EC compliance status - Adhunik Group

Nov 27, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: EC compliance status - Adhunik Group
Page 2: EC compliance status - Adhunik Group

 

 

 

as Annexure‐I.

(iii)  The  company  shall  submit within  3 month their policy towards Corporate Environment Responsibility  which  should  inter‐alia address  (i)  Standard  operating  process/ procedure  to  bring  into  focus  any infringements /violation of environmental or forest  norms/conditions,  (ii)  Hierarchical system  or  Administrative  order  of  the company  to deal with environmental  issues and ensuring compliance EC conditions and (iii)  System  of  reporting  of  non compliance/violation  environmental  norms to  the  Board  of  directors  of  the  Company and /or  stakeholders of shareholders. 

Policy  Towards  Corporate  Environmental  and social responsibility:  ‐  CESR  strategies  aligned  with  organizational goals   ‐ Drive CESR throughout the organization ‐ Developing a culture of sustainability ‐  What  drives  business  to  consider sustainability? ‐ CESR initiatives during a challenging economy ‐  Communication  via  responsibility  reporting and its effect on firm value ‐ CESR  impacting current and  future regulatory practices ‐ Social/Environmental Accounting  ‐ Social/Environmental Sustainability Reporting ‐ Corporate Accountability CSR  Activities  implemented  by  OMML  is enclosed as Annexure‐II. 

(iv)   The  environmental  clearance  is  subject  to approval of the State Land use Department, Government  of  Orissa  for  diversion  of agriculture  land  for non‐agricultural use,  as may be applicable to this project. 

No  agricultural  land  involved  in  the mining activities. 

(v)  Necessary  prior  permission  from  the Competent  Authority  as may  be  applicable for  use  of  grazing  land  for mining  propose shall be obtained. 

No  grazing  land  involved  in  the  Mining activities.   

(vi)  The Project Proponent shall develop  fodder plots  in  the non‐mineralised  area  in  lieu of use of grazing land. 

No  grazing  land  involved  in  the  Mining activities.   

(vii)  The mining operations shall be restricted to above ground water table and  it should not intersect  the  groundwater  table.  In  case of working  below  ground  water  table,  prior approval of the Ministry of Environment and Forests  and  the  Central  Ground  Water Authority  shall  be  obtained,  for  which  a detailed  hydro‐geological  study  shall  be carried out. 

The topography of the area is undulated and hilly  at  an  elevation  above mean  sea  level ranging  from  595m  to  620m.  The  ultimate working depth of mine will be restricted up to 590m AMSL. The ground water table is at 565m  AMSL.  The  Mine  Working  will  not intersect the ground water table.  

(viii)  The project proponent  shall ensure  that no natural watercourse and/or water resources shall  be  obstructed  due  to  any  mining 

No  Natural  Water  course  and/or  water resources will be obstructed due  to Mining operations as an area at 50m on either side 

Page 3: EC compliance status - Adhunik Group

 

 

 

operations.  Adequate  measures  shall  be taken for conservation and protection of the 1st and 2nd order  streams,  if any emanating or passing through the mine lease during the course of mining operation. 

of Water course is left as safety barrier. 

(ix)  The  top  soil  if  any  shall  temporarily  be stored  at  earmarked  site(s)  only  and  it should not be  kept unutilized  for  long. The topsoil  shall  be  used  for  land  reclamation and plantation. 

The entire Over burden generated is lateritic in nature, therefore generation of top soil is nil.  

(x)  The over burden  (OB) generated during  the mining  operations  shall  be  stacked  at earmarked  dump  site(s)  only  and  it  should not be kept active  for a  long period of time and  their  phase‐wise  stabilization  shall  be carried out. Back filing shall commence from the  6th  year  onwards.  The  existing  two dumps  shall  merge  into  one  single  dump and there shall be one external OB dump at the end of the mine life in an area of 5.3 ha. Proper  terracing  of  OB  dumps  shall  be carried out so that the overall slope of dump shall  not  exceed  280.  The  Over  burden dumps  shall be scientifically vegetated with suitable  native  species  to  prevent  erosion and  surface  run off.  In critical areas, use of geo  textiles  shall  be  undertaken  for stabilization  of  the  dump.  The  entire excavated  area  of  23.772  ha.  shall  be backfilled  and  reclaimed  by  plantation. Monitoring  and  management  of rehabilitated  areas  shall  continue  until  the vegetation  becomes  self‐sustaining. Compliance status shall be submitted to the Ministry  of  Environment  &  Forests  and  its Regional Office  located  at Bhubaneswar on six monthly basis. 

Precautionary  Measures  Adopted  During Waste Disposal are as Follows: ‐ i) The  ultimate  dump  slope  has  been maintained  at  20‐220  with  individual terrace slopes not exceeding 370. 

ii) Each  terrace  has  been  maintained inward  slope  with  catch  drain  at  the inward slope of terrace. 

iii) Catch drain of  the  individual  terrace are connected  to  the  garland  drain  outside the  periphery  of  dump.  Catch  drain preferable  made  up  of  halt  concrete open pipes  followed by settling  tanks  to avoid  wash  offs  and  have  provision berms  at  the outer  side  to  reduce gully formation due to rainwater wash offs. 

iv) As  retreating  method  of  dumping  has been  proposed  for  dump  stabilization dead  terraces  have  to  be  planted  also dump slopes from third year onwards. 

 

(xi)  Catch  drains  and  siltation  ponds  of appropriate size shall be constructed around the mine working, mineral and OB dump(s) 

Catch  drains  and  siltation  ponds  around quarry  and  Over  burden  dumps  has  been constructed to prevent run‐off of water and 

Page 4: EC compliance status - Adhunik Group

 

 

 

to  prevent  run  off  of  water  and  flow  of sediments directly  into  the Karo Nallah,  the Tehrai Nallah,  and other water bodies.  The water  so  collected  should  be  utilized  for watering  the mine  area,  roads,  green  belt development  etc.  The  drains  shall  be regularly  desilted  particularly  after  the monsoon and maintained properly. 

Garland  drains,  settling  tanks  and check  dams  of  appropriate  size,  gradient and length shall be constructed both around the  mine  pit  and  over  burden  dumps  to prevent  run  off  of  water  and  flow  of sediments directly  into  the Karo Nallah,  the Tehrai  Nallah  and  other  water  bodies  and sump  capacity  should  be  designed  keeping 50%  safety  margin  over  and  above  peak sudden rainfall (based on 50 years data) and maximum  discharge  in  the  area  adjoining the  mine  site.  Sump  capacity  should  also provide adequate  retention period  to allow proper  settling  of  silt  material. Sedimentation  pits  shall  be  constructed  at the  corners  of  the  garland  drains  and desilted at regular intervals. 

flow  of  sediments  directly  into  the  Karo Nala,  Tehrai  Nala  and  other  water  bodies. Collected water used  for watering  the mine areas,  road,  green  belt  development  etc. Proper de‐siltation and maintenance of  the drains  carried  out,  garland  drains,  settling tanks and check dams constructed.  Retaining wall: (Length, Width, Height:  192.4m x 3m x 2m, Area covered 660Sq. mtrs.) 

Garland drain: (Length, Width, Height:  200m x 2m x 1m, Area covered 660Sq. mtrs.) 

Settling tanks: (L,B,D):  1. 5m x 3m x 1.5m,  2. 6m x 3m x 2m 

 

 

(xii)  Dimension of the retaining wall at the toe of over  burden  dumps  and  the  OB  benches within  the  mine  to  check  run‐off  and siltation shall be based on the rain fall data. 

The retaining wall (Length, Width, Height: 

192.4m x 3m x 2m, Area covered 660Sq. mtrs.) at  the  toe  of  over  burden  dumps  made based  on  the  rainfall  data  to  check  run‐off and siltation. Photographs of Retaining wall is enclosed as Annexure‐III.  

(xiii)  Plantation  shall  be  raised  in  an  area  of 47.084 ha.  including a 7.5m wide green belt in  the safety zone around  the mining  lease, over  burden  dumps,  backfilled  and reclaimed area, mine benches, roads etc. by planting  the  native  species  in  consultation with  the  local DFO/Agriculture Department. The  density  of  the  trees  should  be  around 

Green  belt  has  already  been  developed around the mine boundary, Non‐mineralized dump area and both sides of the haul roads and  Pillar  no  9  to  Pillar  no.15  including safety zones. Till date a total of 27,800 nos. of plants  like Teak, Sisham, Chakunda, Aam, Neem,  Kasi,  Amla,  &  Bamboo  have  been planted  over  an  area  of  14  hectares 

Page 5: EC compliance status - Adhunik Group

 

 

 

2500  plants  per  ha.  Greenbelt  shall  be developed all along the mine lease area in a phased  manner  and  shall  be  completed within first five years. 

approximately with a survival rate of 65% in consultation with the forest department.   

(xiv)  Effective  safeguard  measures  such  as regular water sprinkling shall be carried out in  critical  areas  prone  to  air  pollution  and having high levels of particulate matter such as  around  crushing  and  screening  plant, loading  and  unloading  point  and  transfer points.  Extensive  water  sprinkling  shall  be carried  out  on  haul  roads.  It  should  be ensured  that  the  Ambient  Air  Quality parameters  conform  to  the  norms prescribed  by  the  Central  Pollution  Control Board in this regard. 

Water  sprinkling  in  the haul  road, dumping ground  and  on  transporting  area  has  been regularly carried out twice daily.  Monitoring of Air quality parameter carried out regularly and the results are well within the  prescribed  norms  by  CPCB. Monitoring results are enclosed as Annexure‐IV.  

(xv)  The  project  authority  should  implement suitable conservation measures  to augment ground  water  resources  in  the  area  in consultation  with  the  Regional  Director, Central Ground Water Board. 

The topography of the area is undulated and hilly  at  an  elevation  above mean  sea  level ranging  from  595m  to  620m.  The  ultimate working depth of mine will be restricted up to 590m AMSL. The ground water table is at 565m  AMSL.  The  Mine  Working  will  not intersect the ground water table. Rainwater harvesting  techniques  have  been  practiced as a measure of conservation of water. 

(xvi)  Regular  monitoring  of  ground  water  level and  quality  shall  be  carried  out  in  and around  the  mine  lease  by  establishing  a network of existing wells and  installing new piezometers  during  the  operation.    The periodic monitoring [ (at least four times in a year  –  pre  ‐  monsoon(April‐May), monsoon(August),  post  ‐ monsoon(November)  and  winter(January); once in each season) ] shall be carried out in consultation  with  the  State  Ground Water Board/ Central Ground Water Authority and the  data  thus  collected  may  be  sent regularly to the Ministry of Environment and Forests and its Regional office Bhubaneswar, 

The  mine  lease  area  is  much  above  the ground  water  table  and  at  ultimate  stage also,  it  will  not  touch  the  ground  water table. As such, there is no impact on ground water  table  due  to  this  mining  project. Regular  monitoring  of  water  quality  and water  level  is  being  carried  out  (Ref.: Annexure – IV). 

Page 6: EC compliance status - Adhunik Group

 

 

 

the Central Ground water Authority and the Regional  Director,  Central  Ground  Water Board. If at any stage, it is observed that the groundwater  table  is  getting  depleted  due to  the mining  activity,  necessary  corrective measures shall be carried out. 

(xvii)  The  project  proponent  shall  obtain necessary  prior  permission  of  the competent authorities for drawl of requisite quantity of water (surface water and ground water, if any) for the project. 

The  requisite  quantity  of  water  has  been purchased from local PHED.  

(xviii)  The project proponent shall practice suitable rainwater harvesting measures on long term basis  and  work  out  a  detailed  scheme  for rain  water  harvesting  in  consultation  with Central Ground Water Authority and submit a  copy  of  the  same  to  the  Ministry  of Environment  and  Forests  and  its  Regional Office, Bhubaneswar.  

