Page 1
M/s. Apothecon Pharmaceuticals Pvt. Ltd., Vadodara, Gujarat 1
Attachment-B_ Revised EC Compliance Report
Six Monthly Compliance Report on the Status of Compliance of The Environmental Clearance Conditions
Name of the company : M/s. Apothecon Pharmaceuticals Pvt. Ltd.
Name of the project and address : Bulk Drug Manufacturing Unit at Plot no. 1134 to 1137,1138 A&B,1143
A&B,1144 A&B,Padra - Jambusar Highway, P.O. Dabhasa, Taluka Padra,
Vadodara, Gujarat.
Environmental Clearance letter : F. No. J-11011/609/2008-IA II (I) dated 23rd December 2010
Period of Monitoring : January 2019 to June 2019
No. Condition Compliance status
A SPECIFIC CONDITIONS:
i Adequate pollution control
measures shall be provided to
control air emissions within
norms prescribed by the CPCB
and Gujarat Pollution Control
Board. At no time, the emission
levels shall go beyond the
stipulated standards. In the
event of failure of pollution
control system(s) adopted by
the unit, the respective unit
shall not be restarted until the
control measures are rectified
to achieve the desired
efficiency.
We have provided adequate APCM, i.e. Brine/chiller condensers, scrubbers,
Dust Collectors at necessary stages. We assure that at no time the emission
level has gone beyond the stipulated standards and or the prescribed limit. In
event of any failure, we will intimate to the board and authority time to time. In
the event of failure of pollution control system(s) adopted by the unit, the
respective unit shall not be restarted until the control measures are rectified to
achieve the desired efficiency.
Flue gas emission stacks monitoring done by approved third party details are as
under:
Name Of Env. Monitoring Agency : Aryan Greens (Vadodara)
NABL Certificate No & Valid Up to: TC-8296 & 17/01/2021.
Stack Height Parameters
APCM Limit
Results
Min. Max. Avg.
Boiler-1,2
& TFH
30 m
PM (mg/Nm3)
SO2 (ppm),
NOx (ppm)
150
100
50
61.0
18.0
23.0
80.0
28.0
38.0
72.0
22.0
33.0
DG (250
kVA)
4 m
58.0
18.0
26.0
86.0
26.0
35.0
75.0
21.0
31.0
DG (750
kVA)
4 m
61.0
17.0
30.0
83.0
26.0
41.0
71.0
23.0
34.0
The details of APCM attached with process gas emission stacks are as under:
Stack Heigh
t Parameters APCM Limit
Results
Min. Max. Avg.
Tablet coater
21 m
PM
(mg/Nm3)
Water scrubber
150 31.0 67.0 20.0
Pilot Plant reactor
vessel
20 m
HCl (mg/Nm3)
Cl2
(mg/Nm3)
Caustic/ water
scrubber (2 stage)
20
09
2.5
1.4
3.9
1.4
1.5
0.1
Reactor vessel (API
plant –III)
20 m
HCl (mg/Nm3)
Cl2
(mg/Nm3)
Caustic/ water
scrubber
(2 stage)
20
09
2.0
0.0
3.3
0.0
1.4
0.0
The analysis reports are enclosed as Annexure-1.
Page 2
M/s. Apothecon Pharmaceuticals Pvt. Ltd., Vadodara, Gujarat 2
No. Condition Compliance status
Boiler-1 & TFH
Scrubber with Pilot Plant reactor vessel
Scrubber with Reactor vessel (API plant –III)
Page 3
M/s. Apothecon Pharmaceuticals Pvt. Ltd., Vadodara, Gujarat 3
No. Condition Compliance status
Water scrubber with Tablet Coater
Complied.
ii The National Ambient Air
Quality Emission Standards
issued by the Ministry vide G
S.R No. 826(E) dated 16th
November, 2009 shall be
followed.
Regular monitoring is being carried out to ensure quality of ambient air within
prescribed norms of NAAQS as per Valid CC&A. The monitoring done by
approved third party details are as under:
Name of Env. Monitoring Agency : Aryan Greens (Vadodara)
NABL Certificate No & Valid Up to: TC-8296 & 17/01/2021.
Locations Parameters Limits Results
Min. Max. Avg.
Security Gate
PM10 (µg/m3)
PM2.5 (µg/m3)
SO2 (µg/m3)
NO2 (µg/m3)
HCl (µg/m3)
Cl2 (µg/m3)
VOC(µg/m3)
100
60
80
80
200
100
-
76.0
26.0
14.0
22.0
BDL
BDL
BDL
92.0
43.0
23.0
28.0
BDL
BDL
BDL
86.0
34.0
19.0
25.3
BDL
BDL
BDL
Near ETP
PM10 (µg/m3)
PM2.5 (µg/m3)
SO2 (µg/m3)
NO2 (µg/m3)
HCl (µg/m3)
Cl2 (µg/m3)
VOC(µg/m3)
100
60
80
80
200
100
-
71.0
23.0
15.0
20.0
BDL
BDL
BDL
88.0
32.0
19.0
28.0
BDL
BDL
BDL
81.0
28.0
17.0
24.1
BDL
BDL
BDL
Near R & D
Bldg.
PM10 (µg/m3)
PM2.5 (µg/m3)
SO2 (µg/m3)
NO2 (µg/m3)
HCl (µg/m3)
Cl2 (µg/m3)
VOC(µg/m3)
100
60
80
80
200
100
-
77.0
26.0
13.0
19.0
BDL
BDL
BDL
92.0
45.0
22.0
28.0
BDL
BDL
BDL
85.0
36.0
16.6
25.0
BDL
BDL
BDL
The monitoring reports are enclosed as Annexure-1.
Complied.
Page 4
M/s. Apothecon Pharmaceuticals Pvt. Ltd., Vadodara, Gujarat 4
No. Condition Compliance status
iii Process emission fumes shall
be scrubbed in two stage
scrubbers and treated gas shall
be discharged into atmosphere
through adequate stack height.
Regular monitoring shall be
conducted to check efficiency
of the scrubbers.
In-plant control measures for
checking fugitive emissions
from all the vulnerable sources
shall be provided.
Fugitive emissions shall be
controlled by providing closed
storage, closed handling &
conveyance of Chemicals/
materials, multi-cyclone
separator and water sprinkling
system. Dust suppression
system including water
sprinkling system shall be
provided at loading and
unloading areas to control dust
emissions.
Fugitive emissions in the work
zone environment, product, raw
materials storage area etc. shall
be regularly monitored and
records shall be maintained.
The emissions shall conform to
the limits imposed by GPCB
Caustic and water Scrubbers are installed with process stacks. Details of APCM
attached with process gas stacks and monitoring done by NABL approved third
party Monitoring agency, details are as under:
Name Of Env. Monitoring Agency : Aryan Greens (Vadodara)
NABL Certificate No & Valid Up to: TC-8296 & 17/01/2021.
