Mount Gunson “South Australia’s next Copper-Cobalt Mine” 02 December 2016 Torrens Mining Limited Resource Innovation
Mount Gunson “South Australia’s next Copper-Cobalt Mine”
02 December 2016
Torrens Mining LimitedResource Innovation
Disclaimer & ConfidentialityImportant Notice
This presentation contains certain statements which may constitute “forward-looking statements”. Such statements are only expectations or beliefs and aresubject to inherent risks and uncertainties which could cause actual values, results or performance achievements to differ materially from those expressed orimplied in this presentation. No representation or warranty, express or implied is made by Torrens Mining Limited (ACN 168 295 092) (“Torrens”) that anyforward-looking statement contained in this presentation will occur, be achieved or prove to be correct. You are cautioned against relying upon any forwardlooking statement.
Except for statutory liability which cannot be excluded, each of Torrens, its related body corporates and its and their respective officers, employees andadvisers expressly disclaims any responsibility for the accuracy or completeness of the material contained in this presentation and excludes all liabilitywhatsoever (including in negligence) for any loss or damage which may be suffered by any person as a consequence of any information in this presentation orany error in it or omission from it. Torrens accepts no responsibility to update any person regarding any inaccuracy, omission or change in information inthis presentation or any other information made available to a person, nor any obligation to furnish the person with any further information.
This presentation does not constitute an offer of securities in Torrens or any associates thereof, nor an invitation to apply for such securities. Thispresentation does not provide investment advice or financial product advice. You should obtain professional advice and carry out your own independentinvestigations and assessment of the information in this presentation (including any assumptions) before acting. Information in this presentation which isattributed to a third party source has not been checked or verified by Torrens.
The contents of this work are also confidential and valuable proprietary information of Torrens. The Recipient must treat all data and any informationcontained in this document and the accompanying electronic information or documents referred to in it and any other information or data in relation to theprospects, projects and areas of interest furnished to it (each of which data and information is proprietary to, and subject to confidentiality obligations infavour of Torrens) or subsequently provided by Torrens (including its advisers or personnel) as confidential (whether or not marked as such) as all data andsuch information is by its nature confidential and valuable proprietary information of Torrens.
This work is copyright. All rights reserved. In view of the copyright and the confidentiality of this document no part of this work may be reproduced in anyform by any process or means, without the written permission of Torrens.
© Torrens Mining Limited 2016
M63/15
Mt Gunson>170,000t previous
Cu production100km Olympic Dam
45km WoomeraMt Gunson Cu-Co-Ag
Mining Project
Torrens Mining Limited 3
Two distinct copper deposit types:
Sedimentary-hosted copper-cobalt in Cover Sequence
IOCG (Olympic Dam-style) deposits in basement rocks (up to 1 km deep)
4
O’Brien 2006b
Torrens Mining Limited
Tenements
5
Tenement Granted Expiry Area (sq.km)
EL5636(prev. EL4460)
25-10-2015 24-10-2017 463
EL5108(prev. EL3937)
29-10-2012 28-10-2017 70
EL5333 7-10-2013 6-10-2018 291
Total 824
Torrens Mining Limited
Emmie Bluff IOCG & Sediment-hosted Cu
MG14
Windabout
Establisheds site:
Electrical PowerScheme waterPhoneWoomera 40km Air servicesStuart Hwy
Wall collapse
Torrens Mining Limited6
Open-cut mining inventory*
Dolomitic black shale Cu-Co-Ag sulphide ore
Torrens Mining Limited7
MG14 Resource
117 drill holes
Indicated Resource1.6Mt @ 1.4%Cu, 0.04%Co, 14g/t Ag
Open to NW 500m
Torrens Mining Limited8
Windabout Resource
Torrens Mining Limited
1 kmIndicated Resource
18.7Mt @ 1.0%Cu, 0.05%Co, 10g/t Ag195 drill holes
9
MG14 & Windabout Resources
• 20.3M tonnes @ 1.0%Cu, .05%Co & 10g/t Ag, for 465 M lb Cu (>200Kt), & 26 M lb Co
• Estimated Mineable
13.1M tonnes @ 1.1%Cu, .05%Co & 16g/t Ag
10
Torrens Mining Limited
Why have these deposits not been mined???
Torrens Mining Limited11
Pluses…• Readily marketable commodities• Established mineral resources >200kt Cu
• Shallow starter pit (MG14)• Excellent infrastructure• Supportive community
Torrens Mining Limited12
Minuses…• High Strip Ratio Windabout (circa 20:1)
• Conventional flotation low recovery• Mixed Cu-Co conc low value
Torrens Mining Limited13
Solutions…?• Adopt bulk coal mining technology for Windabout overburden
• Float – Leach processing• Mine gate metal sales
Torrens Mining Limited14
Windabout Overburden Mining Considerations:
Strip Ratio av. 20:1
Free dig overburden
Grid power available
Long mine life (>12yrs)
Flat orebody
15Torrens Mining Limited
Option 1 – Bucket Wheel Excavator
Option 2 – IPC & Excavator
Ore Mining
• Surface Miner• Ideal - mining flat
orebody
• Low dilution
• Soft ore = low pick wear
16
Torrens Mining Limited
Float - Leach - Strip ProcessKey steps:
1) Ore milling
2) Deslime Feed to Float
3) Float Cu & Co sulphides
4) Leach Float tails & slimes
5) GlySmeltTM float cons
6) Products: EW Copper & Cobalt Carbonate
17
Torrens Mining Limited
Undersize
CYCLONE
ORE
LOG WASHER
Float concentrates
FLOAT PLANT
Slimes Float tailsGLYCINE CONCENTRATE LEACH PLANT
Cobalt carbonateSilver in residues
CYANIDE LEACHCOPPER EW PLANT
Tailings
Copper Cathodes
LOM Project Plan• Production 2019
• Mine life 14 years (at 1 Mtpa)
• Recoveries*: 90% of Cu & Co; ~50% Ag
*Based on Bench Testing to date
18
Torrens Mining Limited
LOM Production (at 1mtpa for 14 yrs)
• Copper cathode: 290M lb• Cobalt : 15Mlb • Silver: 3.4 Moz
Estimated Gross Revenue >AU$1,400M
19
Torrens Mining Limited
Exploration Upside• Revamp sediment-hosted Cu effort• Pursue IOCG discovery (e.g. Emmie Bluff)
• Brownfields opportunities• Established regional targets
Torrens Mining Limited
What’s next?•Drilling early 2017•Targeting 500kg metallurgical sample
•PFS
Torrens Mining Limited
What’s next?
Cu-Co-AgMining Project
“South Australia’s Next Copper Mine”
December 2016
Torrens Mining LimitedResource Innovation