Rainwater  harvesting  measures  have  been planned  and  implemented  in  consultation with the CGWB.  

(xix)  Vehicular  emissions  shall  be  kept  under control  and  regularly monitored. Measures shall  be  taken  for maintenance  of  vehicles used  in  mining  operations  and  in transportation  of  mineral.  The  mineral transportation  shall  be  carried  out  through covered  trucks  only  and  the  vehicles carrying  the  mineral  shall  not  be overloaded. 

Necessary steps have been taken to control the vehicular emission. The vehicles that are used  in  the  mining  operations  is  covered with tarpaulin to avoid dust generation.  

(xx)   No  Blasting  shall  be  carried  out  after  the sunset.  Blasting  operation  shall  be  carried out  only  during  the  day  time.  Controlled blasting  shall  be  practiced.  The  mitigative measures  for  control  of  ground  vibrations and  to arrest  fly  rocks and boulders  should be implemented. 

Control  blasting  has  been  practiced  only during day time. 

(xxi)  Drills  shall  either  be  operated  with  dust extractors or equipped with water  injection system. 

Proper measures have been adopted during drilling to prevent dust. 

(xxii)  Mineral  handling  plant  shall  be  provided with  adequate  number  of  high  efficiency dust  extraction  system.  Loading  and 

Water  sprinkling  carried  out  in Haul  roads, loading and unloading areas and all transfer points to control dust. Adequate numbers of 

Page 7: EC compliance status - Adhunik Group

 

 

 

unloading  areas  including  all  the  transfer points  should  also  have  efficient  dust control  arrangements.  These  should  be properly maintained and operated. 

high efficiency dust  extraction  system used in mineral handling area. 

(xxiii)  Sewage treatment plant shall be installed for the  colony.  ETP  shall  also  be  provided  for the  workshop  and  wastewater  generated during mining operation. 

All  the  workers  engaged  in  the mine  area from  the  nearby  villages.  Only  two/three staffs residing  in  the camp. As such sewage treatment  plant  is  not  necessary.  Further, there  is no workshop within the  lease area. Koira is approx. 10 km from the site. Rest of the  time machineries maintenance  is  done at Koira. As such ETP is not required. 

(xxiv)  Pre‐placement  medical  examination  and periodical  medical  examination  of  the workers  engaged  in  the  project  shall  be carried out and records maintained. For the purpose, schedule of health examination of the workers  should be drawn and  followed accordingly. 

Periodic medical examination of the workers carried  out  on weekly  basis  and  the  same will be continued. 

(xxv)  Provision  shall  be made  for  the  housing  of construction  labour within  the  site with  all necessary  infrastructure  and  facilities  such as  fuel  for  cooking,  mobile  toilets,  mobile STP,  safe  drinking  water,  medical  health care, crèche etc. The housing may be  in the form of temporary structures to be removed after the completion of the project. 

As stated earlier, all the workers of this mine are from the nearby villages. As the shift will be  over,  they  will  be  going  back  to  their respective  home.  Hence,  no  additional housing  is  required  for  labours.  However, necessary  infrastructure  made  is  of temporary structures.   

(xxvi)  The  project  proponent  shall  take  all precautionary  measures  during  mining operation for conservation and protection of endangered  fauna  namely  panther,  sloth bear, etc.  spotted  in  the  study area. Action plan for conservation of flora and fauna shall be  prepared  and  implemented  in consultation  with  the  State  Forest  and Wildlife Department. Necessary allocation of funds  for  implementation  of  the conservation  plan  shall  be  made  and  the funds  so  allocated  shall  be  included  in  the project cost. A copy of Wild life conservation plan  shall  be  submitted  to  the  Regional Office, Ministry of Environment and Forests, Bhubaneswar. 

An action plan for conservation of flora and fauna  has  been  prepared  in  consultation with  the  State  Forest  and  Wild  Life department.  Funds  for  Implementation  of  conservation plan will  be  submitted @  20,000/‐  per  ha. after  stage –I  clearance of  Forest Diversion Proposal.   

(xxvii)  The  critical  parameters  such  as RSPM(Particulate matter with size  less  than 

Monitoring  of  Air  and  water  quality 

Page 8: EC compliance status - Adhunik Group

 

 

 

10  micron  i.e.,  PM10)  and  NOx  in  the ambient  air  within  the  impact  zone,  peak particle velocity at 300m distance or within the  nearest  habitation, whichever  is  closer shall  be  monitored  periodically.  Further, quality  of  discharged  water  shall  also  be monitored  [(TDS,  DO,  PH  and  Total Suspended Solids (TSS)]. The monitored data shall  be  uploaded  on  the  website  of  the company  as well  as  displayed  on  a  display board  at  the  project  site  at  a  suitable location near the main gate of the company in  public  domain.  The  Circular  no.  J‐20012/1/2006‐IA.II  (M)  dated  27/05/2009 issued  by  ministry  of  Environment  and Forests, which is available on the website of the Ministry www.envfor.nic.in shall also be referred in this regard for its compliance.  

parameter  carried  out  regularly  and  the results are well within the prescribed norms by CPCB.  

(xxviii)  A Final Mine Closure Plan along with details of  Corpus  Fund  shall  be  submitted  to  the Ministry of Environment & Forests 5 years in advance of final mine closure for approval. 

Condition will  be  complied,  before  5  years prior to final closure of the Mine.  

B.  GENERAL CONDITIONS   

(i)  No  change  in mining  technology and  scope of  working  should  be  made  without  prior approval  of  the Ministry  of  Environment & Forests. 

No  change  in  the  mining  Technology  and working plan has been done. 

(ii)  No  change  in  the  calendar  plan  including excavation, quantum of mineral Manganese ore and waste should be made. 

No  change  in  Calendar  Plan  includingexcavation quantum of Mineral Manganese and waste has occurred. 

(iii)  Atleast  four  ambient  air  quality‐monitoring stations  should  be  established  in  the  core zone  as  well  as  in  the  buffer  zone  for RSPM(Particulate matter with size  less  than 10 micron  i.e.,  PM10),  &  NOx monitoring. Location  of  the  stations  should  be  decided based  on  the  meteorological  data, topographical  features and environmentally and  ecologically  sensitive  targets  and frequency  of  monitoring  should  be undertaken  in  consultation  with  the  State Pollution Control Board.  

Ambient  air quality‐monitoring  stations has been established in the core zone as well as in  the  buffer  zone  for  PM10,  PM2.5,  SO2  & NOx monitoring.  Ref.: Annexure – IV. 

(iv)  Data  on  ambient  air  quality  (RSPM, (Particulate  matter  with  size  less  than  10 micron  i.e.,  PM10),  &  NOx)  should  be 

Ambient air quality‐monitoring stations have been established in the core zone as well as in  the  buffer  zone  for  PM10,  PM2.5,  SO2  & 

Page 9: EC compliance status - Adhunik Group

 

 

 

regularly submitted to the Ministry including its  Regional  office  located  at  Bhubaneswar and  the  State  Pollution  Control  Board  / Central  Pollution  Control  Board  once  in  six months. 

NOx monitoring.  Ref.: Annexure – IV. 

(v)  Fugitive dust emissions from all the sources should  be  controlled  regularly.  Water spraying arrangement on haul roads, loading and unloading and at transfer points should be provided and properly maintained.

Water  sprinkling  in  the haul  road, dumping ground  and  on  transporting  area  has  been regularly carried out twice daily.  Ref: Annexure‐II 

(vi)  Measures  should  be  taken  for  control  of noise  levels  below  85  dBA  in  the  work environment.  Workers  engaged  in operations  of  HEMM,  etc.  should  be provided with ear plugs/muffs. 

It is an opencast, semi‐ mechanized method, surface  mine  with  limited  machinery. Workers  engaged  in  operations  of  HEMM provided  with  ear  plugs/muffs.  Besides having  acoustic  enclosures  for  all machine operating  cabins  are  provided.    Periodical monitoring  of  noise  level  of  mining machines  and  at  some  locations  in  the mining site is being carried out with the help of noise level meter. 

(vii)  Industrial waste water (workshop and waste water  from  the  mine)  should  be  properly collected,  treated  so  as  to  conform  to  the standards  prescribed  under  GSR  422  (E) dated  19th May,  1993  and  31st  December, 1993 or as amended from the time to time. Oil  and  grease  trap  should  be  installed before discharge of workshop effluents.

There  is  no  generation  of  industrial  waste water.  In  the  lease  area  there  is  no workshop. Maintenance of machineries and vehicles done at Koira, 10 Km from the mine site. 

(viii)  Personnel  working  in  dusty  areas  should wear protective respiratory devices and they should  also  be  provided  with  adequate training  and  information  on  safety  and health aspects. Occupational health surveillance program of the  workers  should  be  undertaken periodically to observe any contractions due to  exposure  to  dust  and  take  corrective measures, if needed.  

Occupational  health  surveillance programme  conducted  regularly.  Workers are  supplied  with  protective  respiratory devices and other  corrective measures also undertaken. Ref: Annexure‐II 

(ix)  A separate environmental management cell with  suitable qualified personnel  should be set‐up  under  the  control  of  a  Senior Executive,  who  will  report  directly  to  the Head of the Organization. 

An environment management cell has been formed  under  the  effective  supervision  of the responsible mines manager who reports to the project proponent directly.   

(x)  The  funds  earmarked  for  environmental protection  measures  should  be  kept  in 

Funds  earmarked  for  environmental protection  is being spent on the same head 

Page 10: EC compliance status - Adhunik Group

 

 

 

separate account and should not be diverted for  other  purpose.  Year  wise  expenditure should  be  reported  to  the Ministry  and  its Regional Office located at Bhubaneswar. 

and  the  account  is  being  maintained separately.     

(xi)  The project authorities should inform to the Regional  Office  located  at  Bhubaneswar regarding date of financial closures and final approval  of  the  project  by  the  concerned authorities  and  the  date  of  start  of  land development work. 

It  is  the  expansion  of  existing  mining operations  under  valid  approval  from  the concerned authorities. 

(xii)  The Regional Office of  this Ministry  located at Bhubaneswar shall monitor compliance of the  stipulated  conditions.  The  project authorities should extend full cooperation to the  officer  (s)  of  the  Regional  Office  by furnishing  the  requisite  data/  information/ monitoring reports. 

We will  extend  all  our  co‐operation  during any such inspections by the Authority. 

(xiii)  The  project  proponent  shall  submit  six monthly  report  on  the  status  of  the implementation  of  the  stipulated environmental  clearance  conditions including  results of monitored data(both  in hard  copies  as  well  as  by  e‐mail)  to  the Ministry  of  Environment  and  Foress,  its Regional Office Bhubaneswar, the respective Zonal  Office  of  Central  Pollution  Control Board and the State Pollution Control Board. The  proponent  shall  upload  the  status  of compliance of  the  environmental  clearance conditions,  including  results  of  monitored data on  their website  and  shall update  the same periodically.  It shall simultaneously be sent to the Regional Office of the Ministry of Environment and forests, Bhubaneswar, the respective Zonal Officer of Central Pollution Control  Board  and  the  State  Pollution Control Board.  

Precautionary  Measures  Adopted  During Waste Disposal are as Follows: ‐  i) The  ultimate  dump  slope  has  been 

maintained  at  20‐220  with  individual terrace slopes not exceeding 370. 

ii) Each  terrace  has  been  maintained inward  slope  with  catch  drain  at  the inward slope of terrace. 

iii) Catch drain of  the  individual  terrace are connected  to  the  garland  drain  outside the  periphery  of  dump.  Catch  drain preferable  made  up  of  halt  concrete open pipes  followed by settling  tanks  to avoid  wash  offs  and  have  provision berms  at  the outer  side  to  reduce gully formation due to rainwater wash offs. 

iv) As  retreating  method  of  dumping  has been  proposed  for  dump  stabilization dead  terraces  have  to  be  planted  also dump slopes from third year onwards. 

