Amount Item No Quantity at St Albans Correctional Facility, Eastern Cape Completion of the Construction of Fencing and Building Works Tender No: DCS05ECAN002/WP0/C2 BILL NO. 01 PRELIMINARIES The JBCC Principal Building Agreement (Edition 6.2 - May 2018) prepared by the Joint Building Contracts Committee shall be the applicable building agreement, amended as hereinafter described BUILDING AGREEMENT AND PRELIMINARIES The JBCC Principal Building Agreement contract data form an integral part of this agreement The JBCC General Preliminaries (May 2018) published by the Joint Building Contracts Committee for use with the JBCC Principal Building Agreement (Edition 6.2 - May 2018) shall be deemed to be incorporated in these bills of quantities, amended as hereinafter described The contractor is deemed to have referred to the abovementioned documents for the full intent and meaning of each clause The clauses in the abovementioned documents are hereinafter referred to by clause number and heading only Where any item is not relevant to this agreement such item is marked N/A signifying "not applicable" Where standard clauses or alternatives are not entirely applicable to this agreement such amendments, modifications, corrections or supplements as will apply are given under each relevant clause heading and such amendments, modifications, corrections or supplements shall take precedence notwithstanding anything to the contrary contained in the abovementioned documents The General Preambles for Trades 2017 published by the Association of South African Quantity Surveyors shall be deemed to be incorporated in these bills of quantities and no claims arising from brevity of description of items fully described in the said General Preambles will be entertained PREAMBLES FOR TRADES Supplementary preambles and/or specifications are incorporated in these bills of quantities to satisfy the requirements of this project. Such supplementary preambles and/or specifications shall take precedence over the provisions of the General Preambles -1- Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R
503
Embed
BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
AmountItemNo
Quantity
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 01 PRELIMINARIES
The JBCC Principal Building Agreement (Edition 6.2 - May 2018) prepared by the Joint Building Contracts Committee shall be the applicable building agreement, amended as hereinafter described
BUILDING AGREEMENT AND PRELIMINARIES
The JBCC Principal Building Agreement contract data form an integral part of this agreement
The JBCC General Preliminaries (May 2018) published by the Joint Building Contracts Committee for use with the JBCC Principal Building Agreement (Edition 6.2 - May 2018) shall be deemed to be incorporated in these bills of quantities, amended as hereinafter described
The contractor is deemed to have referred to the abovementioned documents for the full intent and meaning of each clause
The clauses in the abovementioned documents are hereinafter referred to by clause number and heading only
Where any item is not relevant to this agreement such item is marked N/A signifying "not applicable"
Where standard clauses or alternatives are not entirely applicable to this agreement such amendments, modifications, corrections or supplements as will apply are given under each relevant clause heading and such amendments, modifications, corrections or supplements shall take precedence notwithstanding anything to the contrary contained in the abovementioned documents
The General Preambles for Trades 2017 published by the Association of South African Quantity Surveyors shall be deemed to be incorporated in these bills of quantities and no claims arising from brevity of description of items fully described in the said General Preambles will be entertained
PREAMBLES FOR TRADES
Supplementary preambles and/or specifications are incorporated in these bills ofquantities to satisfy the requirements of this project. Such supplementary preambles and/or specifications shall take precedence over the provisions of the General Preambles
-1-
PreliminariesBill No. 1Section No. 1
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
The contractor's prices for all items throughout these bills of quantities shall take account of and include where applicable for all of the obligations, requirements and specifications given in the General Preambles and in any supplementary preambles and/or specifications
If any ambiguity or discrepancy in any of the documents forming part of the contract is found, then the contract data and or amendments within the special conditions of contract and herein shall prevail in cases of conflict between any of the documents
Section A : A recital of the headings of the individual clauses in the aforementioned JBCC Principal Building Agreement
STRUCTURE OF THIS PRELIMINARIES BILL
Section B : A recital of the headings of the individual clauses in the aforementioned JBCC General Preliminaries
Section C : Any special clauses to meet the particular circumstances of the project
Contractors are required to price all individual items in the preliminary and general section of the bill of quantities and should not lump the items into a single sum or amount. This fully priced schedule must be included as part of the priced bill of quantities returnable with tender submission
PRICING OF PRELIMINARIES
In the event that the contractor, due to causes of his own making, fails to achieve the targets set out in his construction programme and his performance is not in accordance with the contract, payment of the time related p&g will be paid in proportion to the value of the monthly progress payment and not in accordance with the projected cash flow for this item. The principal agent shall review the status quo and revert to paying the contractor in accordance with the contract once the contractor has demonstrated improvement of their performance and the principal agent is satisfied that the contractor is performing diligently.
Similarly the full amount of the fixed portion of the p&g will be paid only once the successful contractor has fully complied with deliverables under this section
-2-
PreliminariesBill No. 1Section No. 1
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
Should the contractor select Option A in the contract data for the adjustment of preliminaries, the amounts entered against the relevant items in these preliminaries are to be divided into one or more of the three categories provided namely fixed (F), value related (V) and time related (T)
SECTION A: PRINCIPAL BUILDING AGREEMENT
Clause 1.0 - Definitions and interpretation1
Interpretation (A1-A7)
Pricing of bills of quantities
The contractor is to allow opposite each item for all costs in connection therewith. All prices to include, unless otherwise stated, for all materials, fabrication, conveyance and delivery, unloading, storing, unpacking, hoisting, labour, setting, fitting and fixing in position, cutting and waste (except where to be measured in accordance with the standard system of measurement), patterns, models and templates, plant, temporary works, returning of packaging, duties, taxes (other than Value Added Tax), imposts, establishment charges, overheads, profit and all other obligations arising out of this agreement. Value Added Tax (VAT) is to be separately stated on the summary page of these bills of quantities
Items left unpriced will be deemed to be covered in prices against other items throughout these bills of quantities and no claim for any extras arising out of the contractor's omission to price any item will be entertained
Prices for all construction equipment, temporary works, services and other items shall include for the supply, maintenance, operating cost and subsequent removal and making good as necessary
Contractors are reminded that some of the works are to be undertaken under restrictive site conditions, over steep terrain, in dense vegetation, protected environments etc.
In addition to the usual rates priced for standard measured items in the bills of quantities, contractors shall provide for all additional plant, labour, equipment, temporary works, temporary access ways and any additional supervision, transport, security, special plant and equipment to navigate restrictive site conditions and all things necessary for the completion of the works within this bills of quantities. The rates or amounts tendered for these items shall also include for the contractors management, attendance, profit, costs for removal and reinstatement of the ground conditions, vegetation, etc in the state and condition prior to the works being undertaken.
-3-
PreliminariesBill No. 1Section No. 1
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
In addition to the usual rates priced for compliance with law and regulation in relation to inspections, warranties, guarantees, tests, analysis, commissioning and all things necessary for compliance, the contractor is expected to include in the rates, prices and the tendered total of the prices for all inspections, warranties, guarantees, tests, analysis, commissioning and all things necessary for compliance, payable by the contractor.
Such items include but are not limited to:- Electrical Compliance Certificate
- Plumbing Compliance Certificate
- Structural Steel Compliance Certificate
- Lightning Certificate
- Soil Protection Certificate
- Concrete test results and cube certificates
- Compaction Test results and certificates
- Waterproofing guarantee certificates
- TR1 and TR2 prefabricated roof truss certificates
- Roof covering certificate
- Soil compaction certificates
- Electrical and Mechanical test certificates
- Plumbing and drainage pressure test certificates
- Fire Compliance Certificate
- Entomology Certificate
- SANS 10400-A:2010 compliance certificates
- Any other requirement as per the latest National Building Regulation
Contractors are reminded and hereby given the opportunity to allow for and price all costs related to the abnormal working conditions referred to herein as no claims for additional costs will be entertained for any omission on the part of contractor
Clause 3.9 amended to read ‘The priced document shall not be used as a specification for material and goods and the quantities should not be used for procurement purposes.
All procurement of material will be based on actual site measurements and not on drawings, specifications or the bill of quantities
-4-
PreliminariesBill No. 1Section No. 1
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
Abbreviated descriptions
The items in these bills of quantities utilise abbreviated descriptions. It is the intention that the abbreviated descriptions be fully described when read with the applicable measuring system and the relevant preambles and/or specifications. However, should the full intent and meaning of any description not be clear, the contractor shall, before submission of his tender, call for a written directive from the principal agent, failing which it shall be assumed that the contractor has allowed in his pricing for materials and workmanship in terms of international best practice
Legal status of contractor
If the contractor constitutes a joint venture, consortium or other unincorporated grouping of two or more persons then:
1. These persons are deemed to be jointly and severally liable to the employer for the performance of this agreement
2. These persons shall notify the employer of their leader who has assigned authority to bind the contractor and each of these persons
3. The contractor shall not alter its composition or legal status without the prior written consent of the employer
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
Provision is made in the summary page of these bills of quantities for the inclusion of Value Added Tax (VAT)
Priced document as specification
Clause 5.4 is deemed to be deleted
The principal agent shall decide which portion of the priced document may be used as a specification of materials and goods or methods, if any
Electronic issue of drawings
Some drawings for this project will be issued electronically and the contractor shall be deemed to have received such drawings on the date that such drawings have been dispatched electronically [5.6]
The authority of the principal agent to issue contract instructions [17.1] and perform duties for specific aspects of the works is delegated to agents as follows [6.2]. This does not preclude the principal agent from issuing such contract instructions:
1. Architect
1.1 Duties [6.2] :
The architect is responsible for the architectural design, functional design and quality inspection of the works
1.2 Contract instructions [6.2; 17.1] :
1.2.1 Rectification of discrepancies, errors in description or quantity or omission of items in the agreement other than in the JBCC Principal Building Agreement
1.2.2 Alteration to design, standards or quantity of the works provided that such contract instructions shall not substantially change the scope of the works
-6-
PreliminariesBill No. 1Section No. 1
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
1.2.3 The site [13.0]
1.2.4 Compliance with the law, regulations and bylaws [2.1]
1.2.5 Provision and testing of samples of materials and goods and/or of finishes and assemblies of elements of the works
1.2.6 Opening up of work for inspection, removal or re-execution [23.2.4; 26.4.2]
1.2.7 Removal or re-execution of work
1.2.8 Removal or substitution of any materials and goods
1.2.9 Protection of the works
1.2.10 Making good physical loss and repairing damage to the works [23.2.2]
1.2.11 Rectification of defects [21.2]
1.2.12 A list for practical completion specifying outstanding or defective work to be rectified to achieve practical completion, a list for completion and a list for final completion specifying outstanding or defective work to be rectified to achieve final completion
1.2.13 Expenditure of budgetary allowances, prime cost amounts and provisional sums
1.2.14 Appointment of a subcontractor [14.0; 15.0]
1.2.15 Work by direct contractors [16.0]
1.2.16 On suspension or termination, protection of the works, removal of construction equipment and surplus materials and goods [29.0]
2. Quantity surveyor
2.1 Duties [6.2] :
The quantity surveyor is responsible for all measurements, valuations, financial assessments and all other quantity surveying and cost control functions of the works
2.2 Contract instructions [6.2; 17.1] :
-7-
PreliminariesBill No. 1Section No. 1
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
2.2.1 Rectification of discrepancies, errors in description or quantity or omission of items in the agreement other than in the JBCC Principal Building Agreement
2.2.2 Alteration to design, standards or quantity of the works provided that such contract instructions shall not substantially change the scope of the works
2.2.3 The site [13.0]
2.2.4 Compliance with the law, regulations and bylaws [2.1]
2.2.5 Provision and testing of samples of materials and goods and/or of finishes and assemblies of elements of the works
2.2.6 Opening up of work for inspection, removal or re-execution [23.2.4; 26.4.2]
2.2.7 Removal or re-execution of work
2.2.8 Removal or substitution of any materials and goods
2.2.9 Protection of the works
2.2.10 Making good physical loss and repairing damage to the works [23.2.2]
2.2.11 Rectification of defects [21.2]
2.2.12 A list for practical completion specifying outstanding or defective work to be rectified to achieve practical completion, a list for completion and a list for final completion specifying outstanding or defective work to be rectified to achieve final completion
2.2.13 Expenditure of budgetary allowances, prime cost amounts and provisional sums
2.2.14 Appointment of a subcontractor [14.0; 15.0]
2.2.15 Work by direct contractors [16.0]
2.2.16 On suspension or termination, protection of the works, removal of construction equipment and surplus materials and goods [29.0]
3. Civil and structural engineer
-8-
PreliminariesBill No. 1Section No. 1
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
3.1 Duties [6.2] :
The civil and structural engineer is responsible for all aspects of civil and structural engineering design and quality inspection of the works
3.2 Contract instructions [6.2; 17.1] :
3.2.1 Rectification of discrepancies, errors in description or quantity or omission of items in the agreement other than in the JBCC Principal Building Agreement
3.2.2 Alteration to design, standards or quantity of the works provided that such contract instructions shall not substantially change the scope of the works
3.2.3 The site [13.0]
3.2.4 Compliance with the law, regulations and bylaws [2.1]
3.2.5 Provision and testing of samples of materials and goods and/or of finishes and assemblies of elements of the works
3.2.6 Opening up of work for inspection, removal or re-execution [23.2.4; 26.4.2]
3.2.7 Removal or re-execution of work
3.2.8 Removal or substitution of any materials and goods
3.2.9 Protection of the works
3.2.10 Making good physical loss and repairing damage to the works [23.2.2]
3.2.11 Rectification of defects [21.2]
3.2.12 A list for practical completion specifying outstanding or defective work to be rectified to achieve practical completion, a list for completion and a list for final completion specifying outstanding or defective work to be rectified to achieve final completion
3.2.13 Expenditure of budgetary allowances, prime cost amounts and provisional sums
4. Mechanical engineer
-9-
PreliminariesBill No. 1Section No. 1
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
4.1 Duties [6.2] :
The mechanical engineer is responsible for all aspects of mechanical engineering design and quality inspection of the works ? and, where appointed by the employer for quantity surveying services in respect of the mechanical installations, for all measurements, valuations, financial assessments and all other quantity surveying and cost control functions
4.2 Contract instructions [6.2; 17.1] :
4.2.1 Rectification of discrepancies, errors in description or quantity or omission of items in the agreement other than in the JBCC Principal Building Agreement
4.2.2 Alteration to design, standards or quantity of the works provided that such contract instructions shall not substantially change the scope of the works
4.2.3 Compliance with the law, regulations and bylaws [2.1]
4.2.4 Provision and testing of samples of materials and goods and/or of finishes and assemblies of elements of the works
4.2.5 Opening up of work for inspection, removal or re-execution [23.2.4; 26.4.2]
4.2.6 Removal or re-execution of work
4.2.7 Removal or substitution of any materials and goods
4.2.8 Protection of the works
4.2.9 Making good physical loss and repairing damage to the works [23.2.2]
4.2.10 Rectification of defects [21.2]
4.2.11 A list for practical completion specifying outstanding or defective work to be rectified to achieve practical completion, a list for completion and a list for final completion specifying outstanding or defective work to be rectified to achieve final completion
4.2.12 Expenditure of budgetary allowances, prime cost amounts and provisional sums
-10-
PreliminariesBill No. 1Section No. 1
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
5. Electrical/Electronics engineer
5.1 Duties [6.2] :
The electrical engineer is responsible for all aspects of electrical and electronics engineering design and quality inspection of the works and, where appointed by the employer for quantity surveying services in respect of the electrical and electronics installations, for all measurements, valuations, financial assessments and all other quantity surveying and cost control functions
5.2 Contract instructions [6.2; 17.1] :
5.2.1 Rectification of discrepancies, errors in description or quantity or omission of items in the agreement other than in the JBCC Principal Building Agreement
5.2.2 Alteration to design, standards or quantity of the works provided that such contract instructions shall not substantially change the scope of the works
5.2.3 Compliance with the law, regulations and bylaws [2.1]
5.2.4 Provision and testing of samples of materials and goods and/or of finishes and assemblies of elements of the works
5.2.5 Opening up of work for inspection, removal or re-execution [23.2.4; 26.4.2]
5.2.6 Removal or re-execution of work
5.2.7 Removal or substitution of any materials and goods
5.2.8 Protection of the works
5.2.9 Making good physical loss and repairing damage to the works [23.2.2]
5.2.10 Rectification of defects [21.2]
5.2.11 A list for practical completion specifying outstanding or defective work to be rectified to achieve practical completion, a list for completion and a list for final completion specifying outstanding or defective work to be rectified to achieve final completion
-11-
PreliminariesBill No. 1Section No. 1
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
5.2.12 Expenditure of budgetary allowances, prime cost amounts and provisional sums
6. Health and safety consultant
(Appointed through the contract - refer to Provisional Sums)
6.1 Duties [6.2] :
The health and safety consultant is responsible for all aspects of health and safety of the works. Without derogating from the generality thereof, the health and safety consultant will perform the following specific functions and duties in respect of the health and safety aspects of the works. He shall:
6.1.1 Act as the employer's agent in terms of the Construction Regulations issued in terms of the Occupational Health and Safety Act,1993 as amended
6.1.2 Prepare and update the health and safety specification for the works
6.1.3 Agree with the contractor the health and safety plan for the works
6.1.4 Carry out regular audits to ensure adherence to the safety plan and compliance with the act and regulations
6.1.5 Stop the execution of the works where the agreed specification or plan is not adhered to
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
Item
Clause 10.0 - InsurancesClause 10.1.1 - Contracts Works Insurance
‘the contractor shall be responsible for effecting and maintaining the contract works insurance for the full duration of the contract period. The insured amount for the full scope of works shall be 120% of the contract amount
Clause 10.1.2 - Supplementary InsuranceClause 10.1.3 - Public Liability InsuranceClause 10.1.4 - Removal of Lateral Support InsuranceClause 10.1.5 - Other Insurances
The contractor shall not provide to the employer a guarantee for constructionwithin fifteen (15) working days of acceptance of the contractor's tender.
