TUGAS VI
ANALISIS KELAYAKAN EKONOMI
Dibuat oleh:Lis Ocktty Zahara Pamoga
0612 4041 1472
Kelas: 7 EGA
Dosen Pembimbing: Dr. Ir. Neny Rochyani, M.T
JURUSAN TEKNIK KIMIA PRODI D IV TEKNIK ENERGIPOLITEKNIK NEGERI SRIWIJAYA
2015
TUGAS VI
ANALISIS KELAYAKAN EKONOMI
Dibuat oleh:Arian Epani
0612 4041 1463
Kelas: 7 EGA
Dosen Pembimbing: Dr. Ir. Neny Rochyani, M.T
JURUSAN TEKNIK KIMIA PRODI D IV TEKNIK ENERGIPOLITEKNIK NEGERI SRIWIJAYA
2015
TUGAS VI
ANALISIS KELAYAKAN EKONOMI
Dibuat oleh:Henny Komala Sari Sibarani
0612 4041 1470
Kelas: 7 EGA
Dosen Pembimbing: Dr. Ir. Neny Rochyani, M.T
JURUSAN TEKNIK KIMIA PRODI D IV TEKNIK ENERGIPOLITEKNIK NEGERI SRIWIJAYA
2015
TUGAS VI
ANALISIS KELAYAKAN EKONOMI
Dibuat oleh:Arief Rahmanto0612 4041 1465
Kelas: 7 EGA
Dosen Pembimbing: Dr. Ir. Neny Rochyani, M.T
JURUSAN TEKNIK KIMIA PRODI D IV TEKNIK ENERGIPOLITEKNIK NEGERI SRIWIJAYA
2015
TUGAS VI
ANALISIS KELAYAKAN EKONOMI
Dibuat oleh:Muh. Isnanto Wisnu Wicaksono
0612 4041 1476
Kelas: 7 EGA
Dosen Pembimbing: Dr. Ir. Neny Rochyani, M.T
JURUSAN TEKNIK KIMIA PRODI D IV TEKNIK ENERGIPOLITEKNIK NEGERI SRIWIJAYA
2015
TUGAS VI
Diketahui suatu pembangkit listrik tenaga gas yang akan dibangunmenghasilkan daya listrik total sebesar 2100 kWh. Dengan harga perkWh adalah Rp. 900. jika diketahui komposisi biaya adalah sebagaiberikut:
A. Biaya Investasi Pembuatan PembangkitNo. Uraian Harga (Rp)1.. Total Investasi 55,730,519,970
No. Uraian Harga (Rp)1 Total 4,250,750,200
25%. Berdasarkan data-data tersebut susunlah analisis ekonomi!
PenyelesaianBerdasarkan data-data tersebut dapat disusun analisis ekonomi
B. Biaya Maintenance dan Operational
Dengan discount rate 15%, bunga terendah 20% dan tertinggi
sebagai berikut:Penyusutan pembangkit:Asumsi umur ekonomis pembangkit 15 tahun dan akhir umur tersebutmasih terdapat 10% nilai residu dari masa pakai.
Diketahui:Total Investasi : Rp55,730,519,970.00Nilai residu (10%) : Rp5,573,051,997.00
Penyusutan =investasi - residu
10
=Rp55,730,519,970 - Rp5,573,051,997.00
10= Rp5,015,746,797.30
Penerimaan:Asumsi perhitungan penerimaan 100% dari daya yang dijual, maka:Harga penerimaan =
= Rp 900.00 × 2100 kWh × 8760= 16,556,400,000.00
Dengan menggunakan persamaan, diperoleh:
Thn A B C D E = 15%
0 7500190195 0 0 0 0 7500190195
1 1839600000 4250750200 -2411150200 0.869565 3696304521.7
2 1839600000 4250750200 -2411150200 0.756144 3214177845.0
3 1839600000 4250750200 -2411150200 0.657516 2794937256.5
4 1839600000 4250750200 -2411150200 0.571753 2430380223.1
5 1839600000 4250750200 -2411150200 0.497177 2113374107.0
6 1839600000 4250750200 -2411150200 0.432328 1837716614.8
7 1839600000 4250750200 -2411150200 0.375937 1598014447.6
8 1839600000 4250750200 -2411150200 0.326902 1389577780.6
9 1839600000 4250750200 -2411150200 0.284262 1208328504.8
10 1839600000 4250750200 -2411150200 0.247185 1050720439.0
11 1839600000 4250750200 -2411150200 0.214943 913669946.9
12 1839600000 4250750200 -2411150200 0.186907 794495606.0
13 1839600000 4250750200 -2411150200 0.162528 690865744.4
14 1839600000 4250750200 -2411150200 0.141329 600752821.2
harga per kWh × daya × jam/tahun
1. Net Present Value (NPV) untuk discount rate 15%
F = C × E
15 1839600000 4250750200 -2411150200 0.122894 522393757.6
Total 27594000000 63761253000 -36167253000 5.847370 32355899811
Maka:NVP = 10,756,822,033 - 32,355,899,811
= -21,599,077,778
Payback PeriodDengan menggunakan persamaan PP, diperoleh:PP = Rp55,730,519,970 : -Rp2,411,150,200