Stack Height Paramete
rs APCM Limits
Results
Min. Max. Avg.
Tablet coater
21 m PM
(mg/Nm3)
Water scrubber
150 31.0 67.0 20.0
Pilot Plant
reactor vessel
20 m HCl (mg/Nm3)
Cl2
(mg/Nm3)
Caustic/ water
scrubber (2 stage)
20
09
2.5
1.4
3.9
1.4
1.5
0.1
Reactor vessel
(API plant –
III)
20 m HCl (mg/Nm3)
Cl2
(mg/Nm3)
Caustic/ water
scrubber
(2 stage)
20
09
2.0
0.0
3.3
0.0
1.4
0.0
The monitoring reports are enclosed as Annexure-1.
Water scrubber with Tablet Coater
Scrubber with Pilot Plant reactor vessel
Page 5
M/s. Apothecon Pharmaceuticals Pvt. Ltd., Vadodara, Gujarat 5
No. Condition Compliance status
Scrubber with Reactor vessel (API plant –III)
Complied.
Fugitive emissions in work zone are being measured as VOC & that due to
transportation or dust are measured as PM10, PM2.5, HCl and Cl2.
Fugitive emissions as PM10, PM2.5, HCl and Cl2 are as under:
Locations Parameters Limit Results
Min. Max. Avg.
Security
Gate
PM10 (µg/m3)
PM2.5 (µg/m3)
HCl (µg/m3)
Cl2 (µg/m3)
VOC(µg/m3)
100
60
200
100
-
76.0
26.0
BDL
BDL
BDL
92.0
43.0
BDL
BDL
BDL
86.0
34.0
BDL
BDL
BDL
Near ETP
PM10 (µg/m3)
PM2.5 (µg/m3)
HCl (µg/m3)
Cl2 (µg/m3)
VOC(µg/m3)
100
60
200
100
-
71.0
23.0
BDL
BDL
BDL
88.0
32.0
BDL
BDL
BDL
81.0
28.0
BDL
BDL
BDL
Near R &
D Bldg.
PM10 (µg/m3)
PM2.5 (µg/m3)
HCl (µg/m3)
Cl2 (µg/m3)
VOC(µg/m3)
100
60
200
100
-
77.0
26.0
BDL
BDL
BDL
92.0
45.0
BDL
BDL
BDL
85.0
36.0
BDL
BDL
BDL
Fugitive emissions in the work zone environment are measured as VOC at
various locations and reported time to time. Raw materials sampling and
charging are done at production material dispensing area. Internal inhouse VOC
monitoring also carried out result attach in Annexure - 1.The results of the VOC
are as below:
Area /
Location Parameter
Permissibl
e limit as
per
Factory
Act Second
Schedule –
41F
Results in ppm
Min. Max. Avg.
SVAPI-
Plant-III Acetone
2375
mg/m3 BDL BDL BDL
Page 6
M/s. Apothecon Pharmaceuticals Pvt. Ltd., Vadodara, Gujarat 6
No. Condition Compliance status
R & D
Lab Toluene
560
mg/m3 1.1 1.4 1.25
QC Lab IPA 450
mg/m3 BDL BDL BDL
The analysis reports are enclosed as Annexure-1.
Fume hood provided at necessary locations to control fugitive emissions. Dust
collectors are also provided at necessary locations to control dust emission.
Fume Hood
Dust Collector
Complied.
iv For further control of fugitive
emissions, following steps shall
be followed:
Following steps are taken to control fugitive emissions:
Page 7
M/s. Apothecon Pharmaceuticals Pvt. Ltd., Vadodara, Gujarat 7
No. Condition Compliance status
a. Closed handling system shall
be provided for chemicals.
“Close feed” system is used into batch reactor. Pumps and direct pipeline are
connected to batch reactor for material shifting, to ensure the close feed system
in plant.
Photograph of the closed feed system is as under:
Complied.
b. Reflux condenser shall be
provided over reactor.
Reflux condenser is provided over reducer, the photograph of the same is as
under:
Complied.
c. System of leak detection and
repair of pump/pipeline based
on preventive maintenance.
Preventive maintenance (leak test) is carried out at regular interval of all
equipment so as to ensure/ maintain the efficiency of the recovery system. The
records of leak tests performed by the maintenance team as well as the third
party inspection is attached here as Annexure-2.
Complied.
Page 8
M/s. Apothecon Pharmaceuticals Pvt. Ltd., Vadodara, Gujarat 8
No. Condition Compliance status
d. The acids shall be taken from
storage tanks to reactors
through closed pipeline.
Storage tanks shall be vented
through trap receiver and
condenser operated on chilled
water Cathodic protection shall
be provided to the underground
solvent storage tanks.
We do not possess the storage tank for acid. For Research and Development
work, Utilization of acid quantum is very small.
Complied.
v The gaseous emissions from
DG set shall be dispersed
through adequate stack height
as per CPCB guidelines.
Acoustic enclosure shall be
provided to the DG sets to
mitigate the noise pollution.
Stack height of DG set (04 Meter) has been calculated as per GPCB guideline
and installed.
Acoustic enclosure has been provided to the DG sets to mitigate the noise
pollution.
Complied.
vi The company shall upload the
status of compliance of the
stipulated environmental
clearance conditions, including
results of monitored data on its
website and shall update the
same periodically.
It shall simultaneously be sent
to the Regional office of
MOEF, the respective Zonal
office of CPCB and the Gujarat
Pollution Control Board.
The levels of PM10, PM2.5, NOx,
SO2, HCI and Cl2 in ambient air
shall be monitored and
displayed at a convenient
Compliance reports will be upload from time to time on website.
Noted & Agreed with
We have already submitted the 6 monthly compliance report to the authority for
all six monthly periods between 2015 to 2019. The submission details are as
below:
Sr. No. EC Compliance Report Period Submission Date
1 January-June’ 2019 To be submit
2 July-December’ 2018 03/06/2019
3 January-June’ 2018 24/01/2019
4 July-December’ 2017 18/09/2018
5 January-June’ 2017 13/10/2017
6 July-December’ 2016 28/9/2017
7 January-June’ 2016 19/09/2017
8 July-December’ 2015 10/04/2017
Page 9
M/s. Apothecon Pharmaceuticals Pvt. Ltd., Vadodara, Gujarat 9
No. Condition Compliance status
location near the main gate of
the company and at important
public places.
VOCs monitoring in ambient
air shall also be ensured.
9 January-June’ 2015 10/04/2017
Complied.
The levels of PM10, PM2.5, NOx, SO2, are being monitored in ambient air and
the same is been displayed on a board near our gate.
Complied.
Regular VOC monitoring is being carried out at various locations in the
industry the details of locations and VOC concentration are as under:
Locations Parameters Limit Results
Min. Max. Avg.