Clause 11.5 - Guarantee for payment
The employer shall not provide to the contractor a guarantee for payment. The contractor shall waive his lien or right of continuing possession of the works [11.10]
Extension of waiver of lien
The contractor shall ensure that a waiver of lien is included in all subcontracts and that the works executed on the site are kept free of all liens and other encumbrances at all times [11.10]
The contractor shall provide, maintain and remove on practical completion air conditioned office accommodation with suitable tables and chairs for meetings to be held on the site. Such offices shall be kept clean and fit for use at all times [12.2.18]
-13-
PreliminariesBill No. 1Section No. 1
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
Notice board
The contractor shall erect in a position approved by the principal agent, maintain and remove on practical completion a notice board recommended by the South African Institute of Architects and as approved by the principal agent listing the names and logos of the employer, the contractor and the professional consultants. No subcontractor or supplier notice boards may be erected unless permission is granted by the principal agent for such notice boards to be erected [12.2.18]
Statutory and other notices
The contractor shall submit and/or comply with all statutory and other notices that may be required by any local or other authority in order not to cause any delay to the commencement of the works by the contractor. The contractor shall pay all deposits or fees in this regard
It is, however, specifically recorded that the employer shall be responsible for the timeous approval of building plans by any local or other authorities and the payment of any fees or charges related thereto
In respect of direct contractors the contractor shall:
16
1. Designate an area for the direct contractor to establish a temporary office and workshop and storage of equipment and materials
-14-
PreliminariesBill No. 1Section No. 1
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
2. Allow the use of personnel welfare facilities, where provided
3. Provide water, lighting and single phase electric power to a position within 50m of the place where the direct contract work is to be carried out, other than fuel or power for commissioning of any installation
4. Permit the direct contractor to use erected scaffolding, hoisting facilities, etcprovided by the contractor, in common with others having the likeright, while it remains erected on the site [16.1]
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
Clause 23.0 - Revision of the date for practical completion
Adverse weather conditions
The contract duration includes a monthly allowance of 3 working days for adverse weather conditions [23.1.1] during which rainfall exceeds 10mm per day. These days shall be reflected on the critical path of the construction programme. Where the programmed delays for adverse weather conditions exceed the actual delays incurred the date for practical completion will not be adjusted. Where the actual delays incurred for adverse weather conditions exceed the programmed delays and such delays have impacted on the critical path of the construction programme, the date for practical completion will be adjusted should the requirements of Clause 23.0 be satisfied
Substitution of materials, goods and or workmanship
The removal or substitution of any materials, goods and/or workmanship which
do not conform to the specification or the contract drawings shall not constitute
grounds for the extension of the construction period nor for the adjustment of the
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
Prices submitted
Where prices are submitted by the contractor or subcontractor during the progress of the works in respect of contract instructions or in regard to a claim under the terms of this agreement and notwithstanding the fact that such prices may be used in an interim payment certificate, there is to be no presumption of acceptance. Should the principal agent wish to accept any such prices prior to the issue of the certificate of final completion, it shall be in writing
Clause 25 amended to read ‘The employer shall pay to the contractor the amount certified in interim payment certificate within thirty (30 ) calendar days of the date of issue of the payment certificate or the contractors tax invoice whichever is the later date'
Materials and goods stored off site shall not be included in the amount authorised for payment unless the requirements for an Advanced Payment Guarantee are met
Clause 26.0 - Adjustment of the contract value and final account26
Fluctuations in costs
All fluctuations in costs, with the exception of fluctuations in the rate of Value Added Tax, shall be for the account of the contractor [26.9.5]
Tenant installation/user requirements delayed
There is a possibility that certain works related to tenant installation/user requirements may have to be delayed and may consequently not be executed prior to practical completion
Should the contractor be instructed to do so he shall execute this work under the conditions pertaining to this agreement on the basis that a separate amount for preliminaries appurtenant to this work (if applicable) is agreed to between the contractor and the principal agent and on condition that instruction to proceed with such work is given to him within a period of three (3) calendar months after the date of practical completion of the works
The contractor shall not receive any mark-up for overheads and profit on any omission of tenant installation work or tenant installation work by others. Claims of loss of profit shall not be considered
-17-
PreliminariesBill No. 1Section No. 1
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
The employer reserves the right to omit such work without compensation to the contractor for loss of profit or any other loss which the contractor may suffer as a result of such omission
Cost of claims
All costs incurred by the contractor in the preparation of claims shall be borne by the contractor. This provision shall not preclude an adjudicator or an arbitrator appointed in terms of this agreement [30.6 & 7] from making a determination on costs
Claims from subcontractors
The contractor shall review, assess and adjudicate any claims received by him from any subcontractor and thereafter submit same to the principal agent with a recommendation in order to assist the principal agent in adjudicating the claim [26.6]
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
Item
The required information of the parties and the amount of the contract sum shall be inserted in the agreement for signature of the agreement by the parties
These bills of quantities are in multiple procurement format ie the "wet trades" - earthworks, concrete, formwork and reinforcement, precast concrete, masonry, waterproofing and sub-surface drainage - are provisionally measured and the subsequent trades are budgetary allowances and provisional sums
The contractor shall notify the principal agent if any encroachments of adjoining foundations, buildings, structures, pavements, boundaries, etc. exist in order that the necessary arrangements may be made for the rectification of any such encroachments
Clause 8.3 - Ablution and welfare facilities in compliance to the provisions of the Construction Regulations 2014 issued in terms of the Occupational Health and Safety Act, 1993 as amended:Section (30):Sub-section (1)(a) - Shower facilities after consultation with the employees or the employees representatives, or at least one shower facility for every 15 persons;Sub-section (1)(b) - at least one sanitary facility for each sex and for every 30 workers;Sub-section (1)(c) - changing facilities for each sex andSub-section (1)(d) - sheltered eating areas
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
Clause 11.5 - Disturbance68
Item
Disturbance
All work is to be carried out in such a manner as to cause no unacceptable or unreasonable dust, noise, vibrations, nuisance, inconvenience, annoyance and the like to the public, others, other properties and traffic in so far as they exceed the permissible limitations set by government legislation or by the local authority. Any delays, stoppages and the like arising from or in order to comply with the above will not constitute grounds for an adjustment to the construction period or contract value whatsoever
The contractor shall be responsible for and take all precautions in controlling by whatever means necessary all forms of pollution emanating from the site during the construction period due inter alia to noise, artificial light, wind-blown sand, dust, deposits of mud, etc
The contractor is to ensure that all roads which border the site and are used by the contractor during the execution of the works are kept clean and free of any dirt or debris caused by the execution of the works
Where warranties for materials and/or workmanship are called for, the contractor shall obtain a written warranty, addressed to the employer, from the entity supplying the materials and/or executing the work and shall deliver same to the principal agent on final completion of the contract
75
SECTION C: SPECIFIC PRELIMINARIES
The warranty shall state that workmanship, materials and installation are warranted for a specific period from the date of practical completion and that any defects that may arise during the specified period shall be made good at the expense of the entity supplying the materials and/or doing the work, upon written notice to do so
Item
The warranty will not be enforced if the work is damaged by defects in the execution of the works, in which case the responsibility for replacement shall rest entirely with the contractor
Should overtime be required to be worked for any reason whatsoever, the cost of such overtime is to be borne by the contractor unless the principal agent has specifically authorised, prior to execution thereof, that costs for such overtime are to be borne by the employer
It is specifically agreed that the contractor accepts the obligation of assisting the principal agent in implementing proper cost management. The contractor will be advised by the principal agent of all cost management procedures which will be implemented to ensure that the contract value does not exceed the budget
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
Item
Overloading
The contractor shall take all necessary steps to ensure that no damage occurs due to overloading of any portion of the works or temporary works eg scaffolding, etc. The contractor shall submit details of his proposed loading, storage, plant erection, etc to the principal agent for approval prior to proceeding with such loading, storing or erecting and shall comply with and pay for the principal agent's requirements in connection with the provision of temporary support work, etc. Any damage caused to the works by overloading shall be made good by the contractor at his sole expense
The contractor is advised that propping of floors below may be required if he wishes to use any areas of completed suspended reinforced concrete slabs for vehicle access, storage of materials and goods and location of plant, scaffolding, etc. The location of these areas and any necessary propping shall beapproved by the principal agent and the cost thereof shall be borne by the contractor
Testing of flat roof waterproofing for watertightness
Flat roof waterproof areas shall be flooded and kept "ponded" for at least forty eight (48) hours as a test to ensure the watertightness of the waterproofing and before any further construction work is carried out above the waterproofing
Without limiting the generality of the provisions of clause 2.0, the contractor's attention is drawn to the provisions of the Construction Regulations issued in terms of the Occupational Health and Safety Act, 1993 as amended. It is specifically stated that the employer shall prepare a documented health and safety specification for the works and that the employer shall ensure that the contractor has made provision for the cost of health and safety measures during the execution of the works. The contractor shall price opposite this item for compliance with the act and the regulations and the reasonable provisions of the aforementioned health and safety specification [2.1]
-26-
PreliminariesBill No. 1Section No. 1
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
The contractor shall:
1. Comply with the health and safety specification for the works
2. Prepare and agree with the health and safety consultant the health and safety plan for the works
3. Cooperate with the health and safety consultant in all respects
4. Manage the compliance of all subcontractors with the regulations and with the health and safety plan and specification
5. Conform to the conditions contained in the employer's health and safety specification
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
The Contractor shall follow a sequence of work which will enable him to complete the work in accordance with the provisions of this document.
The Contractor shall allow opposite this Clause whatever cost and charges he may consider necessary to meet the stipulated date(s) and for any out-of-sequence working, inconvenience working in shifts, overtime, etc. and all additional costs whatsoever arising there from.
Notwithstanding anything to the contrary contained herein, the Principal Agent (PA) at all times reserves the right to direct the order in which the various parts of the Contract must be executed. The Contractor shall give priority to any individual section or portion of the works that, in the opinion of the PA, requires to be expedited and no claim for extras in this connection will be considered.
Should it appear, in the PA's opinion, that work in any area is not being executed in accordance with programme requirements, the Contractor shall provide additional manpower and resources and shall work additional overtime and do everything else required to bring the work back into alignment with the programme to the satisfaction of the PA.
The Employer and the Tenants shall have the right to employ other Contractors (hereinafter referred to as "Direct Contractors") to execute any special or other works whether separate or within this Contract. In addition, the Employer and the Tenants shall have the right to send on to the works any furniture, furnishings, curtaining, carpeting, fittings. etc., and have same installed by his/her own employees or by Direct Contractors. The Contractor shall not be entitled to any percentage, profit or discount on the value of any work executed by "Direct Contractors".
Allocation of Work to Local Subcontractors, Suppliers & Local Labour 85
Item
There are no predetermined targets in relation to the allocation of work to local subcontractors, suppliers and local labour, however the contractor is encouraged to allocate work to local subcontractors, suppliers and local labour
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
Item
Advertising rights
The employer may elect to contract with advertising agencies for the erection of advertising hoardings, banners, wraps or the like for the duration of the contract. The contractor shall not prevent such an arrangement and will assist in the facilitation of same. The position and type of advertising structure to be agreed with the principal agent so as not to hinder the contractor in meeting his obligations under this agreement
The contractor undertakes to maintain in confidence any and all information regarding this project and shall obtain appropriate similar undertakings from all subcontractors and suppliers. Such information shall not be used in any way except in connection with the execution of the works
No information regarding this project shall be published or disclosed without the prior written consent of the employer
All rights of publication of articles in the media, together with any advertising relating thereto or in any way connected with this project, shall vest with the employer
The contractor together with his subcontractors shall not, without the prior written consent of the employer, cause any statement or advertisement connected with this project to be printed, screened or aired by the media
Category : Value R........................................
Category : Time R........................................
SUMMARY OF CATEGORIES
-29-
PreliminariesBill No. 1Section No. 1
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 1 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 02
HEALTH AND SAFETY
The JBCC Principal Building Agreement (Edition 5.0 - July 2007) prepared by the Joint Building Contracts Committee shall be the applicable building agreement, amended as hereinafter described
BUILDING AGREEMENT AND PRELIMINARIES
The JBCC Principal Building Agreement contract data form an integral part of this agreement
The JBCC General Preliminaries (July 2007) published by the Joint Building Contracts Committee for use with the JBCC Principal Building Agreement (Edition 5.0 - July 2007) shall be deemed to be incorporated in these bills of quantities, amended as hereinafter described
The contractor is deemed to have referred to the abovementioned documents for the full intent and meaning of each clause
The clauses in the abovementioned documents are hereinafter referred to by clause number and heading only
Where any item is not relevant to this agreement such item is marked N/A signifying "not applicable"
Where standard clauses or alternatives are not entirely applicable to this agreement such amendments, modifications, corrections or supplements as will apply are given under each relevant clause heading and such amendments, modifications, corrections or supplements shall take precedence notwithstanding anything to the contrary contained in the abovementioned documents
-30-
Health and SafetyBill No. 2Section No. 1
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
The General Preambles for Trades 2017 published by the Association of South African Quantity Surveyors shall be deemed to be incorporated in these bills of quantities and no claims arising from brevity of description of items fully described in the said General Preambles will be entertained
PREAMBLES FOR TRADES
Supplementary preambles and/or specifications are incorporated in these bills of quantities to satisfy the requirements of this project. Such supplementary preambles and/or specifications shall take precedence over the provisions of the General Preambles
The contractor's prices for all items throughout these bills of quantities shall take account of and include where applicable for all of the obligations, requirements and specifications given in the General Preambles and in any supplementary preambles and/or specifications
-31-
Health and SafetyBill No. 2Section No. 1
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
Failure, by the Tenderer, to price the items indicated below individually or per item will result in the Tender being deemed non-responsive. The legal requirements contemplated in the Construction Regulations (CR) 5(1)(g):
“A Client must ensure that potential principal contractors submitting tenders, have made adequate provision for the cost of health and safety measures”and CR 5(1)(h) “A client must ensure that principal contractor to be appointed has the necessary competencies and resources to carry out the construction work safely”
Shall apply and will be used to motivate the disqualification of the Tender. The contractor’s attention is further drawn to Section 41 of the Occupational Health and Safety Act No. 85 Of 1993: This Act not affected by agreements
Subject to the provisions of sections 10 (4) and 37 (2), a provision of this Act or a condition specified in any notice or direction issued there under or subject to which exemption was granted to any person under section 40, shall not be affected by any condition of any agreement, whether such agreement was entered into before or after the commencement of this Act or before or after the imposition of any such condition, as the case may be.
