Microsoft Word - EC_compliance statusas AnnexureI.
(iii)  The  company  shall  submit within  3 month  their policy towards Corporate Environment  Responsibility  which  should  interalia  address  (i)  Standard  operating  process/  procedure  to  bring  into  focus  any  infringements /violation of environmental or  forest  norms/conditions,  (ii)  Hierarchical  system  or  Administrative  order  of  the  company  to deal with environmental  issues  and ensuring compliance EC conditions and  (iii)  System  of  reporting  of  non  compliance/violation  environmental  norms  to  the  Board  of  directors  of  the  Company  and /or  stakeholders of shareholders. 
Policy  Towards  Corporate  Environmental  and  social responsibility:     CESR  strategies  aligned  with  organizational  goals     Drive CESR throughout the organization   Developing a culture of sustainability    What  drives  business  to  consider  sustainability?   CESR initiatives during a challenging economy    Communication  via  responsibility  reporting  and its effect on firm value   CESR  impacting current and  future regulatory  practices   Social/Environmental Accounting    Social/Environmental Sustainability Reporting   Corporate Accountability  CSR  Activities  implemented  by  OMML  is  enclosed as AnnexureII. 
(iv)   The  environmental  clearance  is  subject  to  approval of the State Land use Department,  Government  of  Orissa  for  diversion  of  agriculture  land  for nonagricultural use,  as  may be applicable to this project. 
No  agricultural  land  involved  in  the mining  activities. 
(v)  Necessary  prior  permission  from  the  Competent  Authority  as may  be  applicable  for  use  of  grazing  land  for mining  propose  shall be obtained. 
No  grazing  land  involved  in  the  Mining  activities.    
(vi)  The Project Proponent shall develop  fodder  plots  in  the nonmineralised  area  in  lieu of  use of grazing land. 
No  grazing  land  involved  in  the  Mining  activities.    
(vii)  The mining operations shall be restricted to  above ground water table and  it should not  intersect  the  groundwater  table.  In  case of  working  below  ground  water  table,  prior  approval of the Ministry of Environment and  Forests  and  the  Central  Ground  Water  Authority  shall  be  obtained,  for  which  a  detailed  hydrogeological  study  shall  be  carried out. 
The topography of the area is undulated and  hilly  at  an  elevation  above mean  sea  level  ranging  from  595m  to  620m.  The  ultimate  working depth of mine will be restricted up  to 590m AMSL. The ground water table is at  565m  AMSL.  The  Mine  Working  will  not  intersect the ground water table.   
(viii)  The project proponent  shall ensure  that no  natural watercourse and/or water resources  shall  be  obstructed  due  to  any  mining 
 
 
 
operations.  Adequate  measures  shall  be  taken for conservation and protection of the  1st and 2nd order  streams,  if any emanating  or passing through the mine lease during the  course of mining operation. 
of Water course is left as safety barrier. 
(ix)  The  top  soil  if  any  shall  temporarily  be  stored  at  earmarked  site(s)  only  and  it  should not be  kept unutilized  for  long. The  topsoil  shall  be  used  for  land  reclamation  and plantation. 
The entire Over burden generated is lateritic  in nature, therefore generation of top soil is  nil.   
(x)  The over burden  (OB) generated during  the  mining  operations  shall  be  stacked  at  earmarked  dump  site(s)  only  and  it  should  not be kept active  for a  long period of time  and  their  phasewise  stabilization  shall  be  carried out. Back filing shall commence from  the  6th  year  onwards.  The  existing  two  dumps  shall  merge  into  one  single  dump  and there shall be one external OB dump at  the end of the mine life in an area of 5.3 ha.  Proper  terracing  of  OB  dumps  shall  be  carried out so that the overall slope of dump  shall  not  exceed  280.  The  Over  burden  dumps  shall be scientifically vegetated with  suitable  native  species  to  prevent  erosion  and  surface  run off.  In critical areas, use of  geo  textiles  shall  be  undertaken  for  stabilization  of  the  dump.  The  entire  excavated  area  of  23.772  ha.  shall  be  backfilled  and  reclaimed  by  plantation.  Monitoring  and  management  of  rehabilitated  areas  shall  continue  until  the  vegetation  becomes  selfsustaining.  Compliance status shall be submitted to the  Ministry  of  Environment  &  Forests  and  its  Regional Office  located  at Bhubaneswar on  six monthly basis. 
Precautionary  Measures  Adopted  During  Waste Disposal are as Follows:   i) The  ultimate  dump  slope  has  been  maintained  at  20220  with  individual  terrace slopes not exceeding 370. 
ii) Each  terrace  has  been  maintained  inward  slope  with  catch  drain  at  the  inward slope of terrace. 
iii) Catch drain of  the  individual  terrace are  connected  to  the  garland  drain  outside  the  periphery  of  dump.  Catch  drain  preferable  made  up  of  halt  concrete  open pipes  followed by settling  tanks  to  avoid  wash  offs  and  have  provision  berms  at  the outer  side  to  reduce gully  formation due to rainwater wash offs. 
 
(xi)  Catch  drains  and  siltation  ponds  of  appropriate size shall be constructed around  the mine working, mineral and OB dump(s) 
 
 
 
to  prevent  run  off  of  water  and  flow  of  sediments directly  into  the Karo Nallah,  the  Tehrai Nallah,  and other water bodies.  The  water  so  collected  should  be  utilized  for  watering  the mine  area,  roads,  green  belt  development  etc.  The  drains  shall  be  regularly  desilted  particularly  after  the  monsoon and maintained properly. 
Garland  drains,  settling  tanks  and  check  dams  of  appropriate  size,  gradient  and length shall be constructed both around  the  mine  pit  and  over  burden  dumps  to  prevent  run  off  of  water  and  flow  of  sediments directly  into  the Karo Nallah,  the  Tehrai  Nallah  and  other  water  bodies  and  sump  capacity  should  be  designed  keeping  50%  safety  margin  over  and  above  peak  sudden rainfall (based on 50 years data) and  maximum  discharge  in  the  area  adjoining  the  mine  site.  Sump  capacity  should  also  provide adequate  retention period  to allow  proper  settling  of  silt  material.  Sedimentation  pits  shall  be  constructed  at  the  corners  of  the  garland  drains  and  desilted at regular intervals. 
flow  of  sediments  directly  into  the  Karo  Nala,  Tehrai  Nala  and  other  water  bodies.  Collected water used  for watering  the mine  areas,  road,  green  belt  development  etc.  Proper desiltation and maintenance of  the  drains  carried  out,  garland  drains,  settling  tanks and check dams constructed.   Retaining wall: (Length, Width, Height:   192.4m x 3m x 2m, Area covered 660Sq. mtrs.) 
Garland drain: (Length, Width, Height:   200m x 2m x 1m, Area covered 660Sq. mtrs.) 
 
