REEEP GROUP SDN. BHD. (Company No.: 920626-D) No. 10, Jalan 17/155C, Bandar Bukit Jalil 57000 Kuala Lumpur, Malaysia. E-mail Address: [email protected] Website: www.reeepgroup.com RENEWABLE ENERGY & ENERGY EFFICIENCY PARTNERSHIP LONG TERM ENERGY SOLUTION FOR INDUSTRIAL PLANT 24 hour operation Plant Electricity Bill > RM50k/month Natural Gas Bill > RM50k/month Contract with Utility Providers: Over Engineering Services, Contract & Project Management:- Renewable Energy Power Plant Oil & Gas Utility Industrial & Commercial
32

REEEP GROUP SDN. BHD (Company No.: 920626-D)

Apr 13, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: REEEP GROUP SDN. BHD (Company No.: 920626-D)

REEEP GROUP SDN. BHD.  (Company No.: 920626-D)

No. 10, Jalan 17/155C, Bandar Bukit Jalil 57000 Kuala Lumpur, Malaysia.E-mail Address: [email protected]: www.reeepgroup.com

RENEWABLE ENERGY & ENERGY EFFICIENCY PARTNERSHIP

LONG TERM ENERGY SOLUTION FOR INDUSTRIAL PLANT 24 hour operation Plant Electricity Bill > RM50k/month Natural Gas Bill > RM50k/month Contract with Utility Providers: Over

Engineering Services, Contract & Project Management:- Renewable Energy Power Plant Oil & Gas Utility Industrial & Commercial

Page 2: REEEP GROUP SDN. BHD (Company No.: 920626-D)

Introduction1Expansion – Problem and Solution2

Long Term Energy Solution3Technology Selection4

Contents

REEEP GROUP – Solution Provider 5

Page 3: REEEP GROUP SDN. BHD (Company No.: 920626-D)

Introduction1

Page 4: REEEP GROUP SDN. BHD (Company No.: 920626-D)

Energy is the Ability to do Work

Energy can not be created and destroyed!

Energy can be transformed from one Form to another Form

Forms of Energy: Chemical, Thermal (Heat), Kinetic, Magnetic, Electrical, Light, Sound, Nuclear, Potential

Energy Efficiency: i) Boundary; ii) Output vs Input

Conservation: Electricity   < = >  Thermal Energy FIN‐TECHNOLOGY Management: Cooling < = >  Heating

ENERGY - FUNDAMENTAL

Page 5: REEEP GROUP SDN. BHD (Company No.: 920626-D)

Power Plant

Boiler

Fuel (100%)Fuel (100%)

Efficiency< 40%

Conventional

Co-generationSystem

Fuel (100%)

ElectricityEfficiency

>80%

Co-generation

Thermal Energy

Electricity

Thermal Energy

Efficiency – Conventional versus Co-generation)

Page 6: REEEP GROUP SDN. BHD (Company No.: 920626-D)

• Use of single fuel / energy source  => produce two or more types of usable energy (Electricity, Thermal Energy)

• Recover waste heat from power generation equipment => usable thermal energy (Steam, Heat; Chilled/Hot: Water/Air)

CONCEPT - COGENERATION / COMBINED-HEAT-POWER(CHP)

Page 7: REEEP GROUP SDN. BHD (Company No.: 920626-D)

FACTORY 1 PRODUCT

TNB

UTILITIES

FACTORY 2 PRODUCT

UTILITIES

Electricity

Thermal Energy

EXPANSION – PROBLEM OF ENERGY SUPPLY

FACTORY 3

UTILITIES

PRODUCT

Page 8: REEEP GROUP SDN. BHD (Company No.: 920626-D)

FACTORY 1 PRODUCT

TNB

UTILITIES

FACTORY 2 PRODUCT

UTILITIES

Thermal Energy

Electricity

Thermal Energy

EXPANSION – TYPICAL SUPPLY SOLUTION OFELECTRICITY AND THERMAL ENERGY

FACTORY 3

UTILITIES

PRODUCT

Thermal Energy

Page 9: REEEP GROUP SDN. BHD (Company No.: 920626-D)

Expansion – Problem and Solution2

Contents

Page 10: REEEP GROUP SDN. BHD (Company No.: 920626-D)

TNB: MINIMUM SUPPLY SCHEMES FOR VARIOUS M.D. LEVELS

Page 11: REEEP GROUP SDN. BHD (Company No.: 920626-D)

Direct 11kV TNB Supply – Not Available, Tariff E2 Direct 33kV TNB Supply – Need More Space, Tariff E2 Direct 132kV TNB Supply – Need Space and Long Lead, 

Tariff E3  Cheaper Tariff The Worst Case – Self Generation CHP Island Operation Diesel Engine Generator – Too Costly to Operate Cogeneration Plant Combined Heat and Power (CHP)

CHP is a Solution.

