YOU ARE DOWNLOADING DOCUMENT

Please tick the box to continue:

Transcript
Page 1: Unstable Angina /Non-ST Elevation Myocardial Infarction Critical Pathway Toolkit

Unstable Angina /Non-ST Elevation Myocardial Infarction

Critical Pathway Toolkit

Adapted from Dr Chris CannonSTRIVE Scientific Committee – 2008 Based on ACC/AHA Guidelines - 2007

Page 2: Unstable Angina /Non-ST Elevation Myocardial Infarction Critical Pathway Toolkit
Page 3: Unstable Angina /Non-ST Elevation Myocardial Infarction Critical Pathway Toolkit
Page 4: Unstable Angina /Non-ST Elevation Myocardial Infarction Critical Pathway Toolkit

Anticoagulants

Enoxaparin more effective in preventing combined end point of death or MI vs Unfractionated heparin (UFH).

Avoid cross-over during PCILast SC dose >8 hrs, 0.3 mg/kg of

iv.Last SC dose <8 hours, no

additional enoxaparin.

Page 5: Unstable Angina /Non-ST Elevation Myocardial Infarction Critical Pathway Toolkit

Anticoagulants Bivalirudin (single therapy) lower risk of

bleeding compared to Enoxaparin and UFH. Approved only for early PCI.

Fondaparinux Lower risk of bleed but increased risk of catheter-related thrombi, to switch to UFH in Cath Lab.

Page 6: Unstable Angina /Non-ST Elevation Myocardial Infarction Critical Pathway Toolkit
Page 7: Unstable Angina /Non-ST Elevation Myocardial Infarction Critical Pathway Toolkit
Page 8: Unstable Angina /Non-ST Elevation Myocardial Infarction Critical Pathway Toolkit
Page 9: Unstable Angina /Non-ST Elevation Myocardial Infarction Critical Pathway Toolkit
Page 10: Unstable Angina /Non-ST Elevation Myocardial Infarction Critical Pathway Toolkit

Lipid Management

Fasting lipid profile workup within 24h [Class I, LOE: C]

Statin regardless of LDL-C [Class I, LOE: A]

Page 11: Unstable Angina /Non-ST Elevation Myocardial Infarction Critical Pathway Toolkit

Beta-blockers

Ellis K, et al. 6-month mortality in ACS pts undergoing PCI1.7% Beta-blockers vs 3.7% without beta-blockers.

(Pooled results from EPIC, EPILOG, RAPPORT, CAPTURE and EPISTENT J Interv Cardiol 2003;16:299–305.)

Page 12: Unstable Angina /Non-ST Elevation Myocardial Infarction Critical Pathway Toolkit

Beta-blockers

ACC/AHA 2007 Class 1 (LOE B)#Oral therapy initiated ≤24 h if NOHeart failure Low-output stateIncreased risk for cardiogenic shockRelative contraindications PR ›0.24 s2nd or 3rd degree heart blockReactive airway disease

Page 13: Unstable Angina /Non-ST Elevation Myocardial Infarction Critical Pathway Toolkit

Angiotensin-aldosterone inhibitorsPulmonary congestion or LVEF ≤ 40% -

ACEI within 24h or ARB if intolerant.

LV dysfunction, hypertension or diabetes – Long-term ACEI or ARB.

LVEF ≤ 40% and symptomatic heart failure or diabetes

(without renal dysfunction/hyperkalemia)Aldosterone-receptor blockade in addition to ACEI.

Page 14: Unstable Angina /Non-ST Elevation Myocardial Infarction Critical Pathway Toolkit

Optimal Discharge PlanningOptimal blood pressure <140/90 mm Hg [Class I, LOE: A]

<130/80 in diabetes or chronic kidney disease mm Hg [Class I, LOE: A]

Discharge education Medication use, cardiac rehabilitation, lifestyle modification (diet, exercise & smoking cessation) [Class I, LOE: C]

Follow-up2-6 weeks in low risk, medically treated, revascularized,

14 days high risk [ Class I, LOE: C]

Page 15: Unstable Angina /Non-ST Elevation Myocardial Infarction Critical Pathway Toolkit
Page 16: Unstable Angina /Non-ST Elevation Myocardial Infarction Critical Pathway Toolkit
Page 17: Unstable Angina /Non-ST Elevation Myocardial Infarction Critical Pathway Toolkit
Page 18: Unstable Angina /Non-ST Elevation Myocardial Infarction Critical Pathway Toolkit
Page 19: Unstable Angina /Non-ST Elevation Myocardial Infarction Critical Pathway Toolkit
Page 20: Unstable Angina /Non-ST Elevation Myocardial Infarction Critical Pathway Toolkit
Page 21: Unstable Angina /Non-ST Elevation Myocardial Infarction Critical Pathway Toolkit
Page 22: Unstable Angina /Non-ST Elevation Myocardial Infarction Critical Pathway Toolkit

Cardiac Admission Checklist

Page 23: Unstable Angina /Non-ST Elevation Myocardial Infarction Critical Pathway Toolkit

Cardiac Admission Checklist

Page 24: Unstable Angina /Non-ST Elevation Myocardial Infarction Critical Pathway Toolkit

Cardiac Discharge Prescription

Page 25: Unstable Angina /Non-ST Elevation Myocardial Infarction Critical Pathway Toolkit

Adapted by

Kamelia Emamian M.D. and Thao Huynh, MD, MSC.


Related Documents