Slovak Environmental Slovak Environmental InspectorateInspectorate
Procedure of issuing the permits in the Slovak Republic
Legal norms
Act No. 245/2003 Coll. on integrated pollution prevention and control and on changes and amendments to some
Laws
Ordinance of the Ministry of
Environment (MoE) SR No. 391/2003 Coll., as a guideline for execution of
the IPPC Law
SEI - Slovak Environmental Inspectorate
Head office - deals with appeals
Environmental Inspectorates on regional level - deal with permitting procedures
Head Office Bratislava
EI Košice
EI Bratislava EI
Banská BystricaEI
Žilina
SEI
Integrated Permit and Control Unit
established on
1. 8. 2003
Integrated permit procedure comprises procedures in the areas of:
• air protection• surface and underground waters • wastes• protection of agricultural land • protection of forest land • human health protection• veterinary protection of a territory• protection of nature and landscape
One part of integrated permit procedure
building permit procedure
Integrated permit procedure concerns:
• change of the installation character
• change in the operation of an installation
• extension of an installation
Integrated permit procedure
does not include
• territory planning procedure
• Environmental Impact Assessment (EIA)
• Setting conditions for prevention of serious industrial accidents (SEVESO II)
Characteristics of the installations according to the IPPC Law
• existing installation – an installation for which the building permit application was submitted before 30 October 1999 and it started operating by 30 October 2000
• new installation – an installation which is not an existing installation (the installation put into operation after 30 October 2000)
Issuing an integrated permit - deadlines
• new installations – must have the integrated permit issued by the date of the SR accession to EU, i.e. by 30 April 2004
• existing installations – must have the integrated permit issued by 8 years from the IPPC Directive taking effect at the latest, that is by 30. 10. 2007
Numbers of installations for which it is necessary to issue the integrated
permits
BA BB ZA KE
New installations
16 5 6 7 34
Existing installations 174 131 93 107 505
190 136 99 114 539
Division of installations according to their activities
020406080
100120140160
poč
et p
revá
dzo
k
1 2 3 4 5 6kategória priemyselnej činnosti
Nové prevádzky Jestvujúce prevádzky
Permit procedure
- call for an operator to file the application
- consultation or preliminary hearing re. the preparing application
- start of the proceedings – at the delivery of the application
SEI must do the following • assess if the application is complete• establishes the parties to the proceedings and
the relevant authorities • notifies the parties to the proceedings and the
relevant authorities about the launch of the proceeding
• delivers a brief summary of the application to the municipality and the relevant authorities and other parties to the proceedings
• asks the municipality to publish the information and the call on its official notice board or in any other way used locally
Oral proceedings
concerns
• the application
• comments and suggestions of the invited persons
• the minutes of the public meeting of the municipality citizens if there was one
Integrated permitcontains
• details of the measures and technical equipment for air, water and soil protection
• emission limits for substances emitted from the installation
• measures to prevent pollution, mainly by using BATs
• measures to prevent production of waste
• conditions for energy management
• measures to prevent accidents and limit the effects of the accidents mainly in case of launching the installations into operation, failure of technical facilities, short-time interruption of the activity etc.
•requirements for trial operation
Exceptions for the operation
in order to carry out changes in the installation through which the compliance with the permit conditions is
achieved,
or to terminate the activity in the installation
time limited to
• 6 months from the validity of the permit
• until 30 October 2007
Written permit is delivered to
• parties to the proceedings
• relevant authorities
• involved persons
• foreign competent authority
Published
• on the WWW site of SEI and official notice board
• in the municipality concerned
What is ahead of us
• to arrange for personnel and equipment in all regional inspectorates
• to build a BAT centre
• to build an Information system
• training of inspectorss, ... and operators
• awareness campaign for public