Prior to pricing the principal contractor must familiarize him/herself with the Occupational Health and Safety Act No. 85 Of 1993, Construction Regulations 2014, other relevant Regulations and Standards as well as project specific Health & Safety specifications
After pricing of the health and safety bill of quantities, the Contractor must sign the Certificate of Acquaintance as evidence that he has agreed to the contents, obligations and demands of the Occupational Health and Safety Act No. 85 of 1993, Construction Regulations 2014, other relevant Regulations and Standards as well as project specific Health & Safety specifications. Failure, by the Tenderer, to sign the Certificate of Acquaintance may result in the Tender being deemed non-responsive
-32-
Health and SafetyBill No. 2Section No. 1
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
Health and safety1
Item
Notify the provincial director in writing of the commencement of construction work with and including submission of a letter of receipt and acknowledgement of the aforementioned notice by the director of his/her representative
Allow for the appointment of a Full-Time Registered with SACPCMP Competent Construction Health & Safety Officer to assist in the control of all health and safety related aspects on site as per [CR 8(5)] (Unit refers to number of months)
Allow for provision of laptop, printer and telecommunication facilities for the appointed Construction Health & Safety Officer (Unit refers to number of months)
Provide, supply and maintenance for each worker the following SANS approved personal protective equipment & clothing as per the site-specific risk assessments:
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
No
Allow for all compulsory health and safety awarenessprogram (e.g. Inductions, toolbox Talks, SafetyPromotions, H&S related training, etc.) (unit refers to number of months)
Allow for all health & safety training (e.g. H&Srepresentative, working at heights, fall protection planner,first aider level 2, scaffolding inspector, erector,supervisor, temporary works erector, construction plantoperators etc.)
Provide for a Responsible person to prepare and update Method Statements, conduct regular inspections, maintain records, and report to the Principal Agent. (Unit refers to number of months)
Allow provision for Health and safety plans and approval thereof by Safety Agent
34
Item
Allow for Health & Safety Training for SMME Contractors as per OHS Act (Safety Representative, First aid, Fire Fighting , Working at heights etc)
35
-37-
Health and SafetyBill No. 2Section No. 1
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 1 R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
SECTION SUMMARY - Preliminary and General
BillNo
PageNo
Amount
29Preliminaries1
37Health and Safety2
-38-
Section No. 1
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried to Final Summary R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 01
ALTERATIONS (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 102) unless otherwise stated
REMOVAL OF EXISTING WORK
4m2One brick walls1
Breaking down and removing brickwork etc
8m240mm Screed from floors2
Hacking up/off and removing granolithic, screeds, plaster, etc from concrete or brickwork and preparing surfaces for new screed, plaster, tile finishes, etc
8m2Tiles to floors3
Hacking up/off and removing ceramic tiles including removing mortar bed or adhesive from concrete or brickwork and preparing surfaces for new screed, plaster, tile finish, etc
-39-
AlterationsBill No. 1Section No. 2
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BUILDING UP OPENINGS
7m2One brick walls4
Brickwork in NFP bricks in class II mortar in building up openings
MAKING GOOD OF FINISHES ETC
4mEnds of one brick walls5
Making good face brickwork
6m
Chase out crack in top of surface bed to form groove 100mm wide and 50mm deep and fill in with 3:1 cement mortar well caulked, including finishing smooth with a steel trowel to match existing levels
6
Making good concrete floors
22m
Chase out plaster cracks to form recess 25mm wide and 20mm deep and fill with 1:4 cement mortar including floating up smooth to match existing
7
Making good cement plaster
54m2Internal plastered walls8
Remove loose and flaking paint by scraping and sanding on walls, floors etc. to receive new paint
9m2Re-setting of suspended ceilings 9
Remedial work
76m2
Refix existing loose 0.8mm galvanised IBR roof covering to steel members with "SAFLOK 700" or equal approved clips, all in accordance with manufacturer's recommendations and specifications
10
2NoRealign 5300 x 4650mm high galvanised steel vehicle access sliding gates
11
-40-
AlterationsBill No. 1Section No. 2
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
110No"Pelican" or similar approved hold down clip for Pelican suspended ceiling systems
12
110No
"Mitek Bracing Strap" or equal approved galvanised ceiling support straps, 40 x 6mm thick not exceeding 500mm long, fixed to ceiling grid system as per Architectural specification
13
107No
Remove existing structural bolts and replace with galvanised carbon steel structural grade 8.8 M16 structural bolts or equal approved
14
16m
Remove existing grout around base plates and replace with "ABE Epidermix 372" or similar approved grout at an angle of no less than 15 degrees to the horizontal not exceeding 5mm wide and 3mm deep
15
GENERAL MAINTENANCE
252m2External face brick walls 16
Power wash existing surfaces to remove all dirt, grime and loose particles
68m2Corrugated roof coverings17
ItemExisting building including floors, walls, windows, doors, frames, etc
18
Clean down with suitable detergent and rinse thoroughly with clean water
-41-
AlterationsBill No. 1Section No. 2
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 2 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 02
EARTHWORKS (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 104) unless otherwise stated
SITE CLEARANCE
74m2
Digging up and removing rubbish, debris, vegetation, hedges, shrubs and trees not exceeding 200mm girth, bush, etc.
1
Site clearance
EXCAVATION, FILLING, ETC OTHER THAN BULK
EXCAVATION, ETC.
3m3Trenches2
Excavation in earth not exceeding 2m deep
1m3Bases3
-42-
Earthworks (Provisional)Bill No. 2Section No. 2
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
0.4m3Soft rock4
Extra over trench and hole excavations in earth for excavation in
0.1m3Hard rock5
1m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor
6
Extra over all excavations for carting away
6m2Sides of trench and hole excavations not exceeding 1,5m deep
7
Risk of collapse of excavations
ItemKeeping excavations free of all water other than subterranean water
8
Keeping excavations free of water
FILLING ETC
1m3Backfilling to trenches, holes, etc9
Earth filling obtained from the excavations and/or prescribed stock piles on site, compacted to 95% Mod AASHTO density
2m3G6 Material under floors10
Earth filling of approved clean earth supplied by the contractor, compacted to 95% Mod AASHTO density
13m2
Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 95% Mod AASHTO density
11
Compaction of surfaces
WEED KILLERS, INSECTICIDES, ETC
-43-
Earthworks (Provisional)Bill No. 2Section No. 2
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
13m2
Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming (Certificate must be provided)
12
"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee
14m2To bottoms and sides of trenches etc (Certificate must be provided)
13
-44-
Earthworks (Provisional)Bill No. 2Section No. 2
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 2 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 03
CONCRETE, FORMWORK AND REINFORCEMENT
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 110) unless otherwise stated
REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES
1m3Strip footings1
30MPa/19mm concrete
1m3Bases2
REINFORCED CONCRETE CAST ON/IN FORMWORK
1m3Ramps3
30MPa/19mm concrete
0.3m3Steps4
-45-
Concrete,Formwork and ReinforcementBill No. 3Section No. 2
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
7NoMaking and testing 150 x 150 x 150mm concrete strength test cubes (Provisional)
5
TEST BLOCKS
CONCRETE SUNDRIES
13m2Surface beds, slabs, etc6
Finishing top surfaces of concrete smooth with a wood float
(CPAP WORK GROUP NO. 111) unless otherwise stated
SMOOTH FORMWORK (DEGREE OF ACCURACY II)
2m2Steps7
Smooth formwork to sides
MOVEMENT JOINTS ETC
3mNot exceeding 300mm wide 8
Expansion joints with 10mm softboard bitumen impregnated softboard between vertical concrete and brick surfaces
(CPAP WORK GROUP NO. 114) unless otherwise stated
REINFORCEMENT (PROVISIONAL)
0.113tBars not exceeding 10mm diameter9
Mild steel reinforcement to structural concrete work
0.340tBars not exceeding 20mm diameter10
High tensile steel reinforcement to structural concrete work
-46-
Concrete,Formwork and ReinforcementBill No. 3Section No. 2
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
13m2Type 193 fabric reinforcement11
Fabric reinforcement
-47-
Concrete,Formwork and ReinforcementBill No. 3Section No. 2
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 2 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 04
MASONRY
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 116) unless otherwise stated
BRICKWORK
FOUNDATIONS (PROVISIONAL)
3m2One brick walls1
Brickwork of NFX bricks (14 MPa nominal compressive strength) in class II mortar (Corobrik engineering bricks)
BRICKWORK SUNDRIES
35m150mm Wide reinforcement built in horizontally in foundations (Provisional)
2
2,5mm Brickwork reinforcement
42m150mm Wide reinforcement built in horizontally 3
-48-
MasonryBill No. 4Section No. 2
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
FACE BRICKWORK
3m2Extra over brickwork for face brickwork in foundations (Provisional)
4
Corobrik Nala Travetine "FBS", pointed with flush horizontal and vertical joints on all exposed faces
14m2Extra over brickwork for face brickwork 5
-49-
MasonryBill No. 4Section No. 2
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 2 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 05
WATERPROOFING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 120) unless otherwise stated
DAMPPROOFING OF WALLS AND FLOORS
1m2Under walls1
One layer of 375 micron embossed polyethylene damp proof course (SANS 952-1985 type B)
13m2Under surface beds2
One layer of 250 micron green polyethylene waterproof sheeting (SANS 952-1985 type C) sealed at laps with PVC self-adhesive tape
WATERPROOFING TO ROOFS ETC
-50-
WaterproofingBill No. 5Section No. 2
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
18m2On parapet walls3
One layer 4mm special polyester fully bonded waterproof membrane comprising a matrix modified with polypropylene dual reinforced with non-woven polyester cloth and glass fibre tissue, laid with 75mm side and 100mm end laps
SEALING STRIPS, JOINT SEALANTS, ETC
3m10 x 10mm In vertical expansion joints including raking out expansion joint filler as necessary
4
Two-part grey polysulphide sealing compound including backing cord, bond breaker, primer, etc
-51-
WaterproofingBill No. 5Section No. 2
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 2 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 06
ROOF COVERINGS ETC
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 124) unless otherwise stated
PROFILED METAL SHEETING AND ACCESSORIES
13m2Roof covering with pitches not exceeding 25 degrees1
0.8mm Z275 spelter galvanised corrugated steel sheets fixed to timber purlins or rails (Colour to Architectural Specification)
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 07
CARPENTRY AND JOINERY
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 126) unless otherwise stated
FITTINGS
SHELVING
8m600 x 25mm Timber shelf1
400mm Deep varnished meranti timber shelf on 38 x 38mm meranti timber wall brackets plugged to walls including edges sealed with clear silicone sealant
-53-
Carpentry and JoineryBill No. 7Section No. 2
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 2 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 08
CEILINGS, PARTITIONS AND ACCESS FLOORING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
Hangers, suspension grids, "lay-in" panels, etc are to be in accordance with the manufacturers' recommendations and as per architectural specification document (CF-VC-01/03). Item to match existing unless specified by client to replace with alternative specification.
Proprietary suspended ceilings
(CPAP WORK GROUP NO. 129) unless otherwise stated
CEILING TIMBERS, BEADS, INSULATION, ETC
74m2120mm Thick insulation fitted above ceilings1
"Isotherm" polyester high density 7-10kg/m3 thermbonded insulation blanket
SUSPENDED CEILINGS
-54-
Ceilings,Partitions and Access FlooringBill No. 8Section No. 2
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
14m2Ceilings suspended not exceeding 1 000mm below timber purlins in patches
2
1200 x 600 x 12mm Thick PVC ceiling panel screwed to and including screw-up suspension grid
24mL-shape suspended PVC ceiling hangars/supporters fixed to wall
3
Perimeter trim to suspended ceilings
-55-
Ceilings,Partitions and Access FlooringBill No. 8Section No. 2
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 2 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 09
IRONMONGERY
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 132) unless otherwise stated
1No
Electromagnetic door lock for security door with temporary control switch fixed to wall not exceeding 10m, as per ironmongery schedule. Provisions to be made for control from the Main Control Room (elsewhere measured)
1
LOCKS
12No100mm High anodised aluminium letter or numeral2
LETTERS, NAMEPLATES, ETC
8No20mm Diameter stainless steel curtain rod fixed to wall3
PELMETS AND CURTAIN TRACKS
-56-
IronmongeryBill No. 9Section No. 2
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
1No20mm Diameter chromium plated towel rail 600mm long including end brackets, plugged
4
BATHROOM FITTINGS
1No"White" vandal proof double toilet roll holder, plugged5
1NoChromium plated coat hook, plugged6
1No
"Parrot" or similar approved pinning board 1000 x 1000mm high with green pinning material and aluminium frame, plugged
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 10
STRUCTURAL STEEL (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 134) unless otherwise stated
GALVANISED STEEL COLUMNS AND BEAMS
0.73t100 x 100mm x 15.044kg/m hot rolled square tubing columns in heights exceeding 2m and not exceeding 4m
1
Welded columns in single lengths constructed of 100 x 100 x 5mm thick mild steel square tubing with 100 x 100 x 5mm thick flat base, cap, bearer and connection plates, bolted to concrete with 250 x 16mm diameter chemical anchor bolt
GALVANISED STEEL PURLINS, GIRTS, BRACING, ETC
0.13t75 x 50 x 20 x 3mm Thick galvanised cold-formed lipped channel purlins
2
Purlins and girts, bolted to steel
-58-
Structural SteelBill No. 10Section No. 2
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 2 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 11
METALWORK
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 136) unless otherwise stated
GALVANISED STEEL GATES, SCREENS, ETC
HOT DIPPED GALVANISED STRAIGHT PROFILE FENCE
6m
3050 x 50 x 50 x 5mm Thick angle iron top rail including all fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification
1
High tensile Galfan Class A mesh panels manufactured in accordance with SANS 10244-2:2003 (refer to the Department of Public Works Standard Technical Specification - Perimeter Fence for Prisons May 2005 Rev01 annexed to the bid document)
-59-
MetalworkBill No. 11Section No. 2
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
6m
5000 x 3050mm Wide straight profile mesh panel (Type 1), 1,4mm single skin with double vertical wires spaced at 76.2mm and all horizontal wires spaced at 12.7mm centre to centre including all break off bolts and all other fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification
2
HOT DIPPED GALVANISED STEEL GATE CRAWLERS
4No
Heavy duty gate crawlers suitable for 6000 x 4000mm high gate including all fittings installed on gates attached to crawl beams as per engineers specification
3
Purpose made gate crawlers as per engineers specification
HOT DIPPED GALVANISED STEEL BOLLARDS
13No
220mm Diameter galvanised mild steel "high impact" bollard, 1500mm total height, 1000mm height above ground with concrete infill laid in and including 500 x 500 x 550m deep 30mpa concrete base
4
"SA Bollards High Impact Bollard" or similar approved
HOT DIPPED GALVANISED STEEL MINOR WORK
2NoGoose neck post 1200mm high including base plates, fittings etc. with necessary provisions for intercom
5
Galvanised hot dipped mild steel posts including base plate, fittings etc.
