Construction of Early Childhood Development Centre
Mpumalanga Province
-1-
Item
No
1
SECTION NO. 1
BILL NO. 1
PRELIMINARIES BUILDING AGREEMENT AND PRELIMINARIES
Preliminaries and General
F:............................. V:.........................T:............................
Carried to Final Summary
Section No. 1
Preliminaries and General
Bill No. 1
Preliminaries and General
Quantity
Item
Rate
R
Amount
Construction of Early Childhood Development Centre
Mpumalanga Province
-2-
Item
No
1
2
3
4
SECTION NO. 2
BILL NO. 1
EARTHWORKS (PROVISIONAL) NOTE :
Unless otherwise stated herein, all items in this bill shall be
deemed to fall into Work Group No. 104 for CPAP formula
purposes SUPPLEMENTARY PREAMBLES
Nature of ground
The nature of the ground is assumed to be loose sandy
material, therefore "earth", but possibly interspersed with "hard
rock" or "soft rock"
Carting away of excavated material
Descriptions of carting away of excavated material shall be
deemed to include loading excavated material onto trucks
directly from the excavations or, alternatively, from stock piles
situated on the building site EXCAVATION, FILLING, ETC
Excavation in earth not exceeding 2m deep
Trenches m3
Extra over trench and hole excavations in earth for
excavation in
Soft rock m3
Hard rock m3
Extra over all excavations for carting away
Surplus material from excavations and/or stock piles on site to
a dumping site to be located by the contractor m3
Carried Forward
Section No. 2
ECD Building
Bill No. 1
Earthworks (Provisional)
Quantity
94
9
5
49
Rate
R
Amount
Construction of Early Childhood Development Centre
Mpumalanga Province
-3-
5
6
7
8
9
10
11
12
Brought Forward
Risk of collapse of excavations
Sides of trench and hole excavations not exceeding 1,5m deep
m2
Keeping excavations free of water
Keeping excavations free of all water other than subterranean
water
Earth filling obtained from the excavations and/or
prescribed stock piles on site compacted to 93% Mod
AASHTO density
Backfilling to trenches, holes, etc m3
Under floors, steps, pavings, etc m3
G5 filling supplied by the contractor compacted to 93%
Mod AASHTO density
Under floors, steps, pavings, etc m3
Coarse river sand filling supplied by the contractor
Sandbed m3
Compaction of surfaces
Compaction of ground surface under floors etc including
scarifying for a depth of 100mm, breaking down oversize
material, adding suitable material where necessary and
compacting to 93% Mod AASHTO density m2 SOIL POISONING
Soil insectiside
Under floors etc including forming and poisoning shallow
furrows against foundation walls etc, filling in furrows and
ramming m2
Carried Forward
Section No. 2
ECD Building
Bill No. 1
Earthworks (Provisional)
338
Item
46
81
40
13
270
270
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-4-
13
14
15
16
17
18
19
20
21
Brought Forward
To bottoms and sides of trenches m2
UNREINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES
15MPa/19mm concrete
Blindings m3
REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES
25MPa/19mm concrete
Strip footings m3
Mild steel reinforcement to structural concrete work
8mm Diameter bars t
High tensile steel reinforcement to structural concrete
work:
10mm Diameter bars t
BRICKWORK NFX clay face bricks pointed with flush horizontal and
vertical joints
Half brick walls m2
One brick walls m2
Brickwork reinforcement
75mm Wide reinforcement built in horizontally m
150mm Wide reinforcement built in horizontally m
MOVEMENT JOINTS, ETC
Carried Forward
Section No. 2
ECD Building
Bill No. 1
Earthworks (Provisional)
433
5
27
2,03
2,03
54
68
635
800
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-5-
22
Brought Forward
Expansion joints with softboard between vertical
concrete surfaces and brickwork
12mm Joints not exceeding 300mm high m
Carried Forward to Summary of Section No. 2
Section No. 2
ECD Building
Bill No. 1
Earthworks (Provisional)
400
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-6-
Item
No
SECTION NO. 2
BILL NO. 2 CONCRETE, FORMWORK AND REINFORCEMENT
NOTE :
Unless otherwise stated herein, all items in this bill shall be
deemed to fall into Work Group No. 110 for CPAP formula
purposes SUPPLEMENTARY PREAMBLES
Cost of tests
The costs of making, storing and testing of concrete test cubes
as required under clause 7 "Tests" of SABS 1200 G shall
include the cost of providing cube moulds necessary for the
purpose, for testing costs and for submitting reports on the
tests to the Principal Agent. The testing shall be undertaken
by an independent firm or institution nominated by the
contractor to the approval of the Principal Agent. (Test cubes
are measured separately)
Formwork
Description of formwork shall be deemed to include use and
waste only (except where described as "left in" or
"permanent"), for fitting together in the required forms,
wedging, plumbing and fixing to true angles and surfaces as
necessary to ensure easy release during stripping and for
reconditioning as necessary before re-use
The vertical strutting shall be carried down to such construction
as is sufficiently strong to afford the required support without
damage and shall remain in position until the newly
constructed work is able to support itself.
Formworks to soffits of solid etc shall be deemed to be slabs
not exceeding 250mm thick unless otherwise described
Carried Forward
Section No. 2
ECD Building
Bill No. 2
Concrete, Formwork and Reinforcement
Quantity Rate
R
Amount
Construction of Early Childhood Development Centre
Mpumalanga Province
-7-
1
2
3
4
5
Brought Forward
Formwork to sides of bases, pile caps, ground beams, etc will
only be measured where it is prescribed by the engineer for
design reasons. Formwork necessitated by irregularity or
collapse of excavated faces will not be measured and the cost
thereof shall be deemed to be included in the allowance for
taking the risk of collapse of the sides of the excavations,
provision for which is made in "Earthworks" UNREINFORCED CONCRETE
15MPa/19mm concrete
Aprons cast in panels m3
REINFORCED CONCRETE
25MPa/19mm concrete
Surface beds on waterproofing m3
CONCRETE SUNDRIES
Finishing top surface of concrete smooth with a wood
float.
Surface beds, slabs, etc. m2
(CPAP FORMULA WORK GROUP NO. 114)
Fabric reinforcement
Type 193 fabric reinforcement in concrete surface beds, slabs,
etc. m2 MOVEMENT JOINTS ETC
Expansion joints with Bitumen impregnated softboard
between vertical concrete and brick surfaces
15mm Joints not exceeding 300mm high m
Carried Forward
Section No. 2
ECD Building
Bill No. 2
Concrete, Formwork and Reinforcement
8
27
270
270
254
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-8-
6
Brought Forward
TEST BLOCKS
Making and testing 150 x 150 x 150mm concrete strength test
cube (Provisional) No
Carried Forward to Summary of Section No. 2
Section No. 2
ECD Building
Bill No. 2
Concrete, Formwork and Reinforcement
9
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-9-
Item
No
1
2
3
SECTION NO. 2
BILL NO. 3
MASONRY NOTE :
Unless otherwise stated herein, all items in this bill shall be
deemed to fall into Work Group No. 116 for CPAP formula
purposes SUPPLEMENTARY PREAMBLES
BRICKWORK
Sizes in descriptions
Where sizes in descriptions are given in brick units, "one brick"
shall represent the length and "half brick" the width of a brick
Face bricks
Bricks shall be ordered timeously to obtain uniformity in size
and colour
Pointing
Descriptions of recessed pointing to fair face brickwork and
face brickwork shall be deemed to include square recessed,
hollow recessed, weathered pointing, etc. SUPERSTRUCTURE
Brickwork of NFP bricks in class II mortar
115mm Half brick walls m2
115mm Half brick walls in beamfilling m2
230mm One brick walls m2
Carried Forward
Section No. 2
ECD Building
Bill No. 3
Masonry
Quantity
301
18
288
Rate
R
Amount
Construction of Early Childhood Development Centre
Mpumalanga Province
-10-
4
5
6
7
8
9
10
11
12
Brought Forward
Corobrick "Firelight Travertine FBX" Face bricks pointed
with flush horizontal and vertical joints
Extra over for face brick work m2
Brick-on-edge header course copings, sills, etc of clay
face bricks pointed with recessed joints on all exposed
faces
Brickwork for brick-on-edge header course 150mm wide sill set
slopping m
Brickwork for brick-on-edge header copping on top of one brick
wall m BRICKWORK SUNDRIES
Brickwork reinforcement
75mm Wide reinforcement built in horizontally m
150mm Wide reinforcement built in horizontally m
Prestressed fabricated lintels
110 x 75mm Lintels in lengths not exceeding 3m m
110 x 75mm Lintels in lengths exceeding 3m m
Galvanised hoop iron cramps, ties, etc
30 x 1,6mm Roof tie 1,5m long with one end fixed to timber
and other end built into brickwork No PRECAST CONCRETE WINDOW SILLS
Natural grey sills in single lengths bedded in class I
mortar including metal fixing lugs etc
150 x 15mm thick corrugated cement pressed precast window
sill m
Carried Forward to Summary of Section No. 2
Section No. 2
ECD Building
Bill No. 3
Masonry
244
37
9
1 251
1 129
69
31
50
37
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-11-
Item
No
1
2
3
4
SECTION NO. 2
BILL NO. 4
WATERPROOFING NOTE :
Unless otherwise stated herein, all items in this bill shall be
deemed to fall into Work Group No. 120 for CPAP formula
purposes DAMP-PROOFING OF WALLS AND FLOORS
One layer of 375 micron "Consol Plastics Brikgrip DPC"
embossed damp proof course
150mm thick half brick walls m2
220mm thick in one brick walls m2
One layer of 250 micron "Consol Plastics Gunplas USB
Green" waterproof sheeting sealed at laps with "Gunplas
Pressure Sensitive Tape"
Under surface beds m2
JOINT SEALANTS, ETC
"Denbraven LM15" polysulphide sealing compound
including backing cord, bond breaker, primer, etc
10 x 10mm expansion joints in floors m
Carried Forward to Summary of Section No. 2
Section No. 2
ECD Building
Bill No. 4
Waterproofing
Quantity
9
22
270
254
Rate
R
Amount
Construction of Early Childhood Development Centre
Mpumalanga Province
-12-
Item
No
1
2
3
4
SECTION NO. 2
BILL NO. 5
ROOF COVERINGS ETC NOTE :
Unless otherwise stated herein, all items in this bill shall be
deemed to fall into Work Group No. 124 for CPAP formula
purposes PROFILED METAL SHEETING AND ACCESSORIES
KLIP-LOK 700 profile roll formed in continuous lengths,
light industrial with 'Global Coat' finish to 1 side on 38 x
76mm SAP Battens at 1200mm Centres Max on Timber
trusses:
Roof covering with pitch exceeding 25 degrees and not
exceeding but 30 degrees m2
300mm wide ridge capping m
150mm high bandage flashing with acrylic sealant m
ROOF AND WALL INSULATION
"Sisalation 410" housing grade glass fibre reinforced
aluminium foil bonded insulation
Insulation laid taut over rafters (at approximately 1 200mm
centres) and fixed concurrent with battens, purlins, etc m2
Carried Forward to Summary of Section No. 2
Section No. 2
ECD Building
Bill No. 5
Roof Covering
Quantity
421
26
24
294
Rate
R
Amount
Construction of Early Childhood Development Centre
Mpumalanga Province
-13-
Item
No
SECTION NO. 2
BILL NO. 6
CARPENTRY AND JOINERY NOTE :
Unless otherwise stated herein, all items in this bill shall be
deemed to fall into Work Group No.126 for CPAP formula
purposes SUPPLEMENTARY PREAMBLES
Particle board:
Particle board shall comply with the following specifications:
a) SABS 1300 Particle board: exterior and flooring type
b) SABS 1301 Particle board: interior type
Joinery:
Descriptions of frames shall be deemed to include frames,
transoms, mullions, rails, etc
Descriptions of hardwood joinery shall be deemed to include
pelleting of bolt holes
Fixing
Items described as "nailed" shall be deemed to be fixed with
hardened steel nails or shot pins to brickwork or concrete
Decorative laminate finish:
Laminate finish shall be glued under pressure. Edge strips
shall be butt jointed at junctions with adjacent similar finish ROOFS, ETC
Plate nailed timber roof truss construction
Carried Forward
Section No. 2
ECD Building
Bill No. 6
Carpentry and Joinery
Quantity Rate
R
Amount
Construction of Early Childhood Development Centre
Mpumalanga Province
-14-
1
2
3
4
5
6
7
Brought Forward
Sawn softwood
38 x 114mm Wall plates m
Design, manufacture and deliver on site, plate nailed roof truss
construction to Early Childwood Development Building, size
270m² overall on plan consisting of ten pitched trusses, each
truss 12 890 x 2000mm high overall with 600mm eaves
overhang projecting both sides, including all necessary purlins,
runners, bracing and cross bracing, hip rafters, jack trusses,
etc (wall plates measured elsewhere)
. No
Take delivery, temporary store, hoist in position and erect plate
nailed timber roof trusses, purlins, gangboarding, temporary
and permanent bracing, etc (measured on slope of roof) m2
Sundries
Two coats creosote on sawn timbers m2
EAVES , VERGES , ETC
PVC Fascia boards
9 x 225mm fascia boards including galvanised steel H-profile
jointing strips m DOORS, ETC
Wrought meranti doors hung to steel frames
Door 813 x 2 032 x 44mm Hardwood "Meranti" timber door
with horizontal slates. No
Hollow core Doors
762 x 1 882 x 44mm Hollow core flush panel door with
hardwood edging. No
Carried Forward
Section No. 2
ECD Building
Bill No. 6
Carpentry and Joinery
46
1
270
5
80
1
4
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-15-
8
9
10
Brought Forward
Semi-solid core doors
813 x 2032 x 44mm semi-solid core flush panel door with
hardwood edging. No
813 x 2032 x 44mm semi-solid core flush panel door with
hardwood edging with louver No
NOTICE BOARDS, KEYBOARDS, DUCKBOARDS, ETC
Softboard
Pinning boards 2100mm x 1200mm high x 12mmm softboard
in 44mm x 22mm rebated meranti surround all fixed to
plastered wall No
Carried Forward to Summary of Section No. 2
Section No. 2
ECD Building
Bill No. 6
Carpentry and Joinery
8
3
5
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-16-
Item
No
1
2
3
SECTION NO. 2
BILL NO. 7 CEILINGS, PARTITIONS AND ACCESS FLOORING
NOTE :
Unless otherwise stated herein, all items in this bill shall be
deemed to fall into Work Group No. 129 for CPAP formula
purposes SUPPLEMENTARY PREAMBLES
Descriptions:
Items described as "nailed" shall be deemed to be fixed with
hardened steel nails or pins or shot pinned to brickwork or
concrete
Items described as "plugged" shall be deemed to include
screwing to fibre, plastic or metal plugs at not exceeding
600mm centres, and where described as "bolted" the bolts
have been given elsewhere CEILINGS ETC
"Aerolite" insulation
75mm Insulation closely fitted and laid on top of
brandering between roof timbers etc m2
6,4mm "Rhino" gypsum plasterboard with H-type pressed
steel jointing strips
Ceilings including 38 x 38mm sawn softwood brandering at
400mm centres m2
2Extra over ceiling for 650 x 650mm trap door of 38 x 50mm
wrought softwood rebated framing with one 38 x 50mm
sawn softwood cross brander covered with ceiling board and
fitted flush in opening No
Carried Forward
Section No. 2
ECD Building
Bill No. 7
Ceilings, Partitions and Access Flooring
Quantity
270
270
3
Rate
R
Amount
Construction of Early Childhood Development Centre
Mpumalanga Province
-17-
4
Brought Forward
"Rhino" gypsum plasterboard cornices
75mm Coved cornices m
Carried Forward to Summary of Section No. 2
Section No. 2
ECD Building
Bill No. 7
Ceilings, Partitions and Access Flooring
254
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-18-
Item
No
1
SECTION NO. 2
BILL NO. 8
IRONMONGERY NOTE :
Unless otherwise stated herein, all items in this bill shall be
deemed to fall into Work Group No. 132 for CPAP formula
purposes SUPPLEMENTARY PREAMBLES
Finishes to ironmongery
Where applicable finishes to ironmongery are indicated by
suffixes in accordance with the following list:
BS Satin bronze lacquered
CH Chromium plated
SC Satin chromium plated
SE Silver enamelled
GE Grey enamelled
AS Anodised silver
AB Anodised bronze
AG Anodised gold
ABL Anodised black
PB Polished brass
PL Polished and lacquered
PT Epoxy coated
SD Sanded
NP Nickle plated
HINGES, BOLTS, ETC.
HINGES
"Dorma"
DBB-SS-009 102 x 75 x 3mm Stainless steel two ball bearing
butt hinge. No LOCKS
Carried Forward
Section No. 2
ECD Building
Bill No. 8
Ironmongery
Quantity
32
Rate
R
Amount
Construction of Early Childhood Development Centre
Mpumalanga Province
-19-
2
3
4
5
6
7
8
9
Brought Forward
"Union"
CZ682TL-73SC Gower lever furnature (LH) with bathroom turn
and emergency release No
2231 4R-76SS bathroom/wc lock case No
CZ682-24-61SC Gower 4-lever locksets No
HANDLES
"Dorma"
DPH213 350 x 32mm stainless steel "D" shaped straight
back-to-back pull handles. No
"Union"
CZ682T-73SC Gower bathroom lever furnature with bathroom
turn and emergency release No CATCHES, CABIN HOOKS, ETC
"Dorma"
150mm Chrome plated cabin hooks and eyes No
PUSH PLATES AND KICKING PLATES
"Dorma"
800 x 200 x 1,2mm type 304 stainless steel kick plate to
outside of door No BATHROOM FITTINGS
"Kimberley-Clark"
Kimberly-Clark Professional SQ3 lockable two toilet roll holder.
No
Carried Forward
Section No. 2
ECD Building
Bill No. 8
Ironmongery
6
6
11
2
6
1
1
6
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-20-
10
11
12
13
14
15
16
17
Brought Forward
Kimberly-Clark Professional series I twinpak Skincare soap
dispenser colour White (code: SA921950), overall size 184 x
110 x 264mm high, installed by Kimberly Clerk installation
team. No
"Chairman Industries"
32mm Type SR1 rear grab rail plugged No
32mm Type DL2 side grab rail plugged No
SUNDRIES
"Dorma"
Union CZ8731SC door stop No
WALL-MOUNTED WASTE BIN
"Franke"
Perforated waste container - BS610 No
TOWEL DISPENSER
"Franke"
Paper towel dispenser - BS600P No
SIGNAGE
All signage to be fixed with adequate heavy duty "no nails
double sided tape to top of door
70mm high white perspex with black vinyl letters. " Classroom"
persex length to be adjusted to accommodation room
designation. FONT TYPE: Bookman Old in capital letters. No
70mm high white perspex with black vinyl letters. "Paraplegic
Classroom" persex length to be adjusted to accommodation
room designation. FONT TYPE: Bookman Old in capital
letters. No
Carried Forward
Section No. 2
ECD Building
Bill No. 8
Ironmongery
4
1
1
16
4
4
3
1
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-21-
18
19
20
21
22
23
24
25
26
27
28
Brought Forward
70mm high white perspex with black vinyl letters. " Office "
persex length to be adjusted to accommodation room
designation. FONT TYPE: Bookman Old in capital letters. No
70mm high white perspex with black vinyl letters. " Store Room "
persex length to be adjusted to accommodation room designation.
FONT TYPE: Bookman Old in capital letters. No
70mm high white perspex with black vinyl letters. " Pantry "
persex length to be adjusted to accommodation room
designation. FONT TYPE: Bookman Old in capital letters. No
70mm high white perspex with black vinyl "Boys WC" persex
length to be adjusted to accommodation room designation.
FONT TYPE: Bookman Old in capital letters. No
70mm high white perspex with black vinyl "Girls WC" persex
length to be adjusted to accommodation room designation.
FONT TYPE: Bookman Old in capital letters. No
70mm high white perspex with black vinyl letters. " Sluice Room "
persex length to be adjusted to accommodation room designation.
FONT TYPE: Bookman Old in capital letters. No
70mm high white perspex with black vinyl letters. " Waiting Area "
persex length to be adjusted to accommodation room designation.