PROBLEM & SOLUTION – Electricity Supply

Page 12: REEEP GROUP SDN. BHD (Company No.: 920626-D)

Possible Gas‐Engine Co‐Generation System Configuration

Page 13: REEEP GROUP SDN. BHD (Company No.: 920626-D)

Possible Gas-Turbine Co-Generation System Configuration No.1

Hot/Supply MediumCold/Return Medium

Electricity

GTG

28°CHW

HRHWHEX

GTG

28°C

HW

HRHWHEX

Facilities11kV Network

Existing HW Boiler

CHILLED WATER SUPPLY

CHILLED WATER RETURN

HEX

HOT WATER SUPPLYJBA SUPPLY

HOW WATER STORAGE TANK

HRHW: Heat Recovery Hot Water

Pre-HOT AIR SUPPLY

Pre-HOT AIR RETURN

Page 14: REEEP GROUP SDN. BHD (Company No.: 920626-D)

Possible Gas-Turbine Co-Generation System Configuration No.2

Hot/Supply MediumCold/Return Medium

Electricity

GTG

28°CTO

HRTOHEX

Facilities11kV Network

Existing Thermal Oil Heater

CHILLED WATER SUPPLY

CHILLED WATER RETURN

HEX

HOT WATER SUPPLYJBA SUPPLY

THERMAL OIL STORAGE TANK

THERMAL OIL SUPPLY (HOT AIR)

THERMAL OIL RETURN (HOT AIR)

HRTO: Heat Recovery Thermal Oil

Page 15: REEEP GROUP SDN. BHD (Company No.: 920626-D)

FACTORY 1 PRODUCT

TNB

CHP

UTILITIES

FACTORY 2 PRODUCT

UTILITIES

ElectricityThermal Energy

Electricity

Thermal Energy

FACTORY 3

UTILITIES

PRODUCT

CHPElectricity

CHPElectricity Thermal Energy

EXPANSION – MID‐TERM SUPPLY SOLUTION OF ELECTRICITY AND THERMAL ENERGY

Page 16: REEEP GROUP SDN. BHD (Company No.: 920626-D)

FACTORY PRODUCT

TNB GAS TURBINEGENERATOR HRHex

Thermal EnergyElectricity

CENTRELIZED CHP PLANT

UTILITIES

CHP

UTILITIES

FACTORY PRODUCT

UTILITIES

ElectricityThermal Energy

Electricity

Thermal Energy

EXPANSION – LONG‐TERM SUPPLY SOLUTION OF ELECTRICITY AND THERMAL ENERGY

Page 17: REEEP GROUP SDN. BHD (Company No.: 920626-D)

Possible Gas-Turbine Co-Generation System Configuration No.3

Hot/Supply MediumCold/Return Medium

Electricity

GTG

28°CTO

HRTOHEX

Facilities11kV Network

HRTO: Heat Recovery Thermal Oil

THERMAL OIL STORAGE TANK

Existing Thermal Oil Heater

HEX

HOT WATER SUPPLYJBA SUPPLY

THERMAL OIL STORAGE TANK

THERMAL OIL SUPPLY (HOT AIR)

THERMAL OIL RETURN (HOT AIR)

HEX

HOT WATER SUPPLYJBA SUPPLY

THERMAL OIL SUPPLY (HOT AIR)

THERMAL OIL RETURN (HOT AIR)

Page 18: REEEP GROUP SDN. BHD (Company No.: 920626-D)

Possible Gas-Turbine Co-Generation System Configuration No.4

Hot/Supply MediumCold/Return Medium

Electricity

GTG

28°CTO

HRTOHEX

Facilities11kV Network

HRTO: Heat Recovery Thermal Oil

THERMAL OIL SUPPLY (HOT AIR)

THERMAL OIL RETURN (HOT AIR)

THERMAL OIL STORAGE TANK

HEX

HOT WATER SUPPLYJBA SUPPLY

HW

HRHWHEX

HOT WATER STORAGE TANK

HRHW: Heat Recovery Hot Water

Page 19: REEEP GROUP SDN. BHD (Company No.: 920626-D)

Long Term Energy Solution3

Contents

Page 20: REEEP GROUP SDN. BHD (Company No.: 920626-D)

ELECTRICITY TARIFF

Page 21: REEEP GROUP SDN. BHD (Company No.: 920626-D)

DistributorLicensee132kV TNBBulk Supply11kV CHP

I

IV

II

III

V

Existing Factories w/o CHP- Diversion- Add Power Supply- Tariff E3

New Factories w/o CHP (Tariff E3 => Cheaper)

New Factories With CHP- No TNB

Standby Fee- 132kV

Backup- Tariff E3

Existing Factories with CHP- Diversion- 132kV Backup- Add Power Supply- Tariff E3

New Factories With Energy Conservation- Technology- Hot Air Generator- Tariff E3

LONG TERM ELECTRICITY SUPPLY SCHEME

Page 22: REEEP GROUP SDN. BHD (Company No.: 920626-D)

LONG TERM COGEN Plant - Simplified Electrical Network

Page 23: REEEP GROUP SDN. BHD (Company No.: 920626-D)

