    CCS Implementation atBSEB - Patna

    As-Is Process Mapping of FICAMay 14, 2011

    BIHAR STATE ELECTRICITY BOARD

  • 8/4/2019 Fica as is Overview Isu

    2/30

    2010 Spanco Ltd, All rights reserved

    About R-APDRP Scheme

    GoIs initiative to reform Distribution Sector during XIth plan

    Programme Size 50,000 Crores

    Coverage Urban towns and cities with population of more than 30,000

    Part-A to cover IT applications in distribution sector (Allocation 10,000 crores)

    PartB to cover System improvement, network strengthening and augmentation,

    etc. (Allocation 40,000 crores)

    Part-A 100% Loan to be converted to Grant on successful implementation of IT

    systems

    Part-B Up to 50% Loan for Part B of the Scheme to be converted to Grant on

    achievement of AT&C Loss reduction targets

    1

  • 8/4/2019 Fica as is Overview Isu

    3/30

    2010 Spanco Ltd, All rights reserved

    R-APDRP Part - A

    Part A will include among others

    Consumer Indexing

    GIS Mapping, Asset mapping

    Metering of Distribution Transformers / Feeders

    Automatic Data Logging

    Ring Fencing

    IT applications for redressal of consumer grievances, meter reading, billing and

    collection

    Energy Audit

    Establishment of Base Line data

    SCADA/DMS also included in Part-A separate RFP

    2

  • 8/4/2019 Fica as is Overview Isu

    4/30

    2010 Spanco Ltd, All rights reserved

    Automation Areas and their Benefits

    Adoption of Information Technology to automate Utility Business Processes

    Metering, Billing, Collections, Development of Consumer Database

    Accurate and Timely Billing leading to better collections

    Maintenance of historical data for analysis and decision support

    Low number of Billing related complaints

    System inbuilt checks for exception reporting and handling

    New Connection, Disconnection and Dismantling

    Automated and Process driven workflow

    Quick processing of applications Complete Status visibility to authorized users for easy tracking

    GIS based Consumer Indexing, Asset Mapping and Network Analysis

    Reliable Consumer database

    Visibility of complete Electrical Network and consumers on GIS map

    Easy to identify theft prone areas and traceability of all consumers

    Support for Network Expansion Planning

    Identity and Access Management, System Security

    Support Systems for IT

    3

  • 8/4/2019 Fica as is Overview Isu

    5/30 2010 Spanco Ltd, All rights reserved

    Automation Areas and their Benefits

    Meter Data Acquisition, Energy Audit

    Proper Energy Audit of Ring fenced towns

    DT Level Energy audit possible

    Consistency in method and approach

    Multiple MIS reports for analysis

    Centralized Customer Care Services, Web Self Services

    Low number of consumer complaints

    Consumer complaint handling made easier through availability of required

    information Reduced consumer visits to Utility offices

    Asset Management, Maintenance Management

    Easy Asset tracking

    Maintenance History for Analysis

    Better maintenance strategy leading to Reduced outages

    Data availability for Repair / Replace strategy

    Management Information System

    Single source of MIS

    Consistent Reports

    4

  • 8/4/2019 Fica as is Overview Isu

    6/30 2010 Spanco Ltd, All rights reserved

    Executive Summary

    BSEBs R-APDRP Roll-Out Timeframe 12 months for the Pilot and additional 6

    months for roll-out

    R-APDRP Scope 71 Towns, 107 Sub Division Offices, 644 Other Offices

    Project Initiation Across the State with Pilot going live by the 12th Month andremaining towns by additional 4 months

    Pilot Within 12th Month (Pilot Town Fatuha + DC at Patna + DR at Gaya + CCCat Patna)

    2nd Wave Roll-Out Within 14th Month (Patna, Gaya, Muzaffarpur, Bhagalpur + 31Towns)

    3rd Wave Roll-Out Within 16th Month (35 Towns)

    5

  • 8/4/2019 Fica as is Overview Isu

    7/30 2010 Spanco Ltd, All rights reserved

    Work Packages under BSEB R-APDRP

    6

    Supply & Installation of Servers, Storage, Backup System etc.

