45

BOILER TRAINING Mr. Customer – Site specific

Feb 07, 2016

Download

Documents

ghazi

A and W TECHNOLOGIES. BOILER TRAINING Mr. Customer – Site specific. Plant Cost Factors per 1000 lbs. Steam. Fuel 74.9%. Labor 10.0%. Equip Deprec 9.8%. Chemicals 0.5%. Water 0.8%. Electricity 2.5%. Sewer 1.5%. Firetube Boiler. Water rises near the tubes and falls - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: BOILER TRAINING Mr.  Customer – Site specific

BOILER TRAININGMr. Customer – Site specific

A and W TECHNOLOGIES

Page 2: BOILER TRAINING Mr.  Customer – Site specific

Plant Cost Factorsper 1000 lbs. Steam

Fuel 74.9%Labor 10.0%

Equip Deprec 9.8%Electricity

2.5%Sewer 1.5%Water 0.8%

Chemicals 0.5%

Page 3: BOILER TRAINING Mr.  Customer – Site specific

Energy Loss Versus Scale Thickness

01234567

1/64 1/32 3/64 1/16

Scale Thickness (Inches)

Ener

gy L

oss

(%)

Iron & Silica High Iron Content "Normal" Scale

Page 4: BOILER TRAINING Mr.  Customer – Site specific

Firetube Boiler

Heat

Water rises nearthe tubes and fallsalong boiler walls

Page 5: BOILER TRAINING Mr.  Customer – Site specific
Page 6: BOILER TRAINING Mr.  Customer – Site specific
Page 7: BOILER TRAINING Mr.  Customer – Site specific

WATER TUBE BOILER

FIRE BOX

Downcomers

RisersRisers

Steam Drum

Mud Drum

Steam

Page 8: BOILER TRAINING Mr.  Customer – Site specific
Page 9: BOILER TRAINING Mr.  Customer – Site specific

Water and its Impurities

• pH 8.0• M Alkalinity 100 ppm• Chlorides 12 ppm• Calcium 75 ppm• Magnesium 30 ppm• Total Hardness 105 ppm• Phosphate .1 ppm• Silica 5 ppm• Iron .05 ppm•Conductivity 230 mmhos

H O2

Page 10: BOILER TRAINING Mr.  Customer – Site specific

:Boiler

Steam

CondensateLost

CondensateReturned

Blowdown

Process

Typical Boiler System

Deaerator

FW pump

Softeners

Makeup

Page 11: BOILER TRAINING Mr.  Customer – Site specific

:

Softeners (Sodium Zeolite)

Deaerator

FW pump

Softeners

Makeup

Page 12: BOILER TRAINING Mr.  Customer – Site specific

Softener Service Cycle

Hard

Soft

105 ppm hardness

0 ppm hardness

Page 13: BOILER TRAINING Mr.  Customer – Site specific

How It Works?

Na+

Na+ Na+

Na+ Na+

Ca+

Mg+

Na+

Na+

Ca+

Mg+

Resin Bead

Water Drop Resin Bead

Water Drop

Page 14: BOILER TRAINING Mr.  Customer – Site specific

Softener Backwash Cycle

Page 15: BOILER TRAINING Mr.  Customer – Site specific

Softener Brining Cycle

saltsolution

Page 16: BOILER TRAINING Mr.  Customer – Site specific
Page 17: BOILER TRAINING Mr.  Customer – Site specific

Softener Slow Rinse Cycle

Page 18: BOILER TRAINING Mr.  Customer – Site specific

Softener Fast Rinse Cycle

Page 19: BOILER TRAINING Mr.  Customer – Site specific

Softener Service Cycle

Hard

Soft

Page 20: BOILER TRAINING Mr.  Customer – Site specific

:

Deaeration

Deaerator

FW pump

Softeners

Makeup

Page 21: BOILER TRAINING Mr.  Customer – Site specific
Page 22: BOILER TRAINING Mr.  Customer – Site specific

Deaeration

STORAGESECTION

5psig 222 F

DEAERATINGSECTION

Page 23: BOILER TRAINING Mr.  Customer – Site specific

Deaeration

STORAGESECTION

5psig 222 F

TRAYS

Page 24: BOILER TRAINING Mr.  Customer – Site specific

Deaeration

STORAGESECTION

SteamInlet

5psig 222 F

Page 25: BOILER TRAINING Mr.  Customer – Site specific

Deaeration

STORAGESECTION

CondensateReturn

SoftMakeup

Steam

5psig 222 F

Page 26: BOILER TRAINING Mr.  Customer – Site specific

Deaeration

STORAGESECTION

Vent

CondensateReturn

SoftMakeup

Steam

5psig 222 F

To Feed Water Pumps

Page 27: BOILER TRAINING Mr.  Customer – Site specific

Solubility of Oxygen in Water

40 60 80 100 120 140 160 180 200 220 240

Temperature *F

24

68

10

12141618

20

ppmOxygen

10 psi 232 F = 0-5 ppb5 psi 222 F = 0-10 ppb0 psi 185 F = 3 ppm

ppb range

Page 28: BOILER TRAINING Mr.  Customer – Site specific

Boiler

Steam

Typical Chemical Feed Points

Deaerator

SulfiteFeedCONT.