11mU-shaped guide rail of 35 x 35 x 5mm u-channel section6
Fixing accessories for 6000 x 4000mm high steel gate
STAINLESS STEEL MINOR WORK
TURNSTILE
-60-
MetalworkBill No. 11Section No. 2
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
1No2180 x 2250mm High double three arm turnstile7
"Type 316" stainless steel "Saturn" finish double three arm turnstiles fitted to "Type 316" stainless steel framework including provision for biometric operated lock and reader on frame
-61-
MetalworkBill No. 11Section No. 2
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 2 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 12
PLASTERING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 142) unless otherwise stated
SCREEDS
17m240mm Thick on floors 1
1:3 Cement screeds steel floated, on concrete
8m250mm Thick on floors 2
INTERNAL PLASTER
31m2On walls in patches3
Cement plaster steel trowelled, on brickwork
-62-
PlasteringBill No. 12Section No. 2
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
3m
50 x 50 x 3mm L-section galvanised mild steel dividing strips between differing floor finishes fixed with galvanised M10 bolts
4
CORNER PROTECTORS, DIVIDING STRIPS, ETC
-63-
PlasteringBill No. 12Section No. 2
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 2 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 13
TILING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
SUPPLEMENTARY PREAMBLES
Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding
Tiling described as "fixed with adhesive on power floated concrete" shall be deemed to include for approved tiling key-coat
Ceramic, porcelain, marble and granite tiles are to be fixed and grouted with suitable adhesives and grouts from the "Tal Professional" range of products as recommended by the manufacturer of the tiles
(CPAP WORK GROUP NO. 144) unless otherwise stated
FLOOR TILING
25m2On floors in patches1
300 x 300 x 8mm Porcelain floor tiles fixed with adhesive to screed (screed elsewhere) and flush pointed with epoxy grout
-64-
TilingBill No. 13Section No. 2
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
28mSkirting 70mm high 2
-65-
TilingBill No. 13Section No. 2
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 2 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 14
PLUMBING AND DRAINAGE (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 148) unless otherwise stated
RAINWATER DISPOSAL
17m155 x 100 x 115mm Aluminium ogee roof gutters with baked enamel finish fixed with concealed brackets
1
0,6mm Chromadek seamless gutters and rainwater pipes
4NoExtra over gutter for stopped end2
4NoExtra over gutter for outlet for 100 x 75mm pipe3
11m100 x 75mm Fluted aluminium rainwater downpipes with baked enamel finish fixed as per supplier's detail
4
4NoExtra over rainwater pipe for eaves offset 900mm projection
5
-66-
Plumbing and drainage (Provisional)Bill No. 14Section No. 2
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
4NoExtra over rainwater pipe for shoe 6
1No4.5kg Dry chemical powder fire extinguisher7
FIRE APPLIANCES ETC
1No4.5kg Carbon dioxide fire extinguisher8
19No190 x 190mm ABS plastic symbolic safety sign plugged and screwed to wall
9
-67-
Plumbing and drainage (Provisional)Bill No. 14Section No. 2
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 2 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 15
GLAZING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 150) unless otherwise stated
GLAZING TO ALUMINIUM WITH CLIP-ON BEADS
1m2Panes exceeding 0,1m2 and not exceeding 0,5m21
6mm Clear float glass with aluminium beads
TOPS, SHELVES, DOORS, MIRRORS, ETC
1NoMirror 300 x 450mm high2
4mm Silvered float glass copper backed mirrors with polished edges, holed for and fixed with chromium plated dome capped mirror screws with rubber buffers to plugs in brickwork
-68-
GlazingBill No. 15Section No. 2
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 2 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 16
PAINTWORK
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
All painting shall be done in accordance with the Architects specifications and condition assessment reports unless otherwise described
PAINT SPECIFICATIONS
(CPAP WORK GROUP NO. 152) unless otherwise stated
PAINTWORK ETC TO EXISTING SURFACES
ON EXTERNAL FLOATED PLASTER SURFACES
96m2Parapet walls1
One merit plaster primer, one coat undercoat and two coats "Wall & All" or similar approved emulsion paint (colour to be approved by Client)
ON INTERNAL FLOATED PLASTER SURFACES
-69-
PaintworkBill No. 16Section No. 2
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
293m2Walls2
One merit plaster primer, one coat undercoat and two coats "Wall & All" or similar approved emulsion paint (colour to be approved by Client)
ON METAL SURFACES
5m2Security door3
One coat self etching primer and two coats premium quality polyurethane enamel paint, on galvanised steel. Prepare and treat with anti rust compound suitable for coastal conditions
-70-
PaintworkBill No. 16Section No. 2
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 2 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 17
EXTERNAL WORKS (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
SUPPLEMENTARY PREAMBLES
Descriptions of earth filling, compaction, etc shall be deemed to include for all necessary testing required in accordance with the SABS 1200 series
TESTING OF MATERIAL AND FILLING
(CPAP WORK GROUP NO. 154) unless otherwise stated
ROADWORKS AND PARKING
EXCAVATION, FILLING, ETC OTHER THAN BULK
EXCAVATIONS ETC
132m3Over site between buildings, etc to reduce levels and dispose in prescribed stock piles on site
1
Excavation in earth not exceeding 2m deep
25m3Soft rock2
Extra over excavation in earth for excavation in
-71-
External WorksBill No. 17Section No. 2
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
8m3Hard rock3
132m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor
4
Extra over all excavations for carting away
ItemKeeping excavations free of water other than subterranean water
5
Keeping excavations free of water
LAYER WORK
37m3
Sub-grade course of 150mm thick of G1 crusher run material compacted to 88% Mod AASHTO density
6
Earth filling supplied by the contractor under parking areas, roadways, etc
37m3
Base course of 150mm thick of C4 (G5 gravel material) stabilised with 3% cement compacted to 97% Mod AASHTO density
7
12m3Under floors etc8
Coarse river sand filling supplied by the contractor
249m2
Compaction of ground surfaces under roadworks etc, including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density (Roadbed)
9
Compaction of surfaces
WEED KILLERS, INSECTICIDES, ETC
-72-
External WorksBill No. 17Section No. 2
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
249m2
Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming (Certificate must be provided)
10
"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee
REINFORCED CONCRETE CAST ON/IN FORMWORK
5m3Surface beds11
30MPa/19mm concrete
2NoMaking and testing 150 x 150 x 150mm concrete strength test cubes (Provisional)
12
TEST BLOCKS
CONCRETE SUNDRIES
47m2Surface beds, slabs, etc13
Finishing top surfaces of concrete smooth with a wood float
SMOOTH FORMWORK (DEGREE OF ACCURACY II)
3m2Surface beds14
Smooth formwork to sides
REINFORCEMENT (PROVISIONAL)
47m2Type 193 fabric reinforcement15
Fabric reinforcement
PAVING
-73-
External WorksBill No. 17Section No. 2
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
128m2Paving to roadworks and parking areas to falls16
80mm thick 30MPa precast concrete grey interlocking block paving blocks in accordance with SANS 1058, laid to falls on and including 25mm thick sand layer with joints filled in with sand, compacted with a vibration compactor
74m2Paving to aprons17
50mm thick 30MPa precast concrete grey interlocking block paving blocks in accordance with SANS 1058, laid to falls on and including 25mm thick sand layer with joints filled in with sand, compacted with a vibration compactor
-74-
External WorksBill No. 17Section No. 2
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 2 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 18
ELECTRICAL INSTALLATION
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 160) unless otherwise stated
ACCESS CONTROL
2NoVehicle boom gate and spike barrier 1
ACCESS BARRIERS
2NoSpike boom barrier extension 2
2NoTwo button remotes to operate claws and boom to be handed to the Area Commissioner
2NoTemporary switch fixed to Guards Office for claw and boom operation
3
2No
Two way red and green, 12V DC Traffic light Unit including wall mounted brackets (SS), harness and interface relay
4
-75-
ElectricalBill No. 18Section No. 2
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
2No
D10 Industrial gate motor including tracks, break sensor, impact sensor, burglar proof case, anti-theft brackets etc. to make installation complete
5
"Centurion" or similar or equal approved
Item
Make the necessary provisions for security door electromagnetic door locks to be controlled from the Main Control Room
6
Provision of service infrastructure for future installations
ItemMake the necessary provisions for access barriers to be controlled from the Main Control Room
7
-76-
ElectricalBill No. 18Section No. 2
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 2 R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
SECTION SUMMARY - S01: Work Teams and Workshop Outlet to Maximum
BillNo
PageNo
Amount
41Alterations1
44Earthworks (Provisional)2
47Concrete,Formwork and Reinforcement3
49Masonry4
51Waterproofing5
52Roof Covering6
53Carpentry and Joinery7
55Ceilings,Partitions and Access Flooring8
57Ironmongery9
58Structural Steel10
61Metalwork11
63Plastering12
65Tiling13
67Plumbing and drainage (Provisional)14
68Glazing15
70Paintwork16
74External Works17
76Electrical18
-77-
Section No. 2
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried to Final Summary R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 01
ALTERATIONS
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
Before submitting his tender the tenderer shall visit the site and satisfy himself as to the nature and extent of the work to be done and the value of the materials salvageable from the alterations. No claim for any variations of the contract sum in respect of the nature and extent of the work or of inferior or damaged materials will be entertained
View site
The contractor shall carry out the whole of the works with as little mess and noise as possible and with a minimum of disturbance to tenants in the building and to adjoining premises and their tenants. He shall provide proper protection and provide, erect and remove when directed, any temporary tarpaulins that may be necessary during the progress of the works, all to the satisfaction of the principal agent
General
-78-
AlterationsBill No. 1Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
The contractor will be required to take all dimensions affecting the existing buildings on the site and he will be held solely responsible for the accuracy of all such dimensions where used in the manufacture of new items (doors, windows, fittings, etc)
(CPAP WORK GROUP NO. 102) unless otherwise stated
REMOVAL OF EXISTING WORK
1NoGlazed steel window not exceeding 2,5m²1
Taking out and removing doors, windows, etc, including thresholds, sills, etc (building up openings and making good finishes elsewhere)
1No
Monopitched roof 9 x 10 x 1.8m high overall, of timber trusses and purlins, corrugated sheet steel covering, suspended ceilings and cornices, eaves soffit covering, fascias, barge boards, gutters and rainwater pipes and set all aside for reuse
2
Taking down and removing roofs, floors, panelling, ceilings, partitions, etc
169m2Tiles to floors3
Hacking up/off and removing ceramic tiles including removing mortar bed or adhesive from concrete or brickwork and preparing surfaces for new screed, plaster, tile finish, etc
BUILDING UP OPENINGS
1NoOpening 1511 x 1245mm high overall in one brick wall4
Brickwork in NFP bricks in class II mortar in building up openings, including bonding new to existing and making good cement plaster on one side (making good paintwork elsewhere)
1m2Cutting toothings and bonding new brickwork to existing5
Sundries
-79-
AlterationsBill No. 1Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
2m2Extra over brickwork for face brickwork in patches6
Brickwork in Corobrik Nala Travetine "FBX" face bricks pointed with flush horizontal and vertical joints in class II mortar in building up openings, including bonding new to existing
8mCutting toothings and bonding new face brickwork to existing
7
MAKING GOOD OF FINISHES ETC
110No"Pelican" or similar approved hold down clip for Pelican suspended ceiling systems
8
Remedial work
110No
"Mitek Bracing Strap" or equal approved galvanised ceiling support straps, 40 x 6mm thick not exceeding 500mm long, fixed to ceiling grid system as per Architectural specification
9
OPENINGS THROUGH EXISTING WALLS ETC
1No
Altering opening in one brick wall where 2350 x 915mm high aluminium viewing panel removed to form opening for a higher aluminium viewing panel 2350 x 1500mm high overall by breaking out brickwork on both sides and bottom, including prestressed concrete lintels, making good cement plaster on both sides and into reveals (new viewing panel and making good paintwork elsewhere)
10
Altering openings
1NoOpening for timber door with steel frame 900 x 2032mm high overall through one brick wall
11
Breaking out for and forming openings through brick walls for new doors and frames, including brick lintels, making good cement plaster on one side and into reveals and face brickwork on other side and into reveals and with 20 MPa concrete thresholds with steel trowelled finish (new doors and frames and making good paintwork elsewhere)
-80-
AlterationsBill No. 1Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
2NoOpening for security door with steel frame 1000 x 2035mm high overall through one brick wall
12
-81-
AlterationsBill No. 1Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 3 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 02
CONCRETE, FORMWORK AND REINFORCEMENT
This Bill of Quantities must be read in conjunction with the attached specifications and details
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 110) unless otherwise stated
REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES
1m3Steps1
30MPa/19mm concrete
1m3Ramps2
6m3Underpinning3
REINFORCED CONCRETE CAST ON/IN FORMWORK
14m3Slabs including beams and inverted beams4
30MPa/19mm concrete
-82-
Concrete,Formwork and ReinforcementBill No. 2Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
4NoMaking and testing 150 x 150 x 150mm concrete strength test cubes (Provisional)
5
TEST BLOCKS
CONCRETE SUNDRIES
88m2Surface beds, slabs, etc to falls6
Finishing top surfaces of concrete smooth with a wood float to a non slip surface
7m2Ramps7
2m2Steps 8
(CPAP WORK GROUP NO. 111) unless otherwise stated
SMOOTH FORMWORK (DEGREE OF ACCURACY II)
2m2Steps9
Smooth formwork to sides
2m2Ramps10
88m2Slabs propped up exceeding 3m and not exceeding 5m high
11
Smooth formwork to soffits
(CPAP WORK GROUP NO. 114) unless otherwise stated
REINFORCEMENT (PROVISIONAL)
0.447tBars not exceeding 10mm diameter12
Mild steel reinforcement to structural concrete work
-83-
Concrete,Formwork and ReinforcementBill No. 2Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
1.341tBars not exceeding 20mm diameter13
High tensile steel reinforcement to structural concrete work
1m2Type 245 fabric reinforcement14
Fabric reinforcement
176m2Type 319 fabric reinforcement15
-84-
Concrete,Formwork and ReinforcementBill No. 2Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 3 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO 03
PRECAST CONCRETE
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
Blocks, sills, etc measured linear shall be made in suitable lengths. Large size setting out drawings shall be prepared where necessary and submitted to the principal agent for approval before moulds are made
Sizes
Where kerbstones, blocks, etc are laid in ground descriptions shall be deemed to include necessary excavation, filling in and ramming
General
(CPAP WORK GROUP NO. 112) unless otherwise stated
PRECAST CONCRETE SLABS ETC
-85-
Precast ConcreteBill No. 3Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
Note:Price to include for the complete supply and installation including delivery, costs for the hire of a suitable crane for the duration of the installation, etc
Precast concrete left rough from the mould including bedding, jointing and pointing
RATE ONLY95m2
200mm Thick Concrete Hollow core Echo Precast Slab or equally approved including 55mm toppings as per Engineers drawings
1
-86-
Precast ConcreteBill No. 3Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 3 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 04
MASONRY
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 116) unless otherwise stated
BRICKWORK
SUPERSTRUCTURE
22m2Half brick walls 1
Brickwork of NFP bricks in class II mortar
97m2One brick walls of two half brick skins with inner skin bagged and sealed
2
BRICKWORK SUNDRIES
99m75mm Wide reinforcement built in horizontally 3
2,5mm Brickwork reinforcement
398m150mm Wide reinforcement built in horizontally 4
-87-
MasonryBill No. 4Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
FACE BRICKWORK
38m2Extra over brickwork for face brickwork 5
Corobrik Nala Travetine "FBS", pointed with flush horizontal and vertical joints on all exposed faces
-88-
MasonryBill No. 4Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 3 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 05
WATERPROOFING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 120) unless otherwise stated
WATERPROOFING TO ROOFS ETC
88m2On concrete slab and parapet walls1
One layer 4mm special polyester fully bonded waterproof membrane comprising a matrix modified with polypropylene dual reinforced with non-woven polyester cloth and glass fibre tissue, laid with 75mm side and 100mm end laps
-89-
WaterproofingBill No. 5Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 3 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 06
ROOF COVERINGS ETC
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 124) unless otherwise stated
PROFILED METAL SHEETING AND ACCESSORIES
47m2Roof covering with pitches not exceeding 25 degrees1
0.8mm Z275 spelter galvanised corrugated steel sheets fixed to timber purlins or rails (Colour to Architectural Specification)
47m2Refix existing roof covering with pitches not exceeding 25 degrees
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
11mHead wall flashings not exceeding 500mm girth5
-91-
Roof CoveringsBill No. 6Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 3 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 07
CARPENTRY AND JOINERY
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 126) unless otherwise stated
STRUCTURAL TIMBERWORK ETC
PLATE NAILED TIMBER ROOF TRUSS CONSTRUCTION ETC
Prefabricated roof trusses etc
Item
Roof construction to monopitched roof, 10 x 9m overall on plan x 1800mm high overall, including trusses, jack rafters, permanent bracing and 50 x 76mm purlins at 1050 centres for roof covering (wall plates elsewhere)
1
The following in plate nailed timber roof trusses with a pitch not exceeding 27.5 degrees, from an approved supplier, delivered to site, hoisted into position, fixed and braced on timber wall plates
-92-
Carpentry and JoineryBill No. 7Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
22m76 x 114mm Wall plates2
Sawn softwood grade V4
EAVES, VERGES, ETC
17m
12 x 225mm Fascia boards, including aluminium H-profile fascia joiners and fixed with hot dipped galvanised drive screws and washers (no paint) (product number 041-203 and 685-195)
3
''Everite Nutech'' Medium density fibre-cement fascia boards
28m
10 x 80 x 225mm Barge boards including aluminium H-profile barge joiners and fixed with hot dipped galvanised drive screws and washers (no paint) (product number 721-800)
400mm Deep varnished meranti timber shelf on 38 x 38mm meranti timber wall brackets plugged to walls including edges sealed with clear silicone sealant
-94-
Carpentry and JoineryBill No. 7Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 3 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 08
CEILINGS, PARTITIONS AND ACCESS FLOORING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
Ceilings,Partitions and Access FlooringBill No. 8Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
1No
Extra over ceiling 600 x 600mm trap door complete with trimmers, frame, cross branders, ceiling board, hinges, etc as described (Provisional)
4
82mL-shape suspended PVC ceiling hangars/supporters fixed to wall
5
Perimeter trim to suspended ceilings
ACCESS FLOORING
RAISED FLOORING
40m2On floors6