 
(xii)  Dimension of the retaining wall at the toe of  over  burden  dumps  and  the  OB  benches  within  the  mine  to  check  runoff  and  siltation shall be based on the rain fall data. 
The retaining wall (Length, Width, Height: 
192.4m x 3m x 2m, Area covered 660Sq. mtrs.)  at  the  toe  of  over  burden  dumps  made  based  on  the  rainfall  data  to  check  runoff  and siltation. Photographs of Retaining wall  is enclosed as AnnexureIII.  
(xiii)  Plantation  shall  be  raised  in  an  area  of  47.084 ha.  including a 7.5m wide green belt  in  the safety zone around  the mining  lease,  over  burden  dumps,  backfilled  and  reclaimed area, mine benches, roads etc. by  planting  the  native  species  in  consultation  with  the  local DFO/Agriculture Department.  The  density  of  the  trees  should  be  around 
 
 
 
2500  plants  per  ha.  Greenbelt  shall  be  developed all along the mine lease area in a  phased  manner  and  shall  be  completed  within first five years. 
approximately with a survival rate of 65% in  consultation with the forest department.    
(xiv)  Effective  safeguard  measures  such  as  regular water sprinkling shall be carried out  in  critical  areas  prone  to  air  pollution  and  having high levels of particulate matter such  as  around  crushing  and  screening  plant,  loading  and  unloading  point  and  transfer  points.  Extensive  water  sprinkling  shall  be  carried  out  on  haul  roads.  It  should  be  ensured  that  the  Ambient  Air  Quality  parameters  conform  to  the  norms  prescribed  by  the  Central  Pollution  Control  Board in this regard. 
Water  sprinkling  in  the haul  road, dumping  ground  and  on  transporting  area  has  been  regularly carried out twice daily.   Monitoring of Air quality parameter carried  out regularly and the results are well within  the  prescribed  norms  by  CPCB. Monitoring  results are enclosed as AnnexureIV.   
(xv)  The  project  authority  should  implement  suitable conservation measures  to augment  ground  water  resources  in  the  area  in  consultation  with  the  Regional  Director,  Central Ground Water Board. 
The topography of the area is undulated and  hilly  at  an  elevation  above mean  sea  level  ranging  from  595m  to  620m.  The  ultimate  working depth of mine will be restricted up  to 590m AMSL. The ground water table is at  565m  AMSL.  The  Mine  Working  will  not  intersect the ground water table. Rainwater  harvesting  techniques  have  been  practiced  as a measure of conservation of water. 
(xvi)  Regular  monitoring  of  ground  water  level  and  quality  shall  be  carried  out  in  and  around  the  mine  lease  by  establishing  a  network of existing wells and  installing new  piezometers  during  the  operation.    The  periodic monitoring [ (at least four times in a  year  –  pre    monsoon(AprilMay),  monsoon(August),  post    monsoon(November)  and  winter(January);  once in each season) ] shall be carried out in  consultation  with  the  State  Ground Water  Board/ Central Ground Water Authority and  the  data  thus  collected  may  be  sent  regularly to the Ministry of Environment and  Forests and its Regional office Bhubaneswar, 
 
 
 
the Central Ground water Authority and the  Regional  Director,  Central  Ground  Water  Board. If at any stage, it is observed that the  groundwater  table  is  getting  depleted  due  to  the mining  activity,  necessary  corrective  measures shall be carried out. 
(xvii)  The  project  proponent  shall  obtain  necessary  prior  permission  of  the  competent authorities for drawl of requisite  quantity of water (surface water and ground  water, if any) for the project. 
The  requisite  quantity  of  water  has  been  purchased from local PHED.  
(xviii)  The project proponent shall practice suitable  rainwater harvesting measures on long term  basis  and  work  out  a  detailed  scheme  for  rain  water  harvesting  in  consultation  with  Central Ground Water Authority and submit  a  copy  of  the  same  to  the  Ministry  of  Environment  and  Forests  and  its  Regional  Office, Bhubaneswar.  
Rainwater  harvesting  measures  have  been  planned  and  implemented  in  consultation  with the CGWB.  
(xix)  Vehicular  emissions  shall  be  kept  under  control  and  regularly monitored. Measures  shall  be  taken  for maintenance  of  vehicles  used  in  mining  operations  and  in  transportation  of  mineral.  The  mineral  transportation  shall  be  carried  out  through  covered  trucks  only  and  the  vehicles  carrying  the  mineral  shall  not  be  overloaded. 
Necessary steps have been taken to control  the vehicular emission. The vehicles that are  used  in  the  mining  operations  is  covered  with tarpaulin to avoid dust generation.  
(xx)   No  Blasting  shall  be  carried  out  after  the  sunset.  Blasting  operation  shall  be  carried  out  only  during  the  day  time.  Controlled  blasting  shall  be  practiced.  The  mitigative  measures  for  control  of  ground  vibrations  and  to arrest  fly  rocks and boulders  should  be implemented. 
Control  blasting  has  been  practiced  only  during day time. 
(xxi)  Drills  shall  either  be  operated  with  dust  extractors or equipped with water  injection  system. 
Proper measures have been adopted during  drilling to prevent dust. 
(xxii)  Mineral  handling  plant  shall  be  provided  with  adequate  number  of  high  efficiency  dust  extraction  system.  Loading  and 
 
