Page 1 of 5 Mount Polley Weekly Post-TSF Breach Update November 5 - 11, 2014 Mount Polley Mining Corporation an Imperial Metals company Box 12 Likely, BC V0L 1N0 T 250.790.2215 F 250.790.2613 November 14, 2014 Ministry of Environment Mining Operations Environmental Protection 2080 Labieux Rd. Nanaimo, BC V9T 6J9 WEEKLY POST-TSF BREACH REPORT – WEEK OF NOVEMBER 5 – 11, 2014 Water Management and TSF Works Polley Lake Dewatering Polley Lake water elevation = 921.75 m To maintain the lake water level within its natural range, pumping from Polley Lake to Hazeltine Creek continued all week, with the exception of approximately 8:00am on Thursday November 6 th to 4:00pm on Friday November 7 th (to accommodate hydrology work being completed downstream). Breaches No breaches of the water management system containing water flow from the Tailings Storage Facility (TSF) occurred this week. TSF and Water Management Structures All works shown in Figure 1 are complete, with the exception of the following projects: Work to adjust the overflow culverts and increase the capacity of the Central Collection Sump is in the planning phase. The buttress lift along the Perimeter Embankment is underway. The foundation preparation for additional buttressing along the Perimeter Embankment is 3% complete. The Perimeter Access Road (referred to as the Breach Haul Road in Figure 1) is being extended with a narrow and shallow road towards Hazeltine Creek along the old channel. All water from TSF water collection systems is currently transferred to Springer Pit via the Central Collection Sump. Water from the Breach Pump is transferred to the Till Borrow Pit to allow settling of suspended solids prior to being transferred to the Central Collection Sump.
13
Embed
Mount Polley Mining Corporation - Imperial Metals · 14-11-2014 · Mount Polley Mining Corporation an Imperial Metals company ... WEEK OF NOVEMBER 5 – 11, 2014 Water Management
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1 of 5 Mount Polley Weekly Post-TSF Breach Update November 5 - 11, 2014
Mount Polley Mining Corporation an Imperial Metals company
Box 12 Likely, BC V0L 1N0 T 250.790.2215 F 250.790.2613
November 14, 2014 Ministry of Environment Mining Operations Environmental Protection 2080 Labieux Rd. Nanaimo, BC V9T 6J9
WEEKLY POST-TSF BREACH REPORT – WEEK OF NOVEMBER 5 – 11, 2014
Water Management and TSF Works
Polley Lake Dewatering
Polley Lake water elevation = 921.75 m
To maintain the lake water level within its natural range, pumping from Polley Lake to Hazeltine Creek continued all week, with the exception of approximately 8:00am on Thursday November 6
th to 4:00pm on Friday November 7
th (to accommodate hydrology
work being completed downstream).
Breaches No breaches of the water management system containing water flow from the Tailings Storage Facility (TSF) occurred this week.
TSF and Water
Management Structures
All works shown in Figure 1 are complete, with the exception of the following projects:
Work to adjust the overflow culverts and increase the capacity of the Central
Collection Sump is in the planning phase.
The buttress lift along the Perimeter Embankment is underway.
The foundation preparation for additional buttressing along the Perimeter
Embankment is 3% complete.
The Perimeter Access Road (referred to as the Breach Haul Road in Figure 1) is
being extended with a narrow and shallow road towards Hazeltine Creek along
the old channel.
All water from TSF water collection systems is currently transferred to Springer Pit via the Central Collection Sump. Water from the Breach Pump is transferred to the Till Borrow Pit to allow settling of suspended solids prior to being transferred to the Central Collection Sump.
Page 2 of 5 Mount Polley Weekly Post-TSF Breach Update November 5 - 11, 2014
Figure 1. Tailings Storage Facility construction works
Page 3 of 5 Mount Polley Weekly Post-TSF Breach Update November 5 - 11, 2014
Sediment and Erosion Control Measures
Silt Curtain The silt curtain attached to the log boom at the mouth of Hazeltine Creek continues to remove sediment from the water column. The curtain is in good condition.