    Installation of Network & PC infrastructure including LAN/ WAN

    Establishment of DC, DR & Customer Care Center

    Implementation of 17 Software Modules

    Integration of the entire IT infrastructure with Legacy Systems

    1

    2

    3

    4

    5

    Facility Management Services for a period of 5 years6

  • 8/4/2019 Fica as is Overview Isu

    8/30 2010 Spanco Ltd, All rights reserved

    Contents

    Objectives

    Module wise list of processes

    Methodology

    Deliverables

    7

  • 8/4/2019 Fica as is Overview Isu

    9/30 2010 Spanco Ltd, All rights reserved

    Objectives

    Objective of this exercise is to map the As-Is processes being followed

    in BSEB with a view to

    Understand the current processes

    Identify key issues and improvement opportunities

    The exercise would cover all modules:

    Customer Service

    Device Management

    Billing

    Finance

    Maintenance Management

    Asset Management

    Conversion team to split-up and join the above groups

    8

  • 8/4/2019 Fica as is Overview Isu

    10/30 2010 Spanco Ltd, All rights reserved

    Module wise list of processes Customer Service

    1. Process Customer Enquiries General Retrieval and Enquiry

    Record Customer Contacts

    Handle Complaints

    Handle High Bill Enquiry

    2. Manage Field Services

    Dispatch Field Service Requests

    Monitor Field Service Requests

    Process Miscellaneous Orders

    3. Support Customer Service Requests

    New Connections process

    Temporary Connection Process

    Disconnection Process

    Category/Tariff change Process

    Process Trouble Call

    Create/Maintain Consumer Account

    Maintain Existing Account

    Handle Ad Hoc Customer

    Correspondence

    9

  • 8/4/2019 Fica as is Overview Isu

    11/30 2010 Spanco Ltd, All rights reserved

    Module wise list of processes Device Management

    1. Process Meter Readings &Consumption

    Maintain Meter Reading Units &Scheduling

    Generate Meter Reading Order

    Read Meters - Periodic

    Read Meters Special Reads

    Upload Meter Readings

    Perform meter reading estimation

    Maintain route cycles

    2. Manage Devices Create/Maintain Utility Installation

    Details

    Perform Device Installation

    Create/Maintain Devicecharacteristics

    Process DeviceInspections/Certification

    Create/Maintain Physical DeviceLocation

    Manage Device movements(Transfer Posting)

    Perform Goods Receipting

    Process Device Remove Order

    Process Device Replacement Order

    Process Device InvestigationOrders

    10

  • 8/4/2019 Fica as is Overview Isu

    12/30

    2010 Spanco Ltd, All rights reserved

    Module wise list of processes Billing

    1. Bill Customer Process Scheduled Electricity Billing

    Process Unscheduled Billing

    Process IndividualReversal/Adjustment

    Produce Invoice Statements

    Process Billing Exceptions/Errors Process Manual Outsorting

    Create/Maintain Tariff Structure,Prices, Discounts, Surcharges,Taxes

    Tariff Configuration - Residential

    Tariff Configuration - Commercial &Industrial

    11

  • 8/4/2019 Fica as is Overview Isu

    13/30

    2010 Spanco Ltd, All rights reserved

    Module wise list of processes Maintenance Management

    1. Plant Maintenance

    Process Emergency Maintenance

    Process Corrective Maintenance

    Process Preventive maintenance

    External service process

    Process condition based

    Process capital investment

    12

  • 8/4/2019 Fica as is Overview Isu

    14/30

    2010 Spanco Ltd, All rights reserved

    Module wise list of processes Finance

    1. Process Payments Accept Cash Desk Payment

    Process Returned Items

    Handle Payment Errors

    Process Transfer Payment

    Process Payments from ATPmachine

    2. Report Revenue Daily GL (General Ledger) Posting

    Periodic GL Reconciliation

    Generate Month-End FinancialReporting

    Maintain Financial & Mgt AccountingData

    Process Year-End Activities

    3. Perform Credit Management Process Customer Credit Enquiry

    Create/Maintain Installment Plans

    Maintain Collection/EnforcementActions

    Handle Disputed Charges/Bills

    Support Manual Credit Follow-up

    Actions Process Receivable Write-off

    Process Advance payments (depositschemes)

    Maintain Refunds

    Process Misc. Credit/Debit

    Annual Interest on Security

    13

  • 8/4/2019 Fica as is Overview Isu

    15/30

    2010 Spanco Ltd, All rights reserved

    Module wise list of processes Asset Management

    14

    1. Asset Management Process

    2. Asset Scrapping Process

    3. Asset Replacement Process

    4. Capital Investment Process

  • 8/4/2019 Fica as is Overview Isu

    16/30

    2010 Spanco Ltd, All rights reserved

    Methodology

    Teams to form groups of two and internally divide the sub-processes amongstthemselves.

