YOU ARE DOWNLOADING DOCUMENT

Please tick the box to continue:

Transcript
Page 1: WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report.

WiFi LAN WITH TV AND RADIO RECEPTION

Page 2: WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report.

Project Stages

Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report

Page 3: WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report.

Project Charter

Page 4: WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report.

Project Charter

Existing Hardware:

LOHHLLJY POUKKGKFFF FGARFGROKGLGHLJHJ GIYJFFF TUGT DEHDHHJJCXCDD

LOHHLLJY POUKKGKFFF FGARFGROKGLGHLJHJ GIYJFFF TUGT DEHDHHJJCXCDD

Page 5: WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report.

Project Charter

Sketch

WiFi Connection

TV and Radio Receiver

LAPTOP LAPTOP

WiFi Adapter

WiFi Adapter

TV Program

Transmitting TV program Over the WiFi LAN Connection

Page 6: WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report.

Project Charter

Page 7: WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report.

Project Charter

Proposed Hardware: Linksys WUSBF54G Wireless-G USB Network Adapter with Wi-Fi Finder STANDARDS: IEEE 802.11b, 802.11g, USB 1.1, USB 2.0 PORT: USB Port CHANNELS: 802.11b/802.11g RECEIVE SENSITIVITY: 54Mbps @ -65dBm, 11Mbps @ -80dBm SECURITY FEATURES: WEP Encryption Compatible with 802.11g and 802.11b (2.4GHz) Standards Support USB 2.0 with up to 54Mbps, High-Speed Data Transfer Rate with Automatic Fallback Compatible with Microsoft Windows 2000 and XP

User Comments Very good range even at 1km Easy to read display with the all require information Rechargeable battery Good Speed

Page 8: WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report.

Project Charter

USB 2.0 AVerMedia TV Hybrid + FM Volar Pen Drive

USB 2.0 Pen Drive Watch Analog TV OR High Quality Digital Terrestrial TV FM Radio broadcasts on your PC/Notebook Microsoft MCE 2005 Compliant on Digital TV PVR Features Time-Shift, TV Scheduler Record Video to MPEG1/2 formats 4:3 and 16:9 wide-screen format 16 Channel Preview Windows XP and XP MCE 2005

Page 9: WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report.

Project Feasibility

Approach Overview:

Implement the LAN connection between two laptops via WiFi adapter.

Install one TV and Radio Receiver in one of the laptops and transfer the signal through Wifi LAN

Description of the solution:

Firstly we need to install two WiFi adapters in two laptops

LAPTOP

WiFi Adapter

LAPTOP

WiFi Adapter

Page 10: WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report.

Project Feasibility

Install one TV and Radio receiver

LAPTOP

WiFi Adapter

Page 11: WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report.

Project Feasibility

Capture some radio or TV signal

LAPTOP

WiFi Adapter

Page 12: WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report.

Project FeasibilityTransfer the signal from one laptop to another using WiFi

connection

WiFi Connection

TV and Radio Receiver

LAPTOP LAPTOP

WiFi Adapter

WiFi Adapter

Transmitting TV program Over the WiFi LAN Connection

Page 13: WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report.

Project Feasibility

Benefit/Cost of solution:

2 x USB WiFI adapters - $126.80 USB TV and Radio Receiver - $108.90 Installation and testing fees - $1000

Page 14: WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report.

Project Feasibility

Recommended solution:

WiFi Connection

TV and Radio Receiver

LAPTOP LAPTOP

WiFi Adapter

WiFi Adapter

TV Program

Transmitting TV program Over the WiFi LAN Connection

Page 15: WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report.

Work Breakdown Structure

Page 16: WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report.

CHANGE CONTROL

Change Request Overview:

Bluetooth dongle has the following features:

Maximum range if the wireless connection is 100 metre Encrypted data Security Easy maintenance

Page 17: WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report.

CLOSE-OUT REPORT

Project Deliverables

DELIVERABLE DATE ACCEPTED

Project Charter 17/10/2007

Project Diagram 17/10/2007

Work Breakdown Structure 24/10/2007

Feasibility Study 24/10/2007

Change Control 31/10/2007

Close-Out Report 07/11/2007

Page 18: WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report.

CLOSE-OUT REPORT

Budget Baseline:

CATEGORY PLANNED ACTUAL VARIANCE

Hardware $500 $235.70 -$264.30

Software $0 $0 $0

Labour $2,000 $1,000 -$1,000

Total $2500 $1235.70 -$1265.30

Page 19: WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report.

CLOSE-OUT REPORT

Schedule Baseline

Page 20: WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report.

And that’s all Gentlemen

Thanks for your Time


Related Documents