Top Banner
Building for Learning Project Photo Progress Report 4 November 2009 – December 2009 Project commencement 21 st September 2009
16

Building for Learning Project Photo Progress Report 4 November 2009 – December 2009

Mar 20, 2016

Download

Documents

neveah

Building for Learning Project Photo Progress Report 4 November 2009 – December 2009 Project commencement 21 st September 2009. AWCC Chairperson Kerryn Dwyer-Parish with Graeme Connelly undertaking site inspections. Kerryn braved the situation – high heels and all. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Building for Learning Project Photo Progress Report 4 November 2009 – December 2009

Building for Learning ProjectPhoto Progress Report 4

November 2009 – December 2009

Project commencement 21st September 2009

Page 2: Building for Learning Project Photo Progress Report 4 November 2009 – December 2009

AWCC Chairperson Kerryn Dwyer-Parish with Graeme Connelly undertaking site inspections

Kerryn braved the situation – high heels and all

Page 3: Building for Learning Project Photo Progress Report 4 November 2009 – December 2009

The 65mm of rain made for 4 ‘internal swimming pools’ but

the task is completed

Page 4: Building for Learning Project Photo Progress Report 4 November 2009 – December 2009

And no photographic record is complete without some ‘rabbit ears’

Page 5: Building for Learning Project Photo Progress Report 4 November 2009 – December 2009

November Internal Refurbishments continue

Page 6: Building for Learning Project Photo Progress Report 4 November 2009 – December 2009

Internal Refurbishments Administration Area

Page 7: Building for Learning Project Photo Progress Report 4 November 2009 – December 2009

New ceilings, plaster, office and painting

Page 8: Building for Learning Project Photo Progress Report 4 November 2009 – December 2009

Key workers without who the job could not be done.

Page 9: Building for Learning Project Photo Progress Report 4 November 2009 – December 2009

December new on-site substation for power required.

Page 10: Building for Learning Project Photo Progress Report 4 November 2009 – December 2009

December – carpet, ceilings and windows in modernised Administration area

Page 11: Building for Learning Project Photo Progress Report 4 November 2009 – December 2009

December – steel, bond deck arrives for 1st Floor

Page 12: Building for Learning Project Photo Progress Report 4 November 2009 – December 2009

December – underground cable boring and concrete footings for stairways and elevator

Page 13: Building for Learning Project Photo Progress Report 4 November 2009 – December 2009

December – Company Directors tour with Graeme Connelly – girls were happy, boys were serious.

L-R. Chairperson Kerryn Dwyer-Parish, Director Jan Wyatt-Brown, Director Alison Mitchell, Corporate Services Manager Pauline Butler, Builder Graeme

Connelly, Director Rod Jones, Director David Ryan.

Page 14: Building for Learning Project Photo Progress Report 4 November 2009 – December 2009

December – bracing underneath bond deck and steel ready for concrete floor above

Page 15: Building for Learning Project Photo Progress Report 4 November 2009 – December 2009

Final preparations and then concrete pour starting 6am, 22nd December – 150 tonne concrete

Page 16: Building for Learning Project Photo Progress Report 4 November 2009 – December 2009

22nd December – 11 truck loads of concrete