YOU ARE DOWNLOADING DOCUMENT

Please tick the box to continue:

Transcript
Page 1: Trajectory
Page 2: Trajectory

Updates !

Page 3: Trajectory

Raise• One raise on system. • Deb did an appointment at IEFL , positive lead

expected for ET.• EP application packages received, co-ordinated

by Seher.

Page 4: Trajectory

Match• Matching Mania with Turkey attended. Two +ve

TN’s received.• Positives from Ghana and coast ivory.• A lot of interview lined up for ET and IT EP’s for

the next week.• Countries :• Jordan, Colombia (Andes, Bogotá ),Hong Kong.

Page 5: Trajectory

RealizationsNo realizations

Page 6: Trajectory

MISCAmazing MTS delivered.


Related Documents