statement and describes the current

state.

Six Sigma Project Management supports the team in many ways. The Template suggests some

useful deliverables for the phase, reduces the approval time of them, and provides a more effective

way of presenting the results through summary forms.

Page 13: Six Sigma Project Management - Bizagi · In the first phase of a Six Sigma project: Define, the Six Sigma Team answers the question: What is wrong with the way things are?. The team

www.bizagi.com

13 Confidential

1.1.1.3 Measure

Description

The second phase is Measure, whereby the Team defines the process and baseline of the current

state. It is important that the team specifies the data required, and the way to collect it.

Six Sigma Project Management suggests some deliverables that help to answer questions like ‘How

is the process working?, What is the variance impact on the customer? or Where are the causes of

the problem? ‘

Diagram

Phase

1.1.1.4 Analyze

Description

In this phase, the team identifies the root causes of the problem and validates them.

Six Sigma Project Management knows that it is necessary to focus on two things:

Analysis of the data

Analysis of the process

For this reason, the Template proposes some deliverables such as Process Capability and Causes

and Effect-diagrams for the analysis of the process.

The analysis of the data requires the uses of statistical tools and techniques for example: Design of

experiments and Correlation and regression analysis, which are proposed by the template also.

Diagram

Phase

1.1.1.5 Improve

Description

In the previous phases the team understood and validated the causes of variation and determined

the state of the process.

In the Improve phase the team gives a solution for the problem, defines the necessary human and

technological resources to achieve the project goals and executes a pilot test.

Diagram

Phase

Page 14: Six Sigma Project Management - Bizagi · In the first phase of a Six Sigma project: Define, the Six Sigma Team answers the question: What is wrong with the way things are?. The team

www.bizagi.com

14 Confidential

1.1.1.6 Control

Description

In this phase, the team should focus on two things: Solution Implementation and Control Plan. The

team needs to monitor the implementation plan based on the pilot test which was performed

during the Improve phase. The Implementation must include the working instructions, training

process and the Control Plan.

Six Sigma Project Management shows all the significant information through the summary form

where any member of the team can find all the information related to the project in order that

control can be maintained easily and quickly.

Diagram

Phase

1.1.1.7 Modify Project

Description

This task is performed when changes to the scope or objectives of the project are required.

The process assigns the task to the Black Belt of the project who is the person who has the

authority to make the changes.

Performers

Black Belt

Allocations

Condition Description

Black Belt The project can be modified by the black belt of

the project.

Forms

1. Name: frm_Modify_Project

Description: Principal Activity Form

Page 15: Six Sigma Project Management - Bizagi · In the first phase of a Six Sigma project: Define, the Six Sigma Team answers the question: What is wrong with the way things are?. The team

www.bizagi.com

15 Confidential

Prototype:

Page 16: Six Sigma Project Management - Bizagi · In the first phase of a Six Sigma project: Define, the Six Sigma Team answers the question: What is wrong with the way things are?. The team

www.bizagi.com

16 Confidential

Actions

Type Description

On Enter Set actual phase

On Exit Send an email to the team members

Notifications

Description Recipients Email

subject

Email body

Inform

about the

changes on

the project

charter.

Black Belt

Green Belt

Team

members

Sponsor

Changes

in the

project

Dear Team

The project had some changes

Please read the comment history and the project chapter.

<SixSigmaProject.ProjectChapter.ProjectBlackBelt.userName>

Good Day

1.1.1.8 Abort Project

Description

When the Project is not linked with the organization´s goals or is not clearly defined, it is not a Six

Sigma Project and it is necessary to abort it.

Performers

Sponsor

Allocations

Condition Description

Case Creator The project can be closed only by the case

creator.

Page 17: Six Sigma Project Management - Bizagi · In the first phase of a Six Sigma project: Define, the Six Sigma Team answers the question: What is wrong with the way things are?. The team

www.bizagi.com

17 Confidential

Forms

1. Name: frm_Abort_Project

Description: Principal Activity Form

Prototype:

Notifications

Description Recipients Email

subject

Email body

Cancel

Project

Sponsor

Black Belt

Green Belt

Team

Members

Cancel

Project

The Project <SixSigmaProject.ProjectChapter.ProjectName>

was aborted because

<SixSigmaProject.CancelProjectReason>

<SixSigmaProject.ProjectChapter.ProjectSponsor.userName>

Good day

1.1.1.9 Minutes

Description

Meetings are necessary throughout a Project for all members of the team. Six Sigma Project

Management gives the possibility of distributing the minutes of these meetings on a formal basis.

Page 18: Six Sigma Project Management - Bizagi · In the first phase of a Six Sigma project: Define, the Six Sigma Team answers the question: What is wrong with the way things are?. The team

www.bizagi.com

18 Confidential

Form

1.1.1.10 Is the Project Finished?

Description

The gateway checks whether the project has finished, if not, it is very important to distribute the

minutes of team´s meeting to all parties involved.