The  following  measures  are  undertaken to stabilize the dump and for the arrest of wash‐offs: 1) Segregation of materials. 2) Water sprinkling. 3) Regular compaction. 4) Terracing at the dead end. 5) Construction of check dam.  

Page 11: EC compliance status - Adhunik Group

 

 

 

6) Development of garland drain.  7) Construction of settling tank.  

(xiv)  A  copy  of  clearance  letter  shall  be  sent  by the proponent to concerned Panchayat, Zila Parisad/Municipal Corporation, Urban  Local Body and the  local NGO,  if any, from whom suggestion  /  representations,  if  any,  were received while processing the proposal. The clearance  letter  shall  also  be  put  on  the website of the company by the proponent.  

Copy  of  Clearance  letter  already  submitted to concerned Panchayat and local NGO’s.  

(xv)  State Pollution Control Board should display a  copy  of  the  clearance  letter  at  the Regional office, District  Industry Centre and the  Collector’s  Office/Tehsildar’s  Office  for 30 days.   

Communicated by SPCB.   

(xvi)  The  environmental  statement  for  each financial  year  ending  31st March  in  Form‐V as  is  mandated  to  be  submitted  by  the project  proponent  to  the  concerned  State Pollution Control Board as prescribed under the Environment (Protection) Rules, 1986, as amended subsequently, shall also be put on the website of  the company along with  the status  of  the  compliance  of  environmental clearance  conditions  and  shall  also be  sent to  the  respective  Regional  Office  of  the Ministry  of  Environment  and  Forests, Bhubaneswar by e‐mail.  

Complied

(xvii)  The  project  authorities  should  advertise  at least  in  two  local  newspapers  widely circulated,  one  of  which  shall  be  in  the vernacular  language  of  the  locality concerned, within 7 days of the  issue of the clearance  letter  informing  that  the  project has been accorded environmental clearance and  a  copy  of  the  clearance  letter  is available  with  the  State  Pollution  Control Board and also at website of the Ministry of Environment  and  Forests  at http://envfor.nic.in and a copy of the same should be  forwarded  to  the Regional Office of this Ministry located Bhubaneswar.  

The Environmental clearance letter has been advertised  in two  local news papers namely The New  Indian Express on 02.11.2011 and Oriya  Daily  News  paper  Dharitri  on 02.11.2011.  

Page 12: EC compliance status - Adhunik Group
Page 13: EC compliance status - Adhunik Group

 

 

 

ANNEXURE‐I CONSENT TO OPERATE RENEWAL– SPECIAL CONDITIONS AND COMPLIANCES 

FOR ORAHURI MANGANESE MINE OF M/S. OMM LTD. 

 Sl. No.  Conditions Compliances 

1. 

A copy of the annual return (annual return submitted  to  IBM,  Govt.  of India/Directorate  of  Mines,  Govt.  of Odisha) shall be submitted every year.  

A  copy  of  the  annual  return  (annual return  submitted  to  IBM,  Govt.  of India/Directorate  of  Mines,  Govt.  of Orissa) is being submitted every year.   

2. 

The environmental  statement  report  shall be  submitted  to  the  Board  in  proper format every year. 

The  environmental  statement  has already been  submitted  to  the Board  in the  appropriate  format  for  the  said Mining Project. 

3. 

Drills  shall  either  be  operated  with  dust extractors  or  equipped  with  water injection  system  to  minimize  dust generation in the work environment. 

Wet  drilling  is  being  practiced  in  the mines.  The  drill  machine  is  equipped with inbuilt water injection system.  

4. 

Controlled  blasting  shall  be  practiced  to minimize generation of dust and fly rocks. No  blasting  shall  be  carried  out  after  the sunset. 

Blasting  is  being  carried  out  during  the day  time only.   Control Blasting  is being carried  to  control  ground  vibration  and to arrest fly rocks & boulders  

5. 

The  top  soil  shall be  stored at earmarked site(s) only and stabilized or shall be used for land reclamation and plantation. 

The  top  soil  generation during next  five years is observed to be nil, as the nature of top‐soil  is lateritic. Hence no proposal has been kept for its stacking. 

6. 

The  over  burden  generated  during  the course  of  mining  shall  be  stacked  at earmarked dump site  (s) and stabilized or used  for  reclamation  of  excavated  land followed by plantation. 

The  intercalated waste  and  overburden from proposed quarry will be dumped at proposed  earmark  dump  area  as  per approved Scheme of Mining. 

7. 

The project proponent shall ensure that no natural  water  course  and/or  water resources  are  obstructed  due  to  any mining operations. 

No  Natural Water  course  and/or water resource is within the lease area. 

Page 14: EC compliance status - Adhunik Group

 

 

 

8. 

Appropriate mitigative measures  shall  be taken  to  prevent  pollution  of  the  nearby water bodies. 

An adequate measure has been taken to prevent  pollution  of  the  nearby  water bodies. 

9. 

Regular monitoring of  ground water  level and  quality  should  be  carried  out  by establishing  a  network  of  existing  wells. The monitoring should be done four times a  year  in  pre‐monsoon  (April/May), monsoon  (August),  post‐monsoon (November) and winter (January) seasons. Data thus collected should be submitted to the Board quarterly. 

Water quality and water level monitoring is being carried out quarterly basic by the environmental  consultant.  The monitoring  reports  are  attached  as annexure given below. 

10. 

Sewage  treatment plant  shall be  installed for  the  colony  if  any.  Other  domestic wastewater shall be discharged to soak pit through septic tank constructed as per BIS specification. 

Domestic wastewater is being discharged to  soak  pit  through  septic  tank constructed as per BIS specification 

11. 

ETP  shall  also  be  provided  for  workshop and  wastewater  generated  if  any  during mining operation if any. 

In  the  lease  area  there  is no workshop. Maintenance  of  machineries  and vehicles will be at Koira, 15 Km from the mine site. As such ETP is not required.  The  impact  of  opencast  mining operations  on  surface  water  is  mainly due  to  wash  off  from  dumps  and  soil erosion  from  mines  and  roads.  As  the area  lies  on  the  top  of  the  hill  and  the rainfall  is  good  in  this  region,  adverse impact  due  to  the  above  factors  is anticipated.  Therefore  the  following measures are proposed to be taken up: 

Garland  drains  around  the  quarry and  dump  site which will  block  the quarry  surface  run  off  through natural nala. 

Settling  tank  /  check dams  to arrest suspended particles.   

Page 15: EC compliance status - Adhunik Group

 

 

 

No impact on ground water quality is anticipated as no perennial drainage channel of the area is intercepted by the mining operations. 

12. 

Check  dams  and  check  weirs  shall  be constructed  at  appropriate  places  of  the mine  lease area  to prevent direct  flow of sediment  directly  into  nearby  water bodies.  The  surface  runoff  water  shall meet  the  prescribed  standards  before disposal to outside. 

Catch drains and  siltation ponds around quarry and over burden dumps has been constructed  to prevent  run‐off of water and  flow of  sediments directly  in  to  the Karo  nala,  Tehrai  nala  and  other water bodies. The water collected is being used for  watering  the mine  areas,  road  and greenbelt development. 

13. 

Retaining wall  shall be constructed at  the toe of topsoil dump and OB dump. Garland drain  shall  be  constructed  around  the topsoil  dumps,  over  burden  dumps  and mineral stack yards terminating at settling pit to prevent run off of water and flow of sediments  directly  into  nearby  water bodies.  Garland  drain  and  sedimentation pit  shall be de‐silted after monsoon or as and when  required. The discharge quality shall meet  the  standard prescribed of  the Board. 

Retaining wall  has  been  constructed  at the  toe  of  topsoil  dump  and  OB  dump having  Length, Width, Height:  192.4m  x 3m  x  2m,  Area  covered  660Sq.mtrs. Garland  drain  (Length,  Width,  Height: 200m  x  2m  x  1m,  Area  covered  660Sq. mtrs.) has been  constructed around  the topsoil  dump,  over  burden  dumps  and mineral  dumps  terminating  at  2  nos.  of settling pit having  (L,B,D):   5m x 3m x 1.5m 

and    6m  x  3m  x  2m  to  prevent  run  off  of water and flow of sediments directly into nearby water bodies.  

14. 

Proper quantification of surface runoff and other wastewater  generated  in  the mine shall be done and data  shall be  furnished to the Board by May‐2014.  

Since the mining area is in hilly terrain no accumulation  of  water  in  the  quarry  is expected.  The  impact  of  mining excavation  on  the  hydrography  of  the area is practically nil. No liquid effluent is generated  during  mining,  which  may pollute  the  surface  or  ground water  of the area.  Proper  quantification  of  surface  runoff and other wastewater generation  in  the mine  will  be  done  accurately  during monsoon and  the data will be  furnished to the Board accordingly. 

Page 16: EC compliance status - Adhunik Group

 

 

 

15. 

Regular  water  sprinkling  shall  be  carried out in critical areas of air pollution such as around  crushing  and  screening  plant,  if any. Water  sprinkling  shall be  carried out on haul roads by  installation of  fixed auto water  sprinkling  system  and  shall  be operated  at  desired  interval.  Haulage roads shall be devoid of ruts and potholes and shall be maintained properly  to avoid generation  of  dust  during  movement  of vehicles. 

Water  sprinkling  in  the  haul  road, dumping  ground  and  on  transporting area has been regularly carried out twice daily.   

16. 

Fixed auto sprinklers shall be provided on the  approach  roads  from  mines  to  raw material handling & product handling area to prevent the generation of dust to be air borne. 

Water  sprinkling  in  the  haul  road, dumping  ground  and  on  transporting area  is  being  carried  out  twice  daily  by engaging 2 nos. of water  tankers having capacity  of  10  KL  for  dust  suppression. Haul  roads  are  maintained  properly  in order to avoid generation of dust during movement of vehicles. 

17. 

At  least  four  Ambient  Air  Quality Monitoring Stations shall be established in core  zone and buffer  zone  for monitoring of RSPM(PM10) and location of the stations shall  be  decided  based  on  the meteorological  data,  topographical features  and  environmentally  and ecologically  sensitive  targets  in consultation  with  the  Regional  officer, State Pollution Control Board.  

Six  nos.  of  ambient  Air  Quality Monitoring  Stations  has  been established  and  location  of  the  stations was  decided  based  on  the meteorological  data,  topographical features  and  environmentally  and ecologically  sensitive  targets  in consultation  with  the  Regional  officer, State Pollution Control Board.  

18. 

Monitoring  of  Ambient  Air  Quality  and fugitive dust emission of the mine shall be done  twice  in  a  week  (24  hourly)  at  a particular site and data shall be submitted to  the state pollution control Board, once in six months. 

Ambient  air  quality monitoring  is  being carried out through third party in core & buffer zone for RPM, SPM, SO2 and NOx. And  Collected  data  is  being  regularly submitted  to  the  Ministry’s  Regional Office at Bhubaneswar and  to  the  State Pollution Control Board/Central Pollution 

Page 17: EC compliance status - Adhunik Group

 

 

 

Control Board once in six months.

Six  monthly  environmental  clearance compliances  are  been  submitted  to  the Ministry’s  Regional  Office  at Bhubaneswar. 

19. 

It  shall  be  ensured  that  the  Ambient  Air Quality Parameters conform to the norms prescribed in the consent order. 

The monitoring  of  the  said  parameters like ambient air quality and water quality Parameters  carried  out  regularly  and  it conforms  to  the  norms  prescribed  for Industrial Area. 

20. 