Page 29: BOILER TRAINING Mr.  Customer – Site specific

Boiler

Steam

Typical Chemical Feed Points

Deaerator

BoilerTrt.

fed by FWpumps on

sample pointFeedwater

SamplePoint Boiler water

Page 30: BOILER TRAINING Mr.  Customer – Site specific

Boiler

Steam

Typical Chemical Feed Points

Deaerator

CondensateFeed PointAlternative

Sample Point

Page 31: BOILER TRAINING Mr.  Customer – Site specific

Chemical FeedHands free & Bulk

Deaerator

A and W TECHNOLOGIES

AWBAWB

AWB

AWBAWB

Liquid Sulfite

InternalTreatment

Amine

Softeners

Bulk containers with productdirectly injected as noted.

Alkalinity

To steamheader

AWB

Page 32: BOILER TRAINING Mr.  Customer – Site specific
Page 33: BOILER TRAINING Mr.  Customer – Site specific

:

TESTING - SOFTENER

Deaerator

Softeners

Makeup

Sample PointSoftener

SOFTENER TESTING

• Hardness 0-1 ppm

Page 34: BOILER TRAINING Mr.  Customer – Site specific

TESTING - FEEDWATER

Deaerator

sample pointFeedwater

FEEDWATER TESTING

• Hardness 0-1 ppm

Page 35: BOILER TRAINING Mr.  Customer – Site specific

TESTING - BOILER WATER

SamplePoint Boiler water

BOILER TESTING

• Conductivity 4500 max Neutralized 2000-3000• Alkalinity 600-900• Sulfite 30-50

Page 36: BOILER TRAINING Mr.  Customer – Site specific

Image Industries Condensate Study

5

6

7

8

9

10

11

4-Feb

9-Feb

14-Feb

19-Feb

24-Feb

1-Mar 6-Mar 11-Mar

16-Mar

21-Mar

26-Mar

31-Mar

5-Apr 10-Apr

15-Apr

20-Apr

pH V

alue

Main C.R.

Wash C.R.

Line 1 LPHX

Line 2 LPHX

Product Usage701 2 Gal 1.5 Gal 1 Gal 2 Gal 1.5 Gal 1.25 Gal 1 Gal 705 1.5 Gal157 2 Gal 2.5 Gal157 L-1 Sat. .5 Gal157 L-2 Sat. 1.5 GalCost per day all treatment $124/day $123/day * $116/day * Protection for line 1 LPHX^ Protection for line 2 LPHX (Both) $72/day ^

Page 37: BOILER TRAINING Mr.  Customer – Site specific
Page 38: BOILER TRAINING Mr.  Customer – Site specific

TESTING - CONDENSATE

DeaeratorSample Point

TESTING

• pH 6.5 – 7.2• Conductivity Record• Hardness 0• Alkalinity 0

Page 39: BOILER TRAINING Mr.  Customer – Site specific

Blowdown

Boiler Blowdown

Bottom

Surface

Page 40: BOILER TRAINING Mr.  Customer – Site specific

Boiler Blowdown

Surface

NeedleValve

Page 41: BOILER TRAINING Mr.  Customer – Site specific

Boiler Blowdown

Surface

AutoBlowdown

Page 42: BOILER TRAINING Mr.  Customer – Site specific

Steam SystemA and W Blowdown Controller

Timed Sample Method

A and W TECHNOLOGIES

Full portedgate valve

Throttling needle valve

Max. 4’ Max 3’

Flush valve

Sampling electrode

Motorized ball valve.Mount horizontally awayfrom heat, as near to flooras possible.

cross

A and W

To drain or cascade to other boiler.

110 VAC

Controller

Page 43: BOILER TRAINING Mr.  Customer – Site specific

Save some money and keep the boiler hot Boiler System

A and W Cascading Blowdown

A and W TECHNOLOGIES

On Line Boiler Boiler in Hot Wet Storage

Boiler BottomBlowdown Boiler Bottom

Blowdown

BlowdownFlashTank

Drain

Flashed steam

Closed

Open

CheckValve

Closed

Open

Closed

Cascading blowdown from an operating boiler is used to keep the idle boiler filled with treated water and hot ready to bring on line. Insure idle boiler ventis open to completely fill boiler then close vent and allow blowdown to exit through the surface blowdownto the blowdown flash tank.

Open

Page 44: BOILER TRAINING Mr.  Customer – Site specific
Page 45: BOILER TRAINING Mr.  Customer – Site specific

Thank you for your business

A and W TECHNOLOGIES