Security
Gate
PM10 (µg/m3)
PM2.5 (µg/m3)
HCl (µg/m3)
Cl2 (µg/m3)
VOC(µg/m3)
100
60
200
100
-
76.0
26.0
BDL
BDL
BDL
92.0
43.0
BDL
BDL
BDL
86.0
34.0
BDL
BDL
BDL
Near ETP
PM10 (µg/m3)
PM2.5 (µg/m3)
HCl (µg/m3)
Cl2 (µg/m3)
VOC(µg/m3)
100
60
200
100
-
71.0
23.0
BDL
BDL
BDL
88.0
32.0
BDL
BDL
BDL
81.0
28.0
BDL
BDL
BDL
Near R &
D Bldg.
PM10 (µg/m3)
PM2.5 (µg/m3)
HCl (µg/m3)
Cl2 (µg/m3)
VOC(µg/m3)
100
60
200
100
-
77.0
26.0
BDL
BDL
BDL
92.0
45.0
BDL
BDL
BDL
85.0
36.0
BDL
BDL
BDL
Complied.
Page 10
M/s. Apothecon Pharmaceuticals Pvt. Ltd., Vadodara, Gujarat 10
No. Condition Compliance status
vii
Solvent management shall be
carried out as follows:
a. Chiller shall be provided
for chilled brine circulation
to condensate the solvent
vapors and reduce solvent
losses Solvent distillation
assembly shall be provided
for ethanol as by product.
Necessary brine chilling plant is in place to circulate the brine to necessary
equipment’s and condensers to prevent the vapour losses and optimum
recovery.
Complied.
b. Reactor shall be connected
to chilled brine condenser
system.
Reactors & Condensers are being provided with chilled brine as a cooling
media circulation system to prevent the vapor losses. Photograph of the same
are as under:
Preventive maintenance is being carried out at regular interval of equipment’s
to ensure the efficiency of the solvent recovery system.
Complied.
Page 11
M/s. Apothecon Pharmaceuticals Pvt. Ltd., Vadodara, Gujarat 11
No. Condition Compliance status
c. Reactor and solvent
handling pump shall have
mechanical seals to prevent
leakages.
Reactors are being provided with mechanical seals to prevent leakages and also
provided vacuum systems instead of using transfer pumps.
Mechanical Seal on Reactor
Vaccum Charging
Vaccum Receiver
Complied.
d. The condensers shall be
provided with sufficient
HTA and residence time so
as to achieve more than
95% recovery.
The condensers are provided with sufficient HTA and residence time and
achieved more than 95% recovery. Photograph of the same is as under:
Complied.
e. Solvents shall be stored in
a separate space specified
with all safety measures.
Solvents are properly stored in separate and isolated place complying to the
requirements of PESO or as per Explosives license with all safety measures.
The Drum solvent storage area is provided with Automatic Ceiling mounted fire
extinguisher system. The area is provided with flame proof electrical fittings.
Also the proper ventilation of the area is ensured.
The photographs of the solvent storage area are as under:
Page 12
M/s. Apothecon Pharmaceuticals Pvt. Ltd., Vadodara, Gujarat 12
No. Condition Compliance status
Complied.
f. Proper earthing shall be
provided in all the
electrical equipment
wherever solvent handling
is done.
Proper earthing provided in all the electrical equipment in the areas where
solvent is handled and stored.
Preventive maintenance is carried out at regular interval of all equipment so as
to ensure/ maintain the efficiency of the recovery system.
Complied.
g. Entire plant shall be flame
proof. The solvent storage
tanks shall be provided
with breather valve to
prevent losses.
We have only Solvent drum storage area with valid license from PESO.
Peso Licence is obtained for storage of solvent vide letter no. P/WC/GJ/16/337
(P252140) dated 26/12/2014. Peso Licence is enclosed as Annexure-3.
Complied.
viii Total ground water requirement
shall not exceed 78 m3/day and
prior permission shall be
obtained from CGWB/SGWB
and a copy be submitted to the
Ministry's Regional Office at
Bhopal within 3 months of
issue of environment clearance.
Permission of CGWA obtained vide letter no. 21-4(725)/WCR/CGWA/2010-
2260 dated 17 Sep, 2010. Permission letter is enclosed as Annexure -4.
Around average 37.3 KL/d water is consumed in last 6 months. The details are
as under:
Month (2019) Quantity of Water Withdrawal (KL/d)
Min Max Average
January 11 51 32.0
February 24 41 34.5
March 18 47 34.9
April 16 45 35.7
May 24 57 41.9
June 31 60 44.8
Complied.
ix Total waste water generation
shall not exceed 45 m3/day and
treated in ETP comprising of
primary, secondary treatment
facility. Treated wastewater
shall be sent to CETP operated
by M/s EICL, Umaraya after
meeting CETP inlet water
quality norms prescribed by
GPCB for further treatment.
Around 20.23 KL/d (Avg.) wastewater is generated in last 6 months. The details
are as under:
Month (2019) Quantity of Wastewater Generation (KL/d)
Min Max Average
January 2.8 27.9 15.8
February 11.3 29.2 19.4
March 8.2 26.6 18.7
April 6.0 31.1 20.2
May 10.8 30.4 20.2
June 13.0 38.3 27.1
The company has its own effluent treatment plant of 75 KL/day capacity to treat
the waste water.
Size of ETP units are mentioned below:
Sr. No. Name of The Unit Dimension (m) Capacity
Primary Treatment
01 Equalization Tank/Neutralization Tank
5 x 5 x (2 + 0.5) 100 m3
02 Flash Mixer 1 x 1 x (1 + 0.5) 1.98 m3
03 Flocculater 1.5 x 1.1 x (1.2+0.5) 1.98 m3
Page 13
M/s. Apothecon Pharmaceuticals Pvt. Ltd., Vadodara, Gujarat 13
No. Condition Compliance status
04 Primary Settling Tank 3.2 x 3.2 x (2.5 x 1 x 0.5) 25.6 m3
Secondary Treatment
01 Aeration Tank-1 15.6 x 7.5 x (4.5+0.5) 526.5 m3
02 Secondary Settling Tank-1 2.7 x 2.7 x (2.5+1 + 0.5) 18.3 m3
03 Aeration Tank-2 7.5 x 6.1 x (4.5+0.5) 206.6 m3
04 Secondary Settling Tank-2 2.7 x 2.7 x (2.5+1 + 0.5) 18.3 m3
05 Intermediate Sump 15 m3
06 Dual Media Filter 5 m3
07 Treated Effluent sump 3.6 x 2.85 x (2 + 0.5) 20.5 m3
08 Sludge Sump 3.6 x 2.85 x (2 + 0.5) 20.5 m3
09 Final Effluent storage tank FRP tank 50 m3
Unit has obtained membership certificate from M/s EICL, Umaraya.
Membership certificate is enclosed as Annexure-5.