    Identify people to be met.

    Map processes using Visio (standards are given overleaf)

    MS-Word to be used to document issues/ improvement opportunities/requirements and data structures

    MapDay in the Life

    Wherever relevant highlight differences between HT and LT

    15

  • 8/4/2019 Fica as is Overview Isu

    17/30

    2010 Spanco Ltd, All rights reserved

    Methodology Standards for Flow Charts

    16

    Area wiseProcess

    Numberingand Name

    Font Verdana16

    StandardProcessSymbols

    Font Arial 10

    Business Process: General Retrieval & Enquiry

  • 8/4/2019 Fica as is Overview Isu

    18/30

    2010 Spanco Ltd, All rights reserved

    Finance- Process Triggers

    Finance Core Areas

    17

    Payments &Returns

    CreditManagement

    General Finance

    Finance

    Payment Processing

    Returns

    Security Deposit

    Refund

    Recovery

    Installment

    Maintain account details

    Reconciliation

    Account Balance

  • 8/4/2019 Fica as is Overview Isu

    19/30

    2010 Spanco Ltd, All rights reserved

    Finance

    Payment Allocation and Priority at BSEB

    Arrear DPS

    Arrear Electricity Duty

    Arrear Energy Charge

    Current DPS

    Current ED

    Current Energy Charge

    18

  • 8/4/2019 Fica as is Overview Isu

    20/30

    2010 Spanco Ltd, All rights reserved

    Finance : Security Deposit

    Security Deposit at BSEB

    Security Deposit is charged while request for new connection/change in load

    Calculation of Security deposit

    The estimated energy charges including fixed/demand charges for a period of two months

    e.g.: If a consumer applied for new Connection in category of DS-II (Single phase)

    for 3 kW his/her SD will be calculated as follows.

    Fixed Charge-Rs 50

    MMC-{40 units*300+ (20+20) units*300}=120+120=240

    Hence His/her SD will be 240+50=Rs 290*2=Rs.580

    In case of temporary connection 10% of total cost of the estimate for the temp

    service connection will be charge as SD.

    19

  • 8/4/2019 Fica as is Overview Isu

    21/30

    2010 Spanco Ltd, All rights reserved

    Finance : Payment Processing

    Presently at BSEB , consumer can pays his/her bill at their respective sub division

    counter only.

    No cross counter payment is accepted presently.

    At PESU apart from counters there is provision for Any time payment (ATP).

    There is no separate counter for energy and non energy bill.

    DCR(Daily collection report) is sent by cashier to the division office on daily

    basis.

    20

  • 8/4/2019 Fica as is Overview Isu

    22/30

    2010 Spanco Ltd, All rights reserved

    Finance : Return

    Presently at BSEB , Consumer can pays his/her bill by cheque at Counter/ATP.

    In case if his/her cheque bounce by reason of Insufficient Fund .

    Then Rs. 75 is posted in consumer account as bank charge.

    All rebates has been removed from his/her account and DPS is posted against

    payment amount.

    Cheque Not Accepted has been printed on his/her future electricity bill.

    EEE is authorized person to approve Cheque payment for this type of consumer.

    21

  • 8/4/2019 Fica as is Overview Isu

    23/30

    2010 Spanco Ltd, All rights reserved

    Finance : Installment

    If a consumer (regular consumer) is not able to pay his/her bill, he/she can

    approach the officials for Installment .

    An agreement is made between consumer and utility for availing installment.

    Approval authority for Installment

    22

    Authorized togrant Number ofInstallment

    AEE EEE ESE GM HO

    Number ofInstallment 10 10 10 10 Any

    Amount 10,000up to 1Lac

    up to 5Lac

    up to 10Lac Any

  • 8/4/2019 Fica as is Overview Isu

    24/30

    2010 Spanco Ltd, All rights reserved

    Finance : Delay Payment Surcharge

    1. For HT Consumer

    BSEB charges Delay payment surcharge to the consumer at the rate of half (0.5 %)

    per week or part thereof on the principal amount of bill.

    2. For LT Consumer

    BSEB charges Delay payment surcharge to the consumer at the rate of 1.5 % per

    month on the principal amount of bill.

    * Delay payment charges are displayed on the bill stating if u do not pay the

    amount by due date X amount of delay payment surcharge will be levied to you.

