Top Banner
Creative Property of The Univesity of Virginia 4 5 1 SITE CONTEXT Creative Property of The University of Virginia granada Creative Property of The University of Virginia lake nicaragua lake nicaragua
44

140626 WatermarkPresentation FINAL

Jul 22, 2016

Download

Documents

nickyzaccack
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

4 5

1 SITE CONTEXT

Creative Property of The University of Virginia

1 PROJECT OVERVIEW CONTEXT

lake nicaragua

granada

lake nicaragua

granada Creative Property of The University of Virginia

lake nicaragua

granada

lake nicaragua

granada

Page 2: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

6 7

1 SITE CONTEXT

Creative Property of The University of Virginia

1

50 acres

el pantanal

to dump

to granada

PROJECT OVERVIEW CONTEXT

Creative Property of The University of Virginia

50 acres

el pantanal

to dump

to granada

Page 3: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

8 970.902 ESQ CERCO

75.932 ESQ CERCO

76.006 CERCO ESQ

68.482 CERCO 0

75M50M40M30M20M0M 100M10M

1 SITE CONTEXT | EXISITNG

Page 4: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

10 11

1

2

PLANPHASING

SCHOOL FOR EL PANTANAL

MASTERPLAN_02

Page 5: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

12 13

1 PLAN

RIGHT OF WAY

PRIMARY SCHOOL

SPECIALTY AG.

SPECIALTY AGRICULTURE

EROSION CONTROL

GATED ENTRANCE

SCHOOL ACCESS WALKING PATH

SECONDARY SCHOOL

TEACHER HOUSING

MARKET / TRADE WORKSHOPS

SPORTS FIELDS

VOLUNTEER HOUSING

AMPHITHEATHER

NATURE WALK

PRAYER PAVILIONSLANDSCAPE TERRACING

Page 6: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

14 15

2 PHASING | PHASE 1

Page 7: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

16 17

2 PHASING | PHASE 2

Page 8: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

18 19

2 PHASING | PHASE 3

Page 9: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

20 21

2 PHASING | PHASE 4

Page 10: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

22 23

2 PHASING | PHASE 5

Page 11: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

24 25

2 PHASING | PHASE 6

Page 12: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

26 27

2 PHASING | PHASE 7

Page 13: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

28 29

1

4

2

5

3

6

7

PHASING

ELEVATIONS

PERSPECTIVES

MATERIAL AXON ARCHITECTURAL DETAILS

PLAN

SECTIONS

SCHOOL FOR EL PANTANAL

PRIMARY SCHOOL_02

Page 14: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

30 31

1 PLAN

grade 4 grade 3

grade 5

grade 6

grade 2

grade 1

parking

pre k -3

pre k -4kindergaten

library + resource center multipurpose

room

parentwaiting area

1 5 10 50

N

Page 15: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

32 33

pre k-4

admin

pre k-3

parking

parentwaiting area

1 5 10 50

N

2 PHASING | PHASE 1

Page 16: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

34 35

pre k -3

pre k -4kindergaten

parentwaiting area

1 5 10 501 5 10 50

N

2 PHASING | PHASE 2

Page 17: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

36 37

grade 2

grade 1

pre k -3

pre k -4kindergaten

parentwaiting area

1 5 10 501 5 10 50

N

2 PHASING | PHASE 3

Page 18: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

38 39

pre k -3

pre k -4kindergaten

parentwaiting area

grade 2

grade 1

grade 4 grade 3

grade 5

grade 6

1 5 10 501 5 10 50

N

2 PHASING | PHSE 4

Page 19: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

40 41

pre k -3

pre k -4kindergaten

parentwaiting area

grade 2

grade 1

grade 4 grade 3

grade 5

grade 6

library + resource center multipurpose

room

1 5 10 501 5 10 50

N

2 PHASING | PHASE 5

Page 20: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

42 43

3 PERSPECTIVES | AERIAL VIEW

Page 21: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

44 45

3 PERSPECTIVES | VIEW TO MOMBACHO

Page 22: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

46 47

3 PERSPECTIVES | FRONT PORCH

Page 23: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

48 49

3 PERSPECTIVES | SHARED OUTDOOR SPACE

Page 24: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

50 51

4 SECTIONS | SUN

N

13

NE SW

DIRECT SUNLIGHT BLOCKED

INDIRECT SUNLIGHT REFLECTED

1M 2M 5M 10M

Page 25: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

52 53

4 SECTIONS | RAIN

E W

N

1M 2M 5M 10M

Page 26: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

54 55

4 SECTIONS | WIND

E W

N

pressure

pressure

1M 2M 5M 10M

Page 27: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

56 57

5 ELEVATIONS

Bookend ConditionRetaining Wall

N

B

A

ALongitudinal Elevation

BTransverse Elevation

1M 2M 5M 10M

Classroom OneStorageClassroom Two Outdoor Classroom

Classroom Front Porch Condition

Page 28: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

58 59

6 MATERIAL AXON

$7.50 m2

$2 m2

$18.25 m2

$6 m2

$12.50 m2

$9.12 m2

$13.50 m2

$4.50 m2 $13.50 m2

$13.28 m2 $6.75 + 6.64 m2 $11.44 + 6.64 m2

$4.50 m2

$4.50 m2

Page 29: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

60 61

8’