Paramete
r Unit
Result Inlet Norms
of CETP Min Max Avg.
pH °C 6.52 7.8 7.39 5 to 9
Temperature
Pt.co. Units 25 34 28.3 45
Colour (Pt.
unit) mg/lit 30 70 47.1 -
TSS mg/lit 40 70 48.8 600
Oil and
Grease mg/lit BDL BDL - 20
Phenolic
compounds mg/lit 0.4 0.8 0.6 5
Arsenic mg/lit BDL BDL - 0.2
Total Chromium
mg/lit BDL BDL - 2
Hexavalent Chromium
mg/lit BDL BDL - 1
Copper mg/lit BDL BDL - 2
Lead mg/lit BDL BDL - 0.2
Mercury mg/lit BDL BDL - 0.01
Nickel mg/lit BDL BDL - 5
Zinc mg/lit BDL BDL - 5
Cadmium mg/lit BDL BDL - 2
Pesticides mg/lit Absent Absent - -
Bio-assay
test %
100% survival
of fish
after 96 hrs in
effluent
100% survival of fish after 96
hrs in effluent
- -
TDS mg/lit 2438 4303 3324.5 -
BOD mg/lit 30 44 34.3 500
COD mg/lit 81 180 130.1 2000
Cyanides mg/lit BDL BDL - 0.2
Chloride (as Cl)
mg/lit 1020 1460 1223.17 -
Sulphate (as SO4)
mg/lit 67 155 111.38 -
Sulphides mg/lit 0.4 0.96 0.65 2
Fluoride (as F)
mg/lit 0.5 1.5 0.97 2
Ammonical Nitrogen
mg/lit 8.2 10 9.07 50
Page 14
M/s. Apothecon Pharmaceuticals Pvt. Ltd., Vadodara, Gujarat 14
No. Condition Compliance status
Sodium
Absorption
Ratio
(SAR)
% 11 22 14.5 -
Free
Ammonia mg/lit BDL BDL - 5
Analysis report is attached as Annexure-1.
Complied.
x NaCl shall be supplied to
caustic soda plants.
Total spent solvent shall be
treated and reused.
Distillation residue shall be
incinerated at CHWI.
Spent oil shall be sold to
registered re-processors.
ETP sludge shall be disposed
off at TSDF.
Manufacturing of API during the period Jan-Jun -2019, No by-product NaCL is
being generated from the process.
Complied.
Unit has obtained membership of CHWIF facility of
RSPL vide letter dated 30/01/2017. Membership certificate is enclosed as
Annexure-6.
8.01 MT distillation residues has been disposed to CHWIF in last 6 months.
Month (2019) Generation (Mt/Month) Disposal
(Mt/Month)
January 3.69 -
February 1.69 3.88
March 2.12 4.13
April 1.44 -
May 1.62 -
June 1.63 -
Around 36.58 MT spent solvent /oil & disc.Container has been sent to
registered re-processor in last 6 months. The details are as under:
Month (2019) Generation (Mt/Month) Disposal
(Mt/Month)
January 22.28 8.08
February 61.25 8.77
March 36.17 0
April 50.09 8.53
May 79.47 11.19
June 6.32 8.08
Unit has obtained membership of TSDF facility of
NECL. Membership certificate is enclosed as Annexure-6.
Around 3.69 MT ETP sludge has been disposed to TSDF in last 6 months. The
details are as under:
Month (2019) Generation (Mt/Month) Disposal
(Mt/Month)
January 2.83 -
February 0.27 3.69
March 0.33 -
April 0.32 -
May 0.40 -
June 0.48 -
Page 15
M/s. Apothecon Pharmaceuticals Pvt. Ltd., Vadodara, Gujarat 15
No. Condition Compliance status
Manifest copies and Financial year disposal details are enclosed as Annexure-6.
Complied.
xi The Company should obtain
Authorization for collection,
storage and disposal of
hazardous waste under the
Hazardous Waste
(Management, Handling and
Trans boundary Movement)
Rules, 2008 and 'Authorization'
should be obtained from GPCB
for the disposal of solid/
hazardous waste in the TSDF.
The concerned company shall
undertake measures for
firefighting facilities in case of
emergency.
'Membership' for the disposal
of solid/hazardous waste to
TSDF shall be obtained.
The Company has obtained Consolidated Consent for Authorization (CCA)
vide letter no. AWH-73492 dated 22/10/2015 valid till 21/10/2020 for collection, storage and disposal of hazardous waste under the Hazardous Waste
(Management, Handling and Trans boundary Movement) Rules, 2008. CCA is
enclosed as Annexure-7.
Complied.
Following firefighting facilities have been installed in plant:
1 Fire Hydrant Reservoir: 314 m3
2 Main Hydrant Pump
Make: Mather & Platt Pumps Ltd
Model : ET ISO No:12 (CAT-B1)
Head: 70 m
Flow: 137 m3/h
Motor : 2955 RPM
3 Jockey Pump
Make: Mather & Platt Pumps Ltd
Model : ET ISO No:03 (CAT-B1)
Head: 70 m
Flow: 11 m3/h
Motor : 2850 RPM
4 Diesel Engine Pump
Make: Graves Cotton Ltd
Model : 4G IIT
Head: 70 m
Flow: 137 m3/h
5 Fire Hydrant Details
Type of Hydrant Total Nos. Installed
Single Hydrant 15
fixed Monitor 1
6 Fire Extinguisher Details
Fire Extinguisher Type Fire Extinguisher
Capacity Quantity
DCP 5 kg, 10 kg 40
ABC 2 kg, 5 kg, 25 kg 61
Foam 9 kg, 50 kg 18
CO2 2 kg, 4.8 kg, 6.8 kg, 9 kg 54
Page 16
M/s. Apothecon Pharmaceuticals Pvt. Ltd., Vadodara, Gujarat 16
No. Condition Compliance status
Fire Hydrant layout attached as Annexure- 7-A.
Unit has obtained membership of TSDF facility of
NECL. Membership certificate is enclosed as Annexure-6.
Complied.
xii The Company shall strictly
comply with the rules and
guidelines under Manufacture,
Storage and Import of
Hazardous Chemicals Rules,
1989 as amended time to time.
Transportation of hazardous
chemicals including phenol
shall be as per the Motor
Vehicle Act (MVA), 1989.
All the hazardous chemicals such as solvents are handled with proper care. The
areas where these chemicals are being stored or consumed warnings are
displayed.
Proper PPE’s are mandatory for workers handling these chemicals.
Page 17
M/s. Apothecon Pharmaceuticals Pvt. Ltd., Vadodara, Gujarat 17
No. Condition Compliance status
All vents of solvent storage units are connected with vent condensers supplied
with chilled brine.
Brine Plant
Chilling Plant
Close feed systems are provided to avoid direct contact, leakages and spillages
of chemicals. Regular work zone monitoring is conducted to check efficiency of
the system adopted.
The unit is strictly complying with all the rules and regulation under
manufacture, storage and import of Hazardous chemicals rules, 1989 as
amended in October, 1994 and January, 2000. Peso Licence is obtained for
storage of solvent vide letter no. P/WC/GJ/16/337 (P252140) dated 26/12/2014.