Sediment Control Works
Current sediment and erosion control works underway on lower Hazeltine Creek (below the Ditch Road) include:
Construction of the Upper and Lower Sedimentation Ponds (see Section
5 of the Lower Hazeltine Creek Erosion and Sediment Control Plan [the
Plan]). The Upper Pond is nearly complete. The Lower Pond is
approximately 30% complete.
o The proposed access road between the two sedimentation
ponds is no longer required and will not be constructed.
Approximately 12 to 15 culverts will no longer be required.
Upgrading of access roads (Section 4 of the Plan).
Rehabilitation work is just beginning in the lower 100 m of Edney Creek.
An application to MFLNRO and DFO was submitted and approved this
past week.
Re-grading and landscaping of select areas (Sections 4 and 9 of the
Plan).
Installation and maintenance of silt control measures including silt
fences and straw bales (see Section 5 of the Plan).
Environmental construction monitoring is occurring continuously during all activities. No change in turbidity in the water in Hazeltine Creek has been detected as a result of the construction.
Design work on the sediment and erosion control plan for upper Hazeltine Creek is complete and under review.
Water Quality Monitoring Program
The maps on pages 1 – 8 of Figure 5 (attached) show locations that have been sampled as part of the water quality monitoring program. The following table is a summary of the current water quality monitoring program. HAC-01a was not sampled one day this week due to time constraints. All locations, including time/weather permitting sites, were completed this week except for QUL-66a, which was completed on November 12th. Frequency Area Sample Locations
Quesnel Lake QUL-2, QUL-20, QUL-21, QUL-22, QUL-31a, QUL-87, QUL-119
Page 4 of 5 Mount Polley Weekly Post-TSF Breach Update November 5 - 11, 2014
Environmental Monitoring Results Mount Polley will continue to present interpreted data on the Mount Polley Updates page of the Imperial Metals website. On November 10th, a Summary of Preliminary Results of Soil Quality Impact Assessment was published on the website.
1. Original in colour.2. Numerical scale reflects full-size print. Print scalingwill distort this scale, however scale bar will remainaccurate.3. Intended for illustration purposes, accuracy has notbeen verified for construction or navigation purposes.* Note: Shoreline has been modified from the FreshWater Atlas source data in the area of HazeltineCreek Mouth to reflect post-release conditions.
1. Data provided by Mount Polley Mining Corporation2. Data downloaded from Data.Gov.BC.ca Data Distribution Service.3. Orthophoto collected by McElhanney on August 5th, 2014
REFERENCESNOTESLEGEND
CLIENT NAME: PROJECT LOCATION:
BY:
CHK'D:
SCALE: DATE: REF No: REV:
PROJ COORD SYS:
DRAFT
_̂
_̂
_̂
_̂
_̂_̂
_̂
_̂
_̂
_̂
_̂
TAILINGSSTORAGE
FACILITY AREA
Polley Lake
HazeltineCreek
Bootjack Creek
Hazelt ineCreek
HAC02
POL-6
HAD-2
HAC03
HAC04HAD-1
HAC05
HAC07
Breach-01
LDA
POL-2
Surface WaterSampling Locations_̂ Hazeltine Creek_̂ Polley Lake_̂ Quesnel Lake_̂ Other Areas
1. Original in colour.2. Numerical scale reflects full-size print. Print scalingwill distort this scale, however scale bar will remainaccurate.3. Intended for illustration purposes, accuracy has notbeen verified for construction or navigation purposes.* Note: Shoreline has been modified from the FreshWater Atlas source data in the area of HazeltineCreek Mouth to reflect post-release conditions.