Regular  monitoring  of  water  quality  of upstream  and downstream of  the nearby water  bodies  if  any  shall  be  carried  out and  record  shall  be  maintained  and submitted  to  the  State  Pollution  control Board once in every year. 

Regular  monitoring  of  water  quality  is being carried out for both upstream and downstream  of  Karo  nallah  &  Teharei Nallah.  

The  data  is  being  maintained  regularly and  submitted  to  concerned  authorities in time.  

21. 

Measure shall be taken for control of noise levels  below  85dBA  in  the  work environment.  

Adequate measures have been taken for control  of  noise  levels  below  the prescribed standards. Workers  engaged  in  operations  of HEMM  provided  with  ear  plugs/muffs. Besides having acoustic enclosures for all machine  operating  cabins  are  provided.  Periodical  monitoring  of  noise  level  of mining machines  and  at  some  locations in  the  mining  site  is  being  carried  out with the help of noise level meter. 

22. 

Ambient air quality monitoring data, noise monitoring  data  and  water/wastewater quality  monitoring  data  shall  be electronically displayed at  the entry point of the mine or at a suitable location of the mine. 

Monitoring/analysis data of ambient air, wastewater  and  noise  has  been  carried regularly  and  displayed  at  Manual display  board  installed  near  the  main gate.  The  electronic  display  system  is  under process and it will install very soon. 

Page 18: EC compliance status - Adhunik Group

 

 

 

23. 

Plantation of  trees shall be undertaken  in the colony/township, over top soil dumps, OB dumps, back filled areas, along the side of  haul  road  and  in  other  areas  of  the mines  not  being  utilized  for  mining activities.  The mine  shall  take  up  avenue plantation and plantation in nearby village areas  in  consultation  with DFO/Horticulture Department. The density of  the  plantation  shall  be  around  2500 plants  per  hectare.  Nursery  shall  also  be developed  for  plantation  activities within the  ML  area  and  free  distribution  of seedlings  to  nearby  villagers.  The  annual statements  pertaining  to  the  number  of trees planted, areas where plantation has been  done,  survival  percentage  and  area in  Ha.  covered  under  plantation  shall  be submitted  to  the  Board,  every  year  in prescribed  format.  The  mine  shall  take steps  for  fulfillment of all  the  stipulations and  necessary  measures  to  check pollution. 

Green  belt  has  already  been  developed around  the  mine  boundary,  Non‐mineralized dump area and both sides of the  haul  roads  and  Pillar  no  9  to  Pillar no.15  including  safety  zones  and mines periphery. Till date a total of 27,800 nos. of  plants  like  Teak,  Sisham,  Chakunda, Aam,  Neem,  Kasi,  Amla,  Acasia  & Bamboo have been planted over an area of  14hectares  approximately  with  a survival rate of 68%  in consultation with the forest department.   

24. 

The mine shall take steps for fulfillment of all  the  stipulations  and  necessary measures to check pollution. 

Necessary  steps are being  taken care  to check pollution.  

25. 

Mining operation  is  subject to  availability of  all  other  statutory  clearances  required under  relevant  Acts/Rules  and  fulfillment of required procedural formalities. 

Agreed 

26. 

The  mine  shall  submit  a  declaration  by 30th  April  every  year  that  all  pollution control  systems  are  in  good  condition, operated and ambient air quality as well as wastewater  quality  conform  to  the prescribed standards. 

We  are  abiding  by  the  stipulated conditions and agree to comply in time. 

 

Page 19: EC compliance status - Adhunik Group

 

 

 

 

ANNEXURE‐II 

 

 

Page 20: EC compliance status - Adhunik Group

 

 

 

INTRODUCTION: 

Orissa Manganese & Minerals Ltd. has been undertaking various peripheral development activities as part of Corporate Social Responsibility to enrich the quality of rural life in and around the areas of mine sites.   

Orissa Manganese and Minerals Pvt. Ltd. (OMM) a private Limited company is engaged primarily  in mining  and marketing  of minerals.  Various minerals  covered  include  Iron  Ore, Manganese  and Graphite. OMM possess a number of mining leases in Jharkhand and Odisha.  

The  six  numbers  of Manganese Mining  Leases  in  Odisha  of M/s.  Orissa Manganese  & Minerals Private Limited is given below: 

 

Sl. No.  Name of the Lease Area in hectares Type of Minerals

1  Patmunda Manganese Mine  807.316  Manganese 

2  Orahuri Manganese Mine  51.476 Manganese 

3  Kusumdihi Manganese Mine  31.549  Manganese 

4  Tentulidihi Manganese Mine  35.613  Manganese 

5  Sanpatholi Manganese Mine 23.290 Manganese 

6  Bhanjikusum Manganese Mine  8.134  Manganese 

 

A. PERIPHERAL  DEVELOPMENT  ACTIVITIES  BY  M/S.  ORISSA  MANGANESE  &  MINERALS 

LIMITED. 

1.0  OBJECTIVE:  

The Government has been doing a number of development projects for people in rural areas. OMML 

on  its  part  has  been  participating  for  augmenting  the  quality  of  life  of  people  in mining  areas 

surrounding  its  projects  and  establishments  and  society  in  general.  The  purpose  of  these 

contributing efforts would be not only  to help people by providing  facilities  for health, education, 

civic amenities etc. but also to create opportunities for development of skills, employment including 

self‐employment and improves the standard of living.   

Various significant peripheral development activities undertaken by OMML are as follows.  

Page 21: EC compliance status - Adhunik Group

 

 

 

a) Literacy / Education. 

b) Health Care Facilities. 

c) Drinking Water. 

d) Rehabilitation/ Resettlement. 

e) Women Empowerment. 

f) Employment Opportunities  

g) Recreational Activities. 

h) Agricultural and Infrastructural Development. 

2.0  SIGNIFICANT PERIPHERAL DEVELOPMENT ACTIVITIES: 

a) Literacy / Education. 

The company on behalf of the Mines has provided teachers in seven schools cater to 1250 students 

spread  across  Koira  Block.  CSR  teams  from  OMM’s  work  ardently  to  support  the  educational 

requirements  of  the  community  and  schools  in  the  neighboring  region  benefiting  thousands  of 

students  from  the underprivileged  section of  the  society. OMM plays a pivotal  role  in  supporting 

Government’s  initiative  towards education of child  in Odisha, under  the project “Literacy”. OMML 

has been trying to create a better platform to attract children to the schools; we have distributed 

School  bags  in  seventeen  schools  around  our mines.  Under  our  CSR  initiatives we  take  up  civil 

repairing & maintenance of the schools. We also extend  the conveyance  facility of  the children of 

distant areas. Company also extends  financial help  for  celebration of Ganesh Puja,  Sarswati Puja, 

Independence Day and Republic Day. We also conduct inter school sports for extract the potentiality 

of  the  child  in  sports  &  game.  Company  organizes  painting,  drawing,  essay  writing  and  debate 

competitions  on  occasion  of Gandhi  Jayanti,  Teacher’s  day  and  children’s  day.  Last  year we  had 

taken the 1000 children of seven schools to Circus show. We have provided furniture to school on 

their  request.  Company  has  also  constructed  and  taking  up  the maintenance  of  the  Anganbadi 

Kendra, as on date we have constructed  two Anganwadi Kendra  (Orahuri & Podadihi) at a cost of 

Rs.11.00 Lacs. Our CSR team continue to monitor all schools and distributed 1800 Health Kits (Tooth 

brush, Tooth Paste and Toilet soap) to  inculcate the sense of Good Health. Company has provided 

Text, Reference & other Books worth sixty thousand to start the library facility at Koira College. 

 

 

 

Page 22: EC compliance status - Adhunik Group

 

 

 

b) Health Care Facilities. 

The  company  management  is  committed  to  provide  comprehensive  &  preventive  health 

services  to  the  workmen  working  in  mines.  To  achieve  this  goal  company  has  given 

appointment  to  one  experienced MBBS  doctor  and  two  pharmacists  to  cater  the  medical 

services  in mines  and patients  are  given medicines  free of  cost.  The  company has provided 

ambulance  support  to  referral and accident victims  to  shift  them  to hospitals at Koida or  to 

CESS Hospital  Joda. The doctor &  team  at  site have  conducted a  series of health awareness 

programs to make the people health conscious. The doctor  from CESS welfare Department  is 

also visit the mines to provide medical facilities once in a week. The company is also conducting 

medical check‐up under  (PME &  IME) of all the work men working as envisaged under mines 

rules. Orissa Manganese & Minerals Ltd. has developed Community Medical Services through 

experienced Medical practitioner to provide comprehensive health services covering preventive 

and curative health care services  to  the community  in more than twenty neighboring villages 

and  patients  are  given medicines  free of  cost. Doctors  advise  children  and  their  parents  on 

various health care  issues and personal hygiene. Medical camps were organized  from time to 

time  benefitting  patients  from  nearby  villages  and  tribal  areas.  As  required,  we  provide 

ambulance support to patients to hospitals at Koira and Joda. The company is also spraying and 

fogging pesticides  to prevent malaria  in  the area. List of villages cover under mobile Medical 

unit.  

1.Patmunda,  2.Kadamdihi,  3.Podadihi,  4.Khajurdihi,  5.Boldihi,  6.Sonua,  7.Badapatuli, 

8.Sanpatuli,  9.Panposhia,  10.Amilam,  11.Kadalia,  12.Teherei,  13.Dublabeda,  14.Orahuri,  15. 

Harishchandrapur, 16.Kusumdihi, 17.Kamando, 18. Dengula,   19. Tentulidihi, 20. Roladihi, 21. 

Kalapahar, 22. Rangua & 23. Kola.  

c) Drinking Water. 

The  company management has  taken  to provide  safe drinking water  to  the people  living  in 

villages  around  the mines  as  a  challenge.  To  fulfil  this  obligation  towards  the  society,  the 

company has made so far some twelve Bore wells in different villages to provide safe & pure 

drinking water.  The  bore well was made  having  high  yield  of water  have  been  fixed with 

submersible pump and over head  tank and  in  rest hand pump have been  installed. We also 

supply water through water tanker having water scarcity. We have also planned to make bore 

well  in all  the peripheral villages  in coming years. The company  is going  to setup  two water 

Purification unit of 2000ltrs per day capacity (under construction) for supply of pure water. We 

Page 23: EC compliance status - Adhunik Group

 

 

 

also  extend  our  cooperation  and  engage  the  technicians  for  repairing  of  tube  well  and 

renovation of dug well in villages.  

Sl .No  Name of the Village  

Water supply facilities  

1   Patmunda   1. Two Bore well has been made.  2. 1200 meter pipeline  spread and 30 water posts made water supply  

2   Podadihi   1. One Bore well made & water supply through pipe line  3   Khajurdihi   1. Water supply through water tanker 4   Baldihi   1. Water supply through water tanker  5   Orahuri   1. One Bore well made & water supply through over head 

tank.  6   Nuagaon   1. Four bore well made in villages & hand pump installed.  

2. Two of these bore well fixed with pump & water supply made through over head tank.  

7   Badapatuli   1. One Bore well made but yet  to  install pump  for water supply as the area is yet to be electrified.  

8   Kadodihi   1. One Bore well made & water  supply  through pump  is continued and over head tank is under construction.  

9   Koida   1. One Bore well made & water  supply  through pump  is continued and over head tank is under construction.  

 

d) Rehabilitation/ Resettlement 

The OMML has  constructed  colony having 65 numbers Pakka Houses near  the mines on  the 

request raised by the villagers who were living in huts. Each House is of 410 Sq ft. built‐up area 

on 10 decimal plots. The colony has been provided with water supply, road, drain, street lights, 

School & Anganbadi Kendra.  

 

e) Women Empowerment. 

