CONSTRUCTING ENVIRONMENTS CHAN JOSHUA TIG HAY 638994 DATE PRINTED CHECKED SCALE DRAWN BY PROJECT NO DWG NO TITLE PROJECT Revision No Date Name Builders/Contractors shall…
Building for Learning Project Photo Progress Report 4 November 2009 â December 2009 Project commencement 21st September 2009 AWCC Chairperson Kerryn Dwyer-Parish with Graeme…
DECEMBER 2011 Formwork and rebar for diving pool walls Aerial view of pile caps for leisure pool area Concrete pour to diving pool walls DECEMBER 2011 Completed section of…
PHOTO DOCUMENTATION OF CONCRETE FOUNDATION AND EPOXY GROUT JOB FOR RECIPROCATING COMPRESSOR Oxy South Cross Unit, Battery No. 6 McCamey, Texas K-9200 Compressor: 1250 HP,…
April 8, 2013 ATIKOKAN PROGRESSATIKOKAN PROGRESS Volume 63, Number 22 Atikokan-Quetico, Canoeing Capital of Canada PM #08621 R #40012356 (Inc. 6¢ HST) $125 M. McKinnon Over…
1. THE CONTRACTOR SHALL EXAMINE ALL CONTRACT DOCUMENTS, CHECK DIMENSIONS AND REPORT ANY DISCREPANCIES TO THE ENGINEER FOR CLARIFICATION PRIOR TO COMMENCING CONSTRUCTION.…
DRAWING LIST COPYRIGHTED. This design is the exclusive property of the Designer and shall not be reproduced without the Designers written permission. These drawings are to…
Steve Jennings: Power, Process and Plant Division, Trimble Navigation Limited Jayan Mundakkal: Construction Automation Manager, Bechtel Construction Operations Inc. • …