FONT TYPE: Bookman Old in capital letters. No
70mm high white perspex with black vinyl letters. " Motor
Activity Zone " persex length to be adjusted to accommodation
room designation. FONT TYPE: Bookman Old in capital
letters. No
70mm high white perspex with black vinyl letters. " Kitchen "
persex length to be adjusted to accommodation room
designation. FONT TYPE: Bookman Old in capital letters. No
"AL5066-06ASE06" 152 x 152mm anodised aluminium plate
with fire extinguisher symbol No
"AL5066-06ASE05" 152 x 152mm anodised aluminium plate
with fire hose reel symbol No
Carried Forward
Section No. 2
ECD Building
Bill No. 8
Ironmongery
1
1
1
2
2
1
1
1
1
2
1
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-22-
29
30
31
32
Brought Forward
"AL5066-06ASE15" 152 x 152mm anodised aluminium plate
with fire escape symbol No
"AL5066-06ASE14" 152 x 152mm anodised aluminium plate
with Fire Fighting Equipment No
Union AL5066-E14AS 150 x 150mm Disabled engraved
pictogram No
PINNING BOARDS, WRITING BOARDS, PROJECTION SCREENS, ETC
"Virtrex" virtreous enamelled writing boards, etc to SABS
CSK-36-1980
Green writing board 4 800 x 1 220mm high consisting of two
fixed panels each 2 400 x 1 220mm high complete with
aluminium chalk rail, etc, plugged No
Carried Forward to Summary of Section No. 2
Section No. 2
ECD Building
Bill No. 8
Ironmongery
10
13
1
4
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-23-
Item
No
1
2
3
SECTION NO. 2
BILL NO. 9
METALWORK NOTE :
Unless otherwise stated herein, all items in this bill shall be
deemed to fall into Work Group No. 136 for CPAP formula
purposes SUPPLEMENTARY PREAMBLES
Descriptions
Descriptions of bolts shall be deemed to include nuts and
washers
Descriptions of expansion anchors and bolts and chemical
anchors and bolts shall be deemed to include nuts, washers
and mortices in brickwork or concrete
Metalwork described as"holed for bolt(s)" shall be deemed to
exclude the bolts unless otherwise described PRESSED STEEL DOOR FRAMES
1,2 mm Thick double rebated door frames suitable for half
brick walls
Frame for door 813 x 2 032mm high No
Frame for door 813 x 2032mm high and fixed fanlight 305mm
high No
1,2 mm double rebate door frame suitable for one brick wall
Frame for door 813 x 2 032mm high No
ALUMINIUM WINDOWS, DOORS, ETC
WINDOWS
Carried Forward
Section No. 2
ECD Building
Bill No. 9
Metal Work
Quantity
13
1
2
Rate
R
Amount
Construction of Early Childhood Development Centre
Mpumalanga Province
-24-
4
5
6
7
8
9
10
11
12
13
14
Brought Forward
Purpose made Bronze anodized aluminium windows
factory fitted with aluminium alloy glazing beads suitable
for harsh marine climate
2400mm wide x 1500mm high (Type B) No
1800mm wide x 1200mm high (Type C) No
2128mm wide x 600mm high (Type D) No
740mm wide x 600mm high (Type E) No
1800mm wide x 900mm high (Type F) No
600mm wide x 600mm high (Type G) No
1800mm wide x 1200mm high (Type J) No
Purpose made Bronze anodized aluminium Double door
with side lights factory fitted with aluminium alloy glazing
beads suitable for harsh marine climate
3600mm wide x 2125mm high (Type A) No
9000mm wide x 2125mm high (Type H) No
3000mm wide x 1500mm high (Type K) No
ALUMINIUM LOUVRE PANELS
louvre panels screwed into timber doors
Panel 150 x 500mm high No
Carried Forward to Summary of Section No. 2
Section No. 2
ECD Building
Bill No. 9
Metal Work
4
1
1
1
1
2
1
4
1
1
3
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-25-
Item
No
1
2
3
4
SECTION NO. 2
BILL NO. 10
PLASTERING NOTE :
Unless otherwise stated herein, all items in this bill shall be
deemed to fall into Work Group No. 142 for CPAP formula
purposes. SCREEDS
1:4 Cement plaster screeds wood floated on concrete
25mm Thick on floors and landings m2
INTERNAL PLASTER
1 coat wood float plaster. 1 coat 2mm trowelled - on
"Pourpet" finish to concrete smooth finish for internal
purposes
On walls m2
On narrow widths m2
EXTERNAL PLASTER
1 coat wood float plaster. 1 coat 2mm trowelled - on
"Pourpet" finish to concrete smooth finish for internal
purposes
On walls m2
Carried Forward to Summary of Section No. 2
Section No. 2
ECD Building
Bill No. 10
Plastering
Quantity
270
569
11
24
Rate
R
Amount
Construction of Early Childhood Development Centre
Mpumalanga Province
-26-
Item
No
1
2
3
4
SECTION NO. 2
BILL NO. 11
TILING NOTE :
Unless otherwise stated herein, all items in this bill shall be
deemed to fall into Work Group No. 144 for CPAP formula
purposes. SUPPLEMENTARY PREAMBLES
Descriptions
Unless described as "fixed with adhesive to plaster (plaster
elsewhere)" descriptions of tiling on brick or concrete walls,
columns, etc shall be deemed to include 1:4 cement plaster
backing and descriptions of tiling on concrete floors etc shall
be deemed to include 1:3 plaster bedding WALL TILING
(PC Amount R120.00/m2) for wall tile size: 200 x 200 x
6mm thick tiles fixed with straight joint in both directions
adhesive to manufacturer
Internal walls m2
Fair exposed cutting and fitting around pipe not exceeding 110
mm internal diameter No FLOOR TILING
(PC Sum of R150 per m2) for Floor tiles size 300 x 300 x
10mm fixed to floors with straight joints in both directions
with the recommended ceresit Tylon adhesive (elsewhere)
and flush pointed with Ceresit Tylon
On floors and landings m2
100mm tile skirting m
Carried Forward to Summary of Section No. 2
Section No. 2
ECD Building
Bill No. 11
Tiling
Quantity
156
20
270
229
Rate
R
Amount
Construction of Early Childhood Development Centre
Mpumalanga Province
-27-
Item
No
SECTION NO. 2
BILL NO. 12
PLUMBING AND DRAINAGE (PROVISIONAL) NOTE :
Unless otherwise stated herein, all items in this bill shall be
deemed to fall into Work Group No. 146 for CPAP formula
purposes. SUPPLEMENTARY PREAMBLES
"Polycop" polypropylene pipes:
Polypropylene pipes 54mm diameter and under shall be
seamless copper coloured class 16 pipes jointed with
"Fast-fuse" heat welded thermoplastic or brass compression
fittings as designed for use with copper pipes as stated
Pipes shall be firmly fixed to walls etc with coloured nylon
snap-in pipe clips with provision for accommodating thermal
movement and jointed and fixed strictly in accordance with the
manufacturer's instructions
All pipe diameters are nominal external
Concrete pipes:
Pipes shall be jointed with ogee joints with rubber collars or
socket and spigot joints with rubber rings
uPVC pipes and fittings:
Soil, waste and vent pipes and fittings shall be solvent weld
jointed
uPVC pressure pipes and fittings:
Pipes for water supply shall be of the class stated
Pipes of 40mm diameter and smaller shall be plain ended with
solvent welded uPVC loose sockets and fittings
Carried Forward
Section No. 2
ECD Building
Bill No. 12
Plumbing and Drainage (Provisional)
Quantity Rate
R
Amount
Construction of Early Childhood Development Centre
Mpumalanga Province
-28-
Brought Forward
Pipes of 50mm diameter and greater shall have sockets and
spigots with push in type integral rubber ring joints. Bends
shall be uPVC and all other fittings shall be cast iron, all with
similar push-in type joints
Copper pipes:
Pipes shall be hard drawn and half-hard pipes of the class
stated. Class 0 (thin walled hard drawn) pipes shall not be
bent. Class 1 (thin walled half-hard), class 2 (half-hard) and
class 3 (heavy walled half-hard) pipes shall only be bent with
benders with inner and outer formers. Fittings to copper
waste, vent and anti-syphon pipes, capillary solder fittings and
compression fittings shall be "Cobra Watertech" type.
Capillary solder fittings shall comply with ISO 2016. Only
compression fittings shall be used in walls or in ground
Fixing of pipes
Unless specifically otherwise stated, descriptions of pipes shall
be deemed to include fixing to walls etc, casting in, building in
or suspending not exceeding 1m below suspension level
Reducing fittings
Where fittings have reducing ends or branches they are
described as "reducing". In the case of pipes with diameters
not exceeding 60mm only the largest end or branch size is
given. Should the contractor wish to use other fittings and
bushes or reducers he may do so on the understanding that no
claim in this regard will be entertained. In the case of pipes
with diameters exceeding 60mm all sizes are given and no
claim for extra bushes, reducers, etc will be entertained
Wire gratings
Descriptions of gutter outlets etc shall be deemed to include
wire balloon gratings
Carried Forward
Section No. 2
ECD Building
Bill No. 12
Plumbing and Drainage (Provisional)
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-29-
Brought Forward
Exposed concrete surfaces
Exposed surfaces of concrete stormwater channels, cover
slabs, inspection eye marker slabs, gulley tops, cleaning eye
tops, catchpits, inspection chambers, etc shall be finished
smooth with plaster
Excavations
No claim for rock excavation will be entertained unless the
contractor has timeously notified the quantity surveyor thereof
prior to backfilling
"Soft rock" and "hard rock" shall be as defined in "Earthworks"
Laying, backfilling, bedding, etc. of pipes
Pipes shall be laid and bedded and trenches shall be carefully
backfilled in accordance with manufacturers' instructions
Where no manufacturers' instructions exist pipes shall be laid
in accordance with clauses 5.1 and 5.2 of each of the
following:
SABS 1200 L : Medium-pressure pipelines
LD : Sewers
LE : Stormwater drainage
Pipe trenches etc shall be backfilled in accordance with
clauses 3, 5.5, 5.6, 5.7 and 7 of SABS 1200
DB : Earthworks (Pipe trenches)
Pipes shall be bedded in accordance with clauses 3.1 to 3.4.1,
5.1 to 5.3 and 7 of SABS 1200
LB : Bedding (Pipes).
Unless otherwise described bedding of rigid pipes shall be
class B bedding
Flush pans
Flush pans shall have straight or side outlets and "P" or "S"
traps as necessary
Carried Forward
Section No. 2
ECD Building
Bill No. 12
Plumbing and Drainage (Provisional)
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-30-
1
2
3
4
5
6
7
Brought Forward
Stainless steel basins, sinks, wash troughs, urinals, etc.
Units shall have standard aprons on all exposed edges and
tiling keys against walls where applicable
Waste unions
Descriptions of waste unions shall be deemed to include
rubber or vulcanite plugs and chains fixed to fittings (CPAP FORMULA WORK GROUP 148)
RAINWATER DISPOSAL
0,8mm Seamless Aluminium OGEE gutters and rainwater
pipes with baked enamel finish
150 x 125mm gutters m
100 x 75mm Diameter rainwater pipes No
Extra over gutter for outlet for 75mm pipe No
Extra over rainwater pipe for shoe No
SANITARY FITTINGS
"Vaal"
"Vaal" Hibiscus Basin Product code: 7023 with two semi
punched tapholes, intergreted overflow and chainstay hole thru
the centre semi-punched taphole. No
'Vaal Hibiscus basin' Product code 7023 with 1 x 12mm C.P.
lever action taps and 32mm C.P lagged bottle trap, waste
outlet plug and chain. nb: cold water tap must be closed to
toilet. nb: NO PEDESTAL No
"Vaal Pearl Paraplegic Semi Close Couple Suite" product
code: 73005C supplied with purpose made C.P side flush lever
(right) and purpose made urea seat and cover plate No
Carried Forward
Section No. 2
ECD Building
Bill No. 12
Plumbing and Drainage (Provisional)
48
4
4
4
4
1
1
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-31-
8
9
10
11
12
13
14
15
16
17
Brought Forward
'VAAL' JUNIOR 104 LOW LEVEL SUITE Product code:
751358 and matching 6 litre cistern, Product code: 712034
(03No.) No
'VAAL' flatback wall hung bowl urinal Product code: 705326
(03No.) No
"VAAL" Hibiscus Close Coupled Suite Product code: 772654 No
"FRANKE"
'Franke' model. Quinline - QLX611 satin 900L x 500W Product
code: 820000 No
'Franke' model. CH SLOP HOPPER 540 X 540MM Product
code - 351350 with "Cobra" model FM.100-35mm water supply
flush valve No TRAPS, ETC
"Marley"
32 x 50mm Deep seal "P" or "S" trap No
"Cobra Watertech"
32mm C.P. lagged bottle traps No
TAPS, VALVES, ETC
Brass
22mm Stopcock No
"Cobra Watertech"
"COBRA" Xena Pillar taps code XE-214-15 No
Chrome plated cobra watertech NOKA Bath/shower diverter mixer
NA-961 complete with overflow, elbows, and rail with adjustable
holder. No
Carried Forward
Section No. 2
ECD Building
Bill No. 12
Plumbing and Drainage (Provisional)
4
1
1
1
1
2
5
10
10
1
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-32-
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
Brought Forward
"Cobra" Tap - "Selene" SE 970 single lever with aerated swivel
outlet BSP female inlet No
PB1.10RB vacuum breaker No
PA1.1RB "Kwikflo" 400 kPa pressure reducing valve No
SANITARY PLUMBING
uPVC pipes
50mm Pipes m
110mm Pipes m
Extra over uPVC pipes for fittings
110mm Reducer No
50mm Bend No
50mm Junction No
110mm Pan connector No
50mm Access bend No
110mm Access bend No
50mm Access junction No
110mm Access bend with anti-syphon horn No
50mm "GI Two-way" vent valve No
Sundries
Testing waste pipe system
WATER SUPPLIES
Carried Forward
Section No. 2
ECD Building
Bill No. 12
Plumbing and Drainage (Provisional)
1
1
1
100
150
4
5
10
5
10
5
5
5
5
Item
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-33-
33
34
35
36
37
38
39
40
41
42
43
Brought Forward
Class 0 copper pipes
15mm Pipes m
15mm Pipes chased into brick walls m
22mm Pipes m
22mm Pipes chased into brick walls m
28mm Pipes chased into brick walls m
Extra over class 0 copper pipes for capillary fittings
15mm Fittings No
22mm Fittings No
28mm Fittings No
Copper overflow and service pipes
15mm Service pipe 500mm girth No
SOLAR WATER HEATING SYSTEM
"Kwikot"
100 Litre Kwikot 600i Dual electric water heater slimline 100
litres 990 x 480mm Geyser. Installed in ceiling. NB All hot
water services to be clad with insulation with min. R-valve 1. No TESTING
Testing water pipe system
FIRE APPLIANCES ETC
Carried Forward
Section No. 2
ECD Building
Bill No. 12
Plumbing and Drainage (Provisional)
80
140
90
150
50
45
50
10
1
1
Item
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-34-
44
45
46
47
48
49
Brought Forward
"Chubb"
Approved hose reel complete with 30m long and 20mm dia
rubber hose, chromium plated stopcock, shut-off nozzle and
wall bracket fixed to wall No
4,5kg Carbon dioxide fire extinguisher complete with 520 x 115
x 22mm thick timber backboard plugged to wall and varnished No WATER SUPPLIES TO FIRE APPLIANCES
Galvanized steel pipes
25mm Pipes m
Extra over galvanized steel pipes for steel fittings
25mm Fitting No
25mm Non-return valve No
CONNECTION
Allow a PC amount of R20,000 for sewer and water
connenction.
Carried Forward to Summary of Section No. 2
Section No. 2
ECD Building
Bill No. 12
Plumbing and Drainage (Provisional)
1
2
10
3
1
Item
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-35-
Item
No
1
SECTION NO. 2
BILL NO. 13
GLAZING NOTE :
Unless otherwise stated herein, all items in this bill shall be
deemed to fall into Work Group No. 150 for CPAP formula
purposes TOPS, SHELVES, DOORS, MIRRORS, ETC
6mm Silvered float glass copper backed mirrors with
polished edges holed for and fixed with chromium plated
dome capped mirror screws with rubber buffers to plugs
in brickwork or concrete
400 x 900 x 4mm "GG" quality polished glass mirror: Fixed to
wall with vertical strips of double sided adhesive tape. One
mirror per wash hand basin. No
Carried Forward to Summary of Section No. 2
Section No. 2
ECD Building
Bill No. 13
Glazing
Quantity
4
Rate
R
Amount
Construction of Early Childhood Development Centre
Mpumalanga Province
-36-
Item
No
1
2
3
4
5
SECTION NO. 2
BILL NO. 14
PAINTWORK NOTE :
Unless otherwise stated herein, all items in this bill shall be
deemed to fall into Work Group No. 152 for CPAP formula
purposes ON FLOATED PLASTER
Prime with One coat Plascon Plaster Primer and two coats
Plascon Plaster Primer on walls.
On internal walls m2
Prime with One coat Plascon Plaster Primer and two coats
Plascon Plaster Primer on walls.
On external walls m2
ON PLASTERBOARD
Prime with one coat Professional Plaster Primer and two
coats Professional Evaluation Acrylic
On Gypsum Ceilings and Cornices m2
One coat primer and two coats exterior quality PVA
emulsion paint
On fascias and bargeboards m2
ON METAL
Spot priming defects in pre primed surfaces with zinc
chromate primer and applying one undercoat and two
coat high gloss enamel paint on steel
On doors frames m2
Carried Forward
Section No. 2
ECD Building
Bill No. 14
Paintwork
Quantity
580
24
270
32
13
Rate
R
Amount
Construction of Early Childhood Development Centre
Mpumalanga Province
-37-
6
7
Brought Forward
ON WOOD
Spot priming defects in pre primed surfaces with wood
primer and applying one undercoat and two coat high
gloss enamel paint on steel
On doors m2
Three coats polyurethane semi-gloss varnish
On doors m2
Carried Forward to Summary of Section No. 2
Section No. 2
ECD Building
Bill No. 14
Paintwork
49
3
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-38-
Bill
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Section No. 2
ECD Building
SECTION SUMMARY - ECD Building
Earthworks (Provisional)
Concrete, Formwork and Reinforcement
Masonry
Waterproofing
Roof Covering
Carpentry and Joinery
Ceilings, Partitions and Access Flooring
Ironmongery
Metal Work
Plastering
Tiling
Plumbing and Drainage (Provisional)
Glazing
Paintwork
Carried to Final Summary
Section No. 2
ECD Building
Page
No
-5-
-8-
-10-
-11-
-12-
-15-
-17-
-22-
-24-
-25-
-26-
-34-
-35-
-37-
Amount
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-39-
Item
No
1
2
3
SECTION NO. 3
BILL NO. 1
EARTHWORKS (PROVISIONAL) NOTE :
Unless otherwise stated herein, all items in this bill shall be
deemed to fall into Work Group No. 104 for CPAP formula
purposes SUPPLEMENTARY PREAMBLES
Nature of ground
The nature of the ground is assumed to be loose sandy
material, therefore "earth", but possibly interspersed with "hard
rock" or "soft rock"
Carting away of excavated material
Descriptions of carting away of excavated material shall be
deemed to include loading excavated material onto trucks
directly from the excavations or, alternatively, from stock piles
situated on the building site SITE CLEARANCE ETC
EXCAVATION, FILLING, ETC
Excavation in earth not exceeding 2m deep
Trenches m3
Extra over trench and hole excavations in earth for
excavation in
Soft rock m3
Hard rock m3
Carried Forward
Section No. 3
Guard House
Bill No. 1
Earthworks (Provisional)
Quantity
11
1
1
Rate
R
Amount
Construction of Early Childhood Development Centre
Mpumalanga Province
-40-
4
5
6
7
8
9
10
11
Brought Forward
Extra over all excavations for carting away
Surplus material from excavations and/or stock piles on site to
a dumping site to be located by the contractor m3
Risk of collapse of excavations
Sides of trench and hole excavations not exceeding 1,5m deep
m2
Keeping excavations free of water
Keeping excavations free of all water other than subterranean
water
Earth filling obtained from the excavations and/or
prescribed stock piles on site compacted to 93% Mod
AASHTO density
Backfilling to trenches, holes, etc m3
Under floors, steps, pavings, etc m3
G5 filling supplied by the contractor compacted to 93%
Mod AASHTO density
Under floors, steps, pavings, etc m3
Coarse river sand filling supplied by the contractor
Sandbed m3
Compaction of surfaces
Compaction of ground surface under floors etc including
scarifying for a depth of 100mm, breaking down oversize
material, adding suitable material where necessary and
compacting to 93% Mod AASHTO density m2 SOIL POISONING
Carried Forward
Section No. 3
Guard House
Bill No. 1
Earthworks (Provisional)
5
36
Item
5
5
5
1
15
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-41-
12
13
14
15
16
17
18
19
Brought Forward
Soil insectiside
Under floors etc including forming and poisoning shallow
furrows against foundation walls etc, filling in furrows and
ramming m2
To bottoms and sides of trenches m2
UNREINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES
15MPa/19mm concrete
Blindings m3
REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES
25MPa/19mm concrete
Strip footings m3
Mild steel reinforcement to structural concrete work
8mm Diameter bars t
High tensile steel reinforcement to structural concrete
work:
10mm Diameter bars t
BRICKWORK NFX clay face bricks pointed with flush horizontal and
vertical joints
Half brick walls m2
One brick walls m2
Carried Forward
Section No. 3
Guard House
Bill No. 1
Earthworks (Provisional)
15
46
1
3
0,23
0,23
2
11
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-42-
20
21
Brought Forward
Brickwork reinforcement
75mm Wide reinforcement built in horizontally m
150mm Wide reinforcement built in horizontally m
Carried Forward to Summary of Section No. 3
Section No. 3
Guard House
Bill No. 1
Earthworks (Provisional)
24
129
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-43-
Item
No
SECTION NO. 3
BILL NO. 2 CONCRETE, FORMWORK AND REINFORCEMENT
NOTE :
Unless otherwise stated herein, all items in this bill shall be
deemed to fall into Work Group No. 110 for CPAP formula
purposes SUPPLEMENTARY PREAMBLES
Cost of tests
The costs of making, storing and testing of concrete test cubes
as required under clause 7 "Tests" of SABS 1200 G shall
include the cost of providing cube moulds necessary for the
purpose, for testing costs and for submitting reports on the
tests to the Principal Agent. The testing shall be undertaken
by an independent firm or institution nominated by the
contractor to the approval of the Principal Agent. (Test cubes
are measured separately)
Formwork
Description of formwork shall be deemed to include use and
waste only (except where described as "left in" or
"permanent"), for fitting together in the required forms,
wedging, plumbing and fixing to true angles and surfaces as
necessary to ensure easy release during stripping and for
reconditioning as necessary before re-use
The vertical strutting shall be carried down to such construction
as is sufficiently strong to afford the required support without
damage and shall remain in position until the newly
constructed work is able to support itself.