Various Cases of POWER SOURCE before Integration

Case 1 Case 2 Case 3 Case 4

A. Case 1:  Normal: 11kV TNB + CHP C. Case 3: CHP Supply is Outage

B. Case 2:  TNB Supply is Outage  ==> Then, D. Case 4:  CHP Supply is Weak

1 Existing Factory w/o CHP TNBNo Supply / GENSET

TNBNo Supply / GENSET

2 Existing Factory with CHP TNB + CHP CHP TNBCHP Load Sharing

3 New Factory w/o CHP TNB No Supply / GENSET

TNB No Supply / GENSET

4 New Factory with CHP TNB + CHP CHP TNBCHP Load Sharing

ITEM PLANTPOWER SOURCE

Page 24: REEEP GROUP SDN. BHD (Company No.: 920626-D)

Various Cases of POWER SOURCE after Integration

Case 1 Case 2 Case 3 Case 4

A. Case 1:  Normal: 132kV TNB + CHPs C. Case 3: 1*CHP Supply is Outage

B. Case 2:  TNB Supply is Outage  ==> Then, D. Case 4:  CHP Supply is Weak

1 Existing Factory w/o CHP TNB + CHP CHPs TNB + CHPCHP Load Sharing

2 Existing Factory with CHP TNB + CHP*2 CHP*2 TNB + CHPCHP Load Sharing

3 New Factory w/o CHP TNB + CHP CHPs TNB + CHP CHP Load Sharing

4 New Factory with CHP TNB + CHP*2 CHP*2 TNB + CHPCHP Load Sharing

ITEM PLANTPOWER SOURCE

Page 25: REEEP GROUP SDN. BHD (Company No.: 920626-D)

Technology Selection4

Contents

Page 26: REEEP GROUP SDN. BHD (Company No.: 920626-D)

Bio‐Mass Boiler – Fuel (transportation and control), Space, Break down, Operation & Maintenance 

Gas Boiler – Gas Supply, Delivery, Efficiency Hot Air Heat Exchanger – Design Issue, Thermal Oil Flow 

Rate; Fan Control & Speed, Efficiency, Flexibility Hot Water – Simple, less energy demand than Hot Air Chilled Water – Simple, less energy demand than Hot 

Water => Less Priority Gas Engine Generator CHP – Only Supply Hot Water with 

Excess Supply Gas Turbine Generator CHP – Flexible, Thermal Energy 

Demand Higher Than Supply => Base Load  High Efficiency

GTG CHP is a Solution.

PROBLEM & SOLUTION – Thermal Energy: Hot Air / Hot Water / Chilled Water

Page 27: REEEP GROUP SDN. BHD (Company No.: 920626-D)

High Efficiency

Increase Plant Reliability of Energy Supply

Outstanding Environmental Benefits

Easy Operation and Maintenance

Light-weight and Compact

Gas Turbine Co-Generation -Features

Page 28: REEEP GROUP SDN. BHD (Company No.: 920626-D)

Contents

REEEP GROUP – Solution Provider 5

Page 29: REEEP GROUP SDN. BHD (Company No.: 920626-D)

REEEP GROUP and Sister Companies Feasibility Study: Tech. and Comm. Capable CHP Detail Engineering: Elec., Mech., Process, C&S Plant Detail Engineering:  Same as above  Revamp or Re‐engineering:  Same as above  Project Management: Capable Design and Built: Capable GTG Principal: Yes!  Thermal Energy  Yes! Local Malaysia Operation & Maintenance: Yes! Experienced Share Risk & Share Profit: Participate Equity/Share Holder

REEEP GROUP is your Partner!

REEEP GROUP – Energy Solution Provider

Page 30: REEEP GROUP SDN. BHD (Company No.: 920626-D)

QUALITY CONTROL PLAN

EXPECTABLE PROJECT COST and SCHEDULE

MAINTENANCE FRIENDLY

USER FRIENDLY SYSTEM

FLEXIBLE SYSTEM ARRANGEMENT

ENVIRONMENTAL FRIENDLY

VALUE ENGINEERING

DESIGN

AUTHORITY REQUIREMENT

SAFETY FIRST

REEEP GroupPolicy -

SAVEFUME - Q

Company Policy - SAVEFUME - Q

Page 31: REEEP GROUP SDN. BHD (Company No.: 920626-D)

Why – Existing Factories Require ElectricityWhy – TNB Supply Issue; Existing Thermal Energy IssueWhy – Company Growing => Need new TechnologiesWhy – Utilities are the fundamental for business expansion How – Cogeneration CHP is a proven technology How – Correct Solution Provider; REEEP How – Customer directly deal with VendorsWhen – Future Expansion, More than 20MWe Elec. Demand When – 132kV System: 18 months; GTG CHP: 8 ~ 10 MthsWhen – Urgent!

GTG lead time: 6 ~ 8 monthsApply Licensee; Coordinate w/ ST & TNB

LONG TERM ENERGY SOLUTION– CONCLUSION

Page 32: REEEP GROUP SDN. BHD (Company No.: 920626-D)

THANK YOU