Slide 1 1 Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano TOTEM – settembre 2005 Penn…
Slide 1 Creighton University ALICE - USA Michael Cherney May 23, 2007 Slide 2 Creighton and ALICE Slow controls presentation at ALICE –September, 2001 Membership in ALICE…
Slide 1 C. Foudas, Imperial CMS Upgrades Workshop FNAL – 18.11.08 1 Trigger Introduction Status of the CMS Trigger Upgrade Activities: –uTCA and Optical Link upgrades…
IL CALCOLO NEL 2004: PHYSICS DATA CHALLENGE III Massimo Masera [email protected] Commissione Scientifica Nazionale I 22 giugno 2004 Sommario The framework: status of AliRoot…
First steps The ORCA Letter of Intent Oscillation Research with Cosmics in the Abyss ORCA Antoine Kouchner University Paris 7 Diderot- AstroParticle and Cosmology KM3NeT…
Trigger studies with beam data the LHC is back 1 18:30 Beam 1 19.00 beam through CMS (23, 34, 45) beam1 through to IP6 19.55 Starting again injection of Beam1 corrected beam…
ATLAS and CMS activities Albert De Roeck CERN ECFA/DESY meeting St Malo 12-15 April 2002 LHC Prospects New date for first beams/collisions: 1/4/2007 Initial physics run starts…