Gateways

Yes: If the project is finished the process ends.

No: If the projects is not finished the process goes to the Minutes event

1.1.1.11 Next Phase

Description

This gateway validates the next phase of the DMAIC to be performed or if the project needs some

modification.

Yes: If the phase ends correctly, the process continues to the next phase.

Changes in project scope required: If the process needs some changes, the process

continues to the Modify Project activity. It is performed by the Black Belt of the project.

1.1.1.12 Is The Project valid?

Description

If the Black Belt in mutual agreement with the team decides that the project is not a Six Sigma

Project, then it has to be aborted.

Page 19: Six Sigma Project Management - Bizagi · In the first phase of a Six Sigma project: Define, the Six Sigma Team answers the question: What is wrong with the way things are?. The team

www.bizagi.com

19 Confidential

Gateways

No: If the project is a Six Sigma Project, valid project, the process goes to the first phase of

the DMAIC cycle, Define.

Yes: If the project is not a valid project, the process continues with the Cancel Project

activity.

1.1.1.13 Can the project continue?

Gates

No: If, after modification, the project is still not valid, then it continues to the Cancel

Activity.

Next Phase: If the project is valid, the process continues to the next task to be

performed.

Page 20: Six Sigma Project Management - Bizagi · In the first phase of a Six Sigma project: Define, the Six Sigma Team answers the question: What is wrong with the way things are?. The team

www.bizagi.com

20 Confidential

2 Phase Version: 1.0

Author: Bizagi Process Modeler.

Description

All the DMAIC phases are equally performed because the sub-process is the same for each of them.

In each phase it is necessary to establish the details and select the deliverables needed. Finally they

will be created to conclude the phase.

2.1 Phase Description

Each phase of the DMAIC process is performed in the same way. In each phase it is necessary to

establish the details deliverables which will be completed to finalize the phase.

Page 21: Six Sigma Project Management - Bizagi · In the first phase of a Six Sigma project: Define, the Six Sigma Team answers the question: What is wrong with the way things are?. The team

www.bizagi.com

21 Confidential

2.1.1 Process Elements

2.1.1.1 Set Phase Details

Description

The Six Sigma Process Management Process suggests the deliverables that are commonly

completed in each phase. The person who performs this activity must select at least one deliverable,

which can be modified, as necessary, by the user.

Additional deliverables can be included if necessary.

Performers

Black Belt

Allocations

Condition Description

Black Belt The task is performed by the black belt assigned

to the project

Forms

1. Name: frm_Set_Phase_Details>

Description: Principal Activity Form

Page 22: Six Sigma Project Management - Bizagi · In the first phase of a Six Sigma project: Define, the Six Sigma Team answers the question: What is wrong with the way things are?. The team

www.bizagi.com

22 Confidential

Prototype:

2. Name: FrmGridAddPhaseDeliverable

Description: Phase deliverable add form

Prototype:

Forms behaviors

Description

The form includes a grid validation, it is necessary to select at least one deliverable.

Actions

Type Description

Page 23: Six Sigma Project Management - Bizagi · In the first phase of a Six Sigma project: Define, the Six Sigma Team answers the question: What is wrong with the way things are?. The team

www.bizagi.com

23 Confidential

On Enter Filter the deliverables from each phase

Set Actual Start Date

On Exit Remove the deliverables that were not selected

Duration

1 day

2.1.1.2 Create Deliverable

Description

In the Create Deliverable sub process all the deliverables selected in the Set Phase Details task are

created and approved. The deliverables are created in a sequence proposed by the process or by

the user.

Each deliverable opens a sub process because the information in each ones is different. Also some

activities can be performed by different people with the same role.

Diagram

Create Deliverable

Loop type

Multi-Instance

MI Ordering

Sequential

2.1.1.3 Finalize Phase

Description

After all the deliverables have been created and approved, it is necessary to select the next activity.

If the phase ends correctly, the process continues to the next phase. Otherwise it is necessary to

specify the changes required and select the Modify Project option.

Allocations

Condition Description

Black Belt The task is performed by the black belt assigned

to the project

Forms

1. Name: frm_Finalize__Phase

Description: Principal Activity Form

Page 24: Six Sigma Project Management - Bizagi · In the first phase of a Six Sigma project: Define, the Six Sigma Team answers the question: What is wrong with the way things are?. The team

www.bizagi.com

24 Confidential

Prototype:

Actions

Type Description

On Enter Set Actual Final Date

Set the attribute Project modifications required

in Null

On Exit Set the next phase

Set Actual Final Date

Page 25: Six Sigma Project Management - Bizagi · In the first phase of a Six Sigma project: Define, the Six Sigma Team answers the question: What is wrong with the way things are?. The team

www.bizagi.com

25 Confidential

3 Create Deliverable Version:

Author:

Description

In the Create Deliverable sub process all the deliverables selected in the Set Phase Details task are

created and approved.