Formworks to soffits of solid etc shall be deemed to be slabs
not exceeding 250mm thick unless otherwise described
Carried Forward
Section No. 3
Guard House
Bill No. 2
Concrete, Formwork and Reinforcement
Quantity Rate
R
Amount
Construction of Early Childhood Development Centre
Mpumalanga Province
-44-
1
2
3
4
5
Brought Forward
Formwork to sides of bases, pile caps, ground beams, etc will
only be measured where it is prescribed by the engineer for
design reasons. Formwork necessitated by irregularity or
collapse of excavated faces will not be measured and the cost
thereof shall be deemed to be included in the allowance for
taking the risk of collapse of the sides of the excavations,
provision for which is made in "Earthworks" UNREINFORCED CONCRETE
15MPa/19mm concrete
Aprons cast in panels m3
REINFORCED CONCRETE
25MPa/19mm concrete
Surface beds on waterproofing m3
CONCRETE SUNDRIES
Finishing top surface of concrete smooth with a wood
float.
Surface beds, slabs, etc. m2
(CPAP FORMULA WORK GROUP NO. 114)
Fabric reinforcement
Type 193 fabric reinforcement in concrete surface beds, slabs,
etc. m2 MOVEMENT JOINTS ETC
Expansion joints with Bitumen impregnated softboard
between vertical concrete and brick surfaces
15mm Joints not exceeding 300mm high m
Carried Forward
Section No. 3
Guard House
Bill No. 2
Concrete, Formwork and Reinforcement
2
2
15
15
19
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-45-
6
Brought Forward
TEST BLOCKS
Making and testing 150 x 150 x 150mm concrete strength test
cube (Provisional) No
Carried Forward to Summary of Section No. 3
Section No. 3
Guard House
Bill No. 2
Concrete, Formwork and Reinforcement
2
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-46-
Item
No
1
2
3
SECTION NO. 3
BILL NO. 3
MASONRY NOTE :
Unless otherwise stated herein, all items in this bill shall be
deemed to fall into Work Group No. 116 for CPAP formula
purposes SUPPLEMENTARY PREAMBLES
BRICKWORK
Sizes in descriptions
Where sizes in descriptions are given in brick units, "one brick"
shall represent the length and "half brick" the width of a brick
Face bricks
Bricks shall be ordered timeously to obtain uniformity in size
and colour
Pointing
Descriptions of recessed pointing to fair face brickwork and
face brickwork shall be deemed to include square recessed,
hollow recessed, weathered pointing, etc. SUPERSTRUCTURE
Brickwork of NFP bricks in class II mortar
115mm Half brick walls m2
115mm Half brick walls in beamfilling m2
230mm One brick walls m2
Carried Forward
Section No. 3
Guard House
Bill No. 3
Masonry
Quantity
7
3
46
Rate
R
Amount
Construction of Early Childhood Development Centre
Mpumalanga Province
-47-
4
5
6
7
8
9
10
11
Brought Forward
Corobrick "Firelight Travertine FBX" Face bricks pointed
with flush horizontal and vertical joints
Extra over for face brick work m2
Brick-on-edge header course copings, sills, etc of clay
face bricks pointed with recessed joints on all exposed
faces
Brickwork for brick-on-edge header course 150mm wide sill
projected at 45 degrees m
Brickwork for brick-on-edge header lintel m
BRICKWORK SUNDRIES
Air bricks etc
229 x 76mm Clay vermin proof air brick No
Brickwork reinforcement
75mm Wide reinforcement built in horizontally m
150mm Wide reinforcement built in horizontally m
Prestressed fabricated lintels
110 x 75mm Lintels in lengths not exceeding 3m m
Galvanised hoop iron cramps, ties, etc
30 x 1,6mm Roof tie 1,5m long with one end fixed to timber
and other end built into brickwork No
Carried Forward to Summary of Section No. 3
Section No. 3
Guard House
Bill No. 3
Masonry
48
7
9
2
20
121
20
20
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-48-
Item
No
1
2
3
4
SECTION NO. 3
BILL NO. 4
WATERPROOFING NOTE :
Unless otherwise stated herein, all items in this bill shall be
deemed to fall into Work Group No. 120 for CPAP formula
purposes DAMP-PROOFING OF WALLS AND FLOORS
One layer of 375 micron "Consol Plastics Brikgrip DPC"
embossed damp proof course
150mm thick half brick walls m2
220mm thick in one brick walls m2
One layer of 250 micron "Consol Plastics Gunplas USB
Green" waterproof sheeting sealed at laps with "Gunplas
Pressure Sensitive Tape"
Under surface beds m2
JOINT SEALANTS, ETC
"Denbraven LM15" polysulphide sealing compound
including backing cord, bond breaker, primer, etc
10 x 10mm expansion joints in floors m
Carried Forward to Summary of Section No. 3
Section No. 3
Guard House
Bill No. 4
Waterproofing
Quantity
0,3
4
12
19
Rate
R
Amount
Construction of Early Childhood Development Centre
Mpumalanga Province
-49-
Item
No
1
2
3
SECTION NO. 3
BILL NO. 5
ROOF COVERINGS ETC NOTE :
Unless otherwise stated herein, all items in this bill shall be
deemed to fall into Work Group No. 124 for CPAP formula
purposes PROFILED METAL SHEETING AND ACCESSORIES
SAFLOK 700 Roofing Sheets (Green) Laid at 17 Degree
pitch on 38 x 76mm SAP Battens at 1200mm Centres Max
on Timber trusses:
Roof covering with pitch exceeding 25 degrees and not
exceeding but 30 degrees m2
300mm wide ridge capping m
ROOF AND WALL INSULATION
"Sisalation 410" housing grade glass fibre reinforced
aluminium foil bonded insulation
Insulation laid taut over rafters (at approximately 1 200mm
centres) and fixed concurrent with battens, purlins, etc m2
Carried Forward to Summary of Section No. 3
Section No. 3
Guard House
Bill No. 5
Roof Covering
Quantity
37
16
15
Rate
R
Amount
Construction of Early Childhood Development Centre
Mpumalanga Province
-50-
Item
No
SECTION NO. 3
BILL NO. 6
CARPENTRY AND JOINERY NOTE :
Unless otherwise stated herein, all items in this bill shall be
deemed to fall into Work Group No.126 for CPAP formula
purposes SUPPLEMENTARY PREAMBLES
Particle board:
Particle board shall comply with the following specifications:
a) SABS 1300 Particle board: exterior and flooring type
b) SABS 1301 Particle board: interior type
Joinery:
Descriptions of frames shall be deemed to include frames,
transoms, mullions, rails, etc
Descriptions of hardwood joinery shall be deemed to include
pelleting of bolt holes
Fixing
Items described as "nailed" shall be deemed to be fixed with
hardened steel nails or shot pins to brickwork or concrete
Decorative laminate finish:
Laminate finish shall be glued under pressure. Edge strips
shall be butt jointed at junctions with adjacent similar finish ROOFS, ETC
Plate nailed timber roof truss construction
Carried Forward
Section No. 3
Guard House
Bill No. 6
Carpentry and Joinery
Quantity Rate
R
Amount
Construction of Early Childhood Development Centre
Mpumalanga Province
-51-
1
2
3
4
5
6
Brought Forward
Sawn softwood
38 x 114mm Wall plates m
Design, manufacture and deliver on site, plate nailed roof truss
construction to Early Childwood Development Building, size
37m² overall on plan consisting of ten pitched trusses, each
truss 2500 x 500mm high overall with 600mm eaves overhang
projecting both sides, including all necessary purlins, runners,
bracing and cross bracing, hip rafters, jack trusses, etc (wall
plates measured elsewhere)
. No
Take delivery, temporary store, hoist in position and erect plate
nailed timber roof trusses, purlins, gangboarding, temporary
and permanent bracing, etc (measured on slope of roof) m2
Sundries
Two coats creosote on sawn timbers m2
EAVES , VERGES , ETC
PVC Fascia boards
9 x 225mm fascia boards including galvanised steel H-profile
jointing strips m DOORS, ETC
Wrought meranti doors hung to steel frames
Door 813 x 2 032 x 44mm Hardwood "Meranti" timber door
with horizontal slates. No
Carried Forward to Summary of Section No. 3
Section No. 3
Guard House
Bill No. 6
Carpentry and Joinery
15
1
37
1
24
2
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-52-
Item
No
1
2
3
SECTION NO. 3
BILL NO. 7 CEILINGS, PARTITIONS AND ACCESS FLOORING
NOTE :
Unless otherwise stated herein, all items in this bill shall be
deemed to fall into Work Group No. 129 for CPAP formula
purposes SUPPLEMENTARY PREAMBLES
Descriptions:
Items described as "nailed" shall be deemed to be fixed with
hardened steel nails or pins or shot pinned to brickwork or
concrete
Items described as "plugged" shall be deemed to include
screwing to fibre, plastic or metal plugs at not exceeding
600mm centres, and where described as "bolted" the bolts
have been given elsewhere CEILINGS ETC
"Aerolite" insulation
75mm Insulation closely fitted and laid on top of
brandering between roof timbers etc m2
6,4mm "Rhino" gypsum plasterboard with H-type pressed
steel jointing strips
Ceilings including 38 x 38mm sawn softwood brandering at
400mm centres m2
2Extra over ceiling for 650 x 650mm trap door of 38 x 50mm
wrought softwood rebated framing with one 38 x 50mm
sawn softwood cross brander covered with ceiling board and
fitted flush in opening No
Carried Forward
Section No. 3
Guard House
Bill No. 7
Ceilings, Partitions and Access Flooring
Quantity
12
12
1
Rate
R
Amount
Construction of Early Childhood Development Centre
Mpumalanga Province
-53-
4
Brought Forward
"Rhino" gypsum plasterboard cornices
75mm Coved cornices m
Carried Forward to Summary of Section No. 3
Section No. 3
Guard House
Bill No. 7
Ceilings, Partitions and Access Flooring
19
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-54-
Item
No
1
SECTION NO. 3
BILL NO. 8
IRONMONGERY NOTE :
Unless otherwise stated herein, all items in this bill shall be
deemed to fall into Work Group No. 132 for CPAP formula
purposes SUPPLEMENTARY PREAMBLES
Finishes to ironmongery
Where applicable finishes to ironmongery are indicated by
suffixes in accordance with the following list:
BS Satin bronze lacquered
CH Chromium plated
SC Satin chromium plated
SE Silver enamelled
GE Grey enamelled
AS Anodised silver
AB Anodised bronze
AG Anodised gold
ABL Anodised black
PB Polished brass
PL Polished and lacquered
PT Epoxy coated
SD Sanded
NP Nickle plated
HINGES, BOLTS, ETC.
HINGES
"Dorma"
DBB-SS-009 102 x 75 x 3mm Stainless steel two ball bearing
butt hinge. No
Carried Forward
Section No. 3
Guard House
Bill No. 8
Ironmongery
Quantity
4
Rate
R
Amount
Construction of Early Childhood Development Centre
Mpumalanga Province
-55-
2
3
4
5
6
7
8
Brought Forward
"Union"
CZ682-24-61SC Gower 4-lever locksets No
HANDLES
"Dorma"
DPH213 350 x 32mm stainless steel "D" shaped straight
back-to-back pull handles. No CATCHES, CABIN HOOKS, ETC
"Dorma"
150mm Chrome plated cabin hooks and eyes No
AL8722AS Rubber buffer hat and coat hook / door stop No
BATHROOM FITTINGS
"Kimberley-Clark"
Kimberly-Clark Professional SQ3 toilet tissue dispenser colour
White (code: SA405607), overall size 130 x 135 x 360mm
high, installed by Kimberly-Clark installation team. No
Kimberly-Clark Professional series I twinpak Skincare soap
dispenser colour White (code: SA921950), overall size 184 x
110 x 264mm high, installed by Kimberly Clerk installation
team. No WALL-MOUNTED WASTE BIN
334 x 258 x 635mm high Kimberly Clark Professional Reflex
Disposal Wall Mounted Waste Bin (colour: WHITE-code:
SA426213). Installation by a Kimberly Clark team. No SIGNAGE
Carried Forward
Section No. 3
Guard House
Bill No. 8
Ironmongery
2
2
2
2
1
1
1
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-56-
9
10
11
12
Brought Forward
All signage to be fixed with adequate heavy duty "no nails
double sided tape to top of door
70mm high white perspex with black vinyl "WC" persex length
to be adjusted to accommodation room designation. FONT
TYPE: Bookman Old in capital letters. No
70mm high white perspex with black vinyl letters. " Guard House "
persex length to be adjusted to accommodation room designation.
FONT TYPE: Bookman Old in capital letters. No
"AL5066-06ASE06" 152 x 152mm anodised aluminium plate
with fire extinguisher symbol No
"AL5066-06ASE05" 152 x 152mm anodised aluminium plate
with fire hose reel symbol No
Carried Forward to Summary of Section No. 3
Section No. 3
Guard House
Bill No. 8
Ironmongery
1
1
1
1
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-57-
Item
No
1
2
3
SECTION NO. 3
BILL NO. 9
METALWORK NOTE :
Unless otherwise stated herein, all items in this bill shall be
deemed to fall into Work Group No. 136 for CPAP formula
purposes SUPPLEMENTARY PREAMBLES
Descriptions
Descriptions of bolts shall be deemed to include nuts and
washers
Descriptions of expansion anchors and bolts and chemical
anchors and bolts shall be deemed to include nuts, washers
and mortices in brickwork or concrete
Metalwork described as"holed for bolt(s)" shall be deemed to
exclude the bolts unless otherwise described
PRESSED STEEL DOOR FRAMES
1,2 mm double rebate door frame suitable for one brick wall
Frame for door 813 x 2 032mm high No
ALUMINIUM WINDOWS, DOORS, ETC
WINDOWS
Purpose made Bronze anodized aluminium windows
factory fitted with aluminium alloy glazing beads suitable
for harsh marine climate
600mm wide x 600mm high No
1800mm wide x 1200mm high No
Carried Forward
Section No. 3
Guard House
Bill No. 9
Metal Work
Quantity
2
1
1
Rate
R
Amount
Construction of Early Childhood Development Centre
Mpumalanga Province
-58-
Brought Forward R
4 1200mm wide x 900mm high No 1
Section No. 3
Guard House
Bill No.9
Metal Work
Carried Forward to Summary of Section No. 3 R
Construction of Early Childhood Development Centre
Mpumalanga Province
-59-
Item
No
1
2
3
SECTION NO. 3
BILL NO. 10
PLASTERING NOTE :
Unless otherwise stated herein, all items in this bill shall be
deemed to fall into Work Group No. 142 for CPAP formula
purposes. SCREEDS
1:4 Cement plaster screeds wood floated on concrete
25mm Thick on floors and landings m2
INTERNAL PLASTER
1 coat wood float plaster. 1 coat 2mm trowelled - on
"Pourpet" finish to concrete smooth finish for internal
purposes
On walls m2
On narrow widths m2
Carried Forward to Summary of Section No. 3
Section No. 3
Guard House
Bill No. 10
Plastering
Quantity
12
54
1
Rate
R
Amount
Construction of Early Childhood Development Centre
Mpumalanga Province
-60-
Item
No
1
2
3
SECTION NO. 3
BILL NO. 11
TILING NOTE :
Unless otherwise stated herein, all items in this bill shall be
deemed to fall into Work Group No. 144 for CPAP formula
purposes. SUPPLEMENTARY PREAMBLES
Descriptions
Unless described as "fixed with adhesive to plaster (plaster
elsewhere)" descriptions of tiling on brick or concrete walls,
columns, etc shall be deemed to include 1:4 cement plaster
backing and descriptions of tiling on concrete floors etc shall
be deemed to include 1:3 plaster bedding WALL TILING
(PC Amount R120.00/m2) for wall tile size: 200 x 200 x
6mm thick tiles fixed with straight joint in both directions
adhesive to manufacturer
Internal walls m2
FLOOR TILING
(PC Sum of R150 per m2) for Floor tiles size 300 x 300 x
10mm fixed to floors with straight joints in both directions
with the recommended ceresit Tylon adhesive (elsewhere)
and flush pointed with Ceresit Tylon
On floors and landings m2
100mm skirting m
Carried Forward to Summary of Section No. 3
Section No. 3
Guard House
Bill No. 11
Tiling
Quantity
1
12
18
Rate
R
Amount
Construction of Early Childhood Development Centre
Mpumalanga Province
-61-
Item
No
SECTION NO. 3
BILL NO. 12
PLUMBING AND DRAINAGE (PROVISIONAL) NOTE :
Unless otherwise stated herein, all items in this bill shall be
deemed to fall into Work Group No. 146 for CPAP formula
purposes. SUPPLEMENTARY PREAMBLES
"Polycop" polypropylene pipes:
Polypropylene pipes 54mm diameter and under shall be
seamless copper coloured class 16 pipes jointed with
"Fast-fuse" heat welded thermoplastic or brass compression
fittings as designed for use with copper pipes as stated
Pipes shall be firmly fixed to walls etc with coloured nylon
snap-in pipe clips with provision for accommodating thermal
movement and jointed and fixed strictly in accordance with the
manufacturer's instructions
All pipe diameters are nominal external
Concrete pipes:
Pipes shall be jointed with ogee joints with rubber collars or
socket and spigot joints with rubber rings
uPVC pipes and fittings:
Soil, waste and vent pipes and fittings shall be solvent weld
jointed
uPVC pressure pipes and fittings:
Pipes for water supply shall be of the class stated
Pipes of 40mm diameter and smaller shall be plain ended with
solvent welded uPVC loose sockets and fittings
Carried Forward
Section No. 3
Guard House
Bill No. 12
Plumbing and Drainage (Provisional)
Quantity Rate
R
Amount
Construction of Early Childhood Development Centre
Mpumalanga Province
-62-
Brought Forward
Pipes of 50mm diameter and greater shall have sockets and
spigots with push in type integral rubber ring joints. Bends
shall be uPVC and all other fittings shall be cast iron, all with
similar push-in type joints
Copper pipes:
Pipes shall be hard drawn and half-hard pipes of the class
stated. Class 0 (thin walled hard drawn) pipes shall not be
bent. Class 1 (thin walled half-hard), class 2 (half-hard) and
class 3 (heavy walled half-hard) pipes shall only be bent with
benders with inner and outer formers. Fittings to copper
waste, vent and anti-syphon pipes, capillary solder fittings and
compression fittings shall be "Cobra Watertech" type.