Women Empowerment refers to empowering women to be self‐dependent by providing them 

access to all the freedoms and opportunities, which they were denied in the past only because 

of  their being women.  In  a  specific  sense, women  empowerment  refers  to  enhancing  their 

position  in  the power  structure of  the  society.  The word women  empowerment  essentially 

means that the women have the power or capacity to regulate their day‐ to‐ day  lives  in the 

social, political and economic terms.  

• Cutting &  Tailoring  training  program  and  distribution  of  sewing machines  to 

passing out students. 

Page 24: EC compliance status - Adhunik Group

 

 

 

• Self  employment  training  program  on  Phenyl  making,  Revolving  fund  and 

training material support. 

• Observation of International Women's Day  in association with Women & Child 

Development Dept., Govt. of Orissa. 

• Distribution  of  Bi  ‐  cycle  among  BPL  College  going  girls  through  DSWO, 

Sundargarh. 

• Participate  in Pallishree mela & Soubhagyabati Yojna Monthly honorarium  for 

Lady trainer for self employment training programme. 

• Revolving fund support to SHG Group. 

 

f) Employment Opportunities : 

The company  is committed and  follows the “Child Labour Rules ” as such, we do not employ 

people below the age of 18 in mines directly or indirectly.  

 

• Skill development training for sustainable income generation and livelihood. 

• Giving indirect and direct employment to local people to work in the mines. 

• Vocational/ Technical training for youth for better employability.   

g) Recreational Activities: 

Besides doing various developmental activities OMML engages itself in creating a platform 

for recreation of the local people of the surrounding villages of the mine site. 

• It  organizes  several  sports  promotion  activities  such  as  Football,  Volley  Ball 

Tournaments  and  athletic meet  time  to  time  to  keep  up  the  lively  sprit  of  the 

locals.  

• Organizes  various  cultural  activities,  social  gathering  and  functions  like Palishree 

mela giving an opportunity to the villagers to prove their cultural abilities. 

 

h) Agricultural and Infrastructural Development. 

• Construction and repairing of Road & Guard Wall. •  Development of community welfare centre and other civic amenities. • Village Electrification.  • Repairing of tube wells • Construction of boundary wall along with gate of Village schools and Temples. • Construction of Children's Park. • Promote intensive and sustainable farming practices for higher productive. 

 

Page 25: EC compliance status - Adhunik Group

 

 

 

3.0  FINANCIAL INVOLVEMENT: 

 

The details of peripheral development activities undertaken by OMML during the last four years and current year is as:‐ 

   (Rs. in Lakhs)  

Sl. No.  Particulars of activities  2008‐09  2009‐10  2010‐11  2011‐12  2012‐13  2013‐14 

1  Road/Infrastructure works  10.65  12.50  14.25  15.50  18.50  12.35 

2  Education  9.70  10.80  12.20  10.40  6.50  5.20 

3  Health Care  8.75  10.50  13.25  12.75  8.20  5.85 

4  Provision of Drinking Water  4.50  6.75  7. 60  8.35  5.65  5.50 

5  Women Empowerment  6.15 8.50 10.25 15.00  8.35  7.75

6  Rehabilitation/Resettlement   12.50 14.00 15.15 10.50  8.25  5.85

7  Social  Welfare/  Sports/ Cultural/  Arts/  Religious activities 

6.00  7.55  8.45  10.85  9.45  8.45 

  Total  58.25  70.60  73.55  83.35  64.90  50.95 

 

 

 

 

 

 

 

 

 

 

 

 

Page 26: EC compliance status - Adhunik Group

 

 

 

 

 

 

 

  

 

  

 

 

Page 27: EC compliance status - Adhunik Group

 

 

 

 

 

  

 

  

 

 

 

 

 

 

Page 28: EC compliance status - Adhunik Group

 

 

 

 

 

 

 

  

 

 

 

    

   

Page 29: EC compliance status - Adhunik Group

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

Page 30: EC compliance status - Adhunik Group

 

 

 

 

  

Environmeental Protectiive Measures

 

 

 

s taken care a

 

 

at Orahuri MA

anganese MiANNEXURE‐Iine 

III 

 

Page 31: EC compliance status - Adhunik Group

 

 

 

 

 

Retaining

Gree

g wall and G

enbelt deve

Garland drai

elopment in 

 

 

n at the bot

 

 

 

the Dump a

ttom periph

and Safety zo

ery of dump

one area 

ps 

 

Page 32: EC compliance status - Adhunik Group

 

 

 

      

 

  

 

 

Water Sprinkling at the village road through water tankers    

    

           

Page 33: EC compliance status - Adhunik Group

Report No. SCS/OMML-OMOM/EM/OCT/AAQ-01 Date: 18.10.2013

AMBIENT AIR MONITORING REPORT

Sl. No. Location of Sampling

Parameters

PM10

(In µg/m3)

PM 2.5

(in µg/m3)

SO2

(in µg/m3)

NOx

(in µg/m3)

01 Main Pit 55.4 26.6 12.4 10.5

02 Haul Road 58.2 27.8 13.4 12.2

03 Main Entrance Gate 54.5 22.8 12.5 11.7

04 Village Harischandrapur

(Up Wind) 56.3 25.6 11.6 12.8

05 Village Kadodihi

(Down Wind) 54.3 28.5 12.4 13.6

06 Village Koira 58.5 29.4 13.4 11.2

Standard as per MoEF Notification G.S.R. 826 (E) dated 16/11/2009

(For 24 Hours Sampling)

100 60 80 80

For SUN CONSULTANCY AND SERVICES

Lab analyst Lab. In-charge

Name of the Client : M/s. ORISSA MANGANESE & MINERALS LTD,

Description of Site : Orahuri Manganese Ore Mine, Sundargarh, (Odisha)

Seasonal Quarter : Post Monsoon (Oct -Dec, 2013)

Monitoring date : 3th – 5th October, 2013

Date of Analysis : Representatives of Sun Consultancy and Services

Page 34: EC compliance status - Adhunik Group

Report No. SCS/OMML-OMOM/EM/OCT/FE-01 Date: 18.10.2013

FUGITIVE DUST MONITORING REPORT

For SUN CONSULTANCY AND SERVICES

Lab analyst Lab. In-charge

FUGITIVE DUST MONITORING LOCATIONS

(FDM)

DESCRIPTION OF THE

LOCATIONS

FUGITIVE DUST LEVEL

(in µg/m3)

FUGITIVE DUST EMISSION STANDARD

AS PER MOEF NOTIFICATION NO.

G.S.R. 809 (E) DATED 04.10.2010 (in µg/m3)

FDM-1 27m N from Main Pit. 217

1200 FDM-2 23m W from Main pit. 204

Name of the Client : M/s. ORISSA MANGANESE & MINERALS LTD,

Description of Site : Orahuri Manganese Ore Mine, Sundargarh, (Odisha)

Seasonal Quarter : Post Monsoon (Oct -Dec, 2013)

Monitoring date : 3th – 5th October, 2013

Date of Analysis : Representatives of Sun Consultancy and Services

Page 35: EC compliance status - Adhunik Group

Report No. SCS/OMML-OMOM/EM/OCT/NOISE-01 Date: 18.10.2013

NOISE LEVEL STUDY REPORT

For SUN CONSULTANCY AND SERVICES

Lab analyst Lab. In-charge

Location ID Name of the Location

Day (6 AM. - 10PM.)

Limits in dB (A)

Night (10PM. – 6AM.)

Limits in dB (A) Max. Min. Max. Min.

N1 Main Pit 65.6 50.5 40.3 36.6

N2 Haul Road 61.6 54.5 42.2 30.5

N3 Main Entrance Gate 54.7 52.2 43.5 31.2

N4 Village Harischandrapur 55.6 47.6 40.3 33.5

N5 Village Kadodihi 53.2 45.6 42.7 32.5

N6 Village Koira 57.3 42.6 42.4 38.2

Permissible limit as per MoEF Notification No. S.O.1046 (E) Dated

22-11-2000 in dB (A) Leq

75 70

Name of the Client : M/s. ORISSA MANGANESE & MINERALS LTD,

Description of Site : Orahuri Manganese Ore Mine, Sundargarh, (Odisha)

Seasonal Quarter : Post Monsoon (Oct -Dec, 2013)

Monitoring date : 3th – 5th October, 2013

Date of Analysis : Representatives of Sun Consultancy and Services

Page 36: EC compliance status - Adhunik Group

Report No. SCS/OMML-OMOM/EM/OCT/GW-01 Date: 18.10.2013

GROUND WATER MONITORING REPORT

Sl. No.

Parameters

Permissible Limits as per IS-10500:2012

LOCATIONS

Mining Lease Area

Dug well water from

village Orahuri

Bore well water from

village Harischand

rapur

Bore well water from

village Rangua

1. Colour, Hazen Units 15 <5 <5 <5 <5 2. Odour Agreeable Agreeable Agreeable Agreeable Agreeable 3. Taste Agreeable Agreeable Agreeable Agreeable Agreeable 4. Turbidity, NTU 5 0.6 1.3 1.3 0.7 5. pH No relaxation 7.2 7.5 7.2 6.8

6. Total Hardness (as CaCO3),mg/l 600 135 165 161 150

7. Iron ( as Fe),mg/l No relaxation 0.08 0.11 0.14 0.09 8. Chloride ( as Cl),mg/l 1000 46 39 35 42 9. Residual Chlorine, mg/l 1 NIL NIL NIL NIL 10. Fluoride (as F ) mg/l 1.5 ND ND ND ND 11. Dissolved Solids, mg/l 2000 173 192 171 183 12. Calcium (as Ca),mg/l 200 49.8 58.4 52.7 42.4 13. Magnesium (as Mg),mg/l 100 8.15 7.65 9.16 9.54 14. Copper (as Cu),mg/l 1.5 BDL BDL BDL BDL 15. Manganese (as Mn),mg/l 0.3 0.02 0.02 0.01 0.01 16. Sulphate (as SO4),mg/l 400 10.5 12.2 10.9 9.4 17. Nitrate ( as NO3),mg/l No relaxation BDL BDL BDL BDL

18. Phenolic compounds (as C6,H5OH),mg/l 0.002 ND ND ND ND

19. Mercury, (as Hg),mg/l No relaxation ND ND ND ND 20. Cadmium (as Cd),mg/l No relaxation ND ND ND ND 21. Selenium (as Se), mg/l No relaxation ND ND ND ND 22. Arsenic (as As), mg/l 0.05 ND ND ND ND 23. Cyanide (as CN) mg/l No relaxation ND ND ND ND 24. Lead (as Pb), mg/l No relaxation ND ND ND ND 25. Zinc (as Zn),mg/l 15 BDL BDL BDL BDL

26. Total Chromium ( as Cr),mg/l No relaxation NIL NIL NIL NIL

Name of the Client : M/s. ORISSA MANGANESE & MINERALS LTD,

Description of Site : Orahuri Manganese Ore Mine, Sundargarh, (Odisha)

Seasonal Quarter : Post Monsoon (Oct -Dec, 2013)

Monitoring date : 3th – 5th October, 2013

Date of Analysis : Representatives of Sun Consultancy and Services

Page 37: EC compliance status - Adhunik Group

27. Mineral Oil, mg/l No relaxation BDL BDL BDL BDL 28. Alkalinity(as CaCO3),mg/l 600 82 77 65 64 29. Boron (as B), mg/l 1.0 NIL NIL NIL NIL

30. Total coli form organisms, MPN/100 ml <2 <2 <2 <2 Note: BDL-Below Detection Level, N.D.-Not Detectable

For SUN CONSULTANCY AND SERVICES

Lab analyst Lab. In-charge

Page 38: EC compliance status - Adhunik Group

Report No. SCS/OMML-OMOM/EM/OCT/SW-01 Date: 18.10.2013

SURFACE WATER MONITORING REPORT

Sl. No.