1. Data provided by Mount Polley Mining Corporation2. Data downloaded from Data.Gov.BC.ca Data Distribution Service.3. Orthophoto collected by McElhanney on August 5th, 2014
REFERENCESNOTESLEGEND
CLIENT NAME: PROJECT LOCATION:
BY:
CHK'D:
SCALE: DATE: REF No: REV:
PROJ COORD SYS:
DRAFT
_̂
_̂
_̂
_̂
_̂
_̂
_̂ _̂_̂
_̂
_̂̂_
_̂
_̂
_̂
_̂
_̂
_̂
_̂_̂
_̂
_̂
_̂
Quesnel Lake
Youngren Cree
k
Foley Creek
East Yo ungre
n Creek
Poquette Creek
Poqu
ette C
reek
Quesnel River
Fisher Creek
Bilboa CreekBilboa Creek
Quesnel River
Po
quetteCr
eek
Quesnel River
Quesnel River
Slum Gulch Creek
0
QUL-20
QUL-63
QUL-100
QUR-1
QUL-105QUL-81
QUL-122 QUL-123
QUL-107
QUL-108
QUL-126QUL-127
QUL-128
QUL-129
QUL-130
QUR-2
QUL-90
QUL-70
QUL-91
QUL-92
QUL-93
QUL-94
QUL-135
Surface WaterSampling Locations_̂ Hazeltine Creek_̂ Polley Lake_̂ Quesnel Lake_̂ Other Areas
1. Original in colour.2. Numerical scale reflects full-size print. Print scalingwill distort this scale, however scale bar will remainaccurate.3. Intended for illustration purposes, accuracy has notbeen verified for construction or navigation purposes.* Note: Shoreline has been modified from the FreshWater Atlas source data in the area of HazeltineCreek Mouth to reflect post-release conditions.
1. Data provided by Mount Polley Mining Corporation2. Data downloaded from Data.Gov.BC.ca Data Distribution Service.3. Orthophoto collected by McElhanney on August 5th, 2014
REFERENCESNOTESLEGEND
CLIENT NAME: PROJECT LOCATION:
BY:
CHK'D:
SCALE: DATE: REF No: REV:
PROJ COORD SYS:
DRAFT
_̂
_̂
_̂
_̂
_̂_̂
_̂_̂
_̂
_̂
_̂_̂
_̂
_̂
_̂ _̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂_̂
_̂
_̂
_̂
_̂
_̂
_̂_̂
_̂
_̂
_̂
_̂
_̂
_̂̂_
_̂_̂
_̂
Quesnel Lake
Cedar Creek
Poquette C reek
Slum GulchCreek
Gro g an Creek
Fi sher Creek
MartCreek
Bilboa Creek
Dag Creek
Bilboa Creek
Dow Cree
k
Ques
nelR
i ver
CubCreek
-50
-40
-30
-20
-20
-10
0
QUL-20
QUL-22
QUL-34
QUL-35QUL-36
QUL-61QUL-62
QUL-63
QUL-64
QUL-73QUL-69
QUL-95
QUL-100
QUL-101QUL-ST-FFF-1
QUL-105
QUL-81
QUL-111
QUL-122
QUL-123
QUL-124
QUL-107
QUL-108
QUL-109
QUL-104
QUL-126
QUL-127
QUL-130
QUL-77
QUL-38
QUL-39
QUL-89QUL-90
QUL-60
QUL-68
QUL-70
QUL-71
QUL-72
QUL-91 QUL-92
QUL-93QUL-94
QUL-135
Surface WaterSampling Locations_̂ Hazeltine Creek_̂ Polley Lake_̂ Quesnel Lake_̂ Other Areas
1. Original in colour.2. Numerical scale reflects full-size print. Print scalingwill distort this scale, however scale bar will remainaccurate.3. Intended for illustration purposes, accuracy has notbeen verified for construction or navigation purposes.* Note: Shoreline has been modified from the FreshWater Atlas source data in the area of HazeltineCreek Mouth to reflect post-release conditions.
