Documents BOILER TRAINING Mr. Customer – Site specific A and W TECHNOLOGIES.

Slide 1BOILER TRAINING Mr. Customer – Site specific A and W TECHNOLOGIES Slide 2 Plant Cost Factors per 1000 lbs. Steam Fuel 74.9% Labor 10.0% Equip Deprec 9.8% Electricity…

Documents BOILER TRAINING Mr. Customer – Site specific

BOILER TRAINING Mr. Customer â Site specific Plant Cost Factors per 1000 lbs. Steam Fuel 74.9% Labor 10.0% Equip Deprec 9.8% Electricity 2.5% Sewer 1.5% Water 0.8% Chemicals…