Capillary solder fittings shall comply with ISO 2016. Only
compression fittings shall be used in walls or in ground
Fixing of pipes
Unless specifically otherwise stated, descriptions of pipes shall
be deemed to include fixing to walls etc, casting in, building in
or suspending not exceeding 1m below suspension level
Reducing fittings
Where fittings have reducing ends or branches they are
described as "reducing". In the case of pipes with diameters
not exceeding 60mm only the largest end or branch size is
given. Should the contractor wish to use other fittings and
bushes or reducers he may do so on the understanding that no
claim in this regard will be entertained. In the case of pipes
with diameters exceeding 60mm all sizes are given and no
claim for extra bushes, reducers, etc will be entertained
Wire gratings
Descriptions of gutter outlets etc shall be deemed to include
wire balloon gratings
Carried Forward
Section No. 3
Guard House
Bill No. 12
Plumbing and Drainage (Provisional)
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-63-
Brought Forward
Exposed concrete surfaces
Exposed surfaces of concrete stormwater channels, cover
slabs, inspection eye marker slabs, gulley tops, cleaning eye
tops, catchpits, inspection chambers, etc shall be finished
smooth with plaster
Excavations
No claim for rock excavation will be entertained unless the
contractor has timeously notified the quantity surveyor thereof
prior to backfilling
"Soft rock" and "hard rock" shall be as defined in "Earthworks"
Laying, backfilling, bedding, etc. of pipes
Pipes shall be laid and bedded and trenches shall be carefully
backfilled in accordance with manufacturers' instructions
Where no manufacturers' instructions exist pipes shall be laid
in accordance with clauses 5.1 and 5.2 of each of the
following:
SABS 1200 L : Medium-pressure pipelines
LD : Sewers
LE : Stormwater drainage
Pipe trenches etc shall be backfilled in accordance with
clauses 3, 5.5, 5.6, 5.7 and 7 of SABS 1200
DB : Earthworks (Pipe trenches)
Pipes shall be bedded in accordance with clauses 3.1 to 3.4.1,
5.1 to 5.3 and 7 of SABS 1200
LB : Bedding (Pipes).
Unless otherwise described bedding of rigid pipes shall be
class B bedding
Flush pans
Flush pans shall have straight or side outlets and "P" or "S"
traps as necessary
Carried Forward
Section No. 3
Guard House
Bill No. 12
Plumbing and Drainage (Provisional)
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-64-
1
2
3
4
5
6
7
Brought Forward
Stainless steel basins, sinks, wash troughs, urinals, etc.
Units shall have standard aprons on all exposed edges and
tiling keys against walls where applicable
Waste unions
Descriptions of waste unions shall be deemed to include
rubber or vulcanite plugs and chains fixed to fittings (CPAP FORMULA WORK GROUP 148)
RAINWATER DISPOSAL
0,8mm Seamless Aluminium OGEE gutters and rainwater
pipes with baked enamel finish
150 x 125mm gutters m
100 x 75mm Diameter rainwater pipes No
Extra over gutter for outlet for 75mm pipe No
Extra over rainwater pipe for shoe No
SANITARY FITTINGS
"Vaal"
"Vaal" Hibiscus Basin Product code: 7023 with two semi
punched tapholes, intergreted overflow and chainstay hole thru
the centre semi-punched taphole. No
"Vaal Pearl Paraplegic Semi Close Couple Suite" product
code: 73005C supplied with purpose made C.P side flush lever
(right) and purpose made urea seat and cover plate No WASTE UNIONS, ETC
"Cobra Watertech"
32mm "345/50CP" bottle trap No
Carried Forward
Section No. 3
Guard House
Bill No. 12
Plumbing and Drainage (Provisional)
24
4
4
4
1
1
1
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-65-
8
9
10
11
12
13
14
15
16
17
18
19
20
Brought Forward
TAPS, VALVES, ETC
Brass
22mm Stopcock No
"Cobra Watertech"
"COBRA" Xena Pillar taps code XE-214-15 No
SANITARY PLUMBING
uPVC pipes
50mm Pipes m
110mm Pipes m
Extra over uPVC pipes for fittings
110mm Reducer No
50mm Bend No
110mm Pan connector No
50mm Access bend No
110mm Access bend No
50mm Access junction No
110mm Access bend with anti-syphon horn No
50mm "GI Two-way" vent valve No
Sundries
Testing waste pipe system
WATER SUPPLIES
Carried Forward
Section No. 3
Guard House
Bill No. 12
Plumbing and Drainage (Provisional)
2
1
50
50
2
4
1
2
3
1
1
1
Item
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-66-
21
22
23
24
25
26
27
28
29
30
Brought Forward
Class 0 copper pipes
15mm Pipes m
15mm Pipes chased into brick walls m
22mm Pipes m
22mm Pipes chased into brick walls m
28mm Pipes chased into brick walls m
Extra over class 0 copper pipes for capillary fittings
15mm Fittings No
22mm Fittings No
28mm Fittings No
TESTING
Testing water pipe system
FIRE APPLIANCES ETC
"Chubb"
4,5kg Carbon dioxide fire extinguisher complete with 520 x 115
x 22mm thick timber backboard plugged to wall and varnished No
Carried Forward to Summary of Section No. 3
Section No. 3
Guard House
Bill No. 12
Plumbing and Drainage (Provisional)
60
20
20
20
10
10
10
5
Item
1
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-67-
Item
No
1
SECTION NO. 3
BILL NO. 13
GLAZING NOTE :
Unless otherwise stated herein, all items in this bill shall be
deemed to fall into Work Group No. 150 for CPAP formula
purposes TOPS, SHELVES, DOORS, MIRRORS, ETC
6mm Silvered float glass copper backed mirrors with
polished edges holed for and fixed with chromium plated
dome capped mirror screws with rubber buffers to plugs
in brickwork or concrete
400 x 900 x 4mm "GG" quality polished glass mirror: Fixed to
wall with vertical strips of double sided adhesive tape. One
mirror per wash hand basin. No
Carried Forward to Summary of Section No. 3
Section No. 3
Guard House
Bill No. 13
Glazing
Quantity
1
Rate
R
Amount
Construction of Early Childhood Development Centre
Mpumalanga Province
-68-
Item
No
1
2
3
4
5
SECTION NO. 3
BILL NO. 14
PAINTWORK NOTE :
Unless otherwise stated herein, all items in this bill shall be
deemed to fall into Work Group No. 152 for CPAP formula
purposes ON FLOATED PLASTER
Prime with One coat Plascon Plaster Primer and two coats
Plascon Plaster Primer on walls.
On internal walls m2
ON PLASTERBOARD
Prime with one coat Professional Plaster Primer and two
coats Professional Evaluation Acrylic
On Gypsum Ceilings and Cornices m2
One coat primer and two coats exterior quality PVA
emulsion paint
On fascias and bargeboards m2
ON METAL
Spot priming defects in pre primed surfaces with zinc
chromate primer and applying one undercoat and two
coat high gloss enamel paint on steel
On doors frames m2
ON WOOD
Three coats polyurethane semi-gloss varnish
On doors m2
Carried Forward to Summary of Section No. 3
Section No. 3
Guard House
Bill No. 14
Paintwork
Quantity
55
12
10
3
7
Rate
R
Amount
Construction of Early Childhood Development Centre
Mpumalanga Province
-69-
Bill
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Section No. 3
Guard House
SECTION SUMMARY - Guard House
Earthworks (Provisional)
Concrete, Formwork and Reinforcement
Masonry
Waterproofing
Roof Covering
Carpentry and Joinery
Ceilings, Partitions and Access Flooring
Ironmongery
Metal Work
Plastering
Tiling
Plumbing and Drainage (Provisional)
Glazing
Paintwork
Carried to Final Summary
Section No. 3
Guard House
Page
No
-42-
-45-
-47-
-48-
-49-
-51-
-53-
-56-
-58-
-59-
-60-
-66-
-67-
-68-
Amount
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-70-
Item
No
1
2
SECTION NO. 4
BILL NO. 1
GENERAL SITEWORKS (PROVISIONAL) SITE CLEARANCE ETC
Site clearance
Digging up and removing rubbish, debris, vegetation, hedges,
shrubs and trees not exceeding 200mm girth, bush, etc m2
Stripping average 150mm thick layer of top soil and stockpiling
on site m2
Carried Forward to Summary of Section No. 4
Section No. 4
External Works
Bill No. 1
General Site Works (Provisional)
Quantity
3 705
3 705
Rate
R
Amount
Construction of Early Childhood Development Centre
Mpumalanga Province
-71-
Item
No
1
2
3
4
5
6
7
SECTION NO. 4
BILL NO. 2
PARKING AND DRIVEWAYS (PROVISIONAL) NOTE : Tenderers are advised to study the "Specification of
Materials and Methods to be used" (OOG-001E) before pricing
this bill
NOTE : All excavations are measured as being in "earth"
and/or filling compacted to 98% modified AASHTO density
---------------
EARTHWORKS
(HAYLETT FORMULA WORK GROUP NO. 104) Open face excavations in earth to reduce levels m3
Extra over all excavations for carting away surplus material
from excavations and/or stockpile on site to a dumping site to
be located by the Contractor m3
Extra over open face excavations in earth for excavations in
soft rock m3
Extra over open face excavations in earth for excavations in
hard rock m3
Allow for keeping all excavations entirely free from water and
mud
125mm base layer of selected gravel material to comply with
minimum CBR 15 and maximum PI 12, imported from
commercial sources and compacted to 95% modified
AASHTO density m3
Over site of G7 sub-base layer C4 material in accordance with
SABS 1200 ME, stabilised to attain UCS 1,5 MPa after seven
days and compacted to 95% Mod AASHTO density m3
Carried Forward
Section No. 4
External Works
Bill No. 2
Parking and Driveways (Provisional)
Quantity
150
150
15
8
Item
75
75
Rate
R
Amount
Construction of Early Childhood Development Centre
Mpumalanga Province
-72-
8
9
10
11
12
13
14
Brought Forward
Compaction of ground surface under pavings, etc including
scarifying for a depth of 150mm, breaking down over size
material, adding suitable material where necessary and
compact to 93% modified AASHTO density m2
25mm thick layer clean, dry, riversand layer treated with an
approved weed killer at the rate of 50 gram per square metre,
spread and levelled to receive paving blocks (elsewhere) m2
Tests to determine the degree of compaction, etc. of ground or
filling No
PRECAST CONCRETE
(HAYLETT FORMULA WORK GROUP NO. 112) Light grey "Grinaker G-blocks" interlocking precast
concrete (35 MPa) paving blocks laid with butt joints on
50mm thick river sand bed with sand swept into joints
including preparation of ground or filling
80mm paving blocks m2
Extra over for edge blocks m
KERBS, CHANNELS, ETC
Concrete barrier kerbing m
METALWORK
(HAYLETT FORMULA WORK GROUP NO. 136) Standard "STOP" sign with standard 50mm diameter
galvanised mild steel fixing post bedded into and including
bases, including all necessary mass concrete, excavations,
etc. No
PAINTING
(HAYLETT FORMULA WORK GROUP NO. 152)
Carried Forward
Section No. 4
External Works
Bill No. 2
Parking and Driveways (Provisional)
501
501
10
501
14
135
2
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-73-
15
Brought Forward
Prepare and paint one coat white reflective road marking paint on precast concrete paving blocks
100mm wide line m
Carried Forward to Summary of Section No. 4
Section No. 4
External Works
Bill No. 2
Parking and Driveways (Provisional)
80
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-74-
Item
No
1
2
SECTION NO. 4
BILL NO. 3
STORMWATER DRAINAGE (PROVISIONAL)
STANDARD PREAMBLES
The contractor is refered to the Model Preambles for Trades
(2008 edition) as issued the Association of South African
Quantity Surveyors before pricing this bill
Descriptions of excavations shall be deemed to include for
setting aside surplus excavated material in spoil heaps for use
as filling or for depositing within 150m of the perimeter of the
excavations and spreading and roughly levelling as directed,
as well as for increase in bulk and multiple handling of
excavated material caused by the Contractor's method of
operation
Descriptions of carting away of excavated material shall be
deemed to include loading excavated material onto trucks
directly from the excavations or, alternatively, from stock piles
situated on the building site and for bulking
Mass concrete with a coarse aggregate of 19mm and a
minimum compressive strength of 15MPa at 28 days
Storm water channel 750mm wide x 150mm thick with rounded
salient edges and finished on exposed surfaces with (2:1)
cement mortar, laid to falls in panels not exceeding 1800mm
long with 12mm bitumen impregnated softboard movement
joints with exposed edges raked out for a depth of 10mm and
filled with bituminous compound including all necessary
excavation and formwork m
Extra Over for Rainwater Catch pits No
Carried Forward to Summary of Section No. 4
Section No. 4
External Works
Bill No. 3
Stormwater Drainage (Provisional)
Quantity
80
1
Rate
R
Amount
Construction of Early Childhood Development Centre
Mpumalanga Province
-75-
Item
No
1
2
3
4
5
6
7
SECTION NO. 4
BILL NO. 4
WALKWAYS (PROVISIONAL) NOTE : All excavations are measured as being in "earth"
and/or filling compacted to 98% modified AASHTO density
---------------
EARTHWORKS
(HAYLETT FORMULA WORK GROUP NO. 104) Open face excavations in earth to reduce levels m3
Extra over all excavations for carting away surplus material
from excavations and/or stockpile on site to a dumping site to
be located by the Contractor m3
Extra over open face excavations in earth for excavations in
soft rock m3
Extra over open face excavations in earth for excavations in
hard rock m3
Allow for keeping all excavations entirely free from water and
mud
125mm base layer of selected gravel material to comply with
minimum CBR 15 and maximum PI 12, imported from
commercial sources and compacted to 95% modified
AASHTO density m3
Compaction of ground surface under pavings, etc including
scarifying for a depth of 150mm, breaking down over size
material, adding suitable material where necessary and
compact to 93% modified AASHTO density m2
Carried Forward
Section No. 4
External Works
Bill No. 4
Walkways (Provisional)
Quantity
23
23
2
1
Item
23
156
Rate
R
Amount
Construction of Early Childhood Development Centre
Mpumalanga Province
-76-
8
9
10
11
Brought Forward
25mm thick layer clean, dry, riversand layer treated with an
approved weed killer at the rate of 50 gram per square metre,
spread and levelled to receive paving blocks (elsewhere) m2
Tests to determine the degree of compaction, etc. of ground or
filling No
PRECAST CONCRETE
(HAYLETT FORMULA WORK GROUP NO. 112) Light grey "Grinaker G-blocks" interlocking precast
concrete (35 MPa) paving blocks laid with butt joints on
50mm thick river sand bed with sand swept into joints
including preparation of ground or filling
60mm paving blocks m2
KERBS, CHANNELS, ETC
Concrete Mountable kerbing m
Carried Forward to Summary of Section No. 4
Section No. 4
External Works
Bill No. 4
Walkways (Provisional)
156
3
156
105
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-77-
Item
No
1
2
3
4
5
6
SECTION NO. 4
BILL NO. 5
FENCING AND BOUNDRY WALL (PROVISIONAL)
BOUNDRY WALL
(CPAP formula work group no. 102)
Excavation in earth not exceeding 2m deep
Trenches m3
Extra over all excavations for carting away
Surplus material from excavations and/or stock piles on site to
a dumping site to be located by the Contractor m3
Risk of collapse of excavations
Sides of trench and hole excavations not exceeding 1,5m deep m2
Earth filling obtained from the excavations and/or
prescribed stockpiles on site compacted to 93% Mod.
AASHTO density
Backfilling to trenches, holes, etc m3
(CPAP formula work group no. 110)
25MPa/19mm Unreinforced concrete cast against
excavated surfaces
Surface blinding under footings and bases m3
Strip footings m3
(CPAP formula work group no. 116)
Carried Forward
Section No. 4
External Works
Bill No. 5
Fencing and boundry walls (Provisional)
Quantity
24
24
94
9
1
7
Rate
R
Amount
Construction of Early Childhood Development Centre
Mpumalanga Province
-78-
7
8
9
10
11
12
13
Brought Forward
Brickwork of NFP bricks in class II mortar
One brick walls m2
Brickwork reinforcement
150mm Wide reinforcement built in horizontally m
Corobrick "Firelight Travertine FBX" Face bricks pointed
with flush horizontal and vertical joints
Extra over brickwork for face brickwork m2
Brick-on-edge header course copings, sills, etc of external
face bricks (Prime Cost Amount R 3 500.00/1000) pointed
with recessed joints on all exposed faces
Coping on top of one brick wall m
STEEL FENCING
DIAMOND MESH FENCE
Security fencing, gates, etc including two coats
aluminium paint on metal stays, framing, etc
Fencing formed of I section or Y section standards 1800mm
long at maximum 2,5m centres driven into ground and with
droppers 2,4m long at maximum 2,5m centres and 2 strands of
galvanised barbed wire tied to standards, posts and eye bolts m
Diamond Mesh Gate 1m x 1,8m high No
WELDED SECURITY FENCING
Excavation in earth not exceeding 2m deep
Holes m3
Carried Forward
Section No. 4
External Works
Bill No. 5
Fencing and boundry walls (Provisional)
156
694
283
59
52
1
7
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-79-
14
15
16
17
18
19
20
Brought Forward
Risk of collapse of excavations
Sides of trench and hole excavations not exceeding 1,5m deep
m2
Soil insecticide
To bottoms and sides of trenches etc m2
20MPa/19mm Concrete
Bases m3
Welded steel palisade security fencing with posts encased
in concrete footings
Palisade security fencing in 2.1 x 3m panels made of 60 x 60 x
5mm slotted channels top and bottom rails , filled in verticaly
with 30 x 30 x 3mm hot rolled angle palisades 1800mm long at
150mm centres, panels fixed to 76 x 76 x 3mm posts with
devils fork end at the top and bottom cast into concrete bases
500 x 500 x 500mm thick (elsewhere). m
Gates, screens, etc.
Manually operated sliding gate 6 000 x 2 440mm high overall,
the outer frame of 75 x 75 x 5mm square tubing and 50 x 50 x
2.5mm welded mesh welded to frame work, complete with
industrial type roller wheels rolling on ground track and
mechanical operating mechanism and padbolt No
1500mm wide x 2400mm high palisade fence Gate complete
including locking mechanism No
Plascon zinc phosphate primer undercoat and plascon
super universal enamel top coat
On gates, grilles, palisade fencing, etc.(both sides measured
over the full flat area) m2
Carried Forward to Summary of Section No. 4
Section No. 4
External Works
Bill No. 5
Fencing and boundry walls (Provisional)
60
60
4
179
1
1
781
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-80-
Bill
No
1
2
3
4
5
Section No. 4
External Works
SECTION SUMMARY - External Works
General Site Works (Provisional)
Parking and Driveways (Provisional)
Stormwater Drainage (Provisional)
Walkways (Provisional)
Fencing and boundry walls (Provisional)
Carried to Final Summary
Section No. 4
External Works
Page
No
-70-
-73-
-74-
-76-
-79-
Amount
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-81-
Item
No
SECTION NO. 5
BILL NO. 1
PROVISIONAL SUMS NOTES:
1. The Contractor's attention is drawn specifically to the
Principal Building Agreement Clause 20.0 (Nominated
Sub-Contractors), Clause 21.0 (Selected Sub-Contractors)
and Clause 22 (Work by Others) and to the related
Clauses in Section 1, Bill No. 1 - Preliminaries
2. The Contractor's attention is drawn also to the definition
of attendance on Nominated or Selected Sub-Contractors
and of fuel, power and water for commissioning of
mechanical and other specialised installations given in the
JBCC Preliminaries
3. Where special attendance includes the provision of
hoisting facilities for a Sub-Contractor then the Contractor
shall:-
* Ensure that the capacities of his hoisting equipment
are sufficient to deal with the masses and the
quantities of the items to be hoisted,
* Schedule the times of availability of the hoisting
equipment for each Sub-Contractor,
* Provide all necessary personnel to operate the
hoisting equipment,
all to enable the Sub-Contractor to execute the hoisting or
lowering of his material, etc. using the facilities provided
by the Contractor
4. Under no circumstances may any Provisional Amount,
etc. be extended at an amount lower than the amount
given in this Bill
Carried Forward
Section No. 5
Provisional Sums
Bill No. 1
Provisional Sums
Quantity Rate
R
Amount
Construction of Early Childhood Development Centre
Mpumalanga Province
-82-
Brought Forward
5. CPAP Formula Work Group 190 shall apply to all lump
sum amounts of profit and attendance
Carried Forward
Section No. 5
Provisional Sums
Bill No.1
Provisional Sums
R
R
Construction of Early Childhood Development Centre
Mpumalanga Province
-83-
1
2
3
4
5
6
7
8
9
10
11
12
Brought Forward
PROVISIONAL SUMS FOR NOMINATED/SELECTED SUB-CONTRACTS
Joinery Fittings
Provide the amount of R 60 000.00 ( Sixty Thousand Rand) for
joinery installation to kitchen.