1. Data provided by Mount Polley Mining Corporation2. Data downloaded from Data.Gov.BC.ca Data Distribution Service.3. Orthophoto collected by McElhanney on August 5th, 2014
REFERENCESNOTESLEGEND
CLIENT NAME: PROJECT LOCATION:
BY:
CHK'D:
SCALE: DATE: REF No: REV:
PROJ COORD SYS:
DRAFT
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂_̂
_̂
_̂
_̂
Quesnel Lake
Polley Lake
Boswell Lake
Nina Lake
C edarCreek
Hazelt ine Creek
Cedar Creek
Cedar Creek
Winkley CreekCedar Cre e k
Bootjack Creek
Deerlet C reek
MeadowyCreek
Dag Creek
Raft Creek
Cub Creek
-110
-100
-100
-110
-90
-80
-80-70-60
-50
0
-10
-20
-30
-40
0-10-20-30-40
-50
HAC02
QUL-18
QUL-21
POL-6
HAD-2
HAC03
HAC04
QUL-124
HAD-1
HAC05
QUL-21a
QUL-66a
HAC07
Breach-01
LDA
QUL-10
QUL-65
QUL-67
P2
POL-2
Surface WaterSampling Locations_̂ Hazeltine Creek_̂ Polley Lake_̂ Quesnel Lake_̂ Other Areas
1. Original in colour.2. Numerical scale reflects full-size print. Print scalingwill distort this scale, however scale bar will remainaccurate.3. Intended for illustration purposes, accuracy has notbeen verified for construction or navigation purposes.* Note: Shoreline has been modified from the FreshWater Atlas source data in the area of HazeltineCreek Mouth to reflect post-release conditions.
1. Data provided by Mount Polley Mining Corporation2. Data downloaded from Data.Gov.BC.ca Data Distribution Service.3. Orthophoto collected by McElhanney on August 5th, 2014
REFERENCESNOTESLEGEND
CLIENT NAME: PROJECT LOCATION:
BY:
CHK'D:
SCALE: DATE: REF No: REV:
PROJ COORD SYS:
DRAFT
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
Quesnel Lake
Edney Creek
Hazeltine Creek
Raft Creek
Hazeltine Creek
-90
-80
-70
-60
-50
-40
-30
-20
-10
0
0-10
-20-30
-40-50
-60-70-100
-90
-90
-80
HAC01
QUL-17
QUL-43
Raft Cr Rec Site
QUL-80
QUL-PW-1
QUL-ST-NF-1
QUL-PW-2QUL-23
QUL-24
QUL-25
QUL-26
QUL-28
HAC06
QUL-11
QUL-12
QUL-13
QUL-14
QUL-15
QUL-7
QUL-8
QUL-9
QUL-10
QUL-66
HAC01A
Surface WaterSampling Locations_̂ Hazeltine Creek_̂ Polley Lake_̂ Quesnel Lake_̂ Other Areas
1. Original in colour.2. Numerical scale reflects full-size print. Print scalingwill distort this scale, however scale bar will remainaccurate.3. Intended for illustration purposes, accuracy has notbeen verified for construction or navigation purposes.* Note: Shoreline has been modified from the FreshWater Atlas source data in the area of HazeltineCreek Mouth to reflect post-release conditions.