 
 
unloading  areas  including  all  the  transfer  points  should  also  have  efficient  dust  control  arrangements.  These  should  be  properly maintained and operated. 
high efficiency dust  extraction  system used  in mineral handling area. 
(xxiii)  Sewage treatment plant shall be installed for  the  colony.  ETP  shall  also  be  provided  for  the  workshop  and  wastewater  generated  during mining operation. 
All  the  workers  engaged  in  the mine  area  from  the  nearby  villages.  Only  two/three  staffs residing  in  the camp. As such sewage  treatment  plant  is  not  necessary.  Further,  there  is no workshop within the  lease area.  Koira is approx. 10 km from the site. Rest of  the  time machineries maintenance  is  done  at Koira. As such ETP is not required. 
(xxiv)  Preplacement  medical  examination  and  periodical  medical  examination  of  the  workers  engaged  in  the  project  shall  be  carried out and records maintained. For the  purpose, schedule of health examination of  the workers  should be drawn and  followed  accordingly. 
Periodic medical examination of the workers  carried  out  on weekly  basis  and  the  same  will be continued. 
(xxv)  Provision  shall  be made  for  the  housing  of  construction  labour within  the  site with  all  necessary  infrastructure  and  facilities  such  as  fuel  for  cooking,  mobile  toilets,  mobile  STP,  safe  drinking  water,  medical  health  care, crèche etc. The housing may be  in the  form of temporary structures to be removed  after the completion of the project. 
As stated earlier, all the workers of this mine  are from the nearby villages. As the shift will  be  over,  they  will  be  going  back  to  their  respective  home.  Hence,  no  additional  housing  is  required  for  labours.  However,  necessary  infrastructure  made  is  of  temporary structures.   
(xxvi)  The  project  proponent  shall  take  all  precautionary  measures  during  mining  operation for conservation and protection of  endangered  fauna  namely  panther,  sloth  bear, etc.  spotted  in  the  study area. Action  plan for conservation of flora and fauna shall  be  prepared  and  implemented  in  consultation  with  the  State  Forest  and  Wildlife Department. Necessary allocation of  funds  for  implementation  of  the  conservation  plan  shall  be  made  and  the  funds  so  allocated  shall  be  included  in  the  project cost. A copy of Wild life conservation  plan  shall  be  submitted  to  the  Regional  Office, Ministry of Environment and Forests,  Bhubaneswar. 
An action plan for conservation of flora and  fauna  has  been  prepared  in  consultation  with  the  State  Forest  and  Wild  Life  department.   Funds  for  Implementation  of  conservation  plan will  be  submitted @  20,000/  per  ha.  after  stage –I  clearance of  Forest Diversion  Proposal.     
(xxvii)  The  critical  parameters  such  as  RSPM(Particulate matter with size  less  than 
Monitoring  of  Air  and  water  quality 
 
 
 
10  micron  i.e.,  PM10)  and  NOx  in  the  ambient  air  within  the  impact  zone,  peak  particle velocity at 300m distance or within  the  nearest  habitation, whichever  is  closer  shall  be  monitored  periodically.  Further,  quality  of  discharged  water  shall  also  be  monitored  [(TDS,  DO,  PH  and  Total  Suspended Solids (TSS)]. The monitored data  shall  be  uploaded  on  the  website  of  the  company  as well  as  displayed  on  a  display  board  at  the  project  site  at  a  suitable  location near the main gate of the company  in  public  domain.  The  Circular  no.  J 20012/1/2006IA.II  (M)  dated  27/05/2009  issued  by  ministry  of  Environment  and  Forests, which is available on the website of  the Ministry www.envfor.nic.in shall also be  referred in this regard for its compliance.  
parameter  carried  out  regularly  and  the  results are well within the prescribed norms  by CPCB.   
(xxviii)  A Final Mine Closure Plan along with details  of  Corpus  Fund  shall  be  submitted  to  the  Ministry of Environment & Forests 5 years in  advance of final mine closure for approval. 
Condition will  be  complied,  before  5  years  prior to final closure of the Mine.   
B.  GENERAL CONDITIONS   
(i)  No  change  in mining  technology and  scope  of  working  should  be  made  without  prior  approval  of  the Ministry  of  Environment &  Forests. 
No  change  in  the  mining  Technology  and  working plan has been done. 
(ii)  No  change  in  the  calendar  plan  including  excavation, quantum of mineral Manganese  ore and waste should be made. 
No  change  in  Calendar  Plan  including excavation quantum of Mineral Manganese  and waste has occurred. 
(iii)  Atleast  four  ambient  air  qualitymonitoring  stations  should  be  established  in  the  core  zone  as  well  as  in  the  buffer  zone  for  RSPM(Particulate matter with size  less  than  10 micron  i.e.,  PM10),  &  NOx monitoring.  Location  of  the  stations  should  be  decided  based  on  the  meteorological  data,  topographical  features and environmentally  and  ecologically  sensitive  targets  and  frequency  of  monitoring  should  be  undertaken  in  consultation  with  the  State  Pollution Control Board.  
Ambient  air qualitymonitoring  stations has  been established in the core zone as well as  in  the  buffer  zone  for  PM10,  PM2.5,  SO2  &  NOx monitoring.   Ref.: Annexure – IV. 
 
 
 
regularly submitted to the Ministry including  its  Regional  office  located  at  Bhubaneswar  and  the  State  Pollution  Control  Board  /  Central  Pollution  Control  Board  once  in  six  months. 
NOx monitoring.   Ref.: Annexure – IV. 
(v)  Fugitive dust emissions from all the sources  should  be  controlled  regularly.  Water  spraying arrangement on haul roads, loading  and unloading and at transfer points should  be provided and properly maintained.
Water  sprinkling  in  the haul  road, dumping  ground  and  on  transporting  area  has  been  regularly carried out twice daily.   Ref: AnnexureII 
(vi)  Measures  should  be  taken  for  control  of  noise  levels  below  85  dBA  in  the  work  environment.  Workers  engaged  in  operations  of  HEMM,  etc.  should  be  provided with ear plugs/muffs. 
It is an opencast, semi mechanized method,  surface  mine  with  limited  machinery.  Workers  engaged  in  operations  of  HEMM  provided  with  ear  plugs/muffs.  Besides  having  acoustic  enclosures  for  all machine  operating  cabins  are  provided.    Periodical  monitoring  of  noise  level  of  mining  machines  and  at  some  locations  in  the  mining site is being carried out with the help  of noise level meter. 
(vii)  Industrial waste water (workshop and waste  water  from  the  mine)  should  be  properly  collected,  treated  so  as  to  conform  to  the  standards  prescribed  under  GSR  422  (E)  dated  19th May,  1993  and  31st  December,  1993 or as amended from the time to time.  Oil  and  grease  trap  should  be  installed  before discharge of workshop effluents.
There  is  no  generation  of  industrial  waste  water.  In  the  lease  area  there  is  no  workshop. Maintenance of machineries and  vehicles done at Koira, 10 Km from the mine  site. 
(viii)  Personnel  working  in  dusty  areas  should  wear protective respiratory devices and they  should  also  be  provided  with  adequate  training  and  information  on  safety  and  health aspects.  Occupational health surveillance program of  the  workers  should  be  undertaken  periodically to observe any contractions due  to  exposure  to  dust  and  take  corrective  measures, if needed.   
Occupational  health  surveillance  programme  conducted  regularly.  Workers  are  supplied  with  protective  respiratory  devices and other  corrective measures also  undertaken. Ref: AnnexureII 
(ix)  A separate environmental management cell  with  suitable qualified personnel  should be  setup  under  the  control  of  a  Senior  Executive,  who  will  report  directly  to  the  Head of the Organization. 
An environment management cell has been  formed  under  the  effective  supervision  of  the responsible mines manager who reports  to the project proponent directly.   
 