Parameters

Max.

Tolerance limit as per

IS-2296(1982) (Class-C)

LOCATIONS

Teherei Nala near village Kalmanga

Teherei Nala near

village Teherei

Karo Nala near village

Harischandrapur

Karo Nala near village

Kadodihi

1. Colour, Hazen Units 300 1.2 1.0 1.2 1.4

2. Odour Un objectionable

Un objectionable

Un objectionable

Un objectionable

Un objectionable

3. Taste Agreeable Agreeable Agreeable Agreeable Agreeable4. Turbidity, NTU -- 8.5 10.6 9.4 8.9 5. Suspended Solids, mg/l -- 75 95 88 79 6. pH 6.5 – 8.5 7.2 7.1 6.9 7.2

7. Total Hardness (as CaCO3),mg/l -- 204 212 208 196

8. Iron ( as Fe),mg/l 50 0.5 0.61 0.43 0.52 9. Chloride ( as Cl),mg/l 600 42.5 40.9 36.7 45.7 10. Residual Chlorine, mg/l -- NIL NIL NIL NIL 11. Fluoride (as F ) mg/l 1.5 ND ND ND ND 12. Dissolved Solids, mg/l 1500 207 214 198 206 13. Calcium (as Ca),mg/l -- 68.4 62.5 70.6 53.7

14. Magnesium (as Mg),mg/l -- 8.04 13.03 7.85 11.31 15. Copper (as Cu),mg/l 1.5 NIL NIL NIL NIL 16. Manganese (as Mn),mg/l -- 0.03 0.012 0.01 0.017 17. Sulphate (as SO4),mg/l 400 32.5 24.5 26.5 22.7 18. Nitrate ( as NO3),mg/l 50 1.46 1.55 1.38 1.71

19. Mercury, (as Hg),mg/l -- ND ND ND ND

20. Cadmium (as Cd),mg/l 0.01 ND ND ND ND

21. Selenium (as Se), mg/l 0.05 ND ND ND ND

22. Arsenic (as As), mg/l 0.2 ND ND ND ND

23. Cyanide (as CN) mg/l 0.05 ND ND ND ND

Name of the Client : M/s. ORISSA MANGANESE & MINERALS LTD,

Description of Site : Orahuri Manganese Ore Mine, Sundargarh, (Odisha)

Seasonal Quarter : Post Monsoon (Oct -Dec, 2013)

Monitoring date : 3th – 5th October, 2013

Date of Analysis : Representatives of Sun Consultancy and Services

Page 39: EC compliance status - Adhunik Group

24. Lead (as Pb), mg/l 0.1 ND ND ND ND 25. Zinc (as Zn),mg/l 15 BDL BDL BDL BDL

26. Anionic Detergents (as MBAS),mg/l 1 ND ND ND ND

27. Hexavalent Chromium ( as Cr+6),mg/l 0.05 ND ND ND ND

28. Oil & grease, mg/l 0.1 0.01 0.01 BDL BDL 29. Alkalinity(as CaCO3),mg/l -- 71 61 68 65 30. Boron (as B), mg/l -- ND ND ND ND

31. BOD ( 5 days at 20ºC ), mg/l 3 1.2 1.6 1.7 2.1

32. Total coli form organisms, MPN/100 ml 5000+ 142 163 144 182

Note: BDL-Below Detection Level, N.D.-Not Detectable

For SUN CONSULTANCY AND SERVICES

Lab analyst Lab. In-charge

Page 40: EC compliance status - Adhunik Group

Report No. SCS/OMML-OMOM/EM/OCT/FLR-01 Date: 18.10.2013

REPORT OF FLOW RATE

For SUN CONSULTANCY AND SERVICES

Lab analyst Lab. In-charge

Sl.no Locations Flow Rate (L/Sec)

1. Karo Nullah 13.7 L/sec

2. Teheari Nullah 12.8L/sec

Name of the Client : M/s. ORISSA MANGANESE & MINERALS LTD,

Description of Site : Orahuri Manganese Ore Mine, Sundargarh, (Odisha)

Seasonal Quarter : Post Monsoon (Oct -Dec, 2013)

Monitoring date : 3th – 5th October, 2013

Date of Analysis : Representatives of Sun Consultancy and Services

Page 41: EC compliance status - Adhunik Group

Report No. SCS/OMML-OMOM/EM/OCT/GWL-01 Date: 18.10.2013

REPORT OF GROUND WATER LEVEL

For SUN CONSULTANCY AND SERVICES

Lab analyst Lab. In-charge

Sl. no Name of the Locations

Water Level (Below Ground Level in

meters) Fluctuation

Monsoon Post Monsoon

1. Orahuri (Inside the mine lease area) 4.25 6.24 1.99

2. Village Teherei dug well 3.78 5.94 2.16

3. Village Kalmanga dug well 4.56 6.67 2.11

Name of the Client : M/s. ORISSA MANGANESE & MINERALS LTD,

Description of Site : Orahuri Manganese Ore Mine, Sundargarh, (Odisha)

Seasonal Quarter : Post Monsoon (Oct -Dec, 2013)

Monitoring date : 3th – 5th October, 2013

Date of Analysis : Representatives of Sun Consultancy and Services

Page 42: EC compliance status - Adhunik Group

Report No. SCS/OMML-OMOM/EM/OCT/WW-01 Date: 18.10.2013

REPORT OF WASTE WATER ANALYSIS

Sl. No. Parameters Unit

Location Permissible Limits as

Environment protection rule, Gazette No.488

Dated 12.09.1988

Check Dam Garland Drain

1. pH -- 7.2 6.9 5.5 – 9.0

2. TSS mg/l 73.4 67.8 100.0

3. TDS mg/l 77 85 2100.0

4. Oil & Grease mg/l Nil 0.1 10.0

5. BOD @ 270C 3days mg/l 2.5 2.7 30.0

6. COD mg/l 56.7 67.6 250.0

7. Sulphate mg/l 15.7 18.4 1000

For SUN CONSULTANCY AND SERVICES

Lab analyst Lab. In-charge

Name of the Client : M/s. ORISSA MANGANESE & MINERALS LTD,

Description of Site : Orahuri Manganese Ore Mine, Sundargarh, (Odisha)

Seasonal Quarter : Post Monsoon (Oct -Dec, 2013)

Monitoring date : 3th – 5th October, 2013

Date of Analysis : Representatives of Sun Consultancy and Services

Page 43: EC compliance status - Adhunik Group

Report No. SCS/OMML-OMOM/EM/NOV/AAQ-01 Date: 22.11.2013

AMBIENT AIR MONITORING REPORT

Sl. No. Location of Sampling

Parameters

PM10

(In µg/m3)

PM 2.5

(in µg/m3)

SO2

(in µg/m3)

NOx

(in µg/m3)

01 Main Pit 52.7 26.6 11.4 12.5

02 Haul Road 56.8 25.6 13.6 12.7

03 Main Entrance Gate 52.7 22.4 12.8 11.5

04 Village Harischandrapur

(Up Wind) 56.3 25.6 11.6 12.5

05 Village Kadodihi

(Down Wind) 54.4 28.3 12.3 13.6

06 Village Koira 57.5 30.6 13.4 11.2

Standard as per MoEF Notification G.S.R. 826 (E) dated 16/11/2009

(For 24 Hours Sampling)

100 60 80 80

For SUN CONSULTANCY AND SERVICES

Lab analyst Lab. In-charge

Name of the Client : M/s. ORISSA MANGANESE & MINERALS LTD,

Description of Site : Orahuri Manganese Ore Mine, Sundargarh, (Odisha)

Seasonal Quarter : Post Monsoon (Oct -Dec, 2013)

Monitoring date : 5th – 7th November, 2013

Date of Analysis : Representatives of Sun Consultancy and Services

Page 44: EC compliance status - Adhunik Group

Report No. SCS/OMML-OMOM/EM/NOV/FE-01 Date: 22.11.2013

FUGITIVE DUST MONITORING REPORT

For SUN CONSULTANCY AND SERVICES

Lab analyst Lab. In-charge

FUGITIVE DUST MONITORING LOCATIONS

(FDM)

DESCRIPTION OF THE

LOCATIONS

FUGITIVE DUST LEVEL

(in µg/m3)

FUGITIVE DUST EMISSION STANDARD

AS PER MOEF NOTIFICATION NO.

G.S.R. 809 (E) DATED 04.10.2010 (in µg/m3)

FDM-1 27m N from Main Pit. 185

1200 FDM-2 23m W from Main pit. 176

Name of the Client : M/s. ORISSA MANGANESE & MINERALS LTD,

Description of Site : Orahuri Manganese Ore Mine, Sundargarh, (Odisha)

Seasonal Quarter : Post Monsoon (Oct -Dec, 2013)

Monitoring date : 5th – 7th November, 2013

Date of Analysis : Representatives of Sun Consultancy and Services

Page 45: EC compliance status - Adhunik Group

Report No. SCS/OMML-OMOM/EM/NOV/NOISE-01 Date: 22.11.2013

NOISE LEVEL STUDY REPORT

For SUN CONSULTANCY AND SERVICES

Lab analyst Lab. In-charge

Location ID Name of the Location

Day (6 AM. - 10PM.)

Limits in dB (A)

Night (10PM. – 6AM.)

Limits in dB (A) Max. Min. Max. Min.

N1 Main Pit 63.6 51.5 40.3 36.4

N2 Haul Road 62.5 54.5 42.2 30.5

N3 Main Entrance Gate 54.4 52.2 43.4 34.3

N4 Village Harischandrapur 55.6 47.6 40.3 33.5

N5 Village Kadodihi 54.2 42.6 42.7 32.5

N6 Village Koira 57.3 41.8 42.4 38.2

Permissible limit as per MoEF Notification No. S.O.1046 (E) Dated

22-11-2000 in dB (A) Leq

75 70

Name of the Client : M/s. ORISSA MANGANESE & MINERALS LTD,

Description of Site : Orahuri Manganese Ore Mine, Sundargarh, (Odisha)

Seasonal Quarter : Post Monsoon (Oct -Dec, 2013)

Monitoring date : 5th – 7th November, 2013

Date of Analysis : Representatives of Sun Consultancy and Services

Page 46: EC compliance status - Adhunik Group

Report No. SCS/OMML-OMOM/EM/DEC/AAQ-01 Date: 16.12.2013

AMBIENT AIR MONITORING REPORT

Sl. No. Location of Sampling

Parameters

PM10

(In µg/m3)

PM 2.5

(in µg/m3)

SO2

(in µg/m3)

NOx

(in µg/m3)

01 Main Pit 61.7 31.6 12.4 11.5

02 Haul Road 56.8 25.6 13.6 12.7

03 Main Entrance Gate 52.7 22.4 12.8 11.5

04 Village Harischandrapur

(Up Wind) 56.5 25.7 11.6 12.5

05 Village Kadodihi

(Down Wind) 55.7 28.2 12.3 10.6

06 Village Koira 57.3 30.6 12.4 10.2

Standard as per MoEF Notification G.S.R. 826 (E) dated 16/11/2009

(For 24 Hours Sampling)

100 60 80 80

For SUN CONSULTANCY AND SERVICES

Lab analyst Lab. In-charge

Name of the Client : M/s. ORISSA MANGANESE & MINERALS LTD,

Description of Site : Orahuri Manganese Ore Mine, Sundargarh, (Odisha)

Seasonal Quarter : Post Monsoon (Oct -Dec, 2013)

Monitoring date : 6th – 7th Dec, 2013

Date of Analysis : Representatives of Sun Consultancy and Services

Page 47: EC compliance status - Adhunik Group

Report No. SCS/OMML-OMOM/EM/DEC/FE-01 Date: 16.12.2013

FUGITIVE DUST MONITORING REPORT

For SUN CONSULTANCY AND SERVICES

Lab analyst Lab. In-charge

FUGITIVE DUST MONITORING LOCATIONS

(FDM)

DESCRIPTION OF THE

LOCATIONS

FUGITIVE DUST LEVEL

(in µg/m3)

FUGITIVE DUST EMISSION STANDARD

AS PER MOEF NOTIFICATION NO.