1. Data provided by Mount Polley Mining Corporation2. Data downloaded from Data.Gov.BC.ca Data Distribution Service.3. Orthophoto collected by McElhanney on August 5th, 2014
REFERENCESNOTESLEGEND
CLIENT NAME: PROJECT LOCATION:
BY:
CHK'D:
SCALE: DATE: REF No: REV:
PROJ COORD SYS:
DRAFT
_̂
_̂
_̂
_̂_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂_̂ _̂
_̂_̂_̂ _̂ _̂
_̂
_̂
_̂
_̂_̂ _̂ _̂̂_
Quesnel Lake
Winkley Creek
-90
-100
-80-70
-60
-50
-40
-30
-20
-70
-50
-40
-90
-60
-50
0
0-10-20-30
-10
QUL-5
QUL-6
QUL-74
QUL-75QUL-121
QUL-125
QUL-2a
QUL-1
QUL-2
QUL-3
QUL-4
QUL-113QUL-114
QUL-115QUL-116
QUL-117QUL-118
QUL-82 QUL-37
QUL-96
QUL-102
QUL-103
QUL-88QUL-83 QUL-84 QUL-85QUL-86
Surface WaterSampling Locations_̂ Hazeltine Creek_̂ Polley Lake_̂ Quesnel Lake_̂ Other Areas
1. Original in colour.2. Numerical scale reflects full-size print. Print scalingwill distort this scale, however scale bar will remainaccurate.3. Intended for illustration purposes, accuracy has notbeen verified for construction or navigation purposes.* Note: Shoreline has been modified from the FreshWater Atlas source data in the area of HazeltineCreek Mouth to reflect post-release conditions.
1. Data provided by Mount Polley Mining Corporation2. Data downloaded from Data.Gov.BC.ca Data Distribution Service.3. Orthophoto collected by McElhanney on August 5th, 2014
REFERENCESNOTESLEGEND
CLIENT NAME: PROJECT LOCATION:
BY:
CHK'D:
SCALE: DATE: REF No: REV:
PROJ COORD SYS:
DRAFT
_̂_̂
_̂_̂
_̂
_̂
_̂
_̂
_̂
_̂̂_
_̂_̂
_̂_̂
_̂
_̂
_̂
_̂
_̂̂_̂_
_̂
_̂
_̂
_̂
_̂ _̂
_̂̂_
_̂
_̂ _̂
_̂
_̂
_̂
_̂
Freshette Lake
Dillabough Lake
Niquidet Lake
Melissa Lake
Murdock Lakes
Murdock Lakes
Murdock Lakes
Klinne Lake
Annette Lake
Benny Lake
Quesnel Lake
Keno Lake
Jacques Lake
Whiffle Lake
Hen Ingram Lake
Horsefly
River
Spusk sCr eek
Abb ottCr eek
Ni q uidetCreek
Wh iffl eCre ek
Clearb roo k CreekSh
oa
ls Creek
Marsha
llCreek
0-10
-20
-30
-40
-50
-60-70
-80
-90
-100
-110
-120
-130-140
-150
-160
-170
-180
-190
-200
-210
-220
-230
-240
-250-260
-240
-220
-260
-180
-270
-180-160
-150
-50
-240
-230
-220
-200-190-180
-170
-290
-280-250
-230
-210
-90
-70
-60
-270
-260-24
0-22
0
-40-30
-10
0
0
-10
-100
-80-120
-140
-130
-110
-40
-30
0-20
-30
-40
-50
-20
-20
-40
-10
-20
QUL-19
QUL-31
QUL-32
QUL-33
QUL-76
QUL-78
QUL-79
QUL-75
QUL-87
QUL-ST-REF-1
QUL-106
QUL-110QUL-112
QUL-120QUL-1
QUL-30
QUL-31a
QUL-ZOO-8
QUL-132 QUL-119
QUL-40a
QUL-40
QUL-41
QUL-133
QUL-134QUL-131
QUL-ZOO-8a
HOR-1
QUL-120a
QUL-136
Surface WaterSampling Locations_̂ Hazeltine Creek_̂ Polley Lake_̂ Quesnel Lake_̂ Other Areas
1. Original in colour.2. Numerical scale reflects full-size print. Print scalingwill distort this scale, however scale bar will remainaccurate.3. Intended for illustration purposes, accuracy has notbeen verified for construction or navigation purposes.* Note: Shoreline has been modified from the FreshWater Atlas source data in the area of HazeltineCreek Mouth to reflect post-release conditions.