 
 
separate account and should not be diverted  for  other  purpose.  Year  wise  expenditure  should  be  reported  to  the Ministry  and  its  Regional Office located at Bhubaneswar. 
and  the  account  is  being  maintained  separately.     
(xi)  The project authorities should inform to the  Regional  Office  located  at  Bhubaneswar  regarding date of financial closures and final  approval  of  the  project  by  the  concerned  authorities  and  the  date  of  start  of  land  development work. 
It  is  the  expansion  of  existing  mining  operations  under  valid  approval  from  the  concerned authorities. 
(xii)  The Regional Office of  this Ministry  located  at Bhubaneswar shall monitor compliance of  the  stipulated  conditions.  The  project  authorities should extend full cooperation to  the  officer  (s)  of  the  Regional  Office  by  furnishing  the  requisite  data/  information/  monitoring reports. 
We will  extend  all  our  cooperation  during  any such inspections by the Authority. 
(xiii)  The  project  proponent  shall  submit  six  monthly  report  on  the  status  of  the  implementation  of  the  stipulated  environmental  clearance  conditions  including  results of monitored data(both  in  hard  copies  as  well  as  by  email)  to  the  Ministry  of  Environment  and  Foress,  its  Regional Office Bhubaneswar, the respective  Zonal  Office  of  Central  Pollution  Control  Board and the State Pollution Control Board.  The  proponent  shall  upload  the  status  of  compliance of  the  environmental  clearance  conditions,  including  results  of  monitored  data on  their website  and  shall update  the  same periodically.  It shall simultaneously be  sent to the Regional Office of the Ministry of  Environment and forests, Bhubaneswar, the  respective Zonal Officer of Central Pollution  Control  Board  and  the  State  Pollution  Control Board.  
Precautionary  Measures  Adopted  During  Waste Disposal are as Follows:     i) The  ultimate  dump  slope  has  been 
maintained  at  20220  with  individual  terrace slopes not exceeding 370. 
ii) Each  terrace  has  been  maintained  inward  slope  with  catch  drain  at  the  inward slope of terrace. 
iii) Catch drain of  the  individual  terrace are  connected  to  the  garland  drain  outside  the  periphery  of  dump.  Catch  drain  preferable  made  up  of  halt  concrete  open pipes  followed by settling  tanks  to  avoid  wash  offs  and  have  provision  berms  at  the outer  side  to  reduce gully  formation due to rainwater wash offs. 
iv) As  retreating  method  of  dumping  has  been  proposed  for  dump  stabilization  dead  terraces  have  to  be  planted  also  dump slopes from third year onwards. 
 
 
 
6) Development of garland drain.   7) Construction of settling tank.   
(xiv)  A  copy  of  clearance  letter  shall  be  sent  by  the proponent to concerned Panchayat, Zila  Parisad/Municipal Corporation, Urban  Local  Body and the  local NGO,  if any, from whom  suggestion  /  representations,  if  any,  were  received while processing the proposal. The  clearance  letter  shall  also  be  put  on  the  website of the company by the proponent.   
Copy  of  Clearance  letter  already  submitted  to concerned Panchayat and local NGO’s.  
(xv)  State Pollution Control Board should display  a  copy  of  the  clearance  letter  at  the  Regional office, District  Industry Centre and  the  Collector’s  Office/Tehsildar’s  Office  for  30 days.    
Communicated by SPCB.   
(xvi)  The  environmental  statement  for  each  financial  year  ending  31st March  in  FormV  as  is  mandated  to  be  submitted  by  the  project  proponent  to  the  concerned  State  Pollution Control Board as prescribed under  the Environment (Protection) Rules, 1986, as  amended subsequently, shall also be put on  the website of  the company along with  the  status  of  the  compliance  of  environmental  clearance  conditions  and  shall  also be  sent  to  the  respective  Regional  Office  of  the  Ministry  of  Environment  and  Forests,  Bhubaneswar by email.   
Complied
(xvii)  The  project  authorities  should  advertise  at  least  in  two  local  newspapers  widely  circulated,  one  of  which  shall  be  in  the  vernacular  language  of  the  locality  concerned, within 7 days of the  issue of the  clearance  letter  informing  that  the  project  has been accorded environmental clearance  and  a  copy  of  the  clearance  letter  is  available  with  the  State  Pollution  Control  Board and also at website of the Ministry of  Environment  and  Forests  at  http://envfor.nic.in and a copy of the same  should be  forwarded  to  the Regional Office  of this Ministry located Bhubaneswar.  
 
 
 
ANNEXUREI  CONSENT TO OPERATE RENEWAL– SPECIAL CONDITIONS AND COMPLIANCES 
FOR ORAHURI MANGANESE MINE OF M/S. OMM LTD. 
  Sl. No.  Conditions Compliances 
1. 
A copy of the annual return (annual return  submitted  to  IBM,  Govt.  of  India/Directorate  of  Mines,  Govt.  of  Odisha) shall be submitted every year.  
A  copy  of  the  annual  return  (annual  return  submitted  to  IBM,  Govt.  of  India/Directorate  of  Mines,  Govt.  of  Orissa) is being submitted every year.    
2. 
The environmental  statement  report  shall  be  submitted  to  the  Board  in  proper  format every year. 
The  environmental  statement  has  already been  submitted  to  the Board  in  the  appropriate  format  for  the  said  Mining Project. 
3. 
Drills  shall  either  be  operated  with  dust  extractors  or  equipped  with  water  injection  system  to  minimize  dust  generation in the work environment. 
Wet  drilling  is  being  practiced  in  the  mines.  The  drill  machine  is  equipped  with inbuilt water injection system.   
4. 
Controlled  blasting  shall  be  practiced  to  minimize generation of dust and fly rocks.  No  blasting  shall  be  carried  out  after  the  sunset. 
Blasting  is  being  carried  out  during  the  day  time only.   Control Blasting  is being  carried  to  control  ground  vibration  and  to arrest fly rocks & boulders   
5. 
The  top  soil  shall be  stored at earmarked  site(s) only and stabilized or shall be used  for land reclamation and plantation. 
The  top  soil  generation during next  five  years is observed to be nil, as the nature  of topsoil  is lateritic. Hence no proposal  has been kept for its stacking. 
6. 
The  over  burden  generated  during  the  course  of  mining  shall  be  stacked  at  earmarked dump site  (s) and stabilized or  used  for  reclamation  of  excavated  land  followed by plantation. 
The  intercalated waste  and  overburden  from proposed quarry will be dumped at  proposed  earmark  dump  area  as  per  approved Scheme of Mining. 
7. 
 