G.S.R. 809 (E) DATED 04.10.2010 (in µg/m3)

FDM-1 27m N from Main Pit. 217

1200 FDM-2 23m W from Main pit. 237

Name of the Client : M/s. ORISSA MANGANESE & MINERALS LTD,

Description of Site : Orahuri Manganese Ore Mine, Sundargarh, (Odisha)

Seasonal Quarter : Post Monsoon (Oct -Dec, 2013)

Monitoring date : 6th – 7th Dec, 2013

Date of Analysis : Representatives of Sun Consultancy and Services

Page 48: EC compliance status - Adhunik Group

Report No. SCS/OMML-OMOM/EM/DEC/NOISE-01 Date: 16.12.2013

NOISE LEVEL STUDY REPORT

For SUN CONSULTANCY AND SERVICES

Lab analyst Lab. In-charge

Location ID Name of the Location

Day (6 AM. - 10PM.)

Limits in dB (A)

Night (10PM. – 6AM.)

Limits in dB (A) Max. Min. Max. Min.

N1 Main Pit 63.6 51.5 38.7 31.4

N2 Haul Road 60.1 52.5 42.2 30.4

N3 Main Entrance Gate 55.6 52.2 43.4 34.3

N4 Village Harischandrapur 57.6 47.7 40.3 35.5

N5 Village Kadodihi 56.2 42.6 36.5 27.5

N6 Village Koira 58.6 40.4 37.4 28.2

Permissible limit as per MoEF Notification No. S.O.1046 (E) Dated

22-11-2000 in dB (A) Leq

75 70

Name of the Client : M/s. ORISSA MANGANESE & MINERALS LTD,

Description of Site : Orahuri Manganese Ore Mine, Sundargarh, (Odisha)

Seasonal Quarter : Post Monsoon (Oct -Dec, 2013)

Monitoring date : 6th – 7th Dec, 2013

Date of Analysis : Representatives of Sun Consultancy and Services

Page 49: EC compliance status - Adhunik Group

Report No. SCS/OMML-OMOM/EM/JAN/AAQ-01 Date: 28.01.2014

AMBIENT AIR MONITORING REPORT

Sl. No. Location of Sampling

Parameters

PM10

(In µg/m3)

PM 2.5

(in µg/m3)

SO2

(in µg/m3)

NOx

(in µg/m3)

01 Main Pit 55.3 26.3 12.4 10.7

02 Haul Road 57.7 23.2 12.3 12.5

03 Main Entrance Gate 58.5 21.2 11.2 13.4

04 Village Harischandrapur

(Up Wind) 54.2 22.6 11.6 12.7

05 Village Kadodihi

(Down Wind) 55.3 24.5 10.4 13.8

06 Village Koira 59.5 28.4 13.6 12.5

Standard as per MoEF Notification G.S.R. 826 (E) dated 16/11/2009

(For 24 Hours Sampling)

100 60 80 80

For SUN CONSULTANCY AND SERVICES

Lab analyst Lab. In-charge

Name of the Client : M/s. ORISSA MANGANESE & MINERALS LTD,

Description of Site : Orahuri Manganese Ore Mine, Sundargarh, (Odisha)

Seasonal Quarter : Winter(Jan-Feb, 2014)

Monitoring date : 15th – 17th January, 2014

Date of Analysis : Representatives of Sun Consultancy and Services

Page 50: EC compliance status - Adhunik Group

Report No. SCS/OMML-OMOM/EM/JAN/FE-01 Date: 28.01.2014

FUGITIVE DUST MONITORING REPORT

For SUN CONSULTANCY AND SERVICES

Lab analyst Lab. In-charge

FUGITIVE DUST MONITORING LOCATIONS

(FDM)

DESCRIPTION OF THE

LOCATIONS

FUGITIVE DUST LEVEL

(in µg/m3)

FUGITIVE DUST EMISSION STANDARD

AS PER MOEF NOTIFICATION NO.

G.S.R. 809 (E) DATED 04.10.2010 (in µg/m3)

FDM-1 27m N from Main Pit. 214

1200 FDM-2 23m W from Main pit. 194

Name of the Client : M/s. ORISSA MANGANESE & MINERALS LTD,

Description of Site : Orahuri Manganese Ore Mine, Sundargarh, (Odisha)

Seasonal Quarter : Winter(Jan-Feb, 2014)

Monitoring date : 15th – 17th January, 2014

Date of Analysis : Representatives of Sun Consultancy and Services

Page 51: EC compliance status - Adhunik Group

Report No. SCS/OMML-OMOM/EM/JAN/NOISE-01 Date: 28.01.2014

NOISE LEVEL STUDY REPORT

For SUN CONSULTANCY AND SERVICES

Lab analyst Lab. In-charge

Location ID Name of the Location

Day (6 AM. - 10PM.) Limits in dB (A)

Night (10PM. – 6AM.) Limits in dB (A)

Max. Min. Max. Min. N1 Main Pit 62.3 51.3 41.3 35.7

N2 Haul Road 58.6 53.5 40.2 32.5

N3 Main Entrance Gate 54.7 53.2 43.5 31.2

N4 Village Harischandrapur 54.6 47.6 41.3 33.5

N5 Village Kadodihi 56.2 41.6 37.6 32.7

N6 Village Koira 55.6 46.8 43.6 34.2

Permissible limit as per MoEF Notification No. S.O.1046 (E) Dated

22-11-2000 in dB (A) Leq

75 70

Name of the Client : M/s. ORISSA MANGANESE & MINERALS LTD,

Description of Site : Orahuri Manganese Ore Mine, Sundargarh, (Odisha)

Seasonal Quarter : Winter (Jan-Feb, 2014)

Monitoring date : 15th – 17th January, 2014

Date of Analysis : Representatives of Sun Consultancy and Services

Page 52: EC compliance status - Adhunik Group

Report No. SCS/OMML-OMOM/EM/FEB/AAQ-01 Date: 26.02.2014

AMBIENT AIR MONITORING REPORT

Sl. No. Location of Sampling

Parameters

PM10

(In µg/m3)

PM 2.5

(in µg/m3)

SO2

(in µg/m3)

NOx

(in µg/m3)

01 Main Pit 54.6 24.7 11.4 10.7

02 Haul Road 55.2 24.8 12.8 12.3

03 Main Entrance Gate 56.7 25.8 12.5 11.4

04 Village Harischandrapur

(Up Wind) 58.4 27.8 11.6 12.5

05 Village Kadodihi

(Down Wind) 54.2 26.5 11.4 10.6

06 Village Koira 60.5 27.6 12.4 12.8

Standard as per MoEF Notification G.S.R. 826 (E) dated 16/11/2009

(For 24 Hours Sampling)

100 60 80 80

For SUN CONSULTANCY AND SERVICES

Lab analyst Lab. In-charge

Name of the Client : M/s. ORISSA MANGANESE & MINERALS LTD,

Description of Site : Orahuri Manganese Ore Mine, Sundargarh, (Odisha)

Seasonal Quarter : Winter(Jan-Feb, 2014)

Monitoring date : 13th – 15th February, 2014

Date of Analysis : Representatives of Sun Consultancy and Services

Page 53: EC compliance status - Adhunik Group

Report No. SCS/OMML-OMOM/EM/FEB/FE-01 Date: 26.02.2014

FUGITIVE DUST MONITORING REPORT

For SUN CONSULTANCY AND SERVICES

Lab analyst Lab. In-charge

FUGITIVE DUST MONITORING LOCATIONS

(FDM)

DESCRIPTION OF THE

LOCATIONS

FUGITIVE DUST LEVEL

(in µg/m3)

FUGITIVE DUST EMISSION STANDARD

AS PER MOEF NOTIFICATION NO.

G.S.R. 809 (E) DATED 04.10.2010 (in µg/m3)

FDM-1 27m N from Main Pit. 212

1200 FDM-2 23m W from Main pit. 187

Name of the Client : M/s. ORISSA MANGANESE & MINERALS LTD,

Description of Site : Orahuri Manganese Ore Mine, Sundargarh, (Odisha)

Seasonal Quarter : Winter(Jan-Feb, 2014)

Monitoring date : 13th – 15th February, 2014

Date of Analysis : Representatives of Sun Consultancy and Services

Page 54: EC compliance status - Adhunik Group

Report No. SCS/OMML-OMOM/EM/FEB/NOISE-01 Date: 26.02.2014

NOISE LEVEL STUDY REPORT

For SUN CONSULTANCY AND SERVICES

Lab analyst Lab. In-charge

Location ID Name of the Location

Day (6 AM. - 10PM.) Limits in dB (A)

Night (10PM. – 6AM.) Limits in dB (A)

Max. Min. Max. Min. N1 Main Pit 62.5 53.2 40.5 36.7

N2 Haul Road 58.3 51.2 40.2 32.8

N3 Main Entrance Gate 57.9 51.7 43.2 31.2

N4 Village Harischandrapur 55.6 47.4 42.3 32.5

N5 Village Kadodihi 56.7 44.8 37.6 30.1

N6 Village Koira 58.6 46.4 42.3 31.2

Permissible limit as per MoEF Notification No. S.O.1046 (E) Dated

22-11-2000 in dB (A) Leq

75 70

Name of the Client : M/s. ORISSA MANGANESE & MINERALS LTD,

Description of Site : Orahuri Manganese Ore Mine, Sundargarh, (Odisha)

Seasonal Quarter : Winter(Jan-Feb, 2014)

Monitoring date : 13th – 15th February, 2014

Date of Analysis : Representatives of Sun Consultancy and Services

Page 55: EC compliance status - Adhunik Group

Report No. SCS/OMML-OMOM/EM/MARCH/AAQ-01 Date: 20.03.2014

AMBIENT AIR MONITORING REPORT

Sl. No. Location of Sampling

Parameters

PM10

(In µg/m3)

PM 2.5

(in µg/m3)

SO2

(in µg/m3)

NOx

(in µg/m3)

01 Main Pit 62.7 25.6 11.4 11.5

02 Haul Road 58.2 23.8 12.4 12.2

03 Main Entrance Gate 53.5 25.8 12.5 11.4

04 Village Harischandrapur

(Up Wind) 54.3 27.6 11.6 12.7

05 Village Kadodihi

(Down Wind) 54.7 26.5 10.4 12.6

06 Village Koira 62.5 29.4 11.4 12.2

Standard as per MoEF Notification G.S.R. 826 (E) dated 16/11/2009

(For 24 Hours Sampling)

100 60 80 80

For SUN CONSULTANCY AND SERVICES

Lab analyst Lab. In-charge

Name of the Client : M/s. ORISSA MANGANESE & MINERALS LTD,

Description of Site : Orahuri Manganese Ore Mine, Sundargarh, (Odisha)

Seasonal Quarter : Pre Monsoon (March-May 2014)

Monitoring date : 5th – 7th March, 2014

Date of Analysis : Representatives of Sun Consultancy and Services

Page 56: EC compliance status - Adhunik Group

Report No. SCS/OMML-OMOM/EM/MARCH/FE-01 Date: 20.03.2014

FUGITIVE DUST MONITORING REPORT

For SUN CONSULTANCY AND SERVICES

Lab analyst Lab. In-charge

FUGITIVE DUST MONITORING LOCATIONS

(FDM)

DESCRIPTION OF THE

LOCATIONS

FUGITIVE DUST LEVEL

(in µg/m3)

FUGITIVE DUST EMISSION STANDARD

AS PER MOEF NOTIFICATION NO.