Allow for Profit
Allow for general attendance
Electrical Installation and Connection
Provide the amount of R 150 000.00 ( One Hundred and Fifty
Thousand Rand) for electrical installation and connection.
Allow for Profit
Allow for general attendance
Mechanical Installation
Provide the amount of R 50 000.00 ( Fifty Thousand Rand) for
mechanical installation.
3750
Allow for Profit
Allow for general attendance
Landscaping
Provide the amount of R 10 000.00 (Ten Thousand Rand) for
landscaping.
Allow for Profit
Allow for general attendance
Carried Forward
Section No. 5
Provisional Sums
Bill No. 1
Provisional Sums
Item
Item
Item
Item
Item
Item
Item
Item
Item
Item
Item
Item
R
R
60 000
150 000
50 000
10 000
00
00
00 00
Construction of Early Childhood Development Centre
Mpumalanga Province
-84-
13
14
15
16
17
18
19
20
21
22
23
24
Brought Forward
Play Ground Equipment
Provide the amount of R 60 000.00 (Sixty Thousand Rand) for
play ground equipment, sand pit and benches installation
complete.
Allow for Profit
Allow for general attendance
Septic Tank
Provide the amount of R 80 000.00 (Eighty Thousand Rand)
for septic tank
Allow for Profit
Allow for general attendance
CLO Allowance
Provide the amount of R 25 000.00 (Twenty Five Thousand
Rand) for CLO.
Allow for Profit
Allow for general attendance
Borehole and Water Pump Installation
Provide the amount of R 150 000.00 (One Hundred and Fifty
Thousand Rand) for bolerhole equipped complete with 5000l
water tank and a 3m stand.
Allow for Profit
Allow for general attendance
Carried to Final Summary
Section No. 5
Provisional Sums
Bill No. 1
Provisional Sums
Item
Item
Item
Item
Item
Item
Item
Item
Item
Item
Item
Item
R
R
60 000
80 000
25 000
150 000
00
00
00 00
Construction of Early Childhood Development Centre
Mpumalanga Province
-85-
Section
No
1
2
3
4
5
FINAL SUMMARY
Preliminaries and General
ECD Building
Guard House
External Works
Provisional Sums
SUBTOTAL
CONTINGENCIES Allow the sum of R 100 000.00 ( One Hundred Thousand Rand
) for Contingencies to be used at the discretion of the Project
Manager and to be deducted in whole or in part if not required
SUBTOTAL
Add value added tax @ 14%
Carried to Form of Tender
Page
No
-1-
-38-
-69-
-80-
-84-
Item
Amount
R
R
R
R
100 000
00
• this drawing is copyright and remains with the architect, any unauthorized
reproduction, publication, tmsmission and or inclusion of any media is an
infringement.
figured dimensions to be taken in preference to scaled dimensions.
report any discrepancies direct to the architect before commencing work. all work to be done in accordance with the sabs 0400
•
•
•
REV. I DATE DESCRIPTION INIT.
DRAWING No.
NDA.15.01_wd101
REVISION
01
SCHEDULE OF AREAS ITEM SPACE AREA
01 ECD BLOCK 297m2
02 GUARD HOUSE 15.5m2
TOTAL FLOOR AREA 312.5m2
PARKING BAY COUNT
01 PARAPLEGIC BAYS·3.5x5m 01
02 PARKING BAYS- 2.5x5m 07
TOTAL PARKING BAYS 08
SITE COVERAGE
01 TOTAL BUTll UP AREA 312.5m2
02 SITE AREA 3701.8m2
%COVERAGE 8.4%
DENSITY CONTROLS
01 LOT NUMBER 02 STAND AREA 03 MAX. FAR 04 PROPOSED FAR 05 MAX. HEIGHT 06 PROPOSED HEIGHT 07 FRONT BUILDING LINE
08 REAR BUILDING LINE
09 SIDE BUILDING LINE
-
'
3m BUILDING LINE ,
:.-,:.-,:.
-·
z
E I II -· I
.. • a:q I e•
' ' ' ' > , > > ' >
0
w
E
0
0
··-··-··-··-··
65 OOOmm STAND BOUNDARY
NE W PALISADE FENCE
,....0, ,-:---- r 1··---- - -··-··-··-··-··-·f
I
c
·-··-··-··-··-··-,
w
z :I: • w C!l• " w e•
·• •
15 •
z
ORCHAD
LANDSCAPING
,' . 0
VEGE.
•- l ilT • • I
I
'
I
11:1
1\1\.
\/.
NY'h. i 151
w
Cz
l Iw
GARDEN w• I
0 Cl
z o: I z
:::::i r-, zw. I
LL
en w
C!l I I "-• I :t: • C!l.
-- I
0 en ;)) ::::;
0
E I =>Ilil
I :
.,I
.:
,. I ct. E
0 IE11ill
0
r-- "' I I • I w 0
LO IL,-J • z r--
I LO
""" ----- • : !"'"..... ""'! Hlf.,jO : : J -t.
..
NDA "« ---- -1-.. ,L'q
National
q_omm WIPE PAD (g-DRIV AY _ ' .' .. ','.,''.,'' , ' " ' . ,. ' " ' ' '
Development
Agency ' . .' ' ' ' .' ·
·' .'
'k ---- ----i":-""1="
.
' ' ' ' ,
' ' ' ' '
ISSUED FOR CONSTRUCTION
I< ---- --- -il-
A
I
ENTRr
ir
WALL TO DETAIL WALL TO DETAIL
• architect
• client
dgit AROHITEOTS
NELSPRUIT 9 WaterlilyTur n, Unit 7
Rlvt !l'!llde Part: x12-Tel:082 &194952
.KlHANNE SBURG 334 Cilrtelet Esta te, S)TtA nue Broadacre112021- Tel; 011022 4042/3
DUI'.ItAN
SEcnON 3 TilE SPINAKER
180 Mah;trna G:aMhl Road
Ourban 4001- T l:021:'168 2m
EAST LONDON
No. 7 Belsraw Road Southern Wood
East London 5214 -Tel: 043 704 8300
Social Development Department
Social Development MPUMALANGA PROVINCE
MAIN ROAD PROJECT:
MPUMALANGA EARLY CHILDHOOD
DEVELOPMENT CENTRE
• this drawing is copyright and remains with the architect, any unauthorized
reproduction, publication, tmsmission and or inclusion of any media is an
infringement.
figured dimensions to be taken in preference to scaled dimensions.
report any discrepancies direct to the architect before commencing work. all work to be done in accordance with the sabs 0400
•
•
•
REV. I DATE DESCRIPTION INIT.
DRAWING No.
NDA.15.01_wd101
REVISION
01
SITE LAYOUT PROVISIONAL SITE LOCATION:
MPUMALANGA DRAWING TITLE:
- PROPOSED SITE LAYOUT
SCALE 1:200 TOTAL STAND AREA 3701.8m2
DATE: I SCALES:
MARCH 2015 1:200
DRAWN:
ALLAN.M
• this drawing is copyright and remains with the architect, any unauthorized
reproduction, publication, tmsmission and or inclusion of any media is an
infringement.
figured dimensions to be taken in preference to scaled dimensions.
report any discrepancies direct to the architect before commencing work. all work to be done in accordance with the sabs 0400
•
•
•
REV. I DATE DESCRIPTION INIT.
DRAWING No.
NDA.15.01_wd101
REVISION
01
SCHEDULE OF AREAS ITEM SPACE AREA
01 ECD BLOCK 297m2
02 GUARD HOUSE 15.5m2
TOTAL FLOOR AREA 312.5m2
PARKING BAY COUNT
01 PARAPLEGIC BAYS·3.5x5m 01
02 PARKING BAYS- 2.5x5m 07
TOTAL PARKING BAYS 08
SITE COVERAGE
01 TOTAL BUTll UP AREA 312.5m2
02 SITE AREA 3701.8m2
%COVERAGE 8.4%
DENSITY CONTROLS
01 LOT NUMBER 02 STAND AREA 03 MAX. FAR 04 PROPOSED FAR 05 MAX. HEIGHT 06 PROPOSED HEIGHT 07 FRONT BUILDING LINE
08 REAR BUILDING LINE
09 SIDE BUILDING LINE
1
r·;)_ \"
f1; ...; '- "d ":<
e•
-·
I z w
I -· ..
MAIN ROAD MPUMALANGA
"
I z
I
0
• I
.L;r-·. , "'. 65 OOOmm STAND BOUNDARY c
NE W PALISADE FENCE
··-··-··-··-··
w
••.....,(), J:'.ll y -•• -••-. ·-·.-•• -•• -•• -. f ·. , ', j i :7 -... 3m BUILDING LINE , 1 1
-"' i '" )-'O ttR ';J ( I I"' I - 'G ".: 'D." c {0<;f I" I
""'"'"' .. " il > '""" -:2 1 :!; ;;r# :y, .,, ,. :; II
··-- t·ffg,t_ :,., ,,. .. "'·""'" I o I :t -p 101
' '4 g. '\.'} --a " I I
·-··-··-··-··-··-, .....-.:: '- ::.- "'-TI.s!"}o., -: {\ o·,Q, •rD'J en ' <"' >. cf· 'G
-c..,. I "' o til 't...
'-. :,'":, (Jt£ ,. _ . ·r' :-- - ·,.-4P..oz;; ., t':lsJ
0.
0z
-· · L:t o 1rs i:t-.,,,·...,.,,_ y -.""'2:.•...,..
Do' '";) ,
1:: ':1
:I:• k'"- '9'V 1 ?--"i/ ,0- ' P
<'c;· .,.. '·. \ () w C!l• , <y I ! ''o - j! - ·;: ''"" w :
.,:.,:.
·• •
I LANDSCAPING ' I r.L.,
3 i d"''--y, -'·"';;, <? 0 ¥· ,\--}:l :/ c,
,. 'i _a I] co -
·
15 • I
0 1 I
z I I C(.ILT...J
I I
'
I I I
-- • HH-JD
VEGE.
R.E !_!J a- c- I_E e i !.: -----
• •
_l 1
manoo- ----- /1-,-JLIIl
zCl I GARDEN
• I
ow•: I
I w 0 Cl
I w
I :::;
en IC!l
r"l I I
zw. I
"-•
"-
I 0 en
E I .5.Jiil
I
:t:• I
:I: • I
I ;)"i E
E II C!l.
0
:::; E
0 •
Ia:q 0 1
e.-,.•·,.
I ct.
I 0
0 E I"' I •
I w 0 r- "' I I • 10 IL,-J • z r-
10
" --- I• : )ZF.Ll 19738 5 i !1f4 f:f( \ / / &/ / f / § / / / / / / / / / / , I ! !! ..1---..r_ I :
11111111111111 ••••• p-,
1.8m HIGH FENCE PAVED WALKWAY
NDA " ---- -1-..,L'q
National
'k ---- ----i ":-""1="
q_omm WIPE PAD (g-DRIV AY _ Development
Agency
ISSUED FOR CONSTRUCTION
---- --- -il-
A
• architect
dgit
NELSPRUIT 9 WaterlilyTur n, Unit 7
Rlvt !l'!llde Part: x12-Tel:082 &194952
.KlHANNE SBURG 334 Cilrtelet Esta te, S)TtA nue Broadacre112021- Tel; 011022 4042/3
I
ENTRr
ir
• client
AROHITEOTS DURitAN
SEcnON 3 TilE SPINAKER
180 Ma h;trn;G:a Mhl Road
Our b;4001- T l:021:'168 2m
EAST LONDON
No. 7 Belsraw Road Southern Wood
East Londo5214 -Tel: 043 704 8300
Social Development Department
Social Development
MPUMALANGA PROVINCE
PROJECT:
EARLY CHILDHOOD
DEVELOPMENT CENTRE LOCATION:
MPUMALANGA
• this drawing is copyright and remains with the architect, any unauthorized
reproduction, publication, tmsmission and or inclusion of any media is an
infringement.
figured dimensions to be taken in preference to scaled dimensions.
report any discrepancies direct to the architect before commencing work. all work to be done in accordance with the sabs 0400
•
•
•
REV. I DATE DESCRIPTION INIT.
DRAWING No.
NDA.15.01_wd101
REVISION
01
SITE LAYOUT PROVISIONAL SITE DRAWING TITLE:
- PROPOSED SITE LAYOUT
SCALE 1:200 TOTAL STAND AREA 3701.8m2
H 2015 1:200
ALLAN.M
DATE: MARC SCALES: DRAWN:
u
!
DOOR SCHEDULE
ELEVATION/DESCRIPTION QTY
NB: ALL RAINWATER FROM
THE ROOF TO COLLECT
INTOJOJO TANKS,AS
SHOWN.
ALL WATER FROM THE JOJO
,-----CONC.PLATFORM
TO ENG'S DETAILS. y ,.-230ITJTI
,.-23{)JJm THICK
WINDOW SURROUND. I
I lffi
li
• this drawing is copyright and remains with the architect, any unauthorized
reproduction, publication, tmsmission and or inclusion of any media is an
infringement.
• figured dimensions to be taken in preference to scaled dimensions.
• report any discrepancies direct to the architect before commencing work.
I" A M Frame for 230mm wall. I 01
TANKS IS NOT SUITABLE
FOR CONSUMPTION,ONLY
USED FOR IRRIGATION
PURIPOSES.
5730 5500 5500 5500
1m WIDE V-DRAIN APRON.
I • all work to be done in accordance with the sabs 0400
I
DOOR 2032x813x44mm HARDWOOD "MERANTI" TIMBER
DOOR WITH HORIZONTAL SLATES. DOOR FOR
VARNISHING.
\I/
GENERAL NOTES THIS DRAWING IS NOTTO BE SCALED. FIGURE DIMENSIONS TO BE USED ALL
DOOR FRAME I DOUBLE REBATED GALVANIZED PRESSED STEEL
FRAME, POS. FRAME TO TAKE 2032x813mm I
DOOR. PROVIDE HEAVY DUTY BRASS HINGES.
/ \
\ /
i /!!l\
\ /
i !!!l\
THE TIME.
CONTRACTOR IS RESPONSIBLE FOR CORRECT SETIING OUT OF THE BUILDING,
ALL EXTERNAL AND INTERNAL WALLS WITH PARTICULAR REFERENCE TO
REFERENCE I D15 KITCHEN LEFT HAND z>-'
13
J1111ica worktop with a
beveled1front front edge, screw
uLnm•fonnica worktop with a
! beveled front front edge, screw
13 13
32mm formica worl<top with "-----1 beveled front front edge, screw !
formica worktop with a
beveled front front edge, screw
BOUNDARIES, BUILDING LINES ETC.
CONTRACTOR TO VERIFY ALL LEVELS, HEIGHTS AND DIMENSIONS BEFORE
PUTIING ANY WORK
(')
! ""' "'"
fixed otop of a 16mm white
melami.[e cupboard can:as
I
! i "'"
foted on top of a 16mm white
melamine cupboard carcas
fixed on top of a 16mm white
melamine cupboard carcas ""'
"'"
! ! ) .9
fixed on top of a 16mm white
melamine cupboard carcas CONTRACTOR TO CHECK AND VERIFY ALL LEVELS, DATUMS AND DIMENSIONS
ON SITE AND SHALL REPORT ANY DISCREPANCIES OR OMISSIONS TO THIS
OFFICE PRIOR TO START OF WORKS OR DURING THE CONSTRUCTION PHASE.
B --.hJ- Frame for 115mm wall. 04
DOOR I 1882x762X44mm HOLLOW CORE FLUSH PANEL
PARAPLEGIC
CLASSROOM Porcelain Tiles
area_35m'
I ]
·;; CLASSROOM 02 Porcelain Tiles
area_30.3m' -a! :<c=
rJ
CLASSROOM 03 Porcelain Tiles
area_30.3m'
! ! -a! <=
CLASSROOM 04 SMALLER BABIES Porcelain Tiles
araa_30.3m'
THIS DRAWING IS TO BE READ AND UNDERSTOOD IN CONJUNCTION WITH
STRUCTURAL, MECHANICAL, ELECTRICAL AND/ OR ANY OTHER CONSULTANT Is
DOCUMENTATION AS MAY BE APPLICABLE TO THE PROJECT PRIOR TO START
OF WORKS AND ITS DURATION
REPORT TO THE ARCHITECT ALL AMBIGUITIES, DISCREPANCIES, OMISSIONS,
ERRORS. DEPARTURES FROM GOOD PRACTICE DISCOVERED IN THE DOOR WITH HARDWOOD EDGING. DOOR FOR PAINTING.
DOOR FRAME I DOUBLE REBATED GALVANIZED PRESSED
STEEL FRAME, PBS. FRAME TO TAKE
1882x762mm DOOR.
en w "- 0:: --' i5 en D
.8 ! "- I "- I I u
8::
DRAWINGS
BEFORE TENDERING, EXAMINE THE SI"TlE AND ASCERTAIN THE EXTENT AND
NA"TlJRE OF ALL CONDITIONS AFFECTING THE WORK,NOT EXCLUDING THE
LOCATION OF ALL BURIED SERVICES WHICH MAY HAVE TO BE PROTECTED,
REMOVED OR RELOCATED
REFERENCE I D04 GIRLS TOILET
D05 GIRLS TOILET
RIGHT HAND E E
RIGHT HAND g
1800 1585 4900 115
4900
MATERIALS SHALL BE THE BEST OF THEIR RESPEC"TlVE KINDS DESCRIBED ON
THE DRAWINGS AND THE CONTRACTOR SHALL WHERE REQUIRED HEREIN OR
UPON REQUEST OF THE ARCHITECT/ ENGINEER FURNISH VOUCHERS TO
D06 BOYS TOILET LEFT HAND I)! PROVE 1lHAT THE MATERIALS COMPLY HEREWITH
D07 BOYS TOILET
D " c M
LEFT HAND
Frame for 230mm wall. 01
MOTOR
ACTIVITY ZONE "' Porcelain Tiles
1 900 1 715 1 715 1 900 1
1\!1§_
SEATING
AREA
!li
QUALITY OF MA"TlERIALS & WORKMANSHIP TO COMPLYWITH THE RELEVANT
SAB.S & B.S.S. SPECIFICATION & SHALL CONFORM TO THE MINIMUM
STANDARD PREAMBLES IN THE BILL OF QUANTITIES OR, IN THE ABSENCE OF A
BLL OF QUANTITIES, AVAILABLE FOR PERUSAL AT THE OFFICES OF THE
ARCHITECT.
THE CON"TlRACTOR SHALL NOTIFY AND OBTAIN THE APPROVAL OF THE
PLANNING DEPARTMENT AND I OR THE FIRE PREVENTION OFFICER FOR ANY
WORKS UNDER THEIR RESPECTIVE JURISDICTION REQUIRNG INSPECTIONS
PRIOR TO COVERING UP OR PROCEEDING WITH SUBSEQUENT WORK
DOOR 2032x813X44mm SEMISOLID CORE FLUSH PANEL
DOOR WITH HARDWOOD EDGING. DOOR FOR
PAINTING.
DOOR FRAME I DOUBLE REBATED GALVANIZED PRESSED
STEEL FRAME, PBS. FRAME TO TAKE
2032x813mm DOOR.
area_29m' Porcelain Tiles
area_35m'
REFERENCE I D16 PRINCIPAL'S OFFICE
n LEFT HAND
SHARED COVERED
ill
§
D M Framefor115mmwall.l 07 OUTDOOR PLAY AREA Porcelain Tiles
Porcelain Tiles
area_10m' §
DOOR 2032x813X44mm SEMISOLID CORE FLUSH PANEL
DOOR WITH HARDWOOD EDGING. DOOR FOR
PAINTING.
DOOR FRAME DOUBLE REBATED GALVANIZED PRESSED
STEEL FRAME, PBS. FRAME TO TAKE
2032x813mm DOOR.
area_28.4m'
ill
NDA REFERENCE D01 STORE ROOM RIGHT HAND
D09 PARAPLEGIC CLASSROOM LEFT HAND
D10 CLASSROOM 02 RIGHT HAND
D11 CLASSROOMOO LEFTHAND
D12 CLASSROOM 04 RIGHT HAND
D13 SLUICE ROOM LEFT HAND
D14 KITCHEN LEFT HAND
BOYS & GIRLS TOILETS:
are to take the
V-DRAIN APRON. 1m WIDE V-DRAIN APRON.
y
Na1 t]onal
Development Agency
'VAAL'JUNIOR 104 LOW LEVEL SUITE II II II II "bl' II L "I II
Product code: 751358and matching 61itre "' .. .... """" """" "' ·-· "' ••••• "'"' ·-· "' .... "'"'
cistern, Product code: 712034 (03 No.)