600 X 600 x 25mm steel access floor panels on adjustable steel pedestals to allow top level of floor to be 340mm above stub base concrete floor. Steel panels to be covered in melamine sheeting of approved colour
-96-
Ceilings,Partitions and Access FlooringBill No. 8Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 3 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 09
IRONMONGERY
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 132) unless otherwise stated
LOCKS
2NoBathroom indicator bolt1
"Union " or similar approved
2NoFour lever upright lockset2
11No100mm High anodised aluminium letter or numeral3
LETTERS, NAMEPLATES, ETC
PHOTOLUMINESCENT SIGNS
1No150 x 150mm Sign with one pictogram (Male)4
Wall mounted photoluminescent statutory signs in 150 x 150mm modules
-97-
IronmongeryBill No. 9Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
1No150 x 150mm Sign with one pictogram (Female)5
2No150 x 150mm Sign with one pictogram (Paraplegic)6
7m20mm Diameter stainless steel curtain rod fixed to wall7
PELMETS AND CURTAIN TRACKS
2No20mm Diameter chromium plated towel rail 600mm long including end brackets, plugged
8
BATHROOM FITTINGS
2No"White" vandal proof double toilet roll holder, plugged9
2NoChromium plated coat hook, plugged10
2No
'Rodan' waste bin for wall mounting RODX605 (code:359983) in 0.8mm stainless steel with satin finished surface, cylinder lock with Franke standard key , 23 litres capacity including stainless steel screws and dowels
11
"Kimberly-Clark" or similar approved
2No"Ref 427518" soap dispenser, plugged12
2No"Ref 426213" disposal bin, plugged13
2NoStainless steel 'Vandal' proof toilet roll holder14
Stainless Steel
2No32mm "Ref SR2"stainless steel back grab rail 800mm long, plugged
15
"Chairman industries" or similar approved
2No32mm"Ref DL2"stainless steel dogleg side grab rail 900mm girth, plugged
16
13No38mm Diameter rubber door stop plugged17
SUNDRIES
-98-
IronmongeryBill No. 9Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 3 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 10
METALWORK
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 136) unless otherwise stated
HOT DIPPED GALVANISED STEEL GATES, SCREENS, ETC
STEEL SCREENS
21m26000 x 3120 x 3,15mm Weldmesh screen welded to frame
1
Welded mesh screens over turnstiles and gate as per Architects detail
HOT DIPPED GALVANISED WELDED GATES
-99-
MetalworkBill No. 10Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
2No
Single gate for opening size 1000 x 2032mm high of 30 x 30 x 3mm hollow section frame and two horizontal middle rails, filled in with 10mm square mild steel vertical bars at 100mm centres including Union 2195-76 two lever deadlock housed in and including lock box, including suitable hinges, the gate fixed in steel screen (elsewhere measured)
2
Galvanised hot dipped mild steel with 16mm intermediate bars at 100mm centres as per gate detail
HOT DIPPED GALVANISED STEEL MINOR WORK
13m300 x 300mm Deep cable trench with chequer plate covering to pass through wall
3
HOT DIPPED GALVANISED STEEL CHANNELS
BAFFLE EXHAUST
1NoGenerator baffle exhaust constructed from 0.6mm galvanised sheet metal as per engineers specification
4
0.6mm Hot dipped galvanised sheet metal
STAINLESS STEEL MINOR WORK
TURNSTILE
1No2180 x 2250mm High double three arm turnstile5
"Type 316" stainless steel "Saturn" finish double three arm turnstiles fitted to "Type 316" stainless steel framework including provision for biometric operated lock and reader on frame
Refer to Door Schedule
HOT DIPPED GALVANISED PRESSED STEEL DOORS
-100-
MetalworkBill No. 10Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
1NoDoor size 1000 x 2035mm (D12)6
Hollow metal type door with view panel to DCS details and specification. Electronic door lock controlled from main control room. 150 x 450mm view panel with 9.5mmHPR laminated glass fitted in Neoprene gaskets
REFIX EXISTING DOORS AND FRAMES
1NoDoor size 1000 x 2035mm (D12)7
Refix existing hollow metal type door with view panel to DCS details and specification. Electronic door lock controlled from main control room. 150 x 450mm view panel with 9.5mm HPR laminated glass fitted in Neoprene gaskets
Refer to Window Schedule
ALUMINIUM CASEMENT WINDOWS
1NoPurpose made viewing panel, 2350 x 915mm high8
Natural anodised viewing panel complete with subframes, with 100 x 25mm aluminium meeting stiles, 30 x 20mm aluminium glass beads, ironmongery, 16mm multi laminated bullet resisting glass set in neoprene gaskets, sealing, etc and fixing to brickwork
-101-
MetalworkBill No. 10Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 3 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 11
PLASTERING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 142) unless otherwise stated
SCREEDS
57m240mm Thick on floors 1
1:3 Cement screeds steel floated, on concrete
INTERNAL PLASTER
58m2On walls2
Cement plaster steel trowelled, on brickwork
10m2On narrow widths3
-102-
PlasteringBill No. 11Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 3 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 12
TILING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
SUPPLEMENTARY PREAMBLES
Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding
Tiling described as "fixed with adhesive on power floated concrete" shall be deemed to include for approved tiling key-coat
Ceramic, porcelain, marble and granite tiles are to be fixed and grouted with suitable adhesives and grouts from the "Tal Professional" range of products as recommended by the manufacturer of the tiles
(CPAP WORK GROUP NO. 144) unless otherwise stated
WALL TILING
48m2On walls1
300 x 300 x 8mm glazed ceramic tiles fixed with adhesive to plaster (plaster elsewhere) and flush pointed with tinted grout
-103-
TilingBill No. 12Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
FLOOR TILING
102m2On floors2
300 x 300 x 8mm Porcelain floor tiles fixed with adhesive to screed (screed elsewhere) and flush pointed with epoxy grout
13m2Skirting 70mm high3
-104-
TilingBill No. 12Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 3 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 13
PLUMBING AND DRAINAGE (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 148) unless otherwise stated
RAINWATER DISPOSAL
31m155 x 100 x 115mm Aluminium ogee roof gutters with baked enamel finish fixed with concealed brackets
1
0,6mm Chromadek seamless gutters and rainwater pipes
7NoExtra over gutter for stopped end2
4NoExtra over gutter for outlet for 100 x 75mm pipe3
18m100 x 75mm Fluted aluminium rainwater downpipes with baked enamel finish fixed as per supplier's detail
4
4NoExtra over rainwater pipe for eaves offset 900mm projection
5
-105-
Plumbing and drainage (Provisional)Bill No. 13Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
4NoExtra over rainwater pipe for shoe 6
SANITARY FITTINGS
2No
"Vaal Pearl Paraplegic" vitreous china semi-close coupled 90 degree outlet open rim washdown pan and matching 9 litre cistern with side flush lever as per Architect's Specification
7
"Vaal" or similar approved
2No
380 x 435mm "Vaal Hygia 703602WH " barrier free wash hand basin as per Architect's Specification
8
2NoDouble flap toilet seat9
WASTE UNIONS ETC
2No
Chrome Pop Up Basin waste for basin with overflows as per Architect's Specification
10
"Cobra Watertech" or equal approved
2No40mm 309-40 CP anti-theft plug with spindle 11
TRAPS ETC
2No40mm 360 CP bottle trap12
"Cobra Watertech" or equal approved
TAPS, VALVES, ETC
1No15mm Stopcock13
Brass
1No15mm Fullway gate valve14
-106-
Plumbing and drainage (Provisional)Bill No. 13Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
2No
15mm "Cobra NM-851" or equal approved elbow action basin mixer
15
"Cobra" or equal approved
SANITARY PLUMBING
13m50mm Pipes16
uPVC soil and vent pipes
3m50mm Pipes chased into concrete surface beds17
14m
110mm Pipes laid in and including trenches not exceeding 1m deep
18
4m110mm Pipes 19
2No50mm BSP adaptor20
Extra over uPVC soil and vent pipes for fittings
2No50mm Strap on boss21
9No50mm Bend22
4No50mm Junction23
2No50mm Access bend24
1No50mm Rodding eye25
2No50mm Access junction26
2No50mm Two-way vent valve27
2No110mm Eccentric reducer28
2No110mm Pan connector29
4No110mm Bend30
-107-
Plumbing and drainage (Provisional)Bill No. 13Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
2No110mm Reducing junction31
4No110mm Access bend32
2No110mm Access bend with anti-syphon horn33
2No110mm Access reducing junction34
2No110mm Two way vent valve35
ItemTesting waste pipe system36
Testing
WATER SUPPLIES
14m15mm Pipes37
Class 1 copper pipes with capillary couplings
9m22mm Pipes38
9No15mm Fittings39
Extra over Class1 copper pipes for capillary fittings
2No22mm Fittings40
4No15mm Flexible service pipe41
ItemTesting water pipe system42
Testing
4No9kg Dry chemical powder fire extinguisher43
FIRE APPLIANCES ETC
4No190 x 190mm ABS plastic symbolic safety sign type FB2 plugged and screwed to wall
44
HOLES ETC
-108-
Plumbing and drainage (Provisional)Bill No. 13Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
2NoThrough one brick wall faced one side45
Core drilling hole not exceeding 50mm diameter
2NoThrough one brick wall46
Core drilling hole exceeding 50mm and not exceeding 110mm diameter
-109-
Plumbing and drainage (Provisional)Bill No. 13Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 3 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 14
GLAZING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 150) unless otherwise stated
GLAZING TO ALUMINIUM WITH CLIP-ON BEADS
1m2Panes exceeding 0,1m2 and not exceeding 0,5m21
6mm Clear float glass with aluminium beads
TOPS, SHELVES, DOORS, MIRRORS, ETC
2NoMirror 300 x 450mm high2
4mm Silvered float glass copper backed mirrors with polished edges, holed for and fixed with chromium plated dome capped mirror screws with rubber buffers to plugs in brickwork
-110-
GlazingBill No. 14Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 3 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 15
PAINTWORK
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 152) unless otherwise stated
PAINTWORK ETC TO NEW WORK
ON INTERNAL FLOATED PLASTER SURFACES
620m2Walls1
One merit plaster primer, one coat undercoat and two coats "Wall & All" or similar approved emulsion paint (colour to be approved by Client)
ON METAL
17m2Door frames2
One coat Merit metal primer (UC501), one coat Merit Universal Undercoat (UC1) and two coats Super Universal Enamel (NY1/G) paint
44m2Doors3
-111-
PaintworkBill No. 15Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
19m2On windows with burglar bars (both sides measured) 4
21m2Welded screens5
ON WOOD SURFACES
14m2Doors6
Three coats superior quality clear gloss varnish
ON SMOOTH CONCRETE SURFACES
22m2On floors7
One coat bonding liquid, one coat primer and two coats epoxy paint for interior and exterior use, including stopping blow holes
4m2Skirtings8
3mm Epoxy paint floor finish turned up 100mm against wall to form skirting. Applied to the manufactures recommendation. Colour to be approved
-112-
PaintworkBill No. 15Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 3 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 16
EXTERNAL WORKS (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
SUPPLEMENTARY PREAMBLES
Descriptions of earth filling, compaction, etc shall be deemed to include for all necessary testing required in accordance with the SABS 1200 series
Testing of material and filling
COVERED WALKWAY, STEPS AND RAMPS
ALTERATIONS
TEMPORARY BARRICADES, SCREENS, ETC
90m
Dust screen 2m high between concrete floor and ceiling, of suitable timber framing with 250 micron polyethylene sheeting stapled on one side, including corners, ends, etc
1
Temporary barricades, screens, roofs, etc including removal
REMOVAL OF EXISTING WORK
7m3Surface beds not exceeding 150mm thick2
Breaking up and removing unreinforced concrete
-113-
External WorksBill No. 16Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
MAKING GOOD OF FINISHES ETC
7mEnds of one brick walls3
Making good face brickwork
OPENINGS THROUGH EXISTING WALLS ETC
1NoOpening for security gate with steel frame 1000 x 2000mm high overall through one brick wall
4
Breaking out for and forming openings through 220mm brick walls for new doors and frames, including brick lintels, making good cement plaster on one side and into reveals and face brickwork on other side and into reveals and with 20 MPa concrete thresholds with steel trowelled finish (new doors and frames and making good paintwork elsewhere)
EARTHWORKS (PROVISIONAL)
SITE CLEARANCE, ETC.
44m2
Digging up and removing rubbish, debris, vegetation, hedges, shrubs and trees not exceeding 200mm girth, bush, etc.
5
Site clearance
EXCAVATION, FILLING, ETC OTHER THAN BULK
EXCAVATION, ETC
24m3Reduced levels under floors6
Excavation in earth not exceeding 2m deep
4m3300 x 300 x 500mm Intermediate post base 7
Excavate in earth not exceeding 2m deep.
-114-
External WorksBill No. 16Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
4m3Surplus material from excavations and/or stockpiles on site, to a dumping site to be located by the contractor
8
Extra over all excavations for carting away
54m2Sides of trench and hole excavations not exceeding 1,5m deep
9
Risk of collapse of excavations
ItemKeeping excavations free of all water other than subterranean water
10
Keeping excavations free of water
FILLING, ETC:
27m3Under floors11
Earth filling of G6 material supplied by the contractor, compacted to 93% Mod AASHTO density
242m2
Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material where necessary and compacting to 95% Mod AASHTO density (Certificate must be provided)
12
Compaction of surfaces
WEED KILLERS, INSECTICIDES, ETC
242m2
Treat ground under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming as per clause 2.13 of specification OOG-001E with 50mm sand over poison(sand elsewhere measured, Certificate must be provided)
13
"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee
-115-
External WorksBill No. 16Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
242m2Treat ground to bottoms and sides of trenches etc as described, (Certificate must be provided)
14
CONCRETE, FORMWORK AND REINFORCEMENT
UNREINFORCED CONCRETE
3m3Blinding15
10Mpa/19mm unreinforced concrete
REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES
4m3300 x 300 x 500mm Intermediate post base 16
30MPa/19mm concrete
10m3Surface beds cast in panels on waterproofing17
0.41m3
2950 x 1300 x 100mm Thick (1000mm inside & 300mm outside the fence) plinth cast in 2950mm sections with 50mm expansion gaps filled with 19/32 mm crushed stone (elsewhere measured)
18
13NoMaking and testing 150 x 150 x 150mm concrete strength test cubes (Provisional)
19
TEST BLOCKS
CONCRETE SUNDRIES
242m2Surface beds, slabs, etc20
Finishing top surfaces of concrete smooth with a wood float to a non slip surface
22m2Ramps21
Finishing top surfaces of concrete smooth with a wood float to a non slip surface including non-slip ridging to ramps
-116-
External WorksBill No. 16Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
SMOOTH FORMWORK (DEGREE OF ACCURACY II)
62m2Edges, risers, ends and reveals exceeding 300mm high or wide
22
Smooth formwork to sides
21m2Edges of plinth size 2950 x 1300 x 100mm thick23
MOVEMENT JOINTS ETC
30mNot exceeding 300mm high to edges of surface beds24
Expansion joints with 10mm bitumen impregnated softboard between vertical concrete and brick surfaces
REINFORCEMENT (PROVISIONAL)
0.138tBars not exceeding 10mm diameter25
Mild steel reinforcement to structural concrete work
0.413tBars not exceeding 20mm diameter26
High tensile steel reinforcement to structural concrete work
242m2Type 193 fabric reinforcement27
Fabric reinforcement
WATERPROOFING
DAMP PROOFING OF WALLS AND FLOORS
242m2Under surface beds and plinth28
One layer of 250 micron green polyethylene waterproof sheeting (SANS 952-1985 type C) sealed at laps with PVC self-adhesive tape
-117-
External WorksBill No. 16Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
21.65m2Extra over for 400mm section of steel mesh dipped in bitumen as per detail
29
Bituminous emulsion based coating
ROOF COVERINGS, CLADDINGS, ETC
PROFILED METAL SHEETING AND ACCESSORIES
242m2
Roof covering with pitches not exceeding 25 degrees including cranked ends not exceeding 320 degrees to form fascia not exceeding 750mm
30
0.8mm Z275 spelter galvanised corrugated steel sheets fixed to steel purlins with tek screws (Colour to Architectural Specification)
188mMoulded narrow and broad rib polyethylene filler blocks35
8mCover flashings not exceeding 500mm girth36
8mHead wall flashings not exceeding 500mm girth37
34m
10 x 80 x 225mm Barge boards including aluminium H-profile barge joiners and fixed with hot dipped galvanised drive screws and washers (no paint) (product number 721-800)
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
HOT DIPPED GALVANISED STEEL COLUMNS AND BEAMS
0.89t100 x 100mm x 15.044kg/m hot rolled square tubing columns in heights exceeding 2m and not exceeding 4m
39
Welded columns in single lengths constructed of 100 x 100 x 5mm thick mild steel square tubing with 100 x 100 x 5mm thick flat base, cap, bearer and connection plates, bolted to concrete with 250 x 16mm diameter chemical anchor bolt
HOT DIPPED GALVANISED STEEL TRUSSES
4No
Double pitched light weight steel roof truss 1200 wide x 800mm high with roll formed U-shaped truss profile used for chords and webs, manufactured from tested and certified 0.80mm thick S550GD and galvanised Z200 coated steel assembled using a 12mm hollow core rivet including necessary truss brackets, etc
40
Lightweight steel roof trusses with flat bearer, gusset and connection plates and angle cleats, bolted to concrete
34No
Double pitched light weight steel roof truss 2600 wide x 800mm high with roll formed U-shaped truss profile used for chords and webs, manufactured from tested and certified 0.80mm thick S550GD and galvanised Z200 coated steel assembled using a 12mm hollow core rivet including necessary truss brackets, etc
41
3No
Double pitched light weight steel roof truss 3500 wide x 800mm high with roll formed U-shaped truss profile used for chords and webs, manufactured from tested and certified 0.80mm thick S550GD and galvanised Z200 coated steel assembled using a 12mm hollow core rivet including necessary truss brackets, etc
42
3No
Double pitched light weight steel roof truss 4800 wide x 800mm high with roll formed U-shaped truss profile used for chords and webs, manufactured from tested and certified 0.80mm thick S550GD and galvanised Z200 coated steel assembled using a 12mm hollow core rivet including necessary truss brackets, etc
43
-119-
External WorksBill No. 16Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
HOT DIPPED GALVANISED STEEL PURLINS, GIRTS, BRACING, ETC
2.70t75 x 50 x 20 x 3mm Thick galvanised cold-formed lipped channel purlins
44
Purlins and girts, bolted to steel
2.70t75 x 50 x 20 x 3mm Thick galvanised cold-formed lipped channel girts
45
METALWORK
GALVANISED STEEL GATES, SCREENS, ETC
HOT DIPPED GALVANISED STRAIGHT PROFILE FENCE
182m
3050 x 50 x 50 x 5mm Thick angle iron top rail including all fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification
46
High tensile Galfan Class A mesh panels manufactured in accordance with SANS 10244-2:2003 specification (refer to the Department of Public Works Standard Technical Specification - Perimeter Fence for Prisons May 2005 Rev01 annexed to the bid document)
182m
3000mm High straight profile mesh panel (Type 1), 1,4mm single skin with double vertical wires spaced at 76.2mm and all horizontal wires spaced at 12.7mm centre to centre including all break off bolts and all other fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification
47
1No
Single leaf pedestrian gate 1000m wide x 2000m high including mesh panels, two 101.6mm x 4.5mm gate posts, mesh with double vertical wires, 4mm thick
48
HOT DIPPED GALVANISED STEEL BALUSTRADING
-120-
External WorksBill No. 16Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
17m
Raking balustrading 1000mm high, of 50mm external diameter x 3mm thick continuous pipe handrail, 50mm diameter x 3mm thick continuous top and bottom rails, 50mm diameter x 3mm thick posts at approximately 1500mm centres with 100mm diameter footplates bolted to concrete and 25mm diameter x 2.5mm thick intermediate horizontal balusters at 100mm centres between top and bottom rails
49
Welded balustrading to ramps
5m
Raking balustrading 1000mm high, of 50mm external diameter x 3mm thick continuous pipe handrail, 50mm diameter x 3mm thick continuous top and bottom rails, 50mm diameter x 3mm thick posts at approximately 1500mm centres with 100mm diameter footplates bolted to concrete and 25mm diameter x 2.5mm thick intermediate horizontal balusters at 100mm centres between top and bottom rails
50
Welded balustrading to steps
SCREEN WALLS, ETC.
