Slide 1Presented By: Dean Soultanian Director of Proposal Development & Principal in Charge of PCB Remediation Activities March 30, 2011 Managing PCB Contaminated Building…
1. Failing membrane evident by leaks into parkade. Signs of rust were minimal with no spalling. Optimum time to replace the membrane. Excessive amount of spalling and visible…
1 City Hall ⢠1 Dr. Carlton B. Goodlett Place , Room 244 ⢠San Francisco, California 94102-4689 (415) 554-7460 ⢠Fax (415) 554-7432 ⢠TDD/TTY (415) 554-5227 ⢅
1 Structural Rehabilitation of a Chloride-Contaminated Concrete Silo in the Azores INTRODUCTION A reinforced concrete grain and food-stuff silo, built in 1980 in Lagoa, not…
Managing PCB Contaminated Building Materials Presented By: Dean Soultanian Director of Proposal Development & Principal in Charge of PCB Remediation Activities March…