Peso Licence is enclosed as Annexure-3.
All transportation of Hazardous Chemicals is as per the MVA, 1989 and its
subsequent amendments.
Complied.
xiii Hazardous chemicals shall be
stored in tanks, drums, carboys
etc. Flame arresters shall be
provided on tank farm. Solvent
transfer shall be done by
pumps.
Hazardous chemical such as HCL, Acetic Acid, Formic Acid are stored in
Carboys in a separate Hazardous chemical storage area equipped with Fire
Extinguishers. Solvent transfer is done manually from drum with proper
earthing.
Complied.
Page 18
M/s. Apothecon Pharmaceuticals Pvt. Ltd., Vadodara, Gujarat 18
No. Condition Compliance status
xiv The company shall undertake
following waste minimization
measures :-
a. Metering and control of
quantities of active
ingredients to minimize
waste.
Ingredients/inputs are being properly weighted and charged to the vessel
through hoppers & flow metering control systems.
Complied.
b. Reuse of by-products from
the process as raw materials
or as raw material substitutes
in other processes.
Manufacturing of API during the period Jan to Jun-2019, No by-product NaCL
is being generated from the process.
Complied.
c. Use of automated filling to
minimize spillage.
Ingredients/inputs are being properly measured and transfer to the vessel
through hoppers, transferring pumps & vacuum systems.
Vaccum Charging
Vaccum Receiver
Solvent Transfer Pumps
Charging Hopper
Complied.
d. Use of Close Feed system
into batch reactors.
Batch rectors having close feed systems (Nozzles) for hoppers, transferring
liquids as well as vacuum systems.
Page 19
M/s. Apothecon Pharmaceuticals Pvt. Ltd., Vadodara, Gujarat 19
No. Condition Compliance status
Vacuum Charging
Vacuum Receiver
Complied.
e. Venting equipment through
vapour recovery system.
Batch reactors having two stage condensers and are connected with scrubbers.
Complied.
f. Use of high pressure hoses
for equipment clearing to
reduce wastewater
generation
Water jet hose are being used for cleaning of equipment’s.
Complied.
Page 20
M/s. Apothecon Pharmaceuticals Pvt. Ltd., Vadodara, Gujarat 20
No. Condition Compliance status
xv The unit shall make the
arrangement for protection of
possible fire hazards during
manufacturing process in
material handling. Firefighting
system shall be as per the OISD
117 norms.
The detail of firefighting system is given as under:
Following firefighting facilities have been installed in plant:
1 Fire Hydrant Reservoir: 314 m3
2 Main Hydrant Pump
Make: Mather & Platt Pumps Ltd
Model : ET ISO No:12 (CAT-B1)
Head: 70 m
Flow: 137 m3/h
Motor : 2955 RPM
3 Jockey Pump
Make: Mather & Platt Pumps Ltd
Model : ET ISO No:03 (CAT-B1)
Head: 70 m
Flow: 11 m3/h
Motor : 2850 RPM
4 Diesel Engine Pump
Make: Graves Cotton Ltd
Model : 4G IIT
Head: 70 m
Flow: 137 m3/h
5 Fire Hydrant Details
Type of Hydrant Total Nos. Installed
Single Hydrant 15
fixed Monitor 1
6 Fire Extinguisher Details
Fire Extinguisher Type Fire Extinguisher Capacity Quantity
DCP 5 kg, 10 kg 40
ABC 2 kg, 5 kg, 25 kg 61
Foam 9 kg, 50 kg 18
CO2 2 kg, 4.8 kg, 6.8 kg, 9 kg 54
Complied.
xvi As proposed, green belt shall be
developed in 19,025 sq. m out
of 38,077 sq m. Green belt
design shall be as per CPCB
guidelines.
Total 12925 m2 area is covered with greenbelt which is more than 33 % of total
plot area (38077 sq. m.) consisting of air and noise pollution capturing trees on
periphery; shrubs and lawn. The photographs of greenbelt developed within
plant premises are as under: Plant layout with green belt area marking is
attached as Annexure- 7-B.
Page 21
M/s. Apothecon Pharmaceuticals Pvt. Ltd., Vadodara, Gujarat 21
No. Condition Compliance status
Complied.
xvii Provision shall be made for the
housing for the construction
labour within the site with all
necessary infrastructure and
facilities such as fuel for
cooking mobile toilets mobile
sewage treatment plant, safe
drinking water, medical health
care, creche etc. The housing
may be in the form of
temporary structure to be
removed after the completion
of the project All construction
wastes shall be managed so that
there is no impact on the
surrounding environment.
All necessary housing and other required facilities are provided to construction
labour, construction waste is managed within the construction site to avoid
impact on surrounding environment.
Complied.
B. GENERAL CONDITIONS:
i The project authorities shall
strictly adhere to the
stipulations made by the
Gujarat Pollution Control
Board.
We are periodically submitting the Monthly Patraks, Annual Returns such as
Water Cess, Form-4 Hazardous Waste Returns, Form-V Environment
Statement, etc. as a part of informing the authorities for the environmental
status / conditions during the financial years. The proof of submission is
enclosed as Annexure-8.
Complied.
Page 22
M/s. Apothecon Pharmaceuticals Pvt. Ltd., Vadodara, Gujarat 22
No. Condition Compliance status
ii No further expansion or
modifications in the plant shall
be carried out without prior
approval of the Ministry of
Environment and Forests. In
case of deviations or alterations
in the project proposal from
those submitted to this Ministry
for clearance, a fresh reference
shall be made to the Ministry to
assess the adequacy of
conditions imposed and to add
additional environmental
protection measures required, if
any.
No additional expansion/modification is carried our other than approved from
Ministry of Environment and forests,
Construction work is going on at site is as per the project proposal submitted to
the MoEF, and we have also received the valid extension vide F. No: J-
11011/186/2009-IA-II (I), dated 5th March 2018, up to 23rd December 2020.
The extension letter is enclosed as Annexure-9.
We will provide sufficient environment protection measures for constructed
API plant facility.
Complied.
iii The locations of ambient air
quality monitoring stations
shall be decided In consultation
With the State Pollution
Control Board (SPCB) and it
shall be ensured that at least
one stations is installed in the
upwind and downwind
direction as well as where
maximum ground level
concentrations are anticipated.
Regular monitoring is being carried out to ensure quality of ambient air within
prescribed norms of NAAQS within premises. The details of monitoring are as
under:
Locations Parameters Limits Results
Min. Min. Avg.