EARTHWORKS (PROVISIONAL)
EXCAVATION, FILLING, ETC OTHER THAN BULK
EXCAVATION, ETC
1m3Trenches51
Excavate in earth not exceeding 2m deep.
0.5m3Surplus material from excavations and/or stockpiles on site, to a dumping site to be located by the contractor
52
Extra over all excavations for carting away
5m2Sides of trench and hole excavations not exceeding 1,5m deep
53
Risk of collapse of excavations
-121-
External WorksBill No. 16Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
ItemKeeping excavations free of all water other than subterranean water
54
Keeping excavations free of water
FILLING, ETC:
1m3Backfilling to trenches, holes, etc55
Earth filling obtained from the excavations and/or prescribed stockpiles on site compacted to 95% Mod AASHTO density
3m2
Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material where necessary and compacting to 95% Mod AASHTO density (Certificate must be provided)
56
Compaction of surfaces
WEED KILLERS, INSECTICIDES, ETC
3m2Treat ground to bottoms and sides of trenches etc as described, (Certificate must be provided)
57
"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee
CONCRETE, FORMWORK AND REINFORCEMENT
UNREINFORCED CONCRETE
1m3Blinding58
10Mpa/19mm unreinforced concrete
REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES
-122-
External WorksBill No. 16Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
1m3Strip footings59
30MPa/19mm concrete
3NoMaking and testing 150 x 150 x 150mm concrete strength test cubes (Provisional)
60
TEST BLOCKS
ROUGH FORMWORK (DEGREE OF ACCURACY III)
5m2Strip footings61
Rough formwork to sides
MASONRY
BRICKWORK
FOUNDATIONS (PROVISIONAL)
3m2One brick walls62
Brickwork of NFX bricks (14 MPa nominal compressive strength) in class II mortar (Corobrik engineering bricks)
SUPERSTRUCTURE
15m2Half brick walls63
Corobrik Nala Travetine "FBS", pointed with flush horizontal and vertical joints on all exposed faces
72m2One brick walls of two half brick skins with inner skin bagged and sealed
64
8mHeader course copings65
Brick-on-edge header course copings, sills, etc of "Corobrick Red Leaf Rustic" face bricks, pointed with recessed joints on all exposed faces
-123-
External WorksBill No. 16Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
8mExtra over brickwork for horizontal bands one course high
66
BRICKWORK SUNDRIES
13m
150mm Wide reinforcement built in horizontally in foundations
67
2.5mm Brickwork reinforcement
317m150mm Wide reinforcement built in horizontally68
WATERPROOFING
DAMP PROOFING OF WALLS AND FLOORS
3m2In walls, under cills, etc.69
One layer of 375 micron embossed polyethylene damp proof course (SANS 952-1985 type B)
-124-
External WorksBill No. 16Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 3 R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
SECTION SUMMARY - S02: Visitors Entrance to Medium B
BillNo
PageNo
Amount
81Alterations1
84Concrete,Formwork and Reinforcement2
86Precast Concrete3
88Masonry4
89Waterproofing5
91Roof Coverings6
94Carpentry and Joinery7
96Ceilings,Partitions and Access Flooring8
98Ironmongery9
101Metalwork10
102Plastering11
104Tiling12
109Plumbing and drainage (Provisional)13
110Glazing14
112Paintwork15
124External Works 16
-125-
Section No. 3
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried to Final Summary R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 01
EARTHWORKS (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 104) unless otherwise stated
SITE CLEARANCE, ETC.
101m2
Digging up and removing rubbish, debris, vegetation, hedges, shrubs and trees not exceeding 200mm girth, bush, etc.
1
Site clearance
EXCAVATION, FILLING, ETC OTHER THAN BULK
EXCAVATION, ETC.
10m3Reduced levels under floors2
Excavation in earth not exceeding 2m deep
-126-
Earthworks (Provisional)Bill No. 1Section No. 4
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
10m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor
3
Extra over all excavations for carting away
ItemKeeping excavations free of all water other than subterranean water
4
Keeping excavations free of water
FILLING ETC
101m2
Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 95% Mod AASHTO density
5
Compaction of surfaces
WEED KILLERS, INSECTICIDES, ETC
101m2
Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming (Certificate must be provided)
6
"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee
-127-
Earthworks (Provisional)Bill No. 1Section No. 4
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 4 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 02
CONCRETE, FORMWORK AND REINFORCEMENT
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 110) unless otherwise stated
REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES
11m3Surface beds cast in panels on waterproofing (Aprons and V - channels)
1
30MPa/19mm concrete
2NoMaking and testing 150 x 150 x 150mm concrete strength test cubes (Provisional)
2
TEST BLOCKS
CONCRETE SUNDRIES
-128-
Concrete,Formwork and ReinforcementBill No. 2Section No. 4
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
101m2Surface bed to falls3
Finishing top surfaces of concrete smooth with a wood float to a non slip surface
(CPAP WORK GROUP NO. 111) unless otherwise stated
SMOOTH FORMWORK (DEGREE OF ACCURACY II)
101mAprons and V - Channels not exceeding 300mm high4
Smooth formwork to sides
MOVEMENT JOINTS ETC
11mNot exceeding 300mm wide in Aprons and V - Channels (Provisional)
5
Expansion joints with 10mm softboard bitumen impregnated softboard between vertical concrete and brick surfaces
(CPAP WORK GROUP NO. 114) unless otherwise stated
REINFORCEMENT (PROVISIONAL)
101m2Type 193 fabric reinforcement6
Fabric reinforcement
-129-
Concrete,Formwork and ReinforcementBill No. 2Section No. 4
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 4 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 03
MASONRY
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 116) unless otherwise stated
BRICKWORK
SUPERSTRUCTURE
25m2Half brick walls in beamfilling1
Brickwork of NFP bricks in class II mortar
22m2Half brick walls 2
6m2One brick walls of two half brick skins with inner skin bagged and sealed
3
BRICKWORK SUNDRIES
-130-
MasonryBill No. 3Section No. 4
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
154m150mm Wide reinforcement built in horizontally in foundations (Provisional)
4
2,5mm Brickwork reinforcement
99m150mm Wide reinforcement built in horizontally 5
25m220mm Wide turning pieces6
Turning pieces to soffit of lintels etc
35No30 x 1,6mm Roof tie 1,5m long with one end fixed to timber and other end built into brickwork
7
Galvanised hoop iron cramps, ties, etc
FACE BRICKWORK
21m2Extra over brickwork for face brickwork 8
Corobrik Nala Travetine "FBS", pointed with flush horizontal and vertical joints on all exposed faces
25mExtra over brickwork for brick-on-edge header course lintels
9
35mFair raking cutting10
FIBRE-CEMENT WINDOW SILLS
25m15 x 150mm Wide sills set sloping and slightly projecting11
"Everite-Nutec"
-131-
MasonryBill No. 3Section No. 4
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 4 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 04
WATERPROOFING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 120) unless otherwise stated
DAMPPROOFING OF WALLS
6m2Under walls1
One layer of 375 micron embossed polyethylene damp proof course (SANS 952-1985 type B)
17m2Under sills2
SEALING STRIPS, JOINT SEALANTS, ETC
11m10 x 10mm In vertical expansion joints including raking out expansion joint filler as necessary
3
Two-part grey polysulphide sealing compound including backing cord, bond breaker, primer, etc
-132-
WaterproofingBill No. 4Section No. 4
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
11m
10 x 10mm In vertical expansion joints including raking out expansion joint filler as necessary in foundations (Provisional)
4
-133-
WaterproofingBill No. 4Section No. 4
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 4 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 05
ROOF COVERINGS ETC
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 124) unless otherwise stated
PROFILED METAL SHEETING AND ACCESSORIES
138m2Roof covering with pitches not exceeding 25 degrees with side laps seam stitched
1
0.8mm Z275 spelter galvanised corrugated steel sheets fixed to timber purlins or rails (Colour to Architects Specification)
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
138m2
Insulation sheeting laid taut over purlins and fixed concurrent with roof covering with minimum 150mm stapled laps including steel straining wires at not exceeding 400mm centres and double-sided tape at edges where required
4
"Sisalation 420" heavy industrial grade aluminium foil based insulation
-135-
Roof CoveringBill No. 5Section No. 4
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 4 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 06
CARPENTRY AND JOINERY
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 126) unless otherwise stated
STRUCTURAL TIMBERWORK ETC
PLATE NAILED TIMBER ROOF TRUSS CONSTRUCTION ETC
Prefabricated roof trusses etc
Item
Prefabricated double pitched roof trusses approximately 14100mm X 8500 mm span with 800mm pitch (7.5 degrees) and with 500mm overhang on both sides for roof
1
The following in plate nailed timber roof trusses with a pitch not exceeding 27.5 degrees, from an approved supplier, delivered to site, hoisted into position, fixed and braced on timber wall plates
-136-
Carpentry and JoineryBill No. 6Section No. 4
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
31m76 x 114mm Wall plates2
Sawn treated softwood grade V4
31m38 x 228mm Gangboards3
190m50 x 76mm Purlins4
13m38 x 76mm Trimmers5
Wrought treated softwood grade V4
11m38 x 114mm Sprockets6
18m50 x 76mm Purlins7
EAVES, VERGES, ETC
33m
12 x 225mm Fascia boards, including aluminium H-profile fascia joiners and fixed with hot dipped galvanised drive screws and washers (no paint) (product number 041-203 and 685-195)
8
''Everite Nutech'' Medium density fibre-cement fascia boards
22m
10 x 80 x 225mm Barge boards including aluminium H-profile barge joiners and fixed with hot dipped galvanised drive screws and washers (no paint) (product number 721-800)
26m2Two coats creosote "ABE Provonite" paint on exposed roof timbers and wall plates
10
SUNDRIES
79No"Teco" two way hurricane clips11
TIMBER DOORS, WINDOWS, ETC
-137-
Carpentry and JoineryBill No. 6Section No. 4
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
Refer to Door Schedule
DOORS ETC
3No
40mm Ledged and braced batten single door 900 x 2035mm high with 6mm plywood finish panel at back . 20 x 150mm middle ledged, 20 x 225mm bottom ledged and 20 x 110mm braces (D5)
12
Wrought meranti doors
2NoSingle Fire door 900 x 2035mm high (D5)13
4No40mm Semi solid single door 813 x 2035mm high with veneer suitable for enamel paint finish (D7)
14
FITTINGS
22No
2600 x 450 x 450mm High wrought hardwood benches with 72 x 35mm slats including 50 x 50 x 5mm angle iron framework, fixed with 8mm diameter rawl bolts
15
BENCHES
-138-
Carpentry and JoineryBill No. 6Section No. 4
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 4 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 07
CEILINGS, PARTITIONS AND ACCESS FLOORING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
"Isotherm" polyester high density 7-10kg/m3 thermbonded insulation blanket
NAILED-UP CEILINGS
24m2
1200 x 6mm thick Nutec Fibre cement ceiling board complete with "H" profilejunction strips. Fix with serrated 32mm galvanised nails to 50 x 38mm ceiling battens on edge fixed at right angles to trusses at max. 600mm centres. Treat nails and joiners with a metal primer
2
''Everite Nutec'' Fibre Cement Ceiling Board
-139-
Ceilings,Partitions and Access FlooringBill No. 7Section No. 4
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
2No
Extra over ceiling for 600 x 600mm Hinged, pressed metal ceiling trap door of 38 x 50mm S.A pine braced framing with one cross brander, covered with ceiling board and fitted flush in opening, including necessary trimmers around
3
40m
75mm Nutec fibre cement cornices as per Architect's Specification
4
Nutec Fibre Cement Cornices
SUSPENDED CEILINGS
133m2Ceilings suspended not exceeding 1 000mm below timber purlins
5
1200 x 600 x 12mm Thick PVC ceiling panel screwed to and including screw-up suspension grid
1No
Extra over ceiling 600 x 600mm trap door complete with trimmers, frame, cross branders, ceiling board, hinges, etc as described (Provisional)
6
110No
Extra over ceiling "Mitek Bracing Strap" or equal approved galvanised ceiling support straps, 40 x 6mm thick not exceeding 500mm long, fixed to ceiling grid system as per Architectural specification
7
94mL-shape suspended PVC ceiling hangars/supporters fixed to wall
8
Perimeter trim to suspended ceilings
-140-
Ceilings,Partitions and Access FlooringBill No. 7Section No. 4
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 4 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 08
IRONMONGERY
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 132) unless otherwise stated
LOCKS
7NoBathroom indicator bolt1
"Union " or similar approved
4NoFour lever upright lockset2
PUSH PLATES AND KICK PLATES
4No300 x 75mm Push plate3
Aluminium plates countersunk screwed along edges at not exceeding 200mm centres
4No750 x 150mm Kick plate4
PHOTOLUMINESCENT SIGNS
-141-
IronmongeryBill No. 8Section No. 4
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
1No150 x 150mm Sign with one pictogram (Male)5
Wall mounted photoluminescent statutory signs in 150 x 150mm modules
1No150 x 150mm Sign with one pictogram (Female)6
2No150 x 150mm Sign with one pictogram (Paraplegic)7
1No20mm Diameter chromium plated towel rail 600mm long including end brackets, plugged
8
BATHROOM FITTINGS
4No"White" vandal proof double toilet roll holder, plugged9
1No32mm "GRDG02B" stainless steel side dogleg grab rail twice bent at 45 degree, plugged
12
11No38mm Diameter rubber door stop plugged13
SUNDRIES
-142-
IronmongeryBill No. 8Section No. 4
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 4 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 09
METALWORK
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 136) unless otherwise stated
HOT DIPPED GALVANISED PRESSED STEEL DOOR FRAMES
6NoFrame for door 813 x 2032mm high1
1.6mm Double rebated frames with one and half pair of 100mm steel butt hinges suitable for half brick walls
3NoFrame for door 900 x 2032mm high2
1.6mm Double rebated frames with one and half pair of 100mm steel butt hinges suitable for one brick walls
Refer to Window Schedule
ALUMINIUM CASEMENT WINDOWS
-143-
MetalworkBill No. 9Section No. 4
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
8NoPurpose made window, 533 x 654 mm high (W06)3