8” 6” 4”

3’

7 ARCHITECTURAL DETAILS

EXTRUDED BLOCK WALL CONFIGURATION

SECURITY DOOR FRAME

COLUMN DETAIL

Page 30: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

62 63

1

2

3

BUILDING STRATEGYLANDSCAPE STRATEGY

SITE STRATEGYSCHOOL FOR EL PANTANAL

DESIGN OBJECTIVES_02

Page 31: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

64 65

Page 32: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

66 67

1 SITE STRATEGYnatural stone, mortar, reinforced concrete 2D, 2O, 2Q

SECURITY

Natural Stone FenceThis wall is composed of natural stone that blends well in to the landscape. Layers of vegetation around the wall help create a more inviting atmosphere.

Tall trees with thorns and large leaves provide pro-tection from outsiders, while restricting sightlines to the exterior. In conjunction with barbed fencing the ornamental trees create unique and aesthetically pleasing security.

Acacia Amarilla

LAYERS OF BOUNDARIES AND VISIBILITY

Page 33: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

68 69

1 SITE STRATEGYpoured concrete and stones for planter well 2F, 2G, 2P

TOPOGRAPHIC CONDITIONS

NCA Gathering SpacePoured slab concrete can be utilized for erosion control as well as creating outdoor gathering spaces.

Provides shading with height and large canopy. Placed in low elevations the Ceiba trees can provide shading for areas of personal reflection, while signify-ing a spiritual retreat.

Ceiba Tree

INDIVIDUAL AND COMMUNAL SPACES

Page 34: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

70 71

1 SITE STRATEGYconcretechiltepe floor tile, wood framing and panels, stone

SPIRITUAL SPACES

Convent Statue HallAlthough the statue hall of the Convent is open to the environment, painted white panels are used to re-strict sightlines to the neighboring city; which works to focus attention on the relic statues.

Outdoor furniture composed of heavy stone and concrete requires low maintenance and provides a place for contemplation that will never be moved.

Xalteva Park Benches

PRAYER PAVILION + CONTEMPLATIVE AREAS

Page 35: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

72 73

quarried stone and mortartempered glass and galvanized hardware

PASSIVE SYSTEMS

Glass Louvers at OIOperable louvers are useful for controlling wind flows as well as direct light. Utilizing louvers in a clerestory will allow the user to prevent driving rain from entering the building.

Water channels on site will allow for the collection and retention of rain water as well as provide erosion control around the foundation of the building.

Xalteva Park Water Channel

RAIN HARVESTING

VENTILATION

SOLAR

2 BUILDING STRATEGY

grade 4 grade 3

grade 5

grade 6

grade 2

grade 1

parking

pre k -3

pre k -4kindergaten

library + resource center multipurpose

room

parentwaiting area

1 5 10 50

N

Page 36: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

74 75

2 BUILDING STRATEGYbrick masonry, reinforced concrete, natural stonefabric, wood, corrugated plastic, concrete footers

LIGHTING + SHADE

Impermeable TrellisThis trellis assembly utilizes corrguated plastic sheets to provide ample shelter from rain. Fabric andvegetation are both used to hide the plastic as well has baffle noise caused by rain.

The trellis structure at Xalteva park is composed of brick columns and reinforced concrete beams. The openess of the structure allows the veranera tree to grow and integrate itself in to the design.

Permeable Trellis

ARTIFICIAL

PERMEABLE +

VEGETATION

IMPERMEABLE +

VEGETATION

IMPERMEABLE

grade 4 grade 3

grade 5

grade 6

grade 2

grade 1

parking

pre k -3

pre k -4kindergaten

library + resource center multipurpose

room

parentwaiting area

1 5 10 50

N

Page 37: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

76 77

2 BUILDING STRATEGYclay tile roofing and taquezal framingwood, chiltepe floor tile, cana castilla

LOCAL TYPOLOGY

Veranda ConditionThe porch condition is a common feature of both ru-ral and urban typologies. The depth of this space will vary its use as a large gathering space or a quieter space that can accomodate a few people.

Similar to the organization of Granada, the roof line of the adjacent class modules with convey a sense of community when viewed from the surrounding neighborhoods.

