Slide 1 Status of Calibration and Data Analysis of MAXI GSC M. Sugizaki (RIKEN) on behalf of MAXI Team 2010.11.30 MAXI 20101GSC Calibration and Analysis Status Slide 2 Outline…
Offline software: status and some results of January-June 2008 data acquisition period. E.Choumilov TIM July 21.07.08 E.Choumilov, TIM 21.07.08 Status of TOF, ECAL, TrigLev1…
Slide 1 Group B Calibration Target - Three Springs, Weatherby Springs, Hoagland Tunnel and Spring Creek Spring Presented by Jennifer Sukow, IDWR October 27, 2011 1 Status…
Status of PSD A.Ivashkin (INR, Moscow) PSD structure. In-beam performance in Be run. Performance in Pb test run. PSD trigger in Be run. Status of calibration. Future steps.…
Slide 1Cosmic Ray Run III Cosmic Ray AliEn Catalogue LHC08b 1 Slide 2 Cosmic ray Run III 2 AliEn Repository Description : RUN III cosmics Production : PDC 08/LHC08b Run Range:…
The project is supported by the Hungarian Scientific Research Fund (OTKA): T043145 CMS test setup for the Magnet Test - Cosmic Challange (MTCC) Data Acquisition and Management…