DOCUMENT RESOURCES FOR EVERYONE
Documents tagged
Documents Evo Operation %26 Maintenance v3

GenieEvo Metalclad, vacuum indoor switchgear installation,operation and maintenance instructions version 3.0 / March 2005 Details of revision Version 1.0 2.0 Comment First…

Documents BB64Ad01

Medium Voltage Distribution PIX High Air-insulated switchgear 12–17.5 kV (≤ 50 kA) Assembly Operation Maintenance Technical Manual No. AGS 531 502-02 Edition 03/2010…

Documents Switch Yard

220KV SWITCHYARD AT UNCHAHAR PRESENTED BY: NITISH KUMAR GUPTA ET-2011 OPERATION-GROUP C Substations • HVAC : 220, 400, 765 KV • HVDC: +/- 140, 200, 400, 500, 800 KV •…

Documents Switch Yard

220KV SWITCHYARD AT UNCHAHAR PRESENTED BY: NITISH KUMAR GUPTA ET-2011 OPERATION-GROUP C Substations • HVAC : 220, 400, 765 KV • HVDC: +/- 140, 200, 400, 500, 800 KV •…

Documents LBB & BUSBAR

LBB & BUSBAR PROTECTION PREPARED BY GOPALA KRISHNA PALEPU [email protected], Mobile:9440336984 NOMINICLATURE LBB : Local Breaker Backup Relay. BFR : Breaker Failure…

Documents LBB & BUSBAR

LBB & BUSBAR PROTECTION PREPARED BY GOPALA KRISHNA PALEPU ADE/MRT(PROTECTION) [email protected], Mobile:9440336984 NOMINICLATURE LBB : Local Breaker Backup Relay.…

Documents GRANTS MANAGEMENT Edie Lowery Director of Grant Programs Metropolitan Transit Authority of Harris...

Slide 1GRANTS MANAGEMENT Edie Lowery Director of Grant Programs Metropolitan Transit Authority of Harris County, Texas August 20, 2002 Slide 2 2 SOURCES AND ELIGIBILITY Formula…

Documents Basic Precipitator Control Troubleshooting

Basic Precipitator Control Troubleshooting Particulate Collection Within A Precipitator Precipitator operating and optimizing products Basic Precipitator Troubleshooting…

Entertainment & Humor Electrostatic precipitator EPS Maintenance

1. MAINTENANCE EPSFebrianto W. U – 2209 100 010 2. PERFORMANCE MONITORING As with the operation of any piece of equipment, performancemonitoring and recordkeeping are…

Documents 33kV probs 21122012

No Date nd Description 1 Oct 22 , Tripping of Al Ghail Generators 2012 on reverse power or Stator earth fault while charging TRF1 or TRF2 or TR1 at Al Hamra 2 Oct 22nd ,…