Granada Roof-scape

RURAL (EXTROVERTED) URBAN (INTROVERTED)

grade 4 grade 3

grade 5

grade 6

grade 2

grade 1

parking

pre k -3

pre k -4kindergaten

library + resource center multipurpose

room

parentwaiting area

1 5 10 50

N

Page 38: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

78 79

2 BUILDING STRATEGYtropical woodpoured concrete, wood framing, natural stone

PROGRAMMATIC RELATIONS

Household Courtyard and Water ChannelThe threshold between indoor and outdoor could be mediated by a landscaping feature that controls water around the perimeter of building, establishing a clear boundary between the two spaces.

Although tropical wood is expensive and hard to come by, this basic composition creates an effective screen wall that still allows airflow through the space. With proper maintenance, a less expensive wood could be used.

Jicaro Eco-lodge Wall Screen

CLASSROOM + OUTDOOR RELATIONSHIP

grade 4 grade 3

grade 5

grade 6

grade 2

grade 1

parking

pre k -3

pre k -4kindergaten

library + resource center multipurpose

room

parentwaiting area

1 5 10 50

N

Page 39: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

80 81

3 LANDSCAPE STRATEGY2I, 2N, 2EE, 2FF2D, 2H, 2J, 2K

NOISE BUFFER

Cecropia AngustifoliaPlacing smaller trees and plants between class-rooms provide a buffer for sound transmission while distinguishing the different classroom spaces and entrances.

Larger trees provide a visual buffer in addition to sound buffer. Decorative trees with large canopys also create a cooler atmoshphere.

Laurus Nobilis/Laurel

VEGETATIVE SEPARATION

grade 4 grade 3

grade 5

grade 6

grade 2

grade 1

parking

pre k -3

pre k -4kindergaten

library + resource center multipurpose

room

parentwaiting area

1 5 10 50

N

Page 40: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

82 83

3 LANDSCAPE STRATEGY2L,2O,2DD,2GG 2B, 2D, 2G, 2I, 2K, 2N

COMFORT

Flor de avispa/ HibiscusFast-growing, ornamental flowers growing over trellises provide shading for outdoor classrooms and corridors. Creating permeable or impermeable spaces depending on the layering of the trellises.

Trees with large canopies and height provide shading and natural comfort zones. Arranged in central or outlying areas create either gathering spaces or areas for personal reflection.

Deloix Regia/Malinche

NATURAL SHADING METHODS

grade 4 grade 3

grade 5

grade 6

grade 2

grade 1

parking

pre k -3

pre k -4kindergaten

library + resource center multipurpose

room

parentwaiting area

1 5 10 50

N

Page 41: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

84 85

3 LANDSCAPE STRATEGY2F, 2W, 2BB, 2CC

AGRICULTURE

Larger-scale specialty agriculture projects located near the market and trade school can be commer-cial products sold by the market and near by tourist destinations.

Eruca Sativa/Arugula

SPECIALTY AGRICULTURE

2R, 2S, 2U, 2W

Origanum vulgare/OreganoSmall-scale native and imported plantings that are not necessarily used as specialty agriculture provide students the opportunity to expand their knowledge of herbs and spices. These plants could also supple-ment lunches provided by the school.

Page 42: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

86 87

3 LANDSCAPE STRATEGY2M, 2Y, 2Z, 2CC1A, 1B, 1C, 1E, 1F,1G

EROSION CONTROL + DRAINAGE

Volcanic Rock Wall with VegetationUsed as a retaining wall near arroyos and areas of erosion volcanic rock with vegetation creates an aesthetically pleasing way to hold soil in place form-ing manageable terraced areas for agriculture and circulation.

Growing plants that help with erosion-control and soil stability on sloping topography creates natural erosion controlled areas without the need of terrac-ing.

Cantivara Beans

NATURAL

TERRACED

Page 43: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

88 89

3 LANDSCAPE STRATEGY2B, 2I, 2N, 2P, 2T, 2X, 2DD, 2FF, 2GG1A, 1D, 1E, 1F, 1G, 2L, 2Z

ORNAMENTAL

Bougainvillea/VeraneraDecorative ornamental flowers planted around circu-lation paths frame entrances and corridors. Designed in conjunction with brick, chiltepe, or stone walkways create more formal pathways.

Using ornamental trees to form entrances and circulation paths from the community of El Pantanal into and around the site creates visual boundaries to control flows of people.

Tamarind Tree

ORNAMENTAL LANDSCAPING TO DEFINE CIRCULATION

grade 4 grade 3

grade 5

grade 6

grade 2

grade 1

parking

pre k -3

pre k -4kindergaten

library + resource center multipurpose

room

parentwaiting area

1 5 10 50

N

Page 44: 140626 WatermarkPresentation FINAL

Creative Property of The Univesity of Virginia

90 91

grade 4 grade 3

grade 5

grade 6

grade 2

grade 1

parking

pre k -3

pre k -4kindergaten

library + resource center multipurpose

room

parentwaiting area

1 5 10 50

N