BOYS TOILET:
ISSUED FOR CONSTRUCTION io::::JI I 150x500mm ALUMINUM
VENTILATION LOUVRES.
'VAAL'flatback wall hubowl urinal
Product code: 705326 (415x315x275mm). DA.."V CA..RE BLOCK NOTE
ALL GLAZING TO OMPLY WITH LOCAL BUILDING REGULATIONS WITH REGARDS io THE USE OF SAFETY GLASS WHERE 1-.--h.-te-t --------,-, -,.-u.-----------1 GLAZING IS REQUIRED BELOW 900mm ABOVE FLOOR LEVEL. arc
1 c \ •w-'''''"''""'"
E M Frame for 115mm wall. 02
BATHROOM@ NORMAL HEIGHT.
BOYS & GIRLS TOILET@ 600MM HEIGHT:
'VAAL'HIBISCUS BASIN_Product code- 7023 with two
PROPOSED FLOOR PLAN
Total Floor Area = 297m2
References to trade names are used
only to simplify detailing. Various
The Kitchen worktop is to be 32mm "Formica" laminated
worktop. Product code: 271 Blackstone.
screw fixed on top of a 16mm white melanins cupboard with
ALL GLAZING TO BE FACTORY FITIED WITH ALUMINUM
ALLOY GLAZING BEADS SUITABLE FOR HARSH MARINE
ALL OPENING SIZES TO BE CHECKED ON SITE PRIOR TO
dgit Rlvt !l'!llde Part: x12-Tel:082 &194952
.KlHANNE SBURG 334 Cilrtelet Esta te, S)TtA nue Broadacre112021- Tel; 011022 4042/3
2032x813X44mm SEMISOLID CORE FLUSH PANEL
DOOR WITH HARDWOOD EDGING. DOOR FOR
PAINTING.
semi punched tspholes, integrated overflow and
chainstay hole thru the centre semi-punched taphole.
Provide 32mm C.P.Iagged bottle traps.
Scale 1:50
SCALE IN METRES
similar and approved products are
available for approval prior to
installation.
supawood doors spray painted matt white.
fitted with 156mm wide hollow stainless steel barrel handles
SS202 grade,code 8235 (by Gelmar or similar approved).
MANUFACTURE.
ALL SLABS, BEAMS, COLUMNS, STAIRS AND STRUCTURAL
AROHITEOTS DUI'.ItAN
SEcnON 3 TilE SPINAKER
180 Mah;trna G:aMhl Road
Ourba4001- T l' 021:'168 2m
EAST LONDON
No. 7 Belsraw Road Southern Wood
DOOR FRAME I DOUBLE REBATED GALVANIZED PRESSED
STEEL FRAME, PBS. FRAME TO TAKE
2032x813mm DOOR.
REFERENCE I D02 TOILET LOBBY RIGHT HAND
LEFT HAND
"Cobra" Xena Pillar taps code_XE-214-15 I I I I 0 1 2 3 4 5
BATHROOM:
'VAAL'Hibiscus Close Coupled Suite
Product code_772654.
GENERAL FIRE NOTES
FIRE EXTINGUISHERS TO BE HUNG ON
PURPOSE MADE BOARDS AND LOCATED
IN SECURE POSITIONS AS INDICATED ON
'FRANKE" model. Quinline- QLX611 satin 900L x 500W
Product code:820000.
K chen sink is to take the "Cobra" Tap- 'Selene" SE 970.
REINFORCED CONCRETE AND STRUCTURAL STEEL WORK ACCORDING TO ENGINEER'S DETAILS.
ALL BUILDING WORK IS TO COMPLY WITH SABS 0400 AND LUt;ALt
MUNICIPAL BY-LA WS.
client
East London 5214 -Tel: 043 704 8300
Social Development
PARAPLEGIC TOILET:
'Vaal Pearl Paraplegic Semi Close Couple Suite'
2mm formica worktop with a beveled front front edge,
screw fixed on top of a
wire mesh baskets
constructed to detail spray painted to assorted colours.
PLAN. single lever with aerated swivel outlet BSP female inlet. ALL GLAZING TO COMPLY WITH PART N OF SABS 0400.
710L x 490W x 60D "Defy"
Department Social Development
MPUMALANGA PROVINCE
VENTILATION LOUVRES.
M
Product code_73005C supplied with purpose made C.P. side ftush lever (light) and purpose made urea seat
and cover plate.
PARAPLEGIC TOILET: 'Vaal Hibiscus basin" Product code_7023 with 1x12mm
01 C.P. lever action taps and 32mm C.P.lagged bottle trap,
!:j
g
16mm white melamine
cupboard carcas red, orange, yellow.green,
blue, pink, violet.
Supawood doors spray painted
Gemini solid plate hob (NCP) code: DCD352
Fitted to counter and installed to electrician's details.
Provide 01no."Kwikot' 600i Dual electric water heater slimine
100 Litres 990x4BOmm I1J Geyser. installed in ceiling
void.
CONTRACTOR IS TO BUILD IN APPROVED D.P.C.s, WHETHER OR NOTTHESE ARE SHOWN ON DRAWINGS,TO ALL EXTERNAL
WALLS AT EACH FLOOR, BEAMS OR PARAPETS LEVELS AND TO IPROJECT: Mp MALANGA I ALL WINDOWS, DOORS, GRILLES OR OTHER OPENINGS TO
EXTERNAL WALLS, CAVITY WALLS TO HAVE STEPPED D.P.Cs. EARLy CHILDHOOD
ALL WORK TO DRAINAGE & PLUMBING TO COMPLY WITH LOCAL I DEVELOPMENT CENTRE
E Frame for 115mm wall.
2032x800x44mm SEMISOLID CORE FLUSH PANEL
DOOR WITH HARDWOOD EDGING. DOOR FOR
PAINTING.
DOOR FRAME I DOUBLE REBATED GALVANIZED PRESSED S"TlEEL
FRAME. PBS. FRAME TO TAKE 2032x900mm DOOR.
WITH 305nm OBSCURE GLAZED FANLIGHT ON TOP.
PROVIDE HEAVY DUTY HINGES.
waste outlet plug and chain. Nb: cold water tap must be
closest to toilet.Nb: NO PEDESTAL.
Stainless steel side grab rail "Chai1111an Industries DL2"
and Stainless steel side grab rail "Chairman Industries
SR2'to Paraplegic Toilet.
"Kimberly Clar1<" lockable two roll toilet roll holder
"lockable'to all Toilets.
• matt white. Lockable,Fitted with
119mm Thick Dee Plastic Handles
in WHITE code 211 (by Gelmar or
similar approved)
NB: All hot water services to be clad with insulation with min. R-value 1.
SLUICE ROOM: Provide
'VAAL'HIBISCUS BASIN_Product code- 7023 with two semi
punched tapholes. Provide 32mm chrome plated bottle trap.
"Cobra" Xena Pillar taps_Code -XE-214-15
'FRANKE" model. CH SLOP HOPPER 540x540mmm Poduct code -351350with 'Cobra" model FM.100- 35mm
AUTHORITY BY-LAWS & REGULATIONS.
I.E.s TO BE PROVIDED AT ALL JUNCTIONS AND BENDS.
R.E.s TO BE PROVIDED AT CHANGE OF DIRECTION AND
GRADIENT AND MAXIMUM 25m CENTRES.
DRAINAGE UNDER BUILDINGS TO BE ENCASED IN CONCRETE
AND ACCESS THERETO TO BE PROVIDED FROM BOTH SIDES.
MPUMALANGA
TITLE:
DAY CARE BLOCK
PROPOSED FLOOR PLAN
REFERENCE I D08 PARAPLEGIC TOILET RIGHT HAND
"Kimberly-Ciarl<" soap dispenser, plugged to all Toilets.
"Franke" paper towel dispenser- BS600P.
§
Classroon shelving
'-----1OOmm high Porcelain skirting tile
water supply flush valve. ALL SOIL PIPES TO BE 011Omm HD uPVC TO SASS 967 ALL WASTE PIPES TO BE 050mm HD uPVC TO SASS 967
Provide airconditioning to the Paraplegic classroom, ALL HOT & COLD WATER SUPPLY TO BE IN COPPER.
SCALES:
MARCH 2015 1:50
DRAWN:
ALLAN.M
part elevation "Franke" perforated waste container- BS610. Scale 1:25
covers the rupboard kickplate. classroom 01, classroom 02, seating area,and Principal's office.
No. REVISION
LIGHT AND VENTILATION TO COMPLY WITH PART 0" OF NDA.15.01_wd102 01
THE THE NBR.
DOOR SCHEDULE TO ENG'S UOIAOC . .. • "' 111 • 1 WINDOW SURROUND. 1 WINDOW SURROUND. 1\z
ln :;n.vvriVVVU..E:VI I X
r v I I I Yl""t: ELEVATION/DESCRIPTION QTY SHOWN. 11 11 11 ;2 lffi
TANKS IS NOT SUITABLE , '\ 5730 5500 5500 5500 I ----'k-- FORCONSUMPTION,ONLY od I
1-: R.E€}.-- - -- I '- J - _2_0mDIA. PIPEs toTO FALL 2:_6 GRADIENT. L '-- ...!... /j .If'
1.8mDIA. 1 'I 1 'I 1 'I lg
A M Frame for 230mm wall. 01 f I"' / 1mWIDEV-DRANAPRON. / / 1mWIDEV-DRAINAPRON. '- / '- / I '-
DOOR I 2032xB13x44mm HARDWOOD "MERANTI" TIMBER 1 IK I ""'"' y(@) - ·-- r- -y;
8- --- , - - S - -/-- @) - -r- 17! 1 / /"' ;.: il.
VARNISHING.
DOOR FRAME I DOUBLE REBATED GALVANIZED PRESSED STEEL 1 I \ / double doors with sidelights. Ail double doors with sidelights. double doors with sidelights. \ / \ / double doors with sidelights. I A'[' FRAME, POS. FRAME TO TAKE 2032x813mm
DOOR PROVIDE HEAVY DUTY BRASS HINGES. 1 1 1
I I I \
--'1<-- II I ----'1<-- !z I I @ I '!l 32mm III1Jca worktop With a _ 32mm fo1111ica wor1dop with a 32mm formica worl<lop with a _ _ 32mm formica wor1dop with a I § I I !z
! C'J I I 0 -l'l melaml e cupboard can:as ! ]l melamine cupboard carcas melamine cupboard carcas -l'l ! ! melamine cupboard carcas I I C'J
.
I . - -" ---.S _.,--- --- I .
-hJ- "- CLASSROOM Porceloinnles Porcelain Tiles SMALLER BABIES -=ti- >- <?. ;, -- - :a "' :a "' 1\. >--
DOOR I 1B82x762X44mm HOLLOW CORE FLUSH PANEL ....J > . ii 0 0 (.) > ....J DOOR WITH HARDWOOD EDGING. DOOR FOR ff3 liS :s g ffi PAINTING.
9= :J:: 15 il il ilu:: :J:: 9=
DOOR FRAME I DOUBLE REBATED GALVANIZED PRESSED - --- I o I o -'-=0 I -
STEEL FRAME, PBS. FRAME TO TAKE 600 600 600 1882x762mm DOOR. 'il ,---, ,---, ,--
REFERENCE I D04 GIRLS TOILET RIGHT HAND 400 600 j ,.ill. ,.ill. ,.ill. \11/ \J/ \)/ 115
D05 GIRLS TOILET RIGHT HAND
D06 BOYS TOILET LEFT HAND
007 BOYS TOILET LEFT HAND
----'k-- !ill N - I - """"':-- 1 900 1 715 "' 715 1 900 1 R OM /I
0_: 1 "
c M 01 I @) ;;s "'"' k
11fs TOILET ; Nb:Providemechancal MOTOR SEATING [[• I -
Frame for 230mm wall. • • Porcelain Tiles ve tllatlon to Para. ACTIVITY ZONE ·-n - !tl!J I o
DOOR I 2032xB13X44mm SEMISOLID CORE FLUSH PANEL r) f . ::r Porcelain Tiles 8 -:::::. ,_ 1 : 006 I ( 007 PIOYide - "' area_29m' m I I .l!1
DOOR WITH HARDWOOD EDGING. DOOR FOR - - area 35m' , 2: o .A.
PAINTING. til I 1dose1. 11"1' -=:- - 131l "' II "' 1 .,.- 785
DOOR FRAME I DOUBLE REBATED GALVANIZED PRESSED -'I.-- I @ • 1
1800 TOIL, ·1 0' ·1 8 '""' ·n1es .I!' 1 STEEL FRAME, PBS. FRAME TO TAKE
913 230
!ji 2032x813mm DOOR.
REFERENCE I D16 PRINCIPAL'S OFFICE LEFT HAND Polt91ain TIIos Provide · FHR c15l L=J lmtrll- I 1 P'
1 area_3-7m' @)overhead -, · --,· -
-----'1.-- I • 002 doorcloser. -- 16 · - RE. ill
n-: ;: l!3
- I - oos \ e [:2 \ L/PRINCIPAC1 600 785 " soo 115 1\ 1 .II' ooa 'Toot\ --;-- -'I<-- ,..---1
- I I 'C../ - I I .·- I 015 §
M I ATH /'-......\. """ • ,_ SHARED COVERED o:n o
W11 MANAGER'SH-FI\5 :I 'I ...,.. _ 1
- • l _4.7m' Tub. area_2.6m' Porcelain Tiles - PANT Y g s Porcelai M
D Frame for 115mm wall. 07 RLS = lR S l\:"' PorcelainTIIes Porcelain Tiles I OUTDOOR PLAY AREA N - I area 10m' "' I I'
I , I , " r 1
,>r, !.- •I I _' I ; I +- area
PANEL DOOR I 2032xB13X44mm SEMISOLID CORE FLUSH FOR DOOR WITH HARDWOOD EDGING. DOOR we. E :•c. I (we. I<-- area 31 •
PAINTING.
DOOR FRAME I DOUBLE REBATED GALVANIZED PRESSED
STEEL FRAME, PBS. FRAME TO TAKE 2032xB13mm DOOR.
!
009 PARAPLEGIC CLASSROOM LEFT HAND f I/ J i V J 1 l tmWIDEV-DRAINAPRON. /: - ----- ------ 1\ / tmWIDEV-DRAINAPRON. / REFERENCE I D01 STORE ROOM RIGHT HAND
D10 CLASSROOM 02 RIGHT HAND I, L / _ _L<- / _ _L R.E. I I I
D11 CLASSROOM03 LEFTHAND
'®.' 013 SLUICE ROOM LEFT HAND BOYS & GIRLS TOILETS: I I
D14 KITCHEN LEFT HAND are to take the ., 600 "' 515 "' soo "'31 2128 2808 "' 4IO' 3000 3078
'VAAL" JUNIOR 104 LOW LEVEL SUITE 230
,......, -----'1.-- Product code: 751358 and matching 6 litre 1000 1000 2128 10135 3793 2400 cistern, Product code: 712034 (03 No.) 1 230 115 115 1
23035
'VAAL" flatback wall hubowl urinal ALL GLAZING TO COMPLY WITH LOCAL BUILDING REGULATIONS
VENTILATION LOUVRES.
E M Frame for 115mm wall. 02 BATHROOM@ NORMAL HEIGHT. PROPOSED FLOOR PLAN References to trade names are used The Kitchen wor1dop is to be 32mm 'Formica" laminated ALL GLAZING TO BE FACTORY FITIED WITH ALUMINUM
2032xB13X44mm SEMISOLID CORE FLUSH PANEL semi punched tapholes, integrated overflow and Total Floor Area = 297m similar and approved products are screw fixed on top of a 16mm white melamne cupboard with
MANUFACTURE.
'VAAL" HIBISCUS BASIN_Product code7· 023 with two 2 ALL OPENING SIZES TO BE CHECKED ON SITE PRIOR TO
DOOR WITH HARDWOOD EDGING. DOOR FOR chainstay hole thru the centre semi-punched taphole.
Scale 1:50 available for approval prior to supawood doors spray painted matt white.
PAINTING. fitted with 156mm wide hollow stainless steel barrel handles
DOOR FRAME I DOUBLE REBATED GALVANIZED PRESSED 'Cobra" Xena Pillar taps code_XE-214-15 I I I I REINFORCED CONCRETE AND STRUCTURAL STEEL WORK
STEEL FRAME, PBS. FRAME TO TAKE 0 1 2 3 4 5 GENERAL FIRE NOTES "FRANKE" model. Quinline- QLX611 satin 900L x SOOW ACCORDING TO ENGINEER'S DETAILS. 2032xB13mm DOOR. BATHROOM:
FIRE EXTINGUISHERS TO BE HUNG ON Product code:820000.
REFERENCE I D02 TOILET LOBBY RIGHT HAND Product code_772654.
PURPOSE MADE BOARDS AND LOCATED MUNICIPAL BY-LA WS.
003 BATH LEFT HAND IN SECURE POSITIONS AS INDICATED ON K chen sink is to take the "Cobra" Tap- 'Selene" SE 970.
=Th _32mm formica wor1dop with wire mesh baskets y
' PLAN. single lever with aerated swivel outlet BSP female inlet.
ALL GLAZING TO COMPLY WITH PART N OF SABS 0400.
A
Product code_73005C supplied with purpose made 16mm white melamine red, orange, yellow,green, Gemini solid plate hob (NCP) code: DCD352 CONTRACTOR IS TO BUILD IN APPROVED D.P.C.s, WHETHER OR
and cover plate. WALLS AT EACH FLOOR, BEAMS OR PARAPETS LEVELS AND TO 1AIIJMINIJtut
Provide 01no."Kwikot" 600i Dual electric water heater ALL WINDOWS, DOORS, GRILLES OR OTHER OPENINGS TO VENTILATION LOUVRES.
PARAPLEGIC TOILET: !:j slimine 100 Litres 990x480mm I1J Geyser. installed in ceiling EXTERNAL WALLS, CAVITY WALLS TO HAVE STEPPED D.P.Cs.
E M Frame for 115mm wall. 01 C.P. lever action taps and 32mm C.P.lagged bottle trap, g ALL WORK TO DRAINAGE & PLUMBING TO COMPLY WITH LOCAL
waste outlet plug and chain. Nb: cold water tap must be ' ' matt white. Lockable,Fitted with R-value 1. AUTHORITY BY-LAWS & REGULATIONS.
2032x900x44mm SEMI SOLID CORE FLUSH PANEL closest to toilet.Nb: NO PEDESTAL. DOOR WITH HARDWOOD EDGING. DOOR FOR in WHITE code 211 (by Gelmar or SLUICE ROOM: Provide I.E.s TO BE PROVIDED AT ALL JUNCTIONS AND BENDS.
• this drawing is copyright and remains with the architect, any unauthorized
reproduction, publication, tmsmission and or inclusion of any media is an
infringement.
• all work to be done in accordance with the sabs 0400
REV. I DATE DESCRIPTION INIT.
I GENERAL NOTES
CONTRACTOR IS RESPONSIBLE FOR CORRECT SETIING OUT OF THE BUILDING,
BOUNDARIES, BUILDING LINES ETC.
CONTRACTOR TO VERIFY ALL LEVELS, HEIGHTS AND DIMENSIONS BEFORE PUTIINGANV WORK
CONTRACTOR TO CHECK AND VERIFY ALL LEVELS, DATUMS AND DIMENSIONS ON SITE AND SHALL REPORT ANV DISCREPANCIES OR OMISSIONS TO THIS
THIS DRAWING IS TO BE READ AND UNDERSTOODIN CONJUNCTION WlnH STRUCTURAL, MECHANICAL, ELECTRICAL AND/ OR ANY OTHER CONSULTANT Is
OF WORKS AND ITS DURATION
ERRORS, DEPARTURES FROM GOOD PRACTICE DISCOVERED IN nHE DRAWINGS
NATIJRE OF ALL CONDITIONS AFFECTING THE WORK,NOT EXCLUDING THE LOCATION OF ALL BURIED SERVICES WHICH MAY HAVE TO BE PROTECTED, REMOVED OR RELOCATED
THE DRAWINGS AND nHE CONTRACTOR SHALL WHERE REQUIRED HEREIN OR
PROVE THAT nHE MATERIALS COMPLY HEREWITH
QUALITY OF MATIERIALS & WORKMANSHIP TO COMPLYWITH nHE RELEVANT
BLL OF QUANTITIES, AVAILABLE FOR PERUSAL AT nHE OFFICES OF THE ARCHITECT.