G.S.R. 809 (E) DATED 04.10.2010 (in µg/m3)

FDM-1 27m N from Main Pit. 206

1200 FDM-2 23m W from Main pit. 193

Name of the Client : M/s. ORISSA MANGANESE & MINERALS LTD,

Description of Site : Orahuri Manganese Ore Mine, Sundargarh, (Odisha)

Seasonal Quarter : Pre Monsoon (March-May 2014)

Monitoring date : 5th – 7th March, 2014

Date of Analysis : Representatives of Sun Consultancy and Services

Page 57: EC compliance status - Adhunik Group

Report No. SCS/OMML-OMOM/EM/MARCH/NOISE-01 Date: 20.03.2014

NOISE LEVEL STUDY REPORT

For SUN CONSULTANCY AND SERVICES

Lab analyst Lab. In-charge

Location ID Name of the Location

Day (6 AM. - 10PM.)

Limits in dB (A)

Night (10PM. – 6AM.)

Limits in dB (A) Max. Min. Max. Min.

N1 Main Pit 65.3 53.7 43.3 33.6

N2 Haul Road 62.3 54.5 42.2 32.5

N3 Main Entrance Gate 54.4 52.5 43.5 31.6

N4 Village Harischandrapur 53.6 44.6 40.3 33.5

N5 Village Kadodihi 54.2 46.6 40.7 32.7

N6 Village Koira 59.3 47.4 42.8 36.4

Permissible limit as per MoEF Notification No. S.O.1046 (E) Dated

22-11-2000 in dB (A) Leq

75 70

Name of the Client : M/s. ORISSA MANGANESE & MINERALS LTD,

Description of Site : Orahuri Manganese Ore Mine, Sundargarh, (Odisha)

Seasonal Quarter : Pre Monsoon (March-May 2014)

Monitoring date : 5th – 7th March, 2014

Date of Analysis : Representatives of Sun Consultancy and Services

Page 58: EC compliance status - Adhunik Group

Report No. SCS/OMML-OMOM/EM/MARCH/GW-01 Date: 20.03.2014

GROUND WATER MONITORING REPORT

Sl. No.

Parameters

Permissible Limits as per IS-10500:2012

LOCATIONS

Mining Lease Area

Dug well water from

village Orahuri

Bore well water from

village Harischand

rapur

Bore well water from

village Rangua

1. Colour, Hazen Units 15 <5 <5 <5 <5 2. Odour Agreeable Agreeable Agreeable Agreeable Agreeable 3. Taste Agreeable Agreeable Agreeable Agreeable Agreeable 4. Turbidity, NTU 5 0.7 1.2 1.2 0.9 5. pH No relaxation 6.9 7.1 7.2 7.1

6. Total Hardness (as CaCO3),mg/l 600 143 171 168 148

7. Iron ( as Fe),mg/l No relaxation 0.09 0.12 0.15 0.08 8. Chloride ( as Cl),mg/l 1000 45 37 32 42 9. Residual Chlorine, mg/l 1 NIL NIL NIL NIL 10. Fluoride (as F ) mg/l 1.5 ND ND ND ND 11. Dissolved Solids, mg/l 2000 178 182 164 186 12. Calcium (as Ca),mg/l 200 43.8 57.4 49.8 39.4 13. Magnesium (as Mg),mg/l 100 9.11 7.65 9.11 9.59 14. Copper (as Cu),mg/l 1.5 BDL BDL BDL BDL 15. Manganese (as Mn),mg/l 0.3 0.02 0.03 0.01 0.01 16. Sulphate (as SO4),mg/l 400 10.5 12.2 8.9 7.4 17. Nitrate ( as NO3),mg/l No relaxation BDL BDL BDL BDL

18. Phenolic compounds (as C6,H5OH),mg/l 0.002 ND ND ND ND

19. Mercury, (as Hg),mg/l No relaxation ND ND ND ND 20. Cadmium (as Cd),mg/l No relaxation ND ND ND ND 21. Selenium (as Se), mg/l No relaxation ND ND ND ND 22. Arsenic (as As), mg/l 0.05 ND ND ND ND 23. Cyanide (as CN) mg/l No relaxation ND ND ND ND 24. Lead (as Pb), mg/l No relaxation ND ND ND ND 25. Zinc (as Zn),mg/l 15 BDL BDL BDL BDL

26. Total Chromium ( as Cr),mg/l No relaxation NIL NIL NIL NIL

Name of the Client : M/s. ORISSA MANGANESE & MINERALS LTD,

Description of Site : Orahuri Manganese Ore Mine, Sundargarh, (Odisha)

Seasonal Quarter : Pre Monsoon (March-May 2014)

Monitoring date : 5th – 7th March, 2014

Date of Analysis : Representatives of Sun Consultancy and Services

Page 59: EC compliance status - Adhunik Group

27. Mineral Oil, mg/l No relaxation BDL BDL BDL BDL 28. Alkalinity(as CaCO3),mg/l 600 55 63 49 52 29. Boron (as B), mg/l 1.0 NIL NIL NIL NIL

30. Total coli form organisms, MPN/100 ml <2 <2 <2 <2 Note: BDL-Below Detection Level, N.D.-Not Detectable

For SUN CONSULTANCY AND SERVICES

Lab analyst Lab. In-charge

Page 60: EC compliance status - Adhunik Group

Report No. SCS/OMML-OMOM/EM/MARCH/SW-01 Date: 20.03.2014

SURFACE WATER MONITORING REPORT

Sl. No.

Parameters

Max.

Tolerance limit as per

IS-2296(1982) (Class-C)

LOCATIONS

Teherei Nala near village Kalmanga

Teherei Nala near

village Teherei

Karo Nala near village

Harischandrapur

Karo Nala near village

Kadodihi

1. Colour, Hazen Units 300 1.2 1.0 1.2 1.4

2. Odour Un objectionable

Un objectionable

Un objectionable

Un objectionable

Un objectionable

3. Taste Agreeable Agreeable Agreeable Agreeable Agreeable4. Turbidity, NTU -- 8.5 9.2 9.8 8.3 5. Suspended Solids, mg/l -- 75 103 88 79 6. pH 6.5 – 8.5 7.1 7.3 7.2 7.2

7. Total Hardness (as CaCO3),mg/l -- 205 212 218 198

8. Iron ( as Fe),mg/l 50 0.35 0.45 0.26 0.17 9. Chloride ( as Cl),mg/l 600 42.6 40.6 38.6 37.9 10. Residual Chlorine,mg/l -- NIL NIL NIL NIL 11. Fluoride (as F ) mg/l 1.5 ND ND ND ND 12. Dissolved Solids,mg/l 1500 178 173 146 165 13. Calcium (as Ca),mg/l -- 43.4 53.6 50.6 54.4

14. Magnesium (as Mg),mg/l -- 8.04 6.03 7.43 11.30 15. Copper (as Cu),mg/l 1.5 NIL NIL NIL NIL 16. Manganese (as Mn),mg/l -- 0.03 0.012 0.06 0.018 17. Sulphate (as SO4),mg/l 400 32.5 24.6 27.5 21.7 18. Nitrate ( as NO3),mg/l 50 1.46 1.55 1.38 1.71

19. Mercury, (as Hg),mg/l -- ND ND ND ND

20. Cadmium (as Cd),mg/l 0.01 ND ND ND ND

21. Selenium (as Se), mg/l 0.05 ND ND ND ND

22. Arsenic (as As), mg/l 0.2 ND ND ND ND

23. Cyanide (as CN) mg/l 0.05 ND ND ND ND

Name of the Client : M/s. ORISSA MANGANESE & MINERALS LTD,

Description of Site : Orahuri Manganese Ore Mine, Sundargarh, (Odisha)

Seasonal Quarter : Pre Monsoon (March-May 2014)

Monitoring date : 5th – 7th March, 2014

Date of Analysis : Representatives of Sun Consultancy and Services

Page 61: EC compliance status - Adhunik Group

24. Lead (as Pb), mg/l 0.1 ND ND ND ND 25. Zinc (as Zn),mg/l 15 BDL BDL BDL BDL

26. Anionic Detergents (as MBAS),mg/l 1 ND ND ND ND

27. Hexavalent Chromium ( as Cr+6),mg/l 0.05 ND ND ND ND

28. Oil & grease, mg/l 0.1 BDL 0.01 BDL BDL 29. Alkalinity(as CaCO3),mg/l -- 56 63 52 48 30. Boron (as B), mg/l -- ND ND ND ND

31. BOD ( 5 days at 20ºC ), mg/l 3 1.2 2.0 1.7 2.1

32. Total coli form organisms, MPN/100 ml 5000+ 142 163 144 182

Note: BDL-Below Detection Level, N.D.-Not Detectable

For SUN CONSULTANCY AND SERVICES

Lab analyst Lab. In-charge

Page 62: EC compliance status - Adhunik Group

Report No. SCS/OMML-OMOM/EM/MARCH/FLR-01 Date: 20.03.2014

REPORT OF FLOW RATE

For SUN CONSULTANCY AND SERVICES

Lab analyst Lab. In-charge

Sl. no Locations Flow Rate (L/Sec)

1. Karo Nullah 14.2 L/sec

2. Teheari Nullah 12.5 L/sec

Name of the Client : M/s. ORISSA MANGANESE & MINERALS LTD,

Description of Site : Orahuri Manganese Ore Mine, Sundargarh, (Odisha)

Seasonal Quarter : Pre Monsoon (March-May 2014)

Monitoring date : 5th – 7th March, 2014

Date of Analysis : Representatives of Sun Consultancy and Services

Page 63: EC compliance status - Adhunik Group

Report No. SCS/OMML-OMOM/EM/MARCH/GWL-01 Date: 20.03.2014

REPORT OF GROUND WATER LEVEL

For SUN CONSULTANCY AND SERVICES

Lab analyst Lab. In-charge

Sl. no Name of the Locations Water Level

(Below Ground Level in meters)

1. Orahuri (Inside the mine lease area) 4.87

2. Village Teherei dug well 3.92

3. Village Kalmanga dug well 4.71

Name of the Client : M/s. ORISSA MANGANESE & MINERALS LTD,

Description of Site : Orahuri Manganese Ore Mine, Sundargarh, (Odisha)

Seasonal Quarter : Pre Monsoon (March-May 2014)

Monitoring date : 5th – 7th March, 2014

Date of Analysis : Representatives of Sun Consultancy and Services

Page 64: EC compliance status - Adhunik Group

Report No. SCS/OMML-OMOM/EM/MARCH/WW-01 Date: 20.03.2014

REPORT OF WASTE WATER ANALYSIS

Sl. No. Parameters Unit

Location Permissible Limits as

Environment protection rule, Gazette No.488

Dated 12.09.1988

Check Dam Garland Drain

1. pH -- 7.2 7.3 5.5 – 9.0

2. TSS mg/l 57.6 62.3 100.0

3. TDS mg/l 74 82 2100.0

4. Oil & Grease mg/l Nil 0.13 10.0

5. BOD @ 270C 3days mg/l 2.2 2.7 30.0

6. COD mg/l 55.7 61.7 250.0

7. Sulphate mg/l 13.4 17.7 1000

For SUN CONSULTANCY AND SERVICES

Lab analyst Lab. In-charge

Name of the Client : M/s. ORISSA MANGANESE & MINERALS LTD,

Description of Site : Orahuri Manganese Ore Mine, Sundargarh, (Odisha)

Seasonal Quarter : Pre Monsoon (March-May 2014)

Monitoring date : 5th – 7th March, 2014

Date of Analysis : Representatives of Sun Consultancy and Services