    23

  • 8/4/2019 Fica as is Overview Isu

    25/30

    2010 Spanco Ltd, All rights reserved

    Finance : Delay Payment Surcharge

    24

    For HT Consumer

    For LT Consumer

  • 8/4/2019 Fica as is Overview Isu

    26/30

    2010 Spanco Ltd, All rights reserved

    Finance : Recovery Process

    Process Triggered :Non Payment of Bills by Consumer

    Along with current month bill advance notice intimating the action for

    nonpayment of bill within due date is given to consumer.

    Post due date, grace period of 10 days are given to the consumer to make

    payment .

    If the consumer fails to make the payment within due date + 10 days then

    TDCO (Temporary Disconnection Order) is generated.

    If consumer fails to make the payment within 25 days from issue of TDCO is

    generated.

    If the outstanding are less than his/her Security Deposit then no action is

    taken.

    TDCO & PDCO is generated only in case of unpaid amount greater then SD.25

  • 8/4/2019 Fica as is Overview Isu

    27/30

    2010 Spanco Ltd, All rights reserved

    Finance : Maintain Account (Statement No.1)

    BIHAR STATE ELECTRICITY BOARD

    Annexure - I to Revenue Statement No. - I (E.B.-175)

    Details of Other Charges [i.e. sl. no. -3(ii)(b)] under the Head Miscellaneous and General Charges

    for the Month of january 2011

    Name of Division :GULZARBAGH

    Name of Circle : PESU(E)

    Sl. No. Particulars Amount (InRupees)

    (a) Application fee for new connection/reduction of load/ enhancement of load / request for permanent disconnection 5840

    (b) Testing / Inspection of Consumer's installation 5650

    (c) Meter Testing Fee 7350

    (d) Removing/Re-fixing/Changing of Meter/Meter Board at Consumer's request 2200

    (e) Reconnection Charge 2200

    (f) Supervision, Labour and Establishment Charge for Service Connection 29160

    (g) Initial/Addit ional Security Deposit for availing power supply 826300

    Total [carried to sl. no. - 3(ii)(b) of Revenue Statement No. - I] 878700

    NOTE : These figures need not to be given categorywise but only in the Grand Total column of Revenue Statement No. - I.

    Signature with Seal of Electrical Executive Engineer

    26

    For Details ofStatement1 click here

    http://../New%20Format%20St%20No.-I-Final(A2)%20jan2011.xlshttp://../New%20Format%20St%20No.-I-Final(A2)%20jan2011.xlshttp://../New%20Format%20St%20No.-I-Final(A2)%20jan2011.xlshttp://../New%20Format%20St%20No.-I-Final(A2)%20jan2011.xls
  • 8/4/2019 Fica as is Overview Isu

    28/30

    2010 Spanco Ltd, All rights reserved

    Finance : Maintain Account (Statement No.1)

    BIHAR STATE ELECTRICITY BOARD

    REVENUE STATEMENT NO. VIII OF CIRCLE PESU(W) FOR THE MONTH

    SINo.

    Name ofthe

    consumer

    ConsumerNo.

    Contract

    Demandin KVA

    TransformerCapacity[BSEB/

    Consumer]

    CategoryConsumer &

    SupplyVoltage

    Energy

    MeterStatus

    Maximum

    DemandRecorded

    UnitConsume

    d

    UnitBilled

    MaximumDemandBilled (in

    KVA)

    EnergyCharge

    (inRs.)

    MaximumDemand

    Charge (inRs.)

    PowerFactor

    PowerFactor

    SurchargeRebate

    LoadFactorRebate

    FPPCAOther

    Charge

    27

    Meter

    Rent

    Electricit

    y DutyDPS

    Assessment[12*13*15*1

    7*18*19*20*21*22]

    Remissionin MMG

    UnderI.I.P.2006

    Remissionin

    ElectricityDuty

    Arrea

    r B/F

    Total

    Demand

    [23*26-24*25]

    Due

    Date

    Date ofPaymen

    t

    PromptPaymen

    tRebate

    BankComm

    .

    Collectio

    n

    TotalCollection

    [24*25*30*31*32]

    DuesC/o

    [27*33]

    Reasonfor

    DuesC/o

  • 8/4/2019 Fica as is Overview Isu

    29/30

    2010 Spanco Ltd, All rights reserved

    Finance : Bank Reconciliation statement (Statement No.3A)

    28

  • 8/4/2019 Fica as is Overview Isu

    30/30

    2010 Spanco Ltd, All rights reserved

    29