CM-SAF 3rd User Workshop, Rostock, 06-08/09/2010 1 Integrating CM SAF data with PVGIS for Estimation of Solar Energy System Performance Thomas Huld, Richard Müller, Attilio…
TM UNISTRUT Metal Framing ® ELECTRICAL CONSTRUCTION APPLICATION, INSTALLATION, SPECIFICATION GUIDE Listed under new U/L Standard 5B Where industry pros turn — TM UNISTRUT…
CM-SAF 3rd User Workshop, Rostock, 06-08/09/2010 1 Integrating CM SAF data with PVGIS for Estimation of Solar Energy System Performance Thomas Huld, Richard Müller, Attilio…
Slide 1BigBite Wire-Chamber Status Report Brandon Craver University of Virginia Hall A Collaboration Meeting June 23, 2005 Slide 2 What do we build? Three drift chambers:…
Slide 1 Medical Physics Support of Linear Accelerators Slide 2 Overview of Physics Support Accelerator safety issues Accelerator safety issues Task Group Report #35 Task…
Slide 1GSB : A real-time Software back-end for the GMRT Jayanta Roy National Centre for Radio Astrophysics Pune, India LFRU@GMRT, 12 th December 2008 Collaborators : Yashwant…
Slide 1 1 Calice Meeting 20/9/06David Ward What did we learn from DESY 2005 run? DESY run May 2006. CERN run August 2006. Data/MC comparisons for ECAL Slide 2 2 Calice Meeting…
Slide 1 Update on the RICH Beamtest The RICH Group M. Artuso, S. Blusk, C. Boulahouache, J. Butt, O. Dorjkhaidav, A. Kanan, N. Menaa, R. Mountain, H. Muramatsu, R. Nandakumar,…