Natural anodised casement window units complete with subframes, ironmongery, 4mm glass with aluminium beads, sealing, burglar bars in 25 x 25mm square tubingetc and fixing to brickwork
9NoPurpose made window, 1511 x 1245mm high (W07)4
-144-
MetalworkBill No. 9Section No. 4
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 4 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 10
PLASTERING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 142) unless otherwise stated
SCREEDS
133m240mm Thick on floors 1
1:3 Cement screeds steel floated, on concrete
INTERNAL PLASTER
254m2Plaster on walls2
Cement plaster steel trowelled, on brickwork
25m2Plaster on narrow widths3
8m5 x 40mm Flat section brass weather bar between different floor finishes (In 1 No)
4
CORNER PROTECTORS, DIVIDING STRIPS, ETC
-145-
PlasteringBill No. 10Section No. 4
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 4 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 11
TILING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding
SUPPLEMENTARY PREAMBLES
Tiling described as "fixed with adhesive on power floated concrete" shall be deemed to include for approved tiling key-coat
Ceramic, porcelain, marble and granite tiles are to be fixed and grouted with suitable adhesives and grouts from the "Tal Professional" range of products as recommended by the manufacturer of the tiles
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 144) unless otherwise stated
FLOOR TILING
133m2On floors in patches1
300 x 300 x 8mm Porcelain floor tiles fixed with adhesive to screed (screed elsewhere) and flush pointed with epoxy grout
-146-
TilingBill No. 11Section No. 4
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
94m2Skirting 70mm high 2
-147-
TilingBill No. 11Section No. 4
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 4 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 12
PLUMBING AND DRAINAGE (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 148) unless otherwise stated
RAINWATER DISPOSAL
32m155 x 100 x 115mm Aluminium ogee roof gutters with baked enamel finish fixed with concealed brackets
1
0,6mm Chromadek seamless gutters and rainwater pipes
4NoExtra over gutter for stopped end2
4NoExtra over gutter for outlet for 100 x 75mm pipe3
17m100 x 75mm Fluted aluminium rainwater downpipes with baked enamel finish fixed as per supplier's detail
4
4NoExtra over rainwater pipe for eaves offset 900mm projection
5
-148-
Plumbing and drainage (Provisional)Bill No. 12Section No. 4
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
4NoExtra over rainwater pipe for shoe 6
SANITARY FITTINGS
3No
White vitreous china close coupled toilet set with doubleflap toilet seat and cistern as per Architect's Specification
7
"Vaal" or equal approved by the Architect
1No
"Vaal Pearl Paraplegic" vitreous china semi-close coupled 90 degree outlet open rim washdown pan and matching 9 litre cistern with side flush lever as per Architect's Specification
8
6No
510 x 400mm White vitreous china basin with a single tap hole as per Architect's Specification
9
2No
380 x 435mm "Vaal Hygia 703602WH " barrier free wash hand basin as per Architect's Specification
10
2No
White vitreous china Urinal complete with L.P flushing valves including fixations as per Architect's Specification
11
WASTE UNIONS ETC
6No
Chrome Pop Up Basin waste for basin with overflows as per Architect's Specification
12
"Cobra Watertech" or equal approved
6No40mm 309-40 CP anti-theft plug with spindle 13
TRAPS ETC
8No40mm 360 CP bottle trap14
"Cobra Watertech" or equal approved
-149-
Plumbing and drainage (Provisional)Bill No. 12Section No. 4
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
TAPS, VALVES, ETC
4No15mm Stopcock15
Brass
2No20mm Stopcock16
4No15mm Fullway gate valve17
2No22mm Fullway gate valve18
1No25mm Brass Ball-o-stop19
1No50mm Brass wheelvalve for HDPE pipes20
1No50mm Brass Ball-o-stop21
6No
15mm Basin tap cold water only as per Architect's Specification
22
"Stella pillar taps" equal approved
2No
15mm "Cobra NM-851" or equal approved elbow action basin mixer
23
"Cobra" or equal approved
SANITARY PLUMBING
11m50mm Pipes24
uPVC soil and vent pipes
6m50mm Pipes chased into concrete surface beds25
39m
110mm Pipes laid in and including trenches not exceeding 1m deep
26
6m110mm Pipes 27
-150-
Plumbing and drainage (Provisional)Bill No. 12Section No. 4
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
8No50mm BSP adaptor28
Extra over uPVC soil and vent pipes for fittings
8No50mm Strap on boss29
17No50mm Bend30
8No50mm Junction31
8No50mm Access bend32
8No50mm Access junction33
4No50mm Two-way vent valve34
4No110mm Eccentric reducer35
4No110mm Pan connector36
9No110mm Bend37
4No110mm Reducing junction38
4No110mm Access bend39
4No110mm Access bend with anti-syphon horn40
4No110mm Access reducing junction41
4No110mm Two way vent valve42
ItemTesting waste pipe system43
Testing
WATER SUPPLIES
22m15mm Pipes44
Class 1 copper pipes with capillary couplings
11m22mm Pipes45
-151-
Plumbing and drainage (Provisional)Bill No. 12Section No. 4
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
61No15mm Fittings46
Extra over Class1 copper pipes for capillary fittings
17No22mm Fittings47
12No15mm Flexible service pipe48
22m25mm Pipes laid in and including trenches not exceeding 1m deep
49
Class 12 HDPe pipes
11m50mm Pipes laid in and including trenches not exceeding 1m deep
50
6No25mm Bend (90 degrees)51
Extra over Class 12 HDPe pipes for compression fittings
6No50mm Bend (45 degrees)52
ItemTesting water pipe system53
Testing
8m3
Extra over excavation for pipe trenches, chambers, etc for carting away surplus material to a dumping site to be located by the contractor
54
SUNDRIES
1NoTie into existing sewer line55
2No9kg Dry chemical powder fire extinguisher56
FIRE APPLIANCES ETC
2No190 x 190mm ABS plastic symbolic safety sign plugged and screwed to wall
57
HOLES ETC
-152-
Plumbing and drainage (Provisional)Bill No. 12Section No. 4
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
8NoThrough one brick wall faced one side58
Core drilling hole not exceeding 50mm diameter
4NoThrough one brick wall59
Core drilling hole exceeding 50mm and not exceeding 110mm diameter
-153-
Plumbing and drainage (Provisional)Bill No. 12Section No. 4
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 4 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 13
GLAZING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 150) unless otherwise stated
TOPS, SHELVES, DOORS, MIRRORS, ETC
6NoMirror 300 x 450mm high1
4mm Silvered float glass copper backed mirrors with polished edges, holed for and fixed with chromium plated dome capped mirror screws with rubber buffers to plugs in brickwork
-154-
GlazingBill No. 13Section No. 4
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 4 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 14
PAINTWORK
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 152) unless otherwise stated
PAINTWORK ETC TO NEW WORK
ON INTERNAL FLOATED PLASTER SURFACES
279m2Walls1
One merit plaster primer, one coat undercoat and two coats "Wall & All" or similar approved emulsion paint (colour to be approved by Client)
154m2Ceilings and cornices including priming cover strips2
ON METAL
33m2Doors3
One coat Merit metal primer (UC501), one coat Merit Universal Undercoat (UC1) and two coats Super Universal Enamel (NY1/G) paint
-155-
PaintworkBill No. 14Section No. 4
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
11m2Door frames4
22m2On windows with burglar bars (both sides measured) 5
11m2Welded screens6
ON WOOD SURFACES
33m2Doors7
Three coats superior quality clear gloss varnish
-156-
PaintworkBill No. 14Section No. 4
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 4 R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
SECTION SUMMARY - Waiting Area to Medium B
BillNo
PageNo
Amount
127Earthworks (Provisional)1
129Concrete,Formwork and Reinforcement2
131Masonry3
133Waterproofing4
135Roof Covering5
138Carpentry and Joinery6
140Ceilings,Partitions and Access Flooring7
142Ironmongery8
144Metalwork9
145Plastering10
147Tiling11
153Plumbing and drainage (Provisional)12
154Glazing13
156Paintwork14
-157-
Section No. 4
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried to Final Summary R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 01
ALTERATIONS (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 102) unless otherwise stated
REMOVAL OF EXISTING WORK
14m2Ridge capping not exceeding 750mm girth1
Taking down and removing roofs, floors, panelling, ceilings, partitions, etc
11m2Internal plaster from walls and columns2
Hacking up/off and removing granolithic, screeds, plaster, etc from concrete or brickwork and preparing surfaces for new screed, plaster, tile finishes, etc
MAKING GOOD OF FINISHES ETC
11m2On walls in patches3
Making good cement plaster
-158-
AlterationsBill No. 1Section No. 5
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
6m
Chase out plaster cracks to form recess 25mm wide and 20mm deep and fill with 1:4 cement mortar including floating up smooth to match existing
4
54m2Internal plastered walls5
Remove loose and flaking paint by scraping and sanding on walls, floors etc. to receive new paint
4m2Re-setting of suspended ceilings 6
Remedial work
71m2
Refix existing loose 0.8mm galvanised IBR roof covering to steel members with "SAFLOK 700" or equal approved clips, all in accordance with manufacturer's recommendations and specifications
7
2NoRealign 5300 x 4650mm high galvanised steel vehicle access sliding gates
8
110No"Pelican" or similar approved hold down clip for Pelican suspended ceiling systems
9
110No
"Mitek Bracing Strap" or equal approved galvanised ceiling support straps, 40 x 6mm thick not exceeding 500mm long, fixed to ceiling grid system as per Architectural specification
10
107No
Remove existing structural bolts and replace with galvanised carbon steel structural grade 8.8 M16 structural bolts or equal approved
11
16m
Remove existing grout around base plates and replace with "ABE Epidermix 372" or similar approved grout at an angle of no less than 15 degrees to the horizontal not exceeding 5mm wide and 3mm deep
12
GENERAL MAINTENANCE
81m2External face brick walls 13
Power wash existing surfaces to remove all dirt, grime and loose particles
-159-
AlterationsBill No. 1Section No. 5
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
19m2Corrugated roof coverings14
ItemExisting building including floors, walls, windows, doors, frames, etc
15
Clean down with suitable detergent and rinse thoroughly with clean water
-160-
AlterationsBill No. 1Section No. 5
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 5 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 02
EARTHWORKS (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 104) unless otherwise stated
SITE CLEARANCE, ETC.
28m2
Digging up and removing rubbish, debris, vegetation, hedges, shrubs and trees not exceeding 200mm girth, bush, etc.
1
Site clearance
-161-
Earthworks (Provisional)Bill No. 2Section No. 5
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 5 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 03
CONCRETE, FORMWORK AND REINFORCEMENT
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 110) unless otherwise stated
REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES
0.3m3Steps1
30MPa/19mm concrete
2NoMaking and testing 150 x 150 x 150mm concrete strength test cubes (Provisional)
2
TEST BLOCKS
(CPAP WORK GROUP NO. 111) unless otherwise stated
SMOOTH FORMWORK (DEGREE OF ACCURACY II)
-162-
Concrete,Formwork and ReinforcementBill No. 3Section No. 5
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
2m2Steps3
Smooth formwork to sides
(CPAP WORK GROUP NO. 114) unless otherwise stated
REINFORCEMENT (PROVISIONAL)
0.034tBars not exceeding 10mm diameter4
Mild steel reinforcement to structural concrete work
0.103tBars not exceeding 20mm diameter5
High tensile steel reinforcement to structural concrete work
-163-
Concrete,Formwork and ReinforcementBill No. 3Section No. 5
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 5 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 04
WATERPROOFING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 120) unless otherwise stated
WATERPROOFING TO ROOFS ETC
6m2On parapet walls1
One layer 4mm special polyester fully bonded waterproof membrane comprising a matrix modified with polypropylene dual reinforced with non-woven polyester cloth and glass fibre tissue, laid with 75mm side and 100mm end laps
-164-
WaterproofingBill No. 4Section No. 5
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 5 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 05
ROOF COVERINGS ETC
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
2No38mm Diameter rubber door stop plugged6
SUNDRIES
-169-
IronmongeryBill No. 7Section No. 5
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 5 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 08
METALWORK
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 136) unless otherwise stated
GALVANISED STEEL GATES, SCREENS, ETC
HOT DIPPED GALVANISED GATES
2No
1000 x 2000mm High single leaf pedestrian gate including mesh panels, two 101.6mm x 4.5mm gate posts mesh with double vertical wires, 4mm thick all in accordance to manufacturer's recommendation and attached specification
1
Hot dipped galvanised mild steel gates in accordance ISO 1461 (minimum 45 micron)
HOT DIPPED GALVANISED STRAIGHT PROFILE FENCE
-170-
MetalworkBill No. 8Section No. 5
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
6m
3050 x 50 x 50 x 5mm Thick angle iron top rail including all fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification
2
High tensile Galfan Class A mesh panels manufactured in accordance with SANS 10244-2:2003 specification
6m
5000 x 3050mm Wide straight profile mesh panel (Type 1), 1,4mm single skin with double vertical wires spaced at 76.2mm and all horizontal wires spaced at 12.7mm centre to centre including all break off bolts and all other fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification
3
HOT DIPPED GALVANISED STEEL GATE CRAWLERS
4No
Heavy duty gate crawlers suitable for gate size 6000 x 4000mm high including all fittings installed on gates attached to crawl beams as per engineers specification
4
Purpose made gate crawlers as per engineers specification
HOT DIPPED GALVANISED STEEL BOLLARDS
13No
220mm Diameter galvanised mild steel "high impact" bollard, 1500mm total height, 1000mm height above ground with concrete infill laid in and including 500 x 500 x 550m deep 30mpa concrete base
5
"SA Bollards High Impact Bollard" or similar approved
HOT DIPPED GALVANISED STEEL MINOR WORK
2NoGoose neck post 1200mm high including base plates, fittings etc. with necessary provisions for intercom
6
Galvanised hot dipped mild steel posts including base plate, fittings etc.