 
 
8. 
Appropriate mitigative measures  shall  be  taken  to  prevent  pollution  of  the  nearby  water bodies. 
An adequate measure has been taken to  prevent  pollution  of  the  nearby  water  bodies. 
9. 
Regular monitoring of  ground water  level  and  quality  should  be  carried  out  by  establishing  a  network  of  existing  wells.  The monitoring should be done four times  a  year  in  premonsoon  (April/May),  monsoon  (August),  postmonsoon  (November) and winter (January) seasons.  Data thus collected should be submitted to  the Board quarterly. 
Water quality and water level monitoring  is being carried out quarterly basic by the  environmental  consultant.  The  monitoring  reports  are  attached  as  annexure given below. 
10. 
Sewage  treatment plant  shall be  installed  for  the  colony  if  any.  Other  domestic  wastewater shall be discharged to soak pit  through septic tank constructed as per BIS  specification. 
Domestic wastewater is being discharged  to  soak  pit  through  septic  tank  constructed as per BIS specification 
11. 
ETP  shall  also  be  provided  for  workshop  and  wastewater  generated  if  any  during  mining operation if any. 
In  the  lease  area  there  is no workshop.  Maintenance  of  machineries  and  vehicles will be at Koira, 15 Km from the  mine site. As such ETP is not required.    The  impact  of  opencast  mining  operations  on  surface  water  is  mainly  due  to  wash  off  from  dumps  and  soil  erosion  from  mines  and  roads.  As  the  area  lies  on  the  top  of  the  hill  and  the  rainfall  is  good  in  this  region,  adverse  impact  due  to  the  above  factors  is  anticipated.  Therefore  the  following  measures are proposed to be taken up: 
Garland  drains  around  the  quarry  and  dump  site which will  block  the  quarry  surface  run  off  through  natural nala. 
Settling  tank  /  check dams  to arrest  suspended particles.   
 
 
 
No impact on ground water quality is  anticipated as no perennial drainage  channel of the area is intercepted by  the mining operations. 
12. 
Check  dams  and  check  weirs  shall  be  constructed  at  appropriate  places  of  the  mine  lease area  to prevent direct  flow of  sediment  directly  into  nearby  water  bodies.  The  surface  runoff  water  shall  meet  the  prescribed  standards  before  disposal to outside. 
Catch drains and  siltation ponds around  quarry and over burden dumps has been  constructed  to prevent  runoff of water  and  flow of  sediments directly  in  to  the  Karo  nala,  Tehrai  nala  and  other water  bodies. The water collected is being used  for  watering  the mine  areas,  road  and  greenbelt development. 
13. 
Retaining wall  shall be constructed at  the  toe of topsoil dump and OB dump. Garland  drain  shall  be  constructed  around  the  topsoil  dumps,  over  burden  dumps  and  mineral stack yards terminating at settling  pit to prevent run off of water and flow of  sediments  directly  into  nearby  water  bodies.  Garland  drain  and  sedimentation  pit  shall be desilted after monsoon or as  and when  required. The discharge quality  shall meet  the  standard prescribed of  the  Board. 
Retaining wall  has  been  constructed  at  the  toe  of  topsoil  dump  and  OB  dump  having  Length, Width, Height:  192.4m  x  3m  x  2m,  Area  covered  660Sq.mtrs.  Garland  drain  (Length,  Width,  Height:  200m  x  2m  x  1m,  Area  covered  660Sq.  mtrs.) has been  constructed around  the  topsoil  dump,  over  burden  dumps  and  mineral  dumps  terminating  at  2  nos.  of  settling pit having  (L,B,D):   5m x 3m x 1.5m 
and    6m  x  3m  x  2m  to  prevent  run  off  of  water and flow of sediments directly into  nearby water bodies.  
14. 
Proper quantification of surface runoff and  other wastewater  generated  in  the mine  shall be done and data  shall be  furnished  to the Board by May2014.  
 
 
 
15. 
Regular  water  sprinkling  shall  be  carried  out in critical areas of air pollution such as  around  crushing  and  screening  plant,  if  any. Water  sprinkling  shall be  carried out  on haul roads by  installation of  fixed auto  water  sprinkling  system  and  shall  be  operated  at  desired  interval.  Haulage  roads shall be devoid of ruts and potholes  and shall be maintained properly  to avoid  generation  of  dust  during  movement  of  vehicles. 
Water  sprinkling  in  the  haul  road,  dumping  ground  and  on  transporting  area has been regularly carried out twice  daily.    
16. 
Fixed auto sprinklers shall be provided on  the  approach  roads  from  mines  to  raw  material handling & product handling area  to prevent the generation of dust to be air  borne. 
Water  sprinkling  in  the  haul  road,  dumping  ground  and  on  transporting  area  is  being  carried  out  twice  daily  by  engaging 2 nos. of water  tankers having  capacity  of  10  KL  for  dust  suppression.  Haul  roads  are  maintained  properly  in  order to avoid generation of dust during  movement of vehicles. 
17. 
At  least  four  Ambient  Air  Quality  Monitoring Stations shall be established in  core  zone and buffer  zone  for monitoring  of RSPM(PM10) and location of the stations  shall  be  decided  based  on  the  meteorological  data,  topographical  features  and  environmentally  and  ecologically  sensitive  targets  in  consultation  with  the  Regional  officer,  State Pollution Control Board.  
Six  nos.  of  ambient  Air  Quality  Monitoring  Stations  has  been  established  and  location  of  the  stations  was  decided  based  on  the  meteorological  data,  topographical  features  and  environmentally  and  ecologically  sensitive  targets  in  consultation  with  the  Regional  officer,  State Pollution Control Board.  
18. 
Monitoring  of  Ambient  Air  Quality  and  fugitive dust emission of the mine shall be  done  twice  in  a  week  (24  hourly)  at  a  particular site and data shall be submitted  to  the state pollution control Board, once  in six months. 
 