= -Rp23.1137
Benefit Cost RatioDengan menggunakan persamaan BCR, diperoleh:BCR = -36167253000 - 7500190195
= -4.822178113
Dengan menggunakan persamaan, diperoleh:
Thn A B C D E = 20%
0 7500190195 0 0 0 0 7500190195
1 1839600000 4250750200 -2411150200 0.833333 3542291833.3
2 1839600000 4250750200 -2411150200 0.694444 2951909861.1
3 1839600000 4250750200 -2411150200 0.578704 2459924884.3
4 1839600000 4250750200 -2411150200 0.482253 2049937403.5
5 1839600000 4250750200 -2411150200 0.401878 1708281169.6
6 1839600000 4250750200 -2411150200 0.334898 1423567641.4
7 1839600000 4250750200 -2411150200 0.279082 1186306367.8
8 1839600000 4250750200 -2411150200 0.232568 988588639.8
9 1839600000 4250750200 -2411150200 0.193807 823823866.5
10 1839600000 4250750200 -2411150200 0.161506 686519888.8
11 1839600000 4250750200 -2411150200 0.134588 572099907.3
12 1839600000 4250750200 -2411150200 0.112157 476749922.8
2. Net Present Value (NPV) untuk discount rate 20%
F = C × E
13 1839600000 4250750200 -2411150200 0.093464 397291602.3
14 1839600000 4250750200 -2411150200 0.077887 331076335.2
15 1839600000 4250750200 -2411150200 0.064905 275896946.0
Total 27594000000 63761253000 -36167253000 4.675473 27374456465
Maka:NVP = 8,600,999,473 - 27,374,456,465
= -18,773,456,991.83
Payback PeriodDengan menggunakan persamaan PP, diperoleh:PP = Rp7,500,190,195 : -Rp2,411,150,200
= -Rp3.1106
Benefit Cost RatioDengan menggunakan persamaan BCR, diperoleh:BCR = -36167253000 - 7500190195
= -4.822178113
Internal Rate of ReturnIRR = 0.2 + -18,773,456,992 : -18,773,456,992
Dengan menggunakan persamaan, diperoleh:
Thn A B C D E = 25%
0 7500190195 0 0 0 0 7500190195
1 1839600000 4250750200 -2411150200 0.800000 3400600160.0
2 1839600000 4250750200 -2411150200 0.640000 2720480128.0
3 1839600000 4250750200 -2411150200 0.512000 2176384102.4
4 1839600000 4250750200 -2411150200 0.409600 1741107281.9
5 1839600000 4250750200 -2411150200 0.327680 1392885825.5
6 1839600000 4250750200 -2411150200 0.262144 1114308660.4
7 1839600000 4250750200 -2411150200 0.209715 891446928.3
8 1839600000 4250750200 -2411150200 0.167772 713157542.7
9 1839600000 4250750200 -2411150200 0.134218 570526034.1
3. Net Present Value (NPV) untuk discount rate 25%
F = C × E
10 1839600000 4250750200 -2411150200 0.107374 456420827.3
11 1839600000 4250750200 -2411150200 0.085899 365136661.8
12 1839600000 4250750200 -2411150200 0.068719 292109329.5
13 1839600000 4250750200 -2411150200 0.054976 233687463.6
14 1839600000 4250750200 -2411150200 0.043980 186949970.9
15 1839600000 4250750200 -2411150200 0.035184 149559976.7
Total 27594000000 63761253000 -36167253000 3.859263 23904951088
Maka:NVP = 7,099,499,316 - 23,904,951,088
= -16,805,451,772
Payback PeriodDengan menggunakan persamaan PP, diperoleh:PP = Rp7,500,190,195 : -Rp2,411,150,200
= -Rp3.1106
Benefit Cost RatioDengan menggunakan persamaan BCR, diperoleh:BCR = -36167253000 - 7500190195
= -4.822178113
Internal Rate of ReturnIRR =
= -18773456991.63× 0.45
-1,968,005,220= 9.5393329248 × 0.45= 4.2926998162 = 429.27 %
Evaluasi ProyekNo. Parameter Hasil Perhitungan Kriteria Kelayakan1 NVP Rp16,556,400,000 NVP > 02 PP -Rp3.1106 PP < umur ekonomis3 BCR -4.8222 BCR > 04 IRR 429.27 % IRR > 0
{(0.20+1,804,209,017.92)/(1,804,209,017−(−8,239,787,015))}×(0.20+0,25)
TUGAS
ANALISIS KELAYAKAN EKONOMI
Dibuat oleh:Arian Epani
0612 4041 1463
Kelas: 7 EGA
Dosen Pembimbing: Dr. Ir. Neny Rochyani, M.T