THE CONTRACTOR SHAUL NOTIFY AND OBTAIN THE APPROVAL OF nHE
WORKS UNDER THEIR RESPECTIVE JURISDICTION REQUIRNG INSPECTIONS PRIOR TO COVERING UP OR PROCEEDING WlnH SUBSEQUENT WORK
'
Na t]onal
Development Agency
1-.--h.-te-t --------,-, -,.-u.----------
dgit .KlHANNE SBURG
Rlvt !l'!llde Part: x12-Tel:082 &194952
Broadacre112021- Tel; 011022 4042/3
AROHITEOTS DURitAN
180 Mah;trna G:arlllhl Road
SEcnON 3 TilE SPINAKER
Ourba4001- T l:021:'168 2m
No. 7 Belsraw Road Southern Wood
East London 5214 -Tel: 043 704 8300
• client
Social Development Department
PROJECT:
MPUMALANGA
DEVELOPMENT CENTRE
LOCATION:
MPUMALANGA
DRAWING TITLE:
DAY CARE BLOCK
PROPOSED FLOOR PLAN
MARCH 2015 1:50
ALLAN.M
DRAWING No.
NDA.15.01_wd102 REVISION
01
I
1
'- -' o \ o \ o
1
I
.1 '
"Iii
beveledJfrontfrontedge,screw
"
beveledfrontfrontedge screw
I
beveledfrontfrontedge screw
"
"
beveledfrontfrontedge screw 1
1 I!!!
l
...CONC.PLATFORM
---·.. - .l30mm nHICK ..231mm nHICK
IC::
PURPOSES. JOJOTANK ,I 1295 L I 3600 I. 21:J0 L 3600 I 1 3500 15 3600 I 1180 1 I
DOOR WITH HORIZONTAL SLATES. DOOR FOR
,_1 j I I fe} I I_ I fj JiJ
REFERENCE I 015 KITCHEN LEFT HAND
-+- U:::::::::JI
B
Frame for 115mm wall. 04
L 1 1
PARAPLEGIC 'Iii - CLASSROOM 02 1
CLASSROOM 03 i 'Iii 'Iii CLASSROOM 04 _ . 1 _3---'k-
c ;;:; l Porcelain Tiles o S area_30.3m2
area_30.3rn2 o o "S Porcelain Tiles 0 N
N- '
r---S . · "4:#- . :o.;l I L --
:;:;:;--- I 1115 0
g 1
\([J)1'P
3\orcei"TIIos a;
1-- I !li
I - ·-
'\RAPLEGIC g "tot. l
- I -
012 CLASSROOM 04 RIGHT HAND /R.E; I I I I v I y I z
150x500mm ALUMINUM Product code: 705326 (415x315x275mm). DA."V CA.RE BLOCK WITH REGARDS TO THE USE OF SAFETY GLASS WHERE 1
PARAPLEGIC TOILET:
'Vaal Pearl Paraplegic Semi Close Couple Suite" a beveled front front edge,
screw fixed on top of a
constructed to detail spray
painted to assorted colours.
710L x 490W x 600 "Defy'
Social Development
MPUMALANGA PROVINCE
VIOLET PINK
PROVIDE HEAVY DUTY HINGES. 'lockable" to all Toilets.
Poduct code -351350with "Cobra" model FM.100- 35mm
1 9000 1
- ' -f- c
DDDD , N
lsoolsoolsoolsoolsoolsoolsoolsoolsoolsool
WINDOW
9000x2125mm PURPOSE MADE BRONZE
ANODIZED ALUMINIUM SLIDING WINDOW FRAME
BY SPECIALISTS
01
REFERENCE Wl2 MOTOR ACTIVITY ZONE
J
r1800
- -f-
N ;;;
Sj lsooi!IOOI
- f----- --- -- ----
01
WINDOW 700X1200mm PURPOSE MADE BRONZE
ANODIZED ALUMINIUM SLIDING WINDOW FRAME
BY SPECIALISTS
REFERENCE
W19 PRINCIPAUMANAGER;S OFFICE
K
3000
- I I ----f--
>DOD: ;;;
1600 lsoo lsoo 1600 1600I -------------f--
01
WINDOW
1500x3000mm PURPOSE MADE BRONZE
ANODIZED ALUMINIUM FRAMED DOUBLE DOOR
WITH SIDELIGHTS BY SPECIAUSTS
REFERENCE WID PRINCIPAUMANAGER'S OFFICE
o -/
'
• architect
, D / N
,
c
" /
f-
N
--
N '
'
WINDOW SCHEDULE
3600
PROFILE ROLL FORMED
IN CONTINUOUS LENGTHS, LIGHT
INDUSTRAL Wllli'GLOBAL COAT'
GLOBAL ROOFING SOLUTIONS
ALL GLAZING TO COMPLY WITH LOCAL BUILDING
REGULATIONS WilliREGARDS TO THE USE OF
SAFETY GLASS WHERE GLAZING IS REQUIRED BELOW
900mm ABOVE FLOOR LEVEL.
ALLOY GLAZING BEADS SUITABLE FOR HARSH MARINE
• this drawing is copyright and remains with the architect, any unauthorized
reproduction, publication, tmsmission and or inclusion of any media is an
infringement.
• figured dimensions to be taken in preference to scaled dimensions.
• report any discrepancies direct to the architect before commencing work.
I I
- c \/ \ I
f-
--f-- H / DODD_ ALL OPENING SIZES TO BE CHECKED ON SITE PRIOR
TO MANUFACTURE.
ALL SLABS, BEAMS, COLUMNS, STAIRS AND STRUCTURAL
REV. I DATE
DESCRIPTION
c \/ \ I
f-
!lJ
REINFORCED CONCRETE AND STRUCTURAL STEEL
WORK ACCORDING TO ENGINEER'
D /
" D
BOARD ALL BUILDING WORK IS TO COMPLY Willi SABS 0400 AND
- --f--
A lsoolsooleooleool 04
WINDOW 2125x3600mm PURPOSE MADE BRONZE
ANODIZED ALUMINIUM FRAMED DOUBLE DOOR
I I - ----
LOCAL MUNICIPAL BY-lAWS.
ALL GLAZING TO COMPLY WITH PART N OF SABS 0400.
CONTRACTOR IS TO BUILD IN APPROVED D.P.C.s.
SHOWN ON DRAWINGS,
GENERAL NOTES
WilliSIDELIGHTS BY SPECIALISTS WHElliER OR NOT THESE ARE
TO ALL EXTERNAL WALLS AT EAC
H FLOOR, BEAMS OR
PARAPETS LEVELS AND TO AL L WINDOWS, DOORS, THIS DRAWING IS NOTTO BE SCALED. FIGURE DIMENSIONS TO BE USED ALL REFERENCE W02 PARAPLEGIC CLASSROOM
W03 CLASSROOM 02
W04 CLASSROOM 03
W05 CLASSROOM 04
-- --
CARE BLOCK
PROPOSED FRONT ELEVATION I
KLIP-LOK 700 PROFILE ROLL FORMED
,-----,----IN CONTINUOUS LENGTHS, LIGHT
GRILLES OR OTHER OPENINGS TO EXTERNAL WALLS,
CAVITY WALLS TO HAVE STEPPED D.P.Cs.
ALL WORK TO DRAINAGE & PLUMBING TO COMPLY Willi
LOCAL AUlliORITY BY-lAWS & REGULATIONS.
I.E.s TO BE PROVIDED AT ALL JJNCTIONS AND BENDS.
R.E.s TO BE PROVIDED AT CHANGE OF DIRECTION AND
DRAINAGE UNDER BUILDINGS TO BE ENCASED IN
THE TIME.
CONTRACTOR IS RESPONSIBLE FOR CORRECT SETTING OUT OF THE BUILDING.
ALL EXTERNAL AND INTERNAL WALLS WITH PARTICULAR REFERENCE TO
BOUNDARIES, BUILDING LINES ETC.
CONTRACTOR TO VERIFY ALL LEVELS, HEIGHTS AND DIMENSIONS BEFORE
PUTTING ANY WORK
CONTRACTOR TO CHECK AND VERIFY ALL LEVELS. DATUMS AND DIMENSIONS
ON SITE AND SHALL REPORT ANY DISCREPANCIES OR OMISSIONS TO THIS
>DO: i'l
INDUSTRAL Wllli'GLOBAL COAT"
FINISH TO I SIDE. SUPPLIED BY
CONCRETE AND ACCESS THERETO TO BE PROVDED
FROM BOTH SIDES. OFFICE PRIOR TO START OF WORKS OR DURING THE CONSTRUCTION PHASE.
THIS DRAWING IS TO BE READ AND UNDERSTOOD IN CONJUNCTION Willi
==== ;;;
fll leoolaoo leooleoo I
8 04
ALL SOIL PIPES TO BE ll110mm HD uPVC TO SABS 967 STRUCTURAL, MECHANICAL, ELECTRICAL AND/ OR ANY OTHER CONSULTANT Is
--- ------- -
ANODIZED ALUMINIUM WINDOW FRAME BY
SPECIAUSTS
i'l CONCRETE WINDOW UEDG.E PROTRUDING 500mm I lt
·. ··.:-,·. _.' _,., :.>:
----
ALL HOT & COLD WATER SUPPLY TO BE IN COPPER.
ALL PARKING BAYS SIZES EXCEPT FOR PARAPLEGIC
ON PAVING WITH ROAD PAINT.
REPORT TO lliE ARCHITECT ALL AMBIGUITIES, DISCREPANCIES, OMISSIONS,
DRAWINGS
BEFORE TENDERING. EXAMINE THE SITE AND ASCERTAIN THE EXTENT AND
REFERENCE W03 PARAPLEGIC CLASSROOM
=I' Ill''-
/ \/ './
/ \I "\I
/
\ I \I /
SEE ENGINEER'S DRAWINGS FOR ALL EXTERNAL PARKING.
NATURE OF ALL CONDITIONS AFFECTING THE WORK,NOT EXCLUDING THE
W04 PARAPLEGIC CLASSROOM
woe COT STORAGE
WIO COT STORAGE
\ Ill \/ './
" " v
\I ', I " ",
\ I \I " \ I
" i I I
STORMWATER, PAVING AND KERBING LAYOUTS.
LIGHT AND VENTILATION TO COMPLY WITH PART 6" OF
LOCATION OF ALL BURIED SERVICES WHICH MAY HAVE TO BE PROTECTED,
REMOVED OR RELOCATED
THE DRAWINGS AND lliE CONTRACTOR SHALL WHERE REQUIRED HEREIN OR
/ II II/ II II/ II II / "\ THE THE NBR.
ALL PARTITIONING TO BE RODENT
ADEQUATE FIRE RATING.
PROOF AND HAVE MATERIALS SHALL BE THE BEST OF THEIR RESPECTIVE KINDS DESCRIBED ON
UPON REQUEST OF THE ARCHITECT!ENGINEER FURNISH VOUCHERS TO
PROVE ll1AT lliE MATERIALS COMPLY HEREWITH
1800
g ,
CARE BLOCK
-- I
I
-- ----- QUALITY OF MATERIALS & WORKMANSHIP TO COMPLYWITH lliE RELEVANT
/ 1', N
f- ;;; PROPOSED BACK ELEVATION SAB.S & B.S.S. SPECIFICATION & SHALL CONFORM TO THE MINIMUM
STANDARD PREAMBLES IN lliE BILL OF QUANTITIES OR, IN lliE ABSENCE OF A
BLL OF QUANTITIES, AVAILABLE FOR PERUSAL AT lliE OFFICES OF THE
ARCHITECT.
im'l leoo lsoo lsoo I
c -- -------- ----- 01
1000x1800mm PURPOSE MADE BRONZE WINDOW ANODIZED ALUMINIUM WINDOW FRAME BY
SPECIAUSTS
Scale 1:100 ,-----------------l<ILIP-LOK700 PROFILE ROLL FORMED
IN CONTINUOUS LENGTHS,LIGHT
INDUSTRIAL WITH "GLOBAL COAT'"
FINISH TO ISIDE.SUPPLIED BY
GLOBAL ROOFING SOLUTIONS
KLIP-LOK 700 PROFILE ROLL FORMED---------------,
IN CONTINUOUS LENGTHS, LIGHT
INDUSTRIAL WITH "GLOBAL COAT'"
FINISH TO ISIDE SUPPLIED BY
GLOBAL ROOFING SOLUTIONS
THE CONTRACTOR SHALL NOTIFY AND OBTAIN THE APPROVAL OF lliE
PLANNING DEPARTMENT AND I OR THE FIRE PREVENTION OFFICER FOR ANY
WORKS UNDER THEIR RESPECTIVE JURISDICTION REQUIRNG INSPECTIONS
PRIOR TO COVERING UP OR PROCEEDING Willi SUBSEQUENT WORK
REFERENCE
WII PRINCIPAU MANAGERS OFFICE
,------------f'LASTERPAINT
CONCRETE WINDOW LEDGE
,---------f'ROTRUDING 500mm
CONCRETE WINDOW LEDGE
2128
--+------------------
TIMBER EAVES FEATURE TO DETAIL
EAMLESS 1SOX125x!l.8mm
ALUMINIUM OGEE GUTTER WITH
BAKED ENAMEL FINISH FIXED WITH
CONCEALED BRACKETS ALL TO
SUPPLIERS SPECIFICATION.
- -- - TIMBER EAVES FEATURE--- - -- +- DETAIL
I I
!l! DO
.. ·:".--' ....., :-r ;+ -·>>· '
100x75mm RECTANGULAR FLUTED
ALUMINIUM DOWNPIPE WITH './(>:·.:_!..:..:."!:··:-'·'·': l-/· - ffiEJ'.AII<IED.ALil!o1JMillMJllllABSAT_
--------+ ------------- -
15321532153215321 i'l ;;;
/ _IOOOmm CENTRES, FIXED TO WALL
/ WilliNAIL PLUGS.
D --- ---- 01 N N
COROBRICK FACEBRICI
FRELIGHTTRAVERTINE FBX
FIRELIGHT TRAVERTINE FBX
WINDOW 1000x2400mm PURPOSE MADE BRONZE
ANODIZED ALUMINIUM WINDOW FRAME BY
SPECIAUSTS
REFERENCE Wl4 BATH
DAY CARE BLOCK
SEAMLESS 150x125x0.8mm
ALUMINIUM OGEE GUTTER WITH---,
D ENAMEL FINISH FIXED
'RHINOBOARD'CEILING
FD<ED TO 38XSOMM EX SW.
G.l. FLASHING.
FORMED IN CONTINUOS LENGTHS.
LIGHT INDUSTRIAL WITH 'GLOBAL
COAT' FINISH TO 1 SIDE.SUPPLIED
CARE
Scale 1:100
NDA
I 74o I -- ----
ii!,_ LJ i'l ;;;
E -- ---- ---- 01
WINDOW 700x1200mm PURPOSE MADE BRONZE
ANODIZED ALUMINIUM WINDOW FRAME BY
SPECIAUSTS
Wl3 STORE REFERENCE
BAKE
WITH CONCEALED BRACKETS-
ALL TO SUPPLIERS
SPECIFICATION.
100 x 75mm RECTANGULAR
FLUTED ALUMINIUM DOWNPIPE---,
WITH PRE-PAINTED ALUMINIUM
STRAPS AT IOOOMM CENTRES,
FIXED TO WALL WITH NAIL
PLUGS
FASCIA BOARD
.-----J100P IRON STRAPS OR
GALVANISED WIRE
ANCHORS.
14mmSWWALL
PLATE.
BRANDERING AT 400MM
CENTRES.
TIMBER TRUSSES BY SPECIAList-1opo--tj
ROOF PITCH 1o• -s::r
BY GLOBAL ROOFING SOLUTIONS.
National
Development
Agency
ISSUED FOR CONSTRUCTION
NELSPRUIT 9 WaterlilyTur n, Unit 7
Rlvt!l'!llde Part: x12-Tel:082 &194952
1800
iii
KLIP-LOK 700 PROFILE ROLL
SURFACE STORMWATER
SECTION Z-Z
KLIP-LOK 700 PROFILE ROLL
.6.4mm "RHINOBOARD'CEILING
dgit AROHITEOTS
.KlHANNESBURG 334 Cilrtelet Estate, S)TtA nue
Broadacre112021- Tel; 011022 4042/3
DUl'. ltAN
SEcnON 3 TilE SPINAKER
Ourban 4001- T l:021:'168 2m
T LONDON
-- I
I
-- ----- FORMED IN CONTINUOS LENGTHS,
1000x125mm OPEN_j
CHANNEL TO ENG'S.
Scale 1:100 FIXED TO 38X50MM EX SW.
180 Ma h;trn;G:a Mhl Road
EAS
No. 7 Belsraw Road Southern Wood
-f-
N
/ ' leoolsoolsool
;;; LIGHT INDUSTRIAL WITH 'GLOBAL----,
COAT FINISH TO 1 SIDE. SUPPLIED
BY GLOBAL ROOFING SOLUTIONS.
DETAILS.
150mmHIGH
KLIP.LOK 700 PROFILE ROLL
FORMED IN CONTINUOS LENGTHS,
INDUSTRIAL WITH 'GLOBAL
COAT' FINISH TO ISIDE. SUPPLIED
FORMED IN CONTINUOS LENGlliS,
LIGHT INDUSTRAL Willi 'GLOBAL·
COAT' FINISH TO 1 SIDE. SUPPLIED
BY GLOBAL ROOFING SOLUTIONS.
BRANDERING AT 400MM CENTRES.
IN.150mm HIGH
KLIP-LOK 700 PROFILE ROLL
FORMED IN CONTINUOS LENGTHS.
LIGHT INDUSTRIAL WITH 'GLOBAL
• client
East London 5214 -Tel: 043 704 8300
F ---f-------- ---- 01
1000x1800mm PURPOSE MADE BRONZE
WINDOW ANODIZED ALUMINIUM WINDOW FRAME BY
SPECIAUSTS
SEAMLESS 150xl25x0.8mm
ALUMINIUM OGEE GUTTER WITH
BAKED ENAMEL FINISH FIXED
WITH CONCEALED BRACKETS -
ALL TO SUPPLIERS
SPECIFICATION.
,-----.2.25xl0mm NUTEC
FASCIA BOARD
OOP IRON STRAPS OR
_6.4mm 'RHINOBOARD'CEILING
FIXED TO 38X50MM EX SW.
BRANDERING AT 400MM
CENTRES. I TIMBER TRUSSES BY SPECIALIST.
G.l. FLASHING. BY GLOBAL ROOFING SOLUTIONS.
I '
SEAMLESS 151lx125xO.Bmm
ALUMINIUM OGEE GUTTER Willi
BAKED ENAMEL FINISH FIXED
WITH CONCEALED BRACKETS
ALL TO SUPPLIERS
SPECIFICATION.
1
225x10mm NUTEC FASCIA BOARD
COP IRON STRAPS OR
.6.4mm 'RHINOBOARD' CEILING
FD<ED TO 38XSOMM EX SW.
BRA.NDERING AT 400mrn
CENTRES.
TIMBER TRUSSES BY SPEC LIST.
G.l. FLASHING.
.TM ER EAVES. F URETO
D 'IAIL.
COAT' FINISH TO 1 SIDE. SUPPLIED
BY GLOBAL ROOFING SOLUTIONS. Social Development Department
Social Development
MPUMALANGA PROVINCE
REFERENCE
WOB KITCHEN 100 x 75mm RECTANGULAR
GALVANISED WIRE
ANCHORS. ROOF PitCH 1o· 1--f-----+--- --
100x75mm RECTANGULAR GALVANISEDWIRE
ANCHORS. ROOF PITCH 10•
p d91-t -/---- ------'k-
FLUTED ALUMINIUM DOWNPIPE---,
WITH PRE-PAINTED ALUMINIUM I STRAPS AT IOOOMM CENTRES,
FIXED TO WALL WITH NAIL
fr"'l 1'1 ;:........38xl FLUTED ALUMINIUM DOWNPIPI
WITH PRE-PAINTED ALUMINIUM
I STRAPS AT IOOOMM CENTRES. -- - PROJECT:
N MPUMALANGA PLUGS
-' 1- FD<ED TO WALL WITH NAIL
PLUGS
"""et:L -- - "· •k EARLY CHILDHOOD
DEVELOPMENT CENTRE
CLASSROOM 02 ----- -- a
o,_SN;
CLASSROOM 04
01 · -· II IF----- - --------'k- "'
oln
LOCATION:
-g- -------
i'l ;;;
' ;;;
I
i'l ;;;
o-N
"§' MPUMALANGA
DRAWING TITLE:
N
G 02 DAY CARE BLOCK
PROPOSED ELEVATIONS, SECTIONS
WINDOW 600x1200mm PURPOSE MADE BRONZE
ANODIZED ALUMINIUM WINDOW FRAME BY
SPECIAUSTS
IOOOxl25mmOPENf-- SECTION X-X SURFACE STORMWATER
FLOOR SLAB ON DAMP
MEMBRANE ON SOMM SAND BLINDING ON
ISOmm THICK WELL COMPACTED HARDCORE.