 
 
Six  monthly  environmental  clearance  compliances  are  been  submitted  to  the  Ministry’s  Regional  Office  at  Bhubaneswar. 
19. 
It  shall  be  ensured  that  the  Ambient  Air  Quality Parameters conform to the norms  prescribed in the consent order. 
The monitoring  of  the  said  parameters  like ambient air quality and water quality  Parameters  carried  out  regularly  and  it  conforms  to  the  norms  prescribed  for  Industrial Area. 
20. 
Regular  monitoring  of  water  quality  of  upstream  and downstream of  the nearby  water  bodies  if  any  shall  be  carried  out  and  record  shall  be  maintained  and  submitted  to  the  State  Pollution  control  Board once in every year. 
Regular  monitoring  of  water  quality  is  being carried out for both upstream and  downstream  of  Karo  nallah  &  Teharei  Nallah.  
The  data  is  being  maintained  regularly  and  submitted  to  concerned  authorities  in time.  
21. 
Measure shall be taken for control of noise  levels  below  85dBA  in  the  work  environment.  
Adequate measures have been taken for  control  of  noise  levels  below  the  prescribed standards.  Workers  engaged  in  operations  of  HEMM  provided  with  ear  plugs/muffs.  Besides having acoustic enclosures for all  machine  operating  cabins  are  provided.   Periodical  monitoring  of  noise  level  of  mining machines  and  at  some  locations  in  the  mining  site  is  being  carried  out  with the help of noise level meter. 
22. 
Ambient air quality monitoring data, noise  monitoring  data  and  water/wastewater  quality  monitoring  data  shall  be  electronically displayed at  the entry point  of the mine or at a suitable location of the  mine. 
 
 
 
23. 
Plantation of  trees shall be undertaken  in  the colony/township, over top soil dumps,  OB dumps, back filled areas, along the side  of  haul  road  and  in  other  areas  of  the  mines  not  being  utilized  for  mining  activities.  The mine  shall  take  up  avenue  plantation and plantation in nearby village  areas  in  consultation  with  DFO/Horticulture Department. The density  of  the  plantation  shall  be  around  2500  plants  per  hectare.  Nursery  shall  also  be  developed  for  plantation  activities within  the  ML  area  and  free  distribution  of  seedlings  to  nearby  villagers.  The  annual  statements  pertaining  to  the  number  of  trees planted, areas where plantation has  been  done,  survival  percentage  and  area  in  Ha.  covered  under  plantation  shall  be  submitted  to  the  Board,  every  year  in  prescribed  format.  The  mine  shall  take  steps  for  fulfillment of all  the  stipulations  and  necessary  measures  to  check  pollution. 
Green  belt  has  already  been  developed  around  the  mine  boundary,  Non mineralized dump area and both sides of  the  haul  roads  and  Pillar  no  9  to  Pillar  no.15  including  safety  zones  and mines  periphery. Till date a total of 27,800 nos.  of  plants  like  Teak,  Sisham,  Chakunda,  Aam,  Neem,  Kasi,  Amla,  Acasia  &  Bamboo have been planted over an area  of  14hectares  approximately  with  a  survival rate of 68%  in consultation with  the forest department.    
24. 
The mine shall take steps for fulfillment of  all  the  stipulations  and  necessary  measures to check pollution. 
Necessary  steps are being  taken care  to  check pollution.  
25. 
Mining operation  is  subject to  availability  of  all  other  statutory  clearances  required  under  relevant  Acts/Rules  and  fulfillment  of required procedural formalities. 
Agreed 
26. 
The  mine  shall  submit  a  declaration  by  30th  April  every  year  that  all  pollution  control  systems  are  in  good  condition,  operated and ambient air quality as well as  wastewater  quality  conform  to  the  prescribed standards. 
 
 
 
 
 
Orissa Manganese & Minerals Ltd. has been undertaking various peripheral development activities  as part of Corporate Social Responsibility to enrich the quality of rural life in and around the areas of  mine sites.   
Orissa Manganese and Minerals Pvt. Ltd. (OMM) a private Limited company is engaged primarily  in  mining  and marketing  of minerals.  Various minerals  covered  include  Iron  Ore, Manganese  and  Graphite. OMM possess a number of mining leases in Jharkhand and Odisha.  
 
Sl. No.  Name of the Lease Area in hectares Type of Minerals
1  Patmunda Manganese Mine  807.316  Manganese 
2  Orahuri Manganese Mine  51.476 Manganese 
3  Kusumdihi Manganese Mine  31.549  Manganese 
4  Tentulidihi Manganese Mine  35.613  Manganese 
5  Sanpatholi Manganese Mine 23.290 Manganese 
6  Bhanjikusum Manganese Mine  8.134  Manganese 
 
LIMITED. 
1.0  OBJECTIVE:  
The Government has been doing a number of development projects for people in rural areas. OMML 
on  its  part  has  been  participating  for  augmenting  the  quality  of  life  of  people  in mining  areas 
surrounding  its  projects  and  establishments  and  society  in  general.  The  purpose  of  these 
contributing efforts would be not only  to help people by providing  facilities  for health, education, 
civic amenities etc. but also to create opportunities for development of skills, employment including 
selfemployment and improves the standard of living.   
 
 
 
a) Literacy / Education. 
The company on behalf of the Mines has provided teachers in seven schools cater to 1250 students 
spread  across  Koira  Block.  CSR  teams  from  OMM’s  work  ardently  to  support  the  educational 
requirements  of  the  community  and  schools  in  the  neighboring  region  benefiting  thousands  of 
students  from  the underprivileged  section of  the  society. OMM plays a pivotal  role  in  supporting 
Government’s  initiative  towards education of child  in Odisha, under  the project “Literacy”. OMML 
has been trying to create a better platform to attract children to the schools; we have distributed 
School  bags  in  seventeen  schools  around  our mines.  Under  our  CSR  initiatives we  take  up  civil 
repairing & maintenance of the schools. We also extend  the conveyance  facility of  the children of 
distant areas. Company also extends  financial help  for  celebration of Ganesh Puja,  Sarswati Puja, 
Independence Day and Republic Day. We also conduct inter school sports for extract the potentiality 
of  the  child  in  sports  &  game.  Company  organizes  painting,  drawing,  essay  writing  and  debate 
competitions  on  occasion  of Gandhi  Jayanti,  Teacher’s  day  and  children’s  day.  Last  year we  had 
taken the 1000 children of seven schools to Circus show. We have provided furniture to school on 
their  request.  Company  has  also  constructed  and  taking  up  the maintenance  of  the  Anganbadi 
Kendra, as on date we have constructed  two Anganwadi Kendra  (Orahuri & Podadihi) at a cost of 
Rs.11.00 Lacs. Our CSR team continue to monitor all schools and distributed 1800 Health Kits (Tooth 
brush, Tooth Paste and Toilet soap) to  inculcate the sense of Good Health. Company has provided 
 