Security Gate
PM10 (µg/m3)
PM2.5(µg/m3)
SO2 (µg/m3)
NO2 (µg/m3)
HCl (µg/m3)
Cl2 (µg/m3)
VOC(µg/m3)
100
60
80
80
200
100
-
76.0
26.0
14.0
22.0
BDL
BDL
BDL
92.0
43.0
23.0
28.0
BDL
BDL
BDL
86.0
34.0
19.0
25.3
BDL
BDL
BDL
Near ETP
PM10 (µg/m3)
PM2.5(µg/m3)
SO2 (µg/m3)
NO2 (µg/m3)
HCl (µg/m3)
Cl2 (µg/m3)
VOC(µg/m3)
100
60
80
80
200
100
-
71.0
23.0
15.0
20.0
BDL
BDL
BDL
88.0
32.0
19.0
28.0
BDL
BDL
BDL
81.0
28.0
17.0
24.1
BDL
BDL
BDL
Near R & D
Bldg.
PM10 (µg/m3)
PM2.5(µg/m3)
SO2 (µg/m3)
NO2 (µg/m3)
HCl (µg/m3)
Cl2 (µg/m3)
VOC(µg/m3)
100
60
80
80
200
100
-
77.0
26.0
13.0
19.0
BDL
BDL
BDL
92.0
45.0
22.0
28.0
BDL
BDL
BDL
85.0
36.0
16.6
25.0
BDL
BDL
BDL
The monitoring reports are enclosed as Annexure-1.
Complied.
iv The overall noise levels in and
around the plant area shall be
kept well within the standards
by providing noise control
measures including acoustic
hoods, silencers, enclosures etc.
on all sources of noise
generation. The ambient noise
levels shall conform to the
standards prescribed under
Environment (Protection) Act,
1986 Rules, 1989 viz. 75 dBA
(day time) and 70 dBA (night
time).
The overall noise levels in and around the plant area is kept well within the
standards by providing noise control measures including acoustic hoods,
silencers, encloses etc. on all sources of noise generation. Ambient noise levels
are being monitored regularly. It is mandatory for workers to use PPE’s such as
ear plugs/ear muffs in high noise area.
The ambient noise levels is under the standards prescribed under Environment
Protection act, 1986 Rules, 1989 viz. 75 dB(A) (day time) & 70 dB(A) (night
time).
Equipment generating high noise are equipped with Acoustic enclosures;
regular maintenance, lubrication and vibration pads are assured for such
sources. The results are stated as under;
Page 23
M/s. Apothecon Pharmaceuticals Pvt. Ltd., Vadodara, Gujarat 23
No. Condition Compliance status
Location
Permissible limit (dB(A)) Day - Night time results (dB(A))
Day Night Min. Max. Avg.
Day Night Day Night Day Night
ETP area
75 70
61 52 68 60 65.67 57
Boiler House 65 54 73 67 68.5 60.83
D.G. Set area 61 54 71 62 67.70 58.33
Security main Gate 48 45 68 56 57.33 50.33
Administrat
ion area 46 46 57 58 52.33 49.83
Q. C.
Laboratory 49 45 65 56 57 50
R & D
Laboratory 48 46 67 54 55.5 50
Utility Ground
Floor 61 53 72 58 65.83 56.70
Utility First
Floor 55 50 72 62 64.5 55.33
ADL Area 52 47 62 58 55.5 52.33
The analysis reports for noise level monitoring are attached as Annexure-1.
Complied.
v During transfer of materials,
spillages shall be avoided and
garland drains be constructed to
avoid mixing of accidental
spillages with domestic
wastewater and storm water
drains.
“Close feed” system is used into batch reactor. Pumps and direct pipeline are
connected to batch reactor for material shifting, to ensure the close feed system
in plant.
Photograph of the closed feed system is as under:
Complied.
vi The Company shall harvest
rainwater from the roof-tops of
the buildings and storm water
drains to recharge the ground
water and use the same water
for the process activities of the
project to conserve fresh water.
Rainwater harvesting is carried out through collecting the runoff from rooftops
of the buildings to Percolating wells. Drawing of percolation well is attached
here as Annexure-10.
Effective area- 4660.65 m2
Rain water available- 4324.097 KL
Capacity of rain water Harvesting wells – 250 lit/Min
Nos. of Recharge Bore wells- 02
Complied.
vii Usage of Personnel Protection
Equipments (PPEs) by all
PPE’s are mandatory for all workers and employees as per possible hazard type.
Type and quantity of PPE’s available at unit are as under:
Page 24
M/s. Apothecon Pharmaceuticals Pvt. Ltd., Vadodara, Gujarat 24
No. Condition Compliance status
employees/ workers shall be
ensured. Type Quantity
Purple nitrile Gloves 270 Packet
Surgical Gloves (Powder free) 260 Packet
Sterile Surgical Gloves 15 Packet
Nitrile Gloves 55 Pairs
Rubber Gloves 70 Pairs
Grey nitrile gloves 480 Nos
Plastic Full length hand gloves 10500 Nos
Face Shield 7 Nos
Dust mask 750 Nos
Safety Googles 80 Nos
Full face mask 13 Nos
Half Face mask 08 Nos
Ear Plug/Ear Muff 100 Nos
Complied.
viii Occupational health
surveillance of the workers
shall be done on a regular basis
and records maintained as per
the Factories Act.
Total 85 nos of Pre-employment and 65 nos of annual medical check-up is
carried out in last last 6 months as per Factories Act. Agreement copy of doctor
and health report is attached here as Annexure-11.
Complied.
ix Training shall be imparted to
all employees on safety and
health aspects of chemicals
handling. Pre-employment and
routine periodical medical
examinations for all employees
shall be undertaken on regular
basis. Training to all employees
on handling of chemicals shall
be imparted.
Training of safety and health aspects of chemicals handling is being arranged
periodically. Pre-Employment and periodical check-up is being carried out.
Medical reports are enclosed as Annexure-11.
Complied.
x The company shall also comply
with all the environmental
protection measures and
safeguards proposed in the
project report submitted to the
Ministry.
All the recommendations made
in the EIA/EMP in respect of
environmental management,
risk mitigation measures and
public hearing relating to the
project shall be implemented.
Following are the environmental protection measures and safeguards have been
installed as proposed in the project report submitted to the Ministry &
recommendations made in the EIA/EMP in respect of environmental
management, risk mitigation measures and public hearing:
Point as per EMP of
EIA Report &
Public Hearing
Implementation Details
Page 25
M/s. Apothecon Pharmaceuticals Pvt. Ltd., Vadodara, Gujarat 25
No. Condition Compliance status
Proper collection,
handling & storage
shall be provided for
hazardous waste.
Unit has provided hazardous waste storage area with
pucca flooring, leachate collection system & roof.
Unit shall obtain
necessary
membership
certificate from
approved TSDF,
CHWIF.
Unit has obtained membership of CHWIF facility of
RSPL vide letter dated 30/01/2017. Membership
certificate is enclosed as Annexure-6.
Unit has obtained membership of TSDF facility of
NECL. Membership certificate is enclosed as
Annexure-6.
Company shall install
ETP consisting of
primary and
secondary facility.
Fully Functional ETP having 75 m3/Day capacity is
installed.