Each deliverable opens a sub process because the information in each is different. Also some

activities can be performed by different people whit the same roll.

3.1 Create Deliverable Description

In the Create Deliverable sub process all deliverables selected in the Set Phase Details task are

created and approved.

Each deliverable opens a sub process because the information in each one is different. Also some

activities can be performed by different people with the same role.

Page 26: Six Sigma Project Management - Bizagi · In the first phase of a Six Sigma project: Define, the Six Sigma Team answers the question: What is wrong with the way things are?. The team

www.bizagi.com

26 Confidential

3.1.1 Process Elements

3.1.1.1 Create Deliverable

Description

All the Information related to the deliverable must be included. The person who performs the task

must attach all the information associated with the deliverable, e.g. date collected, graphics, results,

and conclusions.

The Six Sigma Process Management Process maintains all the files, and facilitates access and

modification of them through the summary form and the Modify Project activity.

Performers

Green Belt

Allocations

Condition Description

Team Members The tasks are assigned to the team members by

load.

Forms

1. Name: frm_Create_Deliverable

Description: Principal Activity Form

Prototype:

Page 27: Six Sigma Project Management - Bizagi · In the first phase of a Six Sigma project: Define, the Six Sigma Team answers the question: What is wrong with the way things are?. The team

www.bizagi.com

27 Confidential

Forms behaviors

Description

The form includes a grid validation, it is necessary to add at least one result.

Actions

Type Description

On Enter Set actual phase

Duration

5 days.

3.1.1.2 Approve Deliverable

Description

All the Deliverables need two approvals, one from the Green Belt and other from the Black Belt, The

gateway validates what approval is next. If at some point the Deliverable is not approved, the

process goes to the Create Deliverable activity and the approval process begins again.

Performers

Black Belt

Allocations

Condition Description

Green Belt

Black Belt

All the deliverables need two approvals, one

from the Green Belt and the second from the

Black Belt.

Forms

1. Name: frm_Approve_Deliverable

Description: Principal Activity Form

Page 28: Six Sigma Project Management - Bizagi · In the first phase of a Six Sigma project: Define, the Six Sigma Team answers the question: What is wrong with the way things are?. The team

www.bizagi.com

28 Confidential

Prototype:

3.1.1.3 Deliverable Approved?

Description

All the deliverables need multiple approvals, if the deliverable is approval the process continues

with the next validation, if not the Create Deliverable task is performed again.

Gateways

No: If the deliverable is not approved, the process returns to the Create Deliverable activity.

Yes: If the deliverable is approved, the process continues to the next gateway that validates

if another approval is required.

3.1.1.4 Other Approval?

Description

All Deliverables need several approvals, one from the Green Belt and other from the Black Belt, etc.

This gateway validates what approval is next.

Gateways

Yes: If the Deliverable needs another approval the process continues to the Approve

Deliverable task and validates the person who has to perform it.

Page 29: Six Sigma Project Management - Bizagi · In the first phase of a Six Sigma project: Define, the Six Sigma Team answers the question: What is wrong with the way things are?. The team

www.bizagi.com

29 Confidential

No: If the Deliverable does not need another approval the process can continue with the

final activity, Finalize Deliverable.

3.1.1.5 Finalize Deliverable

Notifications

Descrip

tion

Recipi

ents

Email

subject

Email body

Inform

about

the

complet

ion of

the

delivera

ble

Black

Belt

Green

Belt

Team

Memb

ers

Finalize

Deliver

able

Dear Team

The deliverable <PhaseDeliverables.DeliverableName> is ended.

Please review the information about it.

<PhaseDeliverables.DeliverableResult>

Good Day

<PhaseDeliverables.SixSigmaProjectPhase.SixSigmaProject.ProjectChap

ter.ProjectBlackBelt.userName>

Page 30: Six Sigma Project Management - Bizagi · In the first phase of a Six Sigma project: Define, the Six Sigma Team answers the question: What is wrong with the way things are?. The team

www.bizagi.com

30 Confidential

4 Performers

Green Belt (Role)

A Green Belt is a person who helps in deploy the success of six sigma techniques, and leads small-

scale improvement projects within their respective areas.

Black Belt (Role)

A Black Belt is a professional who can explain Six Sigma philosophies and principles, including

supporting systems and tools.

Sponsor (Role)

The Sponsor is the person who owns the process or can allocate resources for the project

Stakeholder (Role)

The Stakeholders are the people who have a direct interest in the outcome of the project.