 
 
 
 
 
The  company  management  is  committed  to  provide  comprehensive  &  preventive  health 
services  to  the  workmen  working  in  mines.  To  achieve  this  goal  company  has  given 
appointment  to  one  experienced MBBS  doctor  and  two  pharmacists  to  cater  the  medical 
services  in mines  and patients  are  given medicines  free of  cost.  The  company has provided 
ambulance  support  to  referral and accident victims  to  shift  them  to hospitals at Koida or  to 
CESS Hospital  Joda. The doctor &  team  at  site have  conducted a  series of health awareness 
programs to make the people health conscious. The doctor  from CESS welfare Department  is 
also visit the mines to provide medical facilities once in a week. The company is also conducting 
medical checkup under  (PME &  IME) of all the work men working as envisaged under mines 
rules. Orissa Manganese & Minerals Ltd. has developed Community Medical Services through 
experienced Medical practitioner to provide comprehensive health services covering preventive 
and curative health care services  to  the community  in more than twenty neighboring villages 
and  patients  are  given medicines  free of  cost. Doctors  advise  children  and  their  parents  on 
various health care  issues and personal hygiene. Medical camps were organized  from time to 
time  benefitting  patients  from  nearby  villages  and  tribal  areas.  As  required,  we  provide 
ambulance support to patients to hospitals at Koira and Joda. The company is also spraying and 
fogging pesticides  to prevent malaria  in  the area. List of villages cover under mobile Medical 
unit.  
Harishchandrapur, 16.Kusumdihi, 17.Kamando, 18. Dengula,   19. Tentulidihi, 20. Roladihi, 21. 
Kalapahar, 22. Rangua & 23. Kola.  
c) Drinking Water. 
The  company management has  taken  to provide  safe drinking water  to  the people  living  in 
villages  around  the mines  as  a  challenge.  To  fulfil  this  obligation  towards  the  society,  the 
company has made so far some twelve Bore wells in different villages to provide safe & pure 
drinking water.  The  bore well was made  having  high  yield  of water  have  been  fixed with 
submersible pump and over head  tank and  in  rest hand pump have been  installed. We also 
supply water through water tanker having water scarcity. We have also planned to make bore 
well  in all  the peripheral villages  in coming years. The company  is going  to setup  two water 
 
 
 
also  extend  our  cooperation  and  engage  the  technicians  for  repairing  of  tube  well  and 
renovation of dug well in villages.  
Sl .No  Name of the  Village  
Water supply facilities  
1   Patmunda   1. Two Bore well has been made.   2. 1200 meter pipeline  spread and 30 water posts made  water supply  
2   Podadihi   1. One Bore well made & water supply through pipe line   3   Khajurdihi   1. Water supply through water tanker  4   Baldihi   1. Water supply through water tanker   5   Orahuri   1. One Bore well made & water supply through over head 
tank.   6   Nuagaon   1. Four bore well made in villages & hand pump installed.  
2. Two of these bore well fixed with pump & water supply  made through over head tank.  
7   Badapatuli   1. One Bore well made but yet  to  install pump  for water  supply as the area is yet to be electrified.  
8   Kadodihi   1. One Bore well made & water  supply  through pump  is  continued and over head tank is under construction.  
 
d) Rehabilitation/ Resettlement 
The OMML has  constructed  colony having 65 numbers Pakka Houses near  the mines on  the 
request raised by the villagers who were living in huts. Each House is of 410 Sq ft. builtup area 
on 10 decimal plots. The colony has been provided with water supply, road, drain, street lights, 
School & Anganbadi Kendra.  
e) Women Empowerment. 
Women Empowerment refers to empowering women to be selfdependent by providing them 
access to all the freedoms and opportunities, which they were denied in the past only because 
of  their being women.  In  a  specific  sense, women  empowerment  refers  to  enhancing  their 
position  in  the power  structure of  the  society.  The word women  empowerment  essentially 
means that the women have the power or capacity to regulate their day to day  lives  in the 
social, political and economic terms.  
• Cutting &  Tailoring  training  program  and  distribution  of  sewing machines  to 
passing out students. 
• Self  employment  training  program  on  Phenyl  making,  Revolving  fund  and 
training material support. 
• Observation of International Women's Day  in association with Women & Child 
Development Dept., Govt. of Orissa. 
• Distribution  of  Bi    cycle  among  BPL  College  going  girls  through  DSWO, 
Sundargarh. 
Lady trainer for self employment training programme. 
• Revolving fund support to SHG Group. 
 
f) Employment Opportunities : 
The company  is committed and  follows the “Child Labour Rules ” as such, we do not employ 
 
• Skill development training for sustainable income generation and livelihood. 
• Giving indirect and direct employment to local people to work in the mines. 
• Vocational/ Technical training for youth for better employability.    
g) Recreational Activities: 
Besides doing various developmental activities OMML engages itself in creating a platform 
for recreation of the local people of the surrounding villages of the mine site. 
• It  organizes  several  sports  promotion  activities  such  as  Football,  Volley  Ball 
Tournaments  and  athletic meet  time  to  time  to  keep  up  the  lively  sprit  of  the 
locals.  
• Organizes  various  cultural  activities,  social  gathering  and  functions  like Palishree 
 
h) Agricultural and Infrastructural Development. 
 
