TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITED P-1000

1

Lean -ISD

Concept of “lean” from the book:

The Machine That Changed the Worldby:

James P. WomackDaniel T. Jones

Daniel Roos

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITED P-1000

2

lean

Best of both mass and craft productionPrinciples and attributes of lean• Teamwork• Communication• Efficient use of resources and elimination of

waste• Continuous improvement

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITED P-1000

3

lean

Attributes of a lean process/methodology• Defined process/steps• Defined roles/responsibilities• Standard tools/templates• Flexible

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITED P-1000

4

ISD

The bottom line—it is difficult to get consistent, reliable results implementing ISD in a corporate

training organization

Common Benefits Common Complaints• More interactivity and/or

testing• More effective

instructional process• Focus on job performance

and learning versus content

• Better use of instructional media

• Takes too long• Impossible to forecast and

manage• Variable results—

depends on the designer• Each designer uses

his/her own process, formats, defaults, etc.

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITED P-1000

5

lean-ISD

lean applied to ISD would have beneficial impacts on• Quality• Cycle time• Cost

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITED P-1000

6

IAD

CAD

PACT Analysis MCD

Project Planning & Management

Curriculum Architecture Design

Modular Curriculum Development

Instructional Activity Development

lean-ISDvia the PACTSM Processes for T&D

CADDI’s PACT Processes for T&D

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITED P-1000

7

lean-ISDvia the PACTSM Processes for T&D

IAD

CAD

PACT Analysis MCD

Project Planning & Management

Curriculum Architecture Design

Modular Curriculum Development

Instructional Activity Development

Three levels of ISD

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITED P-1000

8

Let’s look at some examples

lean-ISDvia the PACTSM Processes for T&D

Akin to systems engineering of products

• Car development

• Telecommunications product development

• Software development

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITED P-1000

9

lean-Car Development

Component Design &

Development

Auto Integrated Systems Design

Customer Requirements

& Supplier Capabilities

System Design &

Development

Project Planning & Management

e.g., Four-door pickup truck

e.g., H/V/AC system design

e.g., Backseat fan control mechanism

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITED P-1000

10

lean-Telecommunications Product Development

Component Design &

Development

Network Integrated Systems Design

Customer Requirements

& Supplier Capabilities

System Design &

Development

Project Planning & Management

e.g., Networked phone system

e.g., Phone handset

e.g., “Redial” button

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITED P-1000

11

lean-Software Development

Component Design &

Development

Application Suite

Systems Design

Customer Requirements

& Supplier Capabilities

System Design &

Development

Project Planning & Management

e.g., Integrated corporate financial system

e.g., Spreadsheet application

e.g., “Cut & paste” function

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITED P-1000

12

Product X Product Y

CAD assists in a reuse strategy for modules/chunks of T&D content

PACT Processes for T&D

CAD - Curriculum Architecture Design

Macrolevel ISD analysis and designSystems analysis and systems engineering design of the T&D product line• Modular design product line

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITED P-1000

13

PACT Processes for T&D

MCD - Modular Curriculum Development

Midlevel analysis and design

Akin to the ADDIEModel, also known as the “big block diagram,” fromthe work of Robert Gagne, Leslie Briggs, Robert Moran, and Robert Branson

AnalysisA

DesignD

DevelopmentD

ImplementationI

EvaluationE

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITED P-1000

14

PACT Processes for T&D

IAD - Instructional Activity Development

Microlevel analysis and designDevelopment of typical instructional elements or activities, such as• Simulation exercises• Performance tests• Structured, on-the-job training• Demonstrations• Case studies• Etc.

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITED P-1000

15

PACT Processes for T&D

AnalysisSimilar front-end analysis for each PACT Process for T&D

IAD

CAD

PACT Analysis MCD

Project Planning & Management

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITED P-1000

16

PACT Analysis

Target Audience Data

Performance Modeling

Knowledge/Skill Analysis

Existing T&D Assessment

PACT Processes for T&D

AnalysisFour types of ISD Analysis

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITED P-1000

17

PACT Processes for T&D

Project Planning & ManagementPACT embraces• Structured processes• Predefined roles and responsibilities• Detailed planning• Continuous communications• Customer control of content/

supplier control of process

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITED P-1000

18

PACT Processes for T&D

Project Planning & ManagementPlanning and communications tools and templates• Systematic engagement of customers and

stakeholders- The right people doing the right things at the right time

• Interview guides• Project Plan templates

- CAD- MCD- IAD

• PST gate review meeting presentations

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITED P-1000

19

PACT Processes for T&D

Gated Project PhasesEach PACT Process has a gated process model• Gates are key customer/stakeholder