JURUSAN TEKNIK KIMIA PRODI D IV TEKNIK ENERGIPOLITEKNIK NEGERI SRIWIJAYA
2015
TUGAS VI
ANALISIS KELAYAKAN EKONOMI
Dibuat oleh:Lis Ocktty Zahara Pamoga
0612 4041 1472
Kelas: 7 EGA
Dosen Pembimbing: Dr. Ir. Neny Rochyani, M.T
JURUSAN TEKNIK KIMIA PRODI D IV TEKNIK ENERGIPOLITEKNIK NEGERI SRIWIJAYA
2015
TUGAS VI
ANALISIS KELAYAKAN EKONOMI
Dibuat oleh:Arian Epani
0612 4041 1463
Kelas: 7 EGA
Dosen Pembimbing: Dr. Ir. Neny Rochyani, M.T
JURUSAN TEKNIK KIMIA PRODI D IV TEKNIK ENERGIPOLITEKNIK NEGERI SRIWIJAYA
2015
TUGAS VI
ANALISIS KELAYAKAN EKONOMI
Dibuat oleh:Henny Komala Sari Sibarani
0612 4041 1470
Kelas: 7 EGA
Dosen Pembimbing: Dr. Ir. Neny Rochyani, M.T
JURUSAN TEKNIK KIMIA PRODI D IV TEKNIK ENERGIPOLITEKNIK NEGERI SRIWIJAYA
2015
TUGAS VI
ANALISIS KELAYAKAN EKONOMI
Dibuat oleh:Arief Rahmanto0612 4041 1465
Kelas: 7 EGA
Dosen Pembimbing: Dr. Ir. Neny Rochyani, M.T
JURUSAN TEKNIK KIMIA PRODI D IV TEKNIK ENERGIPOLITEKNIK NEGERI SRIWIJAYA
2015
TUGAS VI
ANALISIS KELAYAKAN EKONOMI
Dibuat oleh:Muh. Isnanto Wisnu Wicaksono
0612 4041 1476
Kelas: 7 EGA
Dosen Pembimbing: Dr. Ir. Neny Rochyani, M.T
JURUSAN TEKNIK KIMIA PRODI D IV TEKNIK ENERGIPOLITEKNIK NEGERI SRIWIJAYA
2015
TUGAS VI
Harga (Rp)55,730,519,970
Harga (Rp)4,250,750,200
Rp5,573,051,997.0010
8760
7500190195 0
3696304521.7 1599652174
3214177845.0 1391001890
2794937256.5 1209566861
2430380223.1 1051797271
2113374107.0 914606322
1837716614.8 795309845
1598014447.6 691573779
1389577780.6 601368503
1208328504.8 522929133
1050720439.0 454720985
913669946.9 395409553
794495606.0 343834393
690865744.4 298986429
600752821.2 259988199
F = C × E B × E
522393757.6 226076695
32355899811 10756822033
7500190195 0
3542291833.3 1533000000
2951909861.1 1277500000
2459924884.3 1064583333
2049937403.5 887152778
1708281169.6 739293981
1423567641.4 616078318
1186306367.8 513398598
988588639.8 427832165
823823866.5 356526804
686519888.8 297105670
572099907.3 247588059
476749922.8 206323382
F = C × E B × E
397291602.3 171936152
331076335.2 143280126
275896946.0 119400105
27374456465 8600999473
-18,773,456,992
7500190195 0
3400600160.0 1471680000
2720480128.0 1177344000
2176384102.4 941875200
1741107281.9 753500160
1392885825.5 602800128
1114308660.4 482240102
891446928.3 385792082
713157542.7 308633666
570526034.1 246906932
F = C × E B × E
456420827.3 197525546
365136661.8 158020437
292109329.5 126416349
233687463.6 101133080
186949970.9 80906464
149559976.7 64725171
23904951088 7099499316
Kriteria KelayakanNVP > 0
PP < umur ekonomisBCR > 0IRR > 0
Dengan menggunakan persamaan, diperoleh:
Thn A B C D E = 15%
0 #REF! 0 0 0 0 #REF! 0
1 #REF! #REF! #REF! ### #REF! #REF!
2 #REF! #REF! ### #REF! #REF!
3 #VALUE! ### #VALUE! #VALUE!
4 #VALUE! ### #VALUE! #VALUE!
5 #VALUE! ### #VALUE! #VALUE!
6 #VALUE! ### #VALUE! #VALUE!
7 #VALUE! ### #VALUE! #VALUE!
8 #VALUE! ### #VALUE! #VALUE!
9 #VALUE! ### #VALUE! #VALUE!
10 #VALUE! ### #VALUE! #VALUE!
11 #VALUE! ### #VALUE! #VALUE!
12 #VALUE! ### #VALUE! #VALUE!
13 #VALUE! ### #VALUE! #VALUE!
14 #VALUE! ### #VALUE! #VALUE!
15 #VALUE! ### #VALUE! #VALUE!
Total #REF! #REF! #REF! ### #REF! #REF!
Maka:NVP = #REF! - #REF!
= #REF!
Payback PeriodDengan menggunakan persamaan PP, diperoleh:PP = #REF! : #REF!
= #REF!
Benefit Cost RatioDengan menggunakan persamaan BCR, diperoleh:BCR = #REF! - #REF!
= #REF!
1. Net Present Value (NPV) untuk discount rate 15%
F = C × E B × E
0
#REF!
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#REF!
B × E