 
 
 
 
The details of peripheral development activities undertaken by OMML during the last four years and  current year is as: 
   (Rs. in Lakhs)  
Sl. No.  Particulars of activities  200809  200910  201011  201112  201213  201314 
1  Road/Infrastructure works  10.65  12.50  14.25  15.50  18.50  12.35 
2  Education  9.70  10.80  12.20  10.40  6.50  5.20 
3  Health Care  8.75  10.50  13.25  12.75  8.20  5.85 
4  Provision of Drinking Water  4.50  6.75  7. 60  8.35  5.65  5.50 
5  Women Empowerment  6.15 8.50 10.25 15.00  8.35  7.75
6  Rehabilitation/Resettlement   12.50 14.00 15.15 10.50  8.25  5.85
7  Social  Welfare/  Sports/  Cultural/  Arts/  Religious  activities 
6.00  7.55  8.45  10.85  9.45  8.45 
  Total  58.25  70.60  73.55  83.35  64.90  50.95 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
   
 
 
 
 
 
 
 
   
 
   
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
 
 
     
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
   
III 
       
                     
AMBIENT AIR MONITORING REPORT
Parameters
PM10
03 Main Entrance Gate 54.5 22.8 12.5 11.7
04 Village Harischandrapur
05 Village Kadodihi
06 Village Koira 58.5 29.4 13.4 11.2
Standard as per MoEF Notification G.S.R. 826 (E) dated 16/11/2009
(For 24 Hours Sampling)
100 60 80 80
Lab analyst Lab. In-charge
Seasonal Quarter : Post Monsoon (Oct -Dec, 2013)
Monitoring date : 3th – 5th October, 2013
Date of Analysis : Representatives of Sun Consultancy and Services
Report No. SCS/OMML-OMOM/EM/OCT/FE-01 Date: 18.10.2013
FUGITIVE DUST MONITORING REPORT
Lab analyst Lab. In-charge
FUGITIVE DUST MONITORING LOCATIONS
G.S.R. 809 (E) DATED 04.10.2010 (in µg/m3)
FDM-1 27m N from Main Pit. 217
1200 FDM-2 23m W from Main pit. 204
Name of the Client : M/s. ORISSA MANGANESE & MINERALS LTD,
Description of Site : Orahuri Manganese Ore Mine, Sundargarh, (Odisha)
Seasonal Quarter : Post Monsoon (Oct -Dec, 2013)
Monitoring date : 3th – 5th October, 2013
Date of Analysis : Representatives of Sun Consultancy and Services
Report No. SCS/OMML-OMOM/EM/OCT/NOISE-01 Date: 18.10.2013
NOISE LEVEL STUDY REPORT
Lab analyst Lab. In-charge
Day (6 AM. - 10PM.)
Limits in dB (A)
N1 Main Pit 65.6 50.5 40.3 36.6
N2 Haul Road 61.6 54.5 42.2 30.5
N3 Main Entrance Gate 54.7 52.2 43.5 31.2
N4 Village Harischandrapur 55.6 47.6 40.3 33.5
N5 Village Kadodihi 53.2 45.6 42.7 32.5
N6 Village Koira 57.3 42.6 42.4 38.2
Permissible limit as per MoEF Notification No. S.O.1046 (E) Dated
22-11-2000 in dB (A) Leq
75 70
Seasonal Quarter : Post Monsoon (Oct -Dec, 2013)
Monitoring date : 3th – 5th October, 2013
Date of Analysis : Representatives of Sun Consultancy and Services
Report No. SCS/OMML-OMOM/EM/OCT/GW-01 Date: 18.10.2013
GROUND WATER MONITORING REPORT
LOCATIONS
village Rangua
1. Colour, Hazen Units 15 <5 <5 <5 <5 2. Odour Agreeable Agreeable Agreeable Agreeable Agreeable 3. Taste Agreeable Agreeable Agreeable Agreeable Agreeable 4. Turbidity, NTU 5 0.6 1.3 1.3 0.7 5. pH No relaxation 7.2 7.5 7.2 6.8
6. Total Hardness (as CaCO3),mg/l 600 135 165 161 150
7. Iron ( as Fe),mg/l No relaxation 0.08 0.11 0.14 0.09 8. Chloride ( as Cl),mg/l 1000 46 39 35 42 9. Residual Chlorine, mg/l 1 NIL NIL NIL NIL 10. Fluoride (as F ) mg/l 1.5 ND ND ND ND 11. Dissolved Solids, mg/l 2000 173 192 171 183 12. Calcium (as Ca),mg/l 200 49.8 58.4 52.7 42.4 13. Magnesium (as Mg),mg/l 100 8.15 7.65 9.16 9.54 14. Copper (as Cu),mg/l 1.5 BDL BDL BDL BDL 15. Manganese (as Mn),mg/l 0.3 0.02 0.02 0.01 0.01 16. Sulphate (as SO4),mg/l 400 10.5 12.2 10.9 9.4 17. Nitrate ( as NO3),mg/l No relaxation BDL BDL BDL BDL
18. Phenolic compounds (as C6,H5OH),mg/l 0.002 ND ND ND ND
19. Mercury, (as Hg),mg/l No relaxation ND ND ND ND 20. Cadmium (as Cd),mg/l No relaxation ND ND ND ND 21. Selenium (as Se), mg/l No relaxation ND ND ND ND 22. Arsenic (as As), mg/l 0.05 ND ND ND ND 23. Cyanide (as CN) mg/l No relaxation ND ND ND ND 24. Lead (as Pb), mg/l No relaxation ND ND ND ND 25. Zinc (as Zn),mg/l 15 BDL BDL BDL BDL
26. Total Chromium ( as Cr),mg/l No relaxation NIL NIL NIL NIL
Name of the Client : M/s. ORISSA MANGANESE & MINERALS LTD,
Description of Site : Orahuri Manganese Ore Mine, Sundargarh, (Odisha)
Seasonal Quarter : Post Monsoon (Oct -Dec, 2013)
Monitoring date : 3th – 5th October, 2013
Date of Analysis : Representatives of Sun Consultancy and Services
27. Mineral Oil, mg/l No relaxation BDL BDL BDL BDL 28. Alkalinity(as CaCO3),mg/l 600 82 77 65 64 29. Boron (as B), mg/l 1.0 NIL NIL NIL NIL
30. Total coli form organisms, MPN/100 ml <2 <2 <2 <2 Note: BDL-Below Detection Level, N.D.-Not Detectable
For SUN CONSULTANCY AND SERVICES
Lab analyst Lab. In-charge
SURFACE WATER MONITORING REPORT
Teherei Nala near
2. Odour Un objectionable
Un objectionable
Un objectionable
Un objectionable
Un objectionable
3. Taste Agreeable Agreeable Agreeable Agreeable Agreeable 4. Turbidity, NTU -- 8.5 10.6 9.4 8.9 5. Suspended Solids, mg/l -- 75 95 88 79 6. pH 6.5 &nda