review/approval/decision points

CAD Phase 4

Implementation Planning

CAD Phase 1Project

Planning & Kick-off

CAD Phase 2

Analysis

CAD Phase 3

Design

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITED P-1000

20

PACT Processes for T&D

Gated Project PhasesEach PACT Process has a gated process model• Gates are key customer/stakeholder

review/approval/decision points

MCD Phase 4

Development/ Acquisition

MCD Phase 1Project

Planning & Kick-off

MCD Phase 2

Analysis

MCD Phase 3

Design

MCD Phase 5

Pilot Test

MCD Phase 6

Revision & Release

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITED P-1000

21

PACT Processes for T&D

Gated Project PhasesEach PACT Process has a gated process model• Gates are key customer/stakeholder

review/approval/decision points

IAD Phase 4

Development

IAD Phase 1Project

Planning & Kick-off

IAD Phase 2

Analysis

IAD Phase 3

Design

IAD Phase 5

Pilot Test

IAD Phase 6

Revision & Release

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITED P-1000

22

CAD Phase 4

Implementation Planning

CAD Phase 1Project

Planning & Kick-off

CAD Phases 2/3

Analysis/Design

PACT Processes for T&D

Gated Project PhasesEach PACT Process is the starting point for situational adjustment/adaptation• Phase combinations are possible

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITED P-1000

23

MCD Phase 4

Development/ Acquisition

MCD Phase 1Project

Planning & Kick-off

MCD Phases 2/3

Analysis/Design

MCD Phase 5

Pilot Test

MCD Phase 6

Revision & Release

PACT Processes for T&D

Gated Project PhasesEach PACT Process is the starting point for situational adjustment/adaptation• Phase combinations are possible

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITED P-1000

24

IAD Phases 4/5/6

Development, Pilot Test, and Revision & Release

IAD Phases 2/3

Analysis/Design

PACT Processes for T&D

Gated Project PhasesEach PACT Process is the starting point for situational adjustment/adaptation• Phase combinations are possible

IAD Phase 1Project

Planning & Kick-off

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITED P-1000

25

PACT Processes for T&D

Teams & Roles/Responsibilities

Project Steering Team

Analysis Team

Design Team

Implementation Planning Team

Typical Teams — CAD

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITED P-1000

26

Project Steering Team

Analysis Team

Design Team

Development Team

Pilot Test Team

PACT Processes for T&D

Teams & Roles/ResponsibilitiesTypical Teams — MCD

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITED P-1000

27

Project Steering Team

Analysis Team

Design Team

Development Team

Pilot Test Team

PACT Processes for T&D

Teams & Roles/ResponsibilitiesTypical Teams — IAD

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITED P-1000

28

Word Processing Templates

• Project Plan

• Proposal

• Project Steering Team Review Presentations

• Invitation and Confirmation Letters

Project Planning & Management

Tools and Go-by’s

• Stakeholder/Customer Interview Guide

• Project Plan

• Proposal

PACT Processes for T&D

Tools and Templates

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITED P-1000

29

Analysis

PACT Processes for T&D

Tools and Templates

Word Processing Templates

• Target Audience Data

• Performance Model

• Knowledge/Skill Matrix

• Existing T&D Assessment

• Analysis Team Kick-off Presentation

• Project Steering Team Review Presentation

Tools and Go-by’s

• Analysis Report

• Analysis Database

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITED P-1000

30

Design

PACT Processes for T&D

Tools and Templates

Word Processing Templates

• Event Specs and Maps

• Module Specs and Maps

• Lesson Specs and Maps

• Activity Specs

• Project Steering Team Review Presentation

• Design Team Kick-off Presentation

Tools and Go-by’s

• Design Document

• Design Database

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITED P-1000

31

Development

PACT Processes for T&D

Tools and Templates

Word Processing Templates Tools and Go-by’s

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITED P-1000

32

lean-ISD via the PACT Processes for T&D

Business Benefits

Ensures voice of the customer and voice of the supplier in ISD projects

Customer/Stakeholder

• Project is visible and predictable in terms of

- T&D quality- Investment and returns

- Project tasks and schedule

• Provides managerial review and control points

Supplier

• Puts ISD suppliers in control of instructional integrity within the parameters set by the customer

• Templates and tools enable detailed project planning and communications with the customer

Learner

• T&D is performance oriented and will have a positive impact on learner’s ability to perform

• Modular structure provides flexibility for learner participation

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITED P-1000

33

Standard, but flexible processes and methodologies for ISD

lean-ISD Summary

• A blend of the best of both craft and massproduction approaches, applied to ISD- Common process- Gated process models- Use of teams- Use of tools and templates

• Multilevel design hierarchy used to ensure platform, modular, integrated ISD