IOOOx125mmOPEN-' SECTION Y-Y SURFACE STORMWATER
100mm CONC. FLOOR SLAB ON DAMP PROOF
MEMBRANE ON 50MM SAND BLINDING ON
ISOmm THICK WELL COMPACTED HARDCORE.
.1000xl25mm OPEN
SURFACE STORMWATER
DATE: SCALES:
FEBRUARY 2015 1:100
DRAWN:
L.M
REFERENCE
W15 GIRLS TOILET CHANNEL TO ENG'S. Scale 1:100 DETAILS.
ON INSECTICIDE (ALDRIN I CHLORDANE OR
SIMILAR PRODUCT). CHANNEL TO ENG'S. Scale 1:100 DETAILS.
ON INSECTICIDE (ALDRIN I CHLORDANE OR
SIMILAR PRODUCD.
CHANNEL TO ENG'S.
DETAILS.
DRAWING No. REVISION
Wl6 GIRLS TOILET SUB-STRUCTURE TO ENG's SPECIFICATIONS. SUB-STRUCTURE TO ENG's SPECIFICATIONS. NDA.15.01_wd103 01
75
1r
.-0
75
1r
.-0
OCCUPATION CLASSIFICATION: A3
TI5. General Fire Perfonnance:
having a particular fire resistance.
TI07.Fire stability of strucluralelemenls or components:
Slability of slrucluralelemenls shall comply wilh lhe raquiromenls
conlslned In COLUMN 3 of TABLE 5 of 30 mlnules.
ns. lnlemal wall & partitions:
Fire resistmce of not less then 20 min. applicable.
In any building non-rombuslible matenal shall be used in
suspended ceiling.
Class 4, ftoor covenng lor G1 to comply to COLUMN 3 of TABLE 7
Class 3, ftoor covertng to feeder roules to COfTiliY to COLUMN 3 of TABLE 7 Class 1 ftoor covering to emergency
routes
TI15. Wall Finishes:
Class 4, wall finishes for G11o comply to COLUMN 3 of TABLE 8 Class 1 and 3 Wall covering to emergency and feeder Routes
TI21. Wnh of escape routes :
Minimum width of escape rou1e & stairs to be 1100 mm TABLES
TI28. Lobbies, foyers ole. :
Approved smoke control measures taken in entrance foyers.
TI29.Martirg & Signposling:
All fire fighling equipmenl, emergency routes and exils to be
marted in compliance wnh TT32.2, TI55.4 and in accolllance
wilh SAB.S.1186
TI33. Waler reliculation:
Reticulation for firo fittings shall comply with the roquiremenls
contained in rule WWS
TI34.Hose roels:
01 Hose Reel for every 500m' or part lheroof 5x30m
Fire hose reel in eccolllance with S.A.B.S.543
TI37.Portable fire exiinguishers:
1120Dm' Fire exiinguishers to comply lo COLUMN 2 of TABLE 10 11 x 4,5kg Dry Chemical Powder (DCP) or Carbon Dio de in
accordance wilh S.A.B.S. 810,889 cr 1151installed and
serviced in accoldance wilh SAB.S. 0105
TT39.Fire Stopping of Inaccessible Concealed Space: In any building
there is any inaccessible concealed space with a maximum
dimension of more than 5m such space shall be fire stopped.
TT41.Services in Structural or Separating Elements:
Any service thaipenetrates lhrough any walls and floors shall be
sealed not to penetrate such walls or floors
TT43.Air-Condtioni1g and Ventilation Systems:
Any air-ronditioning system or artificial ventilation system in
any building ohall be so designed to provenllhe dislribution of
products of combustion in lhe event of a fire in such building.
F
! !
-
Fire protection signage
Symbolic safety sign consists of: A Geometric Shape, A Colour and A Pictogram in accordance with s.a.b.s. 1186
75
• this drawing is copyright and remains with the architect, any unauthorized
reproduction, publication, tmsmission and or inclusion of any media is an
infringement.
• figured dimensions to be taken in preference to scaled dimensions.
• report any discrepancies direct to the architect before commencing work. • all work to be done in accordance with the sabs 0400
I I r . I
E-2 Running Man (R) to escape route.
FORM :Square
SIZE : 150 x 150mm
COLOUR : Green Background
F-1 Fire Extinguisher.
FORM : Square
SIZE : 150x 150mm
COLOUR : White with Red Borderline
I I<
PICTOGRAME : White Figure
- TOTAL
75
E-3 General direction Arrow. (L)
FORM :Square
II COLOUR : Green Background PICTOGRAME : White Arrow
I 75
F-4 Location of Fire Fighting Equipment.
FORM : Square
PICTOGRAME : Red Fire Extinguisher
TOTAL
E-3 General direction Aoow. (R)
FORM : Square
COLOUR : Green Background
PICTOGRAME :WhiteArrow
X y
GENERAL NOTES THIS DRAWING IS NOTTO BE SCALED. FIGURE DIMENSIONS TO BE USED ALL THE TIME.
CONTRACTOR IS RESPONSIBLE FOR CORRECT SETIING OUT OF THE BUILDING,
BOUNDARIES, BUILDING LINES ETC.
PUTIING ANY WORK CONTRACTOR TO CHECK AND VERIFY ALL LEVELS, DATUMS AND DIMENSIONS ON SITE AND SHALL REPORT ANY DISCREPANCIES OR OMISSIONS TO THIS OFFICE PRIOR TO START OF WORKS OR DURING THE CONSTRUCTION PHASE. THIS DRAWING IS TO BE READ AND UNDERSTOOD IN CONJUNCTION WITH
1r
.-0
75
SIZE : 150 x 150mm
COLOUR : White with Red Borderline
PICTOGRAME : Red Arrow
TOTAL
Fire Extinguishers to be hung on
I 23035 I
I ,=23=0 ,.!.!§. ,.!.!§. I 30
5730 5500 5500 5500
1295 3600 21:Jd 3600 I ,f 3600 15 3600 1180
DOCUMENTATION AS MAY BE APPLICABUE TO THE PROJECT PRIOR TO START OF WORKS AND ITS DURATION REPORT TO THE ARCHITECT ALL AMBIGUITIES, DISCREPANCIES, OMISSIONS, ERIRORS. DEPARTURES FROM GOOD PRACTICE DISCOVERED IN THE
BEFORE TENDERING, EXAMINE THE SITlE AND ASCERTAIN THE EXTENT AND
a in secure positions as indicated on I
I I
I
I I I
I
LOCAliON OF ALL BURIED SERVICES WHICH MAY HAVE TO BE PROTECTED, REMOVED OR RELOCATED
1r
.-0
••••••• c:{>
ARE ESCAPE ROUTE I'
\II
1m WIDE V-DRAIN APRON. \11
THE DRAWINGS AND THE CONTRACTOR SHALL WHERE REQUIRED HEREIN OR UPON REQUEST OF THE ARCHITECT/ ENGINEER FURNISH VOUCHERS TO PROVE THAT THE MATERIALS COMPLY HEREWITH
SAB.S & B.S.S. SPECIFICATION & SHALL CONFORM TO THE MINIMUM
STANDARD PREAMBLES IN THE BILL OF QUANTITIES OR, IN THE ABSENCE OF A
ARCHITECT.
THE CONTlRACTOR SHAUL NOTIFY AND OBTAIN THE APPROVAL OF THE
FIRE PROTECTION LEGEND -
WORKS UNDER THEIR RESPECTIVE JURISDICTION REQUIRNG INSPECTIONS PRIOR TO COVERING UP OR PROCEEDING WITH SUBSEQUENT WORK
30m ftre hose
reel & hydrant
30m Fire Hose Reel at 1500mm
above floor level I I I "C
I ! ! I .9
Co2 Fire • 4,5 kg Carbon Dioxide Flro Exlngulsher extinguisher
CLASSROOM
g>
Porcelain Tiles
Porcelain Tiles
g>
" SMALLER BABIES
D.C.P. ftreh• 4,5 kg Dry ChemicalPowder Rro Extinguisher ext1ngu1s er
NOTE:
Extinguisher to be mounted on 225 x 1000 x 25mm thick hardwood
backing with hook, plugged and screwed to wall Wood internal
(varnish). Prepare,Illand paint 3 coals polyurelhane matt finish
!ill r-
! -
'w=
ii 0:
-al :8
lj PARAPLEGIC area_35m'
·;;; CLASSROOM 02
i
! 0::
!
CLASSROOM 03 area_30.3m'
1l 8 ! !
\11
·;;;
-;j
I rl
! "-
! \i;
u
CLASSROOM 04 area_30.3m'
::< !il
!);
NDA National
Development
Agency
ISSUED FOR INFORMATION
SHAREDCOV
OUTDOOR PLAY AREA
area 28.4m'
Porcelain Tiles
!;! architect
dgit
NELSPRUIT
Rlvt !l'!llde Part: x12-Tel:082 &194952
.KlHANNE SBURG 334 Cilrtelet Esta te , S)TtA nue Broadacre112021- Tel; 011022 4042/3
SEcnON 3 TilE SPINAKER
Ourban 4001- T l:021:'168 2m
EAST L ONDON
East London 5214 -Tel: 043 704 8300
V-DRAII'l APRON.
I --- --
I
y
1m WIOE V-DRAIN APRON.
client
Social Development Department
Social Development
MPUMALANGA PROVINCE
MPUMALANGA EARLY CHILDHOOD
DEVELOPMENT CENTRE
IDA.'Y CA.RE BLOCK:
PROPOSED FIRE FLOOR PLAN Total Floor Area = 297m2
SCALE IN METRES
1 I I I 0 1 2 3 4 5
MPUMALANGA
TITLE:
DAY CARE BLOCK
PROPOSED FIRE FLOOR PLAN
SCALES:
NDA.15.01_wd104
DRAWN:
01
I
.I I
880 1200 880
2500
.
2960
1 I IIIII I 1 I"
700mmWIDEMELAMINE
WORKTOPATBOOMM
HEIGHT ABOVE
FINISHED FLOOR LEVEL
; F : ;o
"-
"'
N N
w
1
4 dgit
architect
A :
"
A
I'
2100mm High, ,
690x690mm Face brick pier. Facebrick to
architect's approval.
recast concrete
KLIP-LOK 700 PROFILE ROLL
FORMED IN CONTINUOS LENGTHS,
LIGHT INDUSTRIAL WITH 'GLOBAL
In II 1111 1111 II II II II II 1111 II II II II II II II 1111 II II II II II II II 1111 II II II II II 1111 illII II II II II J1 Ill
.60x30x2mm pre-slotted horizontal channels, in normal panel size 3950mm
wide, secured to steelposts.
• this drawing is copyright and remains with the architect, any unauthorized
reproduction, publication, tmsmission and or inclusion of any media is an
infringement.
• figured dimensions to be taken in preference to scaled dimensions.
• report any discrepancies direct to the architect before commencing work. • all work to be done in accordance with the sabs 0400
---
ffi II I'-. w
----
" II II I/
w
/
•all alle fjm in•
t;
w !!l z
:;5
<ii
@)
PROPOSED FIR.ONT ELEVATION COROBRIK
.FACEBRICKS RRELIGHT
li.Bdll rlbtdl.) § N
.60x30x2mm pre-slotted horizontal channels, in
COROBRIK
IFACEBRICKS FIRELIGHT
Scale 1:50 .1200x900mm PURPOSE MADE
ALUMIN.FRAMED WINDOW
(NATURAL ANODISED).
---
KLIP-LOK 700 PROFILE ROLL
FORMED IN CONTINUOS LENGTHS,
INDUSTRIAL WITH GLOBAL
COAT' FINISH TO 1 SIDE.SUPPLIED BY GLOBAL ROOFING SOLUTIONS.
Scale 1:50
1BOili<1200mm PURPOSE MADE ALUMIN. FRAMED WINDOW
(NATURAL ANODISED).
TRAVERTINE FBX
KLIP-LOK 700 PROFILE ROLL
fORMED IN CONTINUOS LENGTHS,
LIGHT INDUSTRIAL WITH 'GLOBAL
COAT' FINISH TO 1 SIDE. SUPPLIED
nonnal panel size 3950mm wide,secured to steel posts.
TRAVERTINE FBX CONCRETE
COPING STONE.
BY GLOBAL ROOFING SOLUTIONS.
COPING STONE.
GALVANISED MILD
STEEL PEDESTRIAN
GATE TO DETAIL.
TE
TO DETAIL.
"' !\!
@)
COROBRIK IIR FACEBRICKS FIRE TRAVERTINE FBX
!\!
2100mm HIGH
690X690mm FACE BRICK
PIER. FACEBRICK TO
ARCHITECT'S
CLOSE COUPLED SUITE I
PROPOSED SIDE ELEV. Scale 1:50
PROPOSED REAR ELEVATION i00x600mm PURPOSE MADE
ALUMIN.FRAMED WINOOW
(NATURALANODISED).
APPROVAL. VAAL_ Product code 772654
TRAVERTINE FBX
w
"-
m
"gl i;'l l!ll
'0 230mm WALL. PLASTER ONE WITH 4 LEVER MORTICE
SEAMLESS 150x125x{).8mm
ALUMINIUM OGEE GUTIER WITH---,
BAKED ENAMEL FINISH FIXED
WITH CONCEALED BRACKETS-
ALL TO SUPPLIERS
SPECIFICATION.
SUPER SISALATION
SINGLE SIDED REFLECTIVE
FOIL, LAMINATE ROOF
INSULATION.
OOP IRON STRAPS OR
GALVANISED WIRE
ANCHORS.
KLIP-LOK 700 PROFILE ROLL
'ORMED IN CONTINUOS LENGTHS,
.IGHT INDUSTRIAL WITH 'GLOBAL
COAT' FINISH TO 1SIDE. SUPPLIED
BY GLOBAL ROOFING SOLUTIONS.
TIMBER TRUSSES BY SPECIALIST.
ROOF PITCH 20•
-- r.. - J r t -100 x75mm RECTANGULAR ] 1 12x220mm FASCIA BOARD
L:FIXEDTORAFTERS.'EVERITE WITH PRE-PAINTED ALUMINIUM FLEXIT, PRESSED NUTEC
STRAPS AT IOOOMM CENTRES, CEMENr
FIXED TO WALL Wllll NAIL _ J J
fil
_J__ I ,¥ I
m
'!II! '1!1 I
61 51
7023
rr
DR
P.
I
...
PLUGS
FIXED TO 38X50MM EX SW.
BRANDERING AT 400mm
CENTRES.
""" """
National
Development Bll I
=· ol
il:l
I
+I
- - t J !:7
0
Agency
E ZE
"w'C-I_)g"'sw
l=u:l t;
g6@
o r. uJlWlJ
c.._jzo::::
Ei5i1::a EZ
5W
i
I Jl T INSIDE
SURFACE STORMWATER
CHANNEL TO ENG'S.
DETAILS.
L_1UUmm CONC.FLOOR SLAB ON DAMP PROOF
MEMBRANE ON 50MM SAND BLINDING ON
1ii0mm THICK WELL COMPACTED HARDCORE.
ON INSECTICIDE (ALDRIN I CHLORDANE OR
SIMILAR PRODUCT).
SUB-STRUCTURE TO ENG's SPECIFICATIONS.
SURFACE STORMWATER
CHANNEL TO ENG'S.
DETAILS.
ISSUED FOR INFORMATION
NELSPRUIT 9 WaterlilyTur n, Unit 7
Rlvt !l'!llde Part: x12-Tel:082 &194952
.KlHANNE SBURG 334 Cilrtelet Esta te, S)TtA nue Broadacre112021- Tel; 011022 4042/3
co:::t:Z>D..
GENERAL FIRE NOTES
ffi
.Y CONTROLLED SLIDING
y
PROPOSED SECTION A-A Scale 1:50
client
AROHITEOTS DURitAN
SEcnON 3 TilE SPINAKER
180 Mah;trna G:aMhl Road
Ourban 4001- T l:021:'168 2m
EAST LONDON
No. 7 Belsraw Road Southern Wood
East London 5214 -Tel: 043 704 8300
Social Development
FIRE EXTINGUISHERS TO BE HUNG
ON PURPOSE MADE BOARDS AND
LOCATED IN SECURE POSITIONS AS
INDICATED ON PLAN.
.I
DAY CARE BLOCK
PROPOSED FLOOR PLAN Total Floor Area= 15.5m2
Scale 1:50
SCALE IN METRES
I I
OUTSIDE
DRIVEWAY
PAVING
;"; 100x100mm GMS VERTICAL
POSTS ON BOTH SIDES TO
SUPPORT PEDESTRIAN
GATE.
NOTE
References to trade names are used
GENERAL NOTES THIS DRAWING IS NOT TO BE SCALED. FIGURE
DIMENSIONS TO BE USED ALL THE TIME.
CONTRACTOR IS RESPONSIBLE FOR CORRECT SETIING
OUT OF THE BUILDING, ALL EXTERNAL AND INTERNAL
WALLS WITH PARTICULAR REFERENCE TO
BOUNDARIES, BUILDING LINES ETC.
CONTRACTOR TO VERIFY ALL LEVELS, HEIGHTS AND
DIMENSIONS BEFORE PUTIING ANY WORK
CONTRACTOR TO CHECK AND VERIFY ALL LEVELS,
DATUMS AND DIMENSIONS ON SITE AD SHALL
REPORT ANY DISCREPANCIES OR OMISSIONS TO
THIS OFFICE PRIOR TO START OF WORKS OR DURING
THE CONSTRUCTIONPHASE. THIS DRAWING IS TO BE READ AND UNDERSTOOD IN
BEFORE TENDERING, EXAMINE THE SITE AND ASCERTAIN THE
EXTENT AND NATURE OF ALL CONDITIONS AFFECTING THE
WORK, NOT EXCLUDING THE LOCATION OF ALL BURIED SERVICES
WHICH MAY HAVE TO BE PROTECTED,REMOVED OR RELOCATED
MATERIALS SHALL BE THE BEST OF THEIR RESPECTIVE KINDS DESCRIBED
ON E DRAWINGS AND THE CONTRACTOR SHALL WHERE REQUIRED
HEREIN OR UPON REQUEST OF THE ARCHITECT/ ENGINEER FURNISH
VOUCHERS TO PROVE THATTHE MATERIALS COMPLY HEREWITH
QUALITY OF MATERIALS & WORKMANSHIP TO COMPLY WITH THE
RELEVANT SAB.S & B.S.S.SPECIFICATION & SHALL CONFORM TO THE MINIMUM STANDARD PREAMBLES IN THE BILL OF QUANTITIES
OR, IN THE ABSENCE OF A BILL OF QUANTITIES, AVAILABLE FOR
PERUSAL AT THE OFFICES OF THE ARCHITECT.
THE CONTRACTOR SHALL OTIFY AND OBTAINE APPROVAL OF
Department
Social Development
MPUMALANGA PROVINCE
MPUMALANGA EARLY CHILDHOOD
DEVELOPMENT CENTRE
MPUMALANGA
TITLE:
GUARD HOUSE 0 1 2 3 4 5
yI
only to simplify detailing. Various
similar and approved products are
available for approval prior to
installation.
CONJUNCTION WITH STRUCTURAL,MECHANICA
ELECTRICAL AND/ OR ANY OTHER CONSULTANT Is DOCUMENTATION AS MAY BE APPLICABLE TO THE
PROJECT PRIOR TO START OF WORKS AND ITS DURATION
REPORT TO THE ARCHITECT ALL AMBIGUITIES, DISCREPANCIES,
THE PLANNING DEPARTMENT AND I OR THE FIRE PREVENTION
OFFICER FOR ANY WORKS UNDER THEIR RESPECTIVE JURISDICTION
REQUIRING INSPECTIONS PRIOR TO COVERING UP OR PROCEEDING
WITH SUBSEQUENT WORK
PROPOSED FLOOR PLAN, SECTION &
ELEVATIONS SCALES:
MARCH 2015 1:50
DRAWN:
ALLAN.M
OMISSIONS ,ERRORS, DEPARTURES FROM GOOD PRACTICE No. REVISION
DISCOVERED IN THE DRAWINGS
NDA.15.01_wd105 00