Page 26
M/s. Apothecon Pharmaceuticals Pvt. Ltd., Vadodara, Gujarat 26
No. Condition Compliance status
Distillation unit is provided for high COD effluent.
Online Effluent monitoring analyser and data logging
is installed at ETP
Unit shall obtain
necessary
membership
certificate from
CETP of EICL,
Umaraya.
Unit has obtained membership certificate from M/s
EICL, Umaraya. Membership certificate is enclosed as
Annexure-5.
Page 27
M/s. Apothecon Pharmaceuticals Pvt. Ltd., Vadodara, Gujarat 27
No. Condition Compliance status
Adequate pollution
control system shall
be provided with
stacks.
Online stack monitoring Analyser and data logging is
installed.
As fuel used in boiler-1 & TFH is diesel APCM is not
required.
Water scrubber is attached with stack of Tablet coater.
Page 28
M/s. Apothecon Pharmaceuticals Pvt. Ltd., Vadodara, Gujarat 28
No. Condition Compliance status
Caustic/ water scrubber is attached with Pilot Plant
reactor vessel.
Caustic/ water scrubber is attached with Reactor vessel
(API plant –III).
Plantation shall be
done in & around
plant
Total 12,925 m2 area is covered with greenbelt which is
more than 33 % of total plot area consisting of air and
noise pollution capturing trees on periphery; shrubs and
lawn. The photographs of greenbelt developed within
plant premises are as under:
Page 29
M/s. Apothecon Pharmaceuticals Pvt. Ltd., Vadodara, Gujarat 29
No. Condition Compliance status
Rain water
harvesting system
shall be provided to
conserve ground
water level.
Rainwater harvesting is carried out through collecting
the runoff from rooftops of the buildings to Percolating
wells.
Effective area- 4660.45 m2
Rain water available- 4324.097 KL
Capacity of rain water Harvesting wells – 250
lit/Min
Nos. of Recharge Bore wells- 02
Drawing of percolation well is attached here as
Annexure-10.
Separate solvent
storage area shall be
provided.
Necessary
permissions shall be
obtained from PESO
if applicable.
Hazardous chemical such as HCL, Acetic Acid, Formic
Acid are stored in Carboys in a separate Hazardous
chemical storage area equipped with Fire
Extinguishers. Solvent transfer is done manually from
drum with proper earthing.
Peso Licence is obtained for storage of solvent vide
letter no. P/WC/GJ/16/337 (P252140) dated
26/12/2014. Peso Licence is enclosed as Annexure-3.
Page 30
M/s. Apothecon Pharmaceuticals Pvt. Ltd., Vadodara, Gujarat 30
No. Condition Compliance status
PPE’s shall be
provided to workers.
Following PPE’s are provided:
Type Quantity
Purple nitrile Gloves 270 Packet
Surgical Gloves (Powder free) 260 Packet
Sterile Surgical Gloves 15 Packet
Nitrile Gloves 55 Pairs
Rubber Gloves 70 Pairs
Grey nitrile gloves 480 Nos
Plastic Full length hand gloves 10500 Nos
Face Shield 7 Nos
Dust mask 750 Nos
Safety Googles 80 Nos
Full face mask 13 Nos
Half Face mask 08 Nos
Ear Plug/Ear Muff 100 Nos
Page 31
M/s. Apothecon Pharmaceuticals Pvt. Ltd., Vadodara, Gujarat 31
No. Condition Compliance status
Onsite offsite
emergency plan shall
be prepared &
rehearsed.
Onsite offsite emergency plan is prepared and
rehearsed at regular interval of time.
Safety audit is carried out by safety auditor once in a 2
years. The recommendation of audit report are enclosed
as Annexure-12.
Regular monitoring
of various
environmental
parameters shall be
carried out to check
effectiveness of
control system.
Regular monitoring of various environmental
parameters is carried out. Analysis reports are enclosed
as Annexure-1.
Complied.
xi The company will undertake all
relevant measures for
improving the socio-economic
conditions of the surrounding
area. CSR activities will be
undertaken by involving local
villages and administration.
The company undertake all relevant measures and CSR activities for improving
the socioeconomic conditions in the surrounding area, Drinking water RO
system and Educational kit provided to nearby village school, photographs are
attached herewith;
xii The company shall undertake
eco-developmental measures
including community welfare
measures in the project area for
the overall improvement of the
environment.
Page 32
M/s. Apothecon Pharmaceuticals Pvt. Ltd., Vadodara, Gujarat 32
No. Condition Compliance status
xiii A separate Environmental
Management Cell equipped
with full-fledged laboratory
facilities shall be set up to carry
out the Environmental
Management and Monitoring
functions.
Company has formed a separate cell involving cross functional departments i.e.
R&D, Production, QC, QA, EHS, Maintenance and security persons.
Following is the structure of an Environmental Cell;
Designation Name of Person Qualification
Associate Vice President& Executive Director (Operation & R&D.)
Mr. Raja Jeyakumar M Sc.Applied Chemistry
Executive director & CFO Mr. Nirmal parikh C.A
GM (Prod.) Mr. Jignesh Chopra M Sc. Ind. Chemistry
GM (Engg.) Mr. Chirag Shah B.E Mechanical
GM- ADL & QC Dr. Rajesh Thekdi Ph.D. Organic synthesis
DGM- QA Mr. Biren Shah B.Sc. Chemistry
GM - RA Mr.Prashant Chudasama
M pharm
AM- EHS Mr. Virat Patel M.Sc. Environment
Sr. Executive- EHS Mr. kanu Patel Diploma Tech
Executive- EHS Mr. Jaimin Vyas M.E Chemical
Officer -EHS Mr.Samarth Mukhekar M.Sc. Environment
Environmental Management Cell equipped with full-fledged laboratory
facilities had been set up to carry out the environmental management and
monitoring functions on continuous basis.
List of parameters being tested in ETP lab are as under:
pH
COD
BOD
TDS
Chloride
Ammonical nitrogen
The organogram is attached here as Annexure-13.
Complied.
xiv The company shall earmark
adequate funds to implement
the conditions stipulated by the
Ministry of Environment and
Forests as well as the State
Government along with the
implementation schedule for all
the conditions stipulated herein.
The funds so earmarked for
environment management
pollution control measures shall
not be diverted for any other
purpose.
Unit will not divert funds allocated for environment management pollution
control measures in other activities. Annual Amount spent on the activities is as
under:
Activity Capital Cost (In Lakhs) Recurring Cost (In Lakhs per annum)
2017-18 2018-19
2019-
20 (Up
to Jun-
2019)
2017-18 2018-19 2019-20 (Up
to Jun-2019)
Continuous Stack Gas
Measurements system
10.46
PTZ
camera and
Electomegnetic
Flowmeters
1.24
TDS Meter, PH Meter
0.86
Submersibl
e Mud Sewage
Pump
0.24
Air blower- 15 HP
1.15
ETP
operation & maintenanc
e Expense
8.33 8.29 6.01
Page 33
M/s. Apothecon Pharmaceuticals Pvt. Ltd., Vadodara, Gujarat 33
No. Condition Compliance status
Projected budget for Year 2019-20:
Capital – Free Budget for EHS
Complied.
xv A copy of the clearance letter
shall be sent by the project
proponent to concerned
Panchayat, Zila Parisad
Municipal Corporation, Urban
local Body and the local NGO,
if any, from who suggestions!
Representations, if any, were
received while processing the
proposal.
A copy of the clearance letter has been submitted to various bodies.
Complied.
xvi The project proponent shall
also submit six monthly reports
on the status of compliance of
the stipulated Environmental
Clearance conditions including
results of monitored data (both
in hard copies as well as by e-
mail) to the respective Regional
Office of MoEF, the respective
Zonal Office of CPCB and the
Gujarat Pollution Control
board. A copy of
Environmental Clearance and
six monthly compliance status
reports shall be posted on the
website of the company.
We have already submitted the 6 monthly compliance report to the authority for
all six monthly periods between 2015 to 2019. The submission details are as
below:
Sr. No. EC Compliance
Report Period Submission Date
1 January-June’ 2019 To be submit
2 July-December’ 2018 03/06/2019
3 January-June’ 2018 24/01/2019
4 July-December’ 2017 18/09/2018
5 January-June’ 2017 13/10/2017
6 July-December’ 2016 28/9/2017
7 January-June’ 2016 19/09/2017
8 July-December’ 2015 10/04/2017
9 January-June’ 2015 10/04/2017
Complied.
xvii The environmental statement
for each financial year ending
31st March in Form-V as is
mandated shall be submitted to
the concerned State Pollution
Control Board as prescribed
under the Environment
(Protection) Rules, 1986, as
amended subsequently, shall
also be put on the website of
the company along with the
status of compliance of
environmental clearance
conditions and shall also be
sent to the respective Regional
Offices of MoEF by email.
The environmental statement for each financial year ending 31st March in
Form-V is being submitted to GPCB – Vadodara and Gandhinagar. We will put
EC compliance and Form-V on our website. Submission proof is enclosed as
Annexure-8.
Complied.
Page 34
M/s. Apothecon Pharmaceuticals Pvt. Ltd., Vadodara, Gujarat 34
No. Condition Compliance status
xvii
i
The project proponent shall
inform the public that the
project has been accorded
environmental clearance by the
Ministry and copies of the
clearance letter are available
with the SPCB
Committee and may also be
seen at Website of the Ministry
at http://envfor.nic.in. This
shall be advertised within seven
days from the date of issue of
the clearance letter, at least in
two local newspapers that are
widely circulated in the region
of which one shall be in the
vernacular language of the
locality concerned and a copy
of the same shall be forwarded
to the concerned Regional
Office of the Ministry.
We have obtained the EC in year 2010 vide letter no. F.No: J-11011/690/2008-
IA (I) dated 23rd December 2010, and inform the public that the project has
been accorded environmental clearance letter and advertised in two local
newspapers that are widely circulated in the region with one in the vernacular
language Gujarati and another in English as per below details;
1. Gujarati News Paper Gujarat Samachar, Dt.02/01/2011,
2. English News Paper Times of India, Dt. 02/01/2011.
The copies of the newspapers are attached here as Annexure-14.
Construction work is going on at site for API plant facility and We have
obtained EC Extension vide file No: J-11011/186/2009-IA (I), dated 5th March
2018 up to 23rd December 2020. EC extension letter is enclosed as Annexure-9.
xix The project authorities shall
inform the Regional Office as
well as the Ministry, the date of
financial closure and final
approval of the project by the
concerned authorities and the
date of start of the project.
We are periodically submitting the Monthly Patraks, Monthly Returns, Annual
Returns such as Water Cess, Form-4 Hazardous Waste Returns, Form-V
Environment Statement, etc. as a part of informing the authorities for the
environmental status / conditions during the financial years. The proof of
submission is enclosed as Annexure-8.
Complied.
Project starting date: 01/04/2017
Project work under process so financial closer date pending.
8. The Ministry may revoke or
suspend the clearance, if
implementation of any of the
above conditions is not
satisfactory.
We clearly understand and assure to comply all the requirements. We also
understand that ministry may revoke and suspend the clearance, if any of the
above condition is not satisfactory.
Noted and Agreed
9. The Ministry reserves the right
to stipulate additional
conditions, if found necessary.
The company in a time bound
manner will implement these
conditions.
We understand that the ministry reserves the right to stipulate additional
conditions, if found necessary. We assure to implement the conditions in a time
bound manner.
Noted and Agreed
10. Any appeal against this
environmental clearance shall
lie with the National Appellate
Authority, if preferred, within a
period of 30 days as prescribed
under section 11 of the
National Environment
Appellate Authority Act, 1997.
We understand that Any appeal against this environment clearance shall lie with
the National Environment Appellate Authority, if preferred within a period of
30 days as prescribed under Section 11 of the National Environment Appellate
Authority Act, 1197.
Noted and Agreed
11. The above conditions will be
enforced, inter-alia under the
provisions of the Water
(Prevention & Control of
Pollution) Act, 1974, Air
(Prevention &. Control of
Water Pollution) Act, 1981 ,
the
Environment (Protection) Act,
1986 Hazardous Wastes
We are complying and will continue to comply with all the statutory
requirements as per the provisions of the Water (Prevention & Control of
Pollution) Act, 1974, Air (Prevention &. Control of Water Pollution) Act, 1981,
the Environment (Protection) Act, 1986 Hazardous Wastes (Management and
Handling) Rules, 2003, 2008 along with their amendments and rules.
PLI Policy is enclosed as Annexure- 15.
The copy of the Onsite Emergency Plant – Apothecon Pharmaceuticals Private
Limited -April-2017 is attached here as Annexure-16.
Page 35
M/s. Apothecon Pharmaceuticals Pvt. Ltd., Vadodara, Gujarat 35
No. Condition Compliance status
(Management and Handling)
Rules, 2003, 2008 and the
Public Liability Insurance Act,
1991 along with their
amendments and rules.
License As per Hazardous Rules
Sr.
No.
Licenses &
Permits
Refere
nce
Numb
er
Expiry Measured
Values
Responsible
Authority
1. Factory License 7571 31/12/2019 Factory
Licence
DISH
2. Stability
certificate
NA/ST
B/APP
L/07/2
016/01
15/7/2021 STABILIT
Y
CERTIFIC
ATE
COMPETE
NT
PERSON
3. Explosive
License for
Petroleum
Storage
P/WC/
GJ/16/
337
(P2521
40)
31/12/2024 CLASS-A PESO
Factory License is enclosed as Annexure-17.
Stability certificate is enclosed as Annexure-18.
Explosives licence is enclosed as Annexure-3.
Complied.