-171-
MetalworkBill No. 8Section No. 5
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
11mU-shaped guide rail of 35 x 35 x 5mm u-channel section7
Fixing accessories for 6000 x 4000mm high steel gate
Refer to Window Schedule
ALUMINIUM CASEMENT WINDOWS
1NoPurpose made window, 1800 x 1245mm high (W01)8
Natural anodised casement window units complete with subframes, ironmongery, 16mm thick bullet resistant glass, sealing, burglar bars in 25 x 25mm square tubing etc and fixing to brickwork
-172-
MetalworkBill No. 8Section No. 5
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 5 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 09
PLUMBING AND DRAINAGE (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 148) unless otherwise stated
RAINWATER DISPOSAL
4m155 x 100 x 115mm Aluminium ogee roof gutters with baked enamel finish fixed with concealed brackets
1
0,6mm Chromadek seamless gutters and rainwater pipes
2NoExtra over gutter for stopped end2
2NoExtra over gutter for outlet for 100 x 75mm pipe3
5m100 x 75mm Fluted aluminium rainwater downpipes with baked enamel finish fixed as per supplier's detail
4
2NoExtra over rainwater pipe for eaves offset 900mm projection
5
-173-
Plumbing and drainage (Provisional)Bill No. 9Section No. 5
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
2NoExtra over rainwater pipe for shoe 6
SANITARY PLUMBING
2m50mm Pipes7
uPVC soil and vent pipes
1m50mm Pipes chased into concrete surface beds8
2m
110mm Pipes laid in and including trenches not exceeding 1m deep
9
1m110mm Pipes 10
1No50mm Bend11
Extra over uPVC soil and vent pipes for fittings
1No50mm Access bend12
1No50mm Rodding eye13
1No110mm Bend14
1No110mm Access bend15
1No4.5kg Dry chemical powder fire extinguisher16
FIRE APPLIANCES ETC
6No190 x 190mm ABS plastic symbolic safety sign plugged and screwed to wall
17
-174-
Plumbing and drainage (Provisional)Bill No. 9Section No. 5
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 5 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 10
GLAZING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 150) unless otherwise stated
GLAZING TO ALUMINIUM WITH CLIP-ON BEADS
1m2Panes exceeding 0,1m2 and not exceeding 0,5m21
6mm Clear float glass with aluminium beads
TOPS, SHELVES, DOORS, MIRRORS, ETC
1NoMirror 300 x 450mm high2
4mm Silvered float glass copper backed mirrors with polished edges, holed for and fixed with chromium plated dome capped mirror screws with rubber buffers to plugs in brickwork
-175-
GlazingBill No. 10Section No. 5
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 5 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 11
PAINTWORK
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
All painting shall be done in accordance with the Architects specifications and condition assessment reports unless otherwise described
PAINT SPECIFICATIONS
(CPAP WORK GROUP NO. 152) unless otherwise stated
PAINTWORK ETC TO EXISTING SURFACES
ON EXTERNAL FLOATED PLASTER SURFACES
37m2Parapet walls1
One merit plaster primer, one coat undercoat and two coats "Wall & All" or similar approved emulsion paint (colour to be approved by Client)
ON INTERNAL FLOATED PLASTER SURFACES
-176-
PaintworkBill No. 11Section No. 5
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
54m2Walls2
One merit plaster primer, one coat undercoat and two coats "Wall & All" or similar approved emulsion paint (colour to be approved by Client)
11m2Walls3
Two coats "Plascon Dampseal" or similar approved waterproof sealer
-177-
PaintworkBill No. 11Section No. 5
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 5 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 12
EXTERNAL WORKS (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
SUPPLEMENTARY PREAMBLES
Descriptions of earth filling, compaction, etc shall be deemed to include for all necessary testing required in accordance with the SABS 1200 series
Testing of material and filling
(CPAP WORK GROUP NO. 154) unless otherwise stated
ROADWORKS AND PARKING
EXCAVATION, FILLING, ETC OTHER THAN BULK
EXCAVATIONS ETC
83m3Over site between buildings, etc to reduce levels and dispose in prescribed stock piles on site
1
Excavation in earth not exceeding 2m deep
16m3Soft rock2
Extra over excavation in earth for excavation in
-178-
External WorksBill No. 12Section No. 5
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
5m3Hard rock3
83m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor
4
Extra over all excavations for carting away
ItemKeeping excavations free of water other than subterranean water
5
Keeping excavations free of water
LAYER WORK
24m3
Sub-grade course of 150mm thick of G1 crusher run material compacted to 88% Mod AASHTO density
6
Earth filling supplied by the contractor under parking areas, roadways, etc
24m3
Base course of 150mm thick of C4 (G5 gravel material) stabilised with 3% cement compacted to 97% Mod AASHTO density
7
8m3Under floors etc8
Coarse river sand filling supplied by the contractor
157m2
Compaction of ground surfaces under roadworks etc, including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density (Roadbed)
9
Compaction of surfaces
WEED KILLERS, INSECTICIDES, ETC
-179-
External WorksBill No. 12Section No. 5
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
157m2
Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming (Certificate must be provided)
10
"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee
PAVING
128m2Paving to roadworks and parking areas to falls11
80mm thick 30MPa precast concrete grey interlocking block paving blocks in accordance with SANS 1058, laid to falls on and including 25mm thick sand layer with joints filled in with sand, compacted with a vibration compactor
28m2Paving to aprons12
50mm thick 30MPa precast concrete grey interlocking block paving blocks in accordance with SANS 1058, laid to falls on and including 25mm thick sand layer with joints filled in with sand, compacted with a vibration compactor
-180-
External WorksBill No. 12Section No. 5
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 5 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 13
ELECTRICAL INSTALLATION
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 160) unless otherwise stated
ACCESS CONTROL
2NoVehicle boom gate and spike barrier 1
ACCESS BARRIERS
2NoSpike boom barrier extension 2
2NoTwo button remotes to operate claws and boom to be handed to the Area Commissioner
3
2NoTemporary switch fixed to Guards Office for claw and boom operation
4
2No
Two way red and green, 12V DC Traffic light Unit including wall mounted brackets (SS), harness and interface relay
5
-181-
ElectricalBill No. 13Section No. 5
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
2No
D10 Industrial gate motor including tracks, break sensor, impact sensor, burglar proof case, anti-theft brackets etc. to make installation complete
6
"Centurion" or similar or equal approved
ItemMake the necessary provisions for access barriers to be controlled from the Main Control Room
7
Provision of service infrastructure for future installations
-182-
ElectricalBill No. 13Section No. 5
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 5 R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
SECTION SUMMARY - S03: Sally Port to Medium B
BillNo
PageNo
Amount
160Alterations1
161Earthworks (Provisional)2
163Concrete,Formwork and Reinforcement3
164Waterproofing4
165Roof Covering5
167Ceilings,Partitions and Access Flooring6
169Ironmongery7
172Metalwork8
174Plumbing and drainage (Provisional)9
175Glazing10
177Paintwork11
180External Works12
182Electrical13
-183-
Section No. 5
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried to Final Summary R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 01
ALTERATIONS (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 102) unless otherwise stated
REMOVAL OF EXISTING WORK
14m2Ridge capping not exceeding 750mm girth1
Taking down and removing roofs, floors, panelling, ceilings, partitions, etc
MAKING GOOD OF FINISHES ETC
2NoRealign 5300 x 4650mm high galvanised steel vehicle access sliding gates
2
Remedial work
71m2
Refix existing loose 0.8mm galvanised IBR roof covering and ridge capping including flashing to steel members with SAFLOK 700 clips screw, all in accordance with manufacturer's recommendations and specifications
3
-184-
AlterationsBill No. 1Section No. 6
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
107No
Remove existing structural bolts and replace with galvanised carbon steel structural grade 8.8 M16 structural bolts or equal approved
4
16m
Remove existing grout around base plates and replace with "ABE Epidermix 372" or similar approved grout at an angle of no less than 15 degrees to the horizontal not exceeding 5mm wide and 3mm deep
5
-185-
AlterationsBill No. 1Section No. 6
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 6 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 02
ROOF COVERINGS ETC
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 03
METALWORK
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 136) unless otherwise stated
HOT DIPPED GALVANISED STEEL GATES, SCREENS, ETC
HOT DIPPED GALVANISED GATES
2No
1000 x 2000mm High single leaf pedestrian gate including mesh panels, two 101.6mm x 4.5mm gate posts mesh with double vertical wires, 4mm thick all in accordance to manufacturer's recommendation and attached specification
1
Hot dipped galvanised mild steel gates in accordance ISO 1461 (minimum 45 micron)
HOT DIPPED GALVANISED STRAIGHT PROFILE FENCE
-187-
MetalworkBill No. 3Section No. 6
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
3m
3050 x 50 x 50 x 5mm Thick angle iron top rail including all fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification
2
High tensile Galfan Class A mesh panels manufactured in accordance with SANS 10244-2:2003 specification (refer to the Department of Public Works Standard Technical Specification - Perimeter Fence for Prisons May 2005 Rev01 annexed to the bid document)
3m
5000 x 3050mm Wide straight profile mesh panel (Type 1), 1,4mm single skin with double vertical wires spaced at 76.2mm and all horizontal wires spaced at 12.7mm centre to centre including all break off bolts and all other fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification
3
HOT DIPPED GALVANISED STEEL GATE CRAWLERS
4No
Heavy duty gate crawlers suitable for gate size 6000 x 4000mm high including all fittings installed on gates attached to crawl beams as per engineers specification
4
Purpose made gate crawlers as per engineers specification
HOT DIPPED GALVANISED STEEL BOLLARDS
13No
220mm Diameter galvanised mild steel "high impact" bollard, 1500mm total height, 1000mm height above ground with concrete infill laid in and including 500 x 500 x 550m deep 30mpa concrete base
5
"SA Bollards High Impact Bollard" or similar approved
HOT DIPPED GALVANISED STEEL MINOR WORK
-188-
MetalworkBill No. 3Section No. 6
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
2NoGoose neck post 1200mm high including base plates, fittings etc. with necessary provisions for intercom
6
Galvanised hot dipped mild steel posts including base plate, fittings etc.
11mU-shaped guide rail of 35 x 35 x 5mm u-channel section7
Fixing accessories for 6000 x 4000mm high steel gate
-189-
MetalworkBill No. 3Section No. 6
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 6 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 04
EXTERNAL WORKS (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
SUPPLEMENTARY PREAMBLES
Descriptions of earth filling, compaction, etc shall be deemed to include for all necessary testing required in accordance with the SABS 1200 series
Testing of material and filling
(CPAP WORK GROUP NO. 154) unless otherwise stated
ROADWORKS AND PARKING
EXCAVATION, FILLING, ETC OTHER THAN BULK
EXCAVATIONS ETC
68m3Over site between buildings, etc to reduce levels and dispose in prescribed stock piles on site
1
Excavation in earth not exceeding 2m deep
13m3Soft rock2
Extra over excavation in earth for excavation in
-190-
External WorksBill No. 4Section No. 6
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
4m3Hard rock3
83m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor
4
Extra over all excavations for carting away
ItemKeeping excavations free of water other than subterranean water
5
Keeping excavations free of water
LAYER WORK
19m3
Sub-grade course of 150mm thick of G1 crusher run material compacted to 88% Mod AASHTO density
6
Earth filling supplied by the contractor under parking areas, roadways, etc
19m3
Base course of 150mm thick of C4 (G5 gravel material) stabilised with 3% cement compacted to 97% Mod AASHTO density
7
6m3Under floors etc8
Coarse river sand filling supplied by the contractor
128m2
Compaction of ground surfaces under roadworks etc, including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density (Roadbed)
9
Compaction of surfaces
WEED KILLERS, INSECTICIDES, ETC
-191-
External WorksBill No. 4Section No. 6
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
128m2
Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming (Certificate must be provided)
10
"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee
PAVING
128m2Paving to roadworks and parking areas to falls11
80mm thick 30MPa precast concrete grey interlocking block paving blocks in accordance with SANS 1058, laid to falls on and including 25mm thick sand layer with joints filled in with sand, compacted with a vibration compactor
-192-
External WorksBill No. 4Section No. 6
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 6 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 05
ELECTRICAL INSTALLATION
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 160) unless otherwise stated
ACCESS CONTROL
2NoVehicle boom gate and spike barrier 1
ACCESS BARRIERS
2NoSpike boom barrier extension 2
2NoTwo button remotes to operate claws and boom to be handed to the Area Commissioner
3
2NoTemporary switch fixed to Guards Office for claw and boom operation
4
2No
Two way red and green, 12V DC Traffic light Unit including wall mounted brackets (SS), harness and interface relay
5
-193-
ElectricalBill No. 5Section No. 6
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
2No
D10 Industrial gate motor including tracks, break sensor, impact sensor, burglar proof case, anti-theft brackets etc. to make installation complete
6
"Centurion" or similar or equal approved
ItemMake the necessary provisions for access barriers to be controlled from the Main Control Room
7
Provision of service infrastructure for future installations
-194-
ElectricalBill No. 5Section No. 6
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 6 R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
SECTION SUMMARY - S04: Sally Port to Ash and Ambulance
BillNo
PageNo
Amount
185Alterations1
186Roof Covering2
189Metalwork3
192External Works4
194Electrical5
-195-
Section No. 6
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried to Final Summary R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 01
ALTERATIONS
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
Before submitting his tender the tenderer shall visit the site and satisfy himself as to the nature and extent of the work to be done and the value of the materials salvageable from the alterations. No claim for any variations of the contract sum in respect of the nature and extent of the work or of inferior or damaged materials will be entertained
View site
Doors, fanlights, windows, fittings, frames, linings, etc which are to remain the property of the employer shall be carefully taken out, temporarily stored, transported over a distance of approximately ?km to store and handed over to the employer
General
-196-
AlterationsBill No. 1Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
Doors, fanlights, windows, fittings, frames, linings, etc which are to be re-used shall be thoroughly overhauled before refixing including taking off, easing and rehanging, cramping up, re-wedging as required and making good cramps, dowels, etc, and oiling, adjusting and repairing ironmongery as necessary, replacing any glass damaged in removal or subsequently and stopping up all nail and screw holes with tinted plastic wood to match timber, unless otherwise described. Re-painting or re-varnishing is given separately
Prices for taking out of doors, windows, etc shall include for removal of all beads, architraves, ironmongery, etc
Prices for taking out and removing doors and frames shall include for removing door stops, cabin hooks, etc
With regard to building up of openings in existing walls, cement screeds and pavings, granolithic, tops of walls, etc, shall be levelled and prepared for raising of brickwork
Making good of finishes shall include making good of the brick and concrete surfaces onto which the new finishes are applied, where necessary
The contractor will be required to take all dimensions affecting the existing buildings on the site and he will be held solely responsible for the accuracy of all such dimensions where used in the manufacture of new items (doors, windows, fittings, etc)
REMOVAL OF EXISTING WORK
1No
Monopitched roof 9 x 10 x 1.8m high overall, of timber trusses and purlins, corrugated sheet steel covering, suspended ceilings and cornices, eaves soffit covering, fascias, barge boards, gutters and rainwater pipes and set all aside for reuse
1
Taking down and removing roofs, floors, panelling, ceilings, partitions, etc
-197-
AlterationsBill No. 1Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
2NoTimber single door and frame not exceeding 2,5m²2
Taking out and removing doors, windows, etc, including thresholds, sills, etc (building up openings and making good finishes elsewhere)
1NoSteel single security door and frame not exceeding 2,5m²
3
Taking out doors with frame, windows, etc, including thresholds, sills, etc, setting aside for re-use and later refixing in similar new position
1NoSteel double door and frame not exceeding 3,5m²4
BUILDING UP OPENINGS
2NoOpening 533 x 1264mm high overall in one brick wall5
Brickwork in NFP bricks in class II mortar in building up openings, including bonding new to existing and making good cement plaster on one side (making good paintwork elsewhere)
2NoOpening 900 x 2100mm high overall in one brick wall6
1NoOpening 1000 x 2100mm high overall in one brick wall7
1NoOpening 1525 x 2135mm high overall in one brick wall8
13m2Cutting toothings and bonding new brickwork to existing9
Sundries
9m2Extra over brickwork for face brickwork in patches10
Brickwork in Corobrik Nala Travetine "FBX" face bricks pointed with flush horizontal and vertical joints in class II mortar in building up openings, including bonding new to existing
31mCutting toothings and bonding new face brickwork to existing
11
-198-
AlterationsBill No. 1Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
MAKING GOOD OF FINISHES ETC
45mEnds of one brick walls12
Making good face brickwork
71m2
Refix existing loose 0.8mm galvanised IBR roof covering to steel members with "SAFLOK 700" or equal approved clips, all in accordance with manufacturer's recommendations and specifications
13
Remedial work
107No
Remove existing structural bolts and replace with galvanised carbon steel structural grade 8.8 M16 structural bolts or equal approved
14
16m
Remove existing grout around base plates and replace with "ABE Epidermix 372" or similar approved grout at an angle of no less than 15 degrees to the horizontal not exceeding 5mm wide and 3mm deep
15
OPENINGS THROUGH EXISTING WALLS ETC
2NoOpening for door with steel frame 813 x 2032mm high overall through one brick wall
16
Breaking out for and forming openings through brick walls for new doors and frames, including brick lintels, making good cement plaster on one side and into reveals and face brickwork on other side and into reveals and with 20 MPa concrete thresholds with steel trowelled finish (new doors and frames and making good paintwork elsewhere)
2NoOpening for security door with steel frame 1000 x 2035mm high overall through one brick wall
17
1NoOpening for double door with steel frame 1535 x 2135mm high overall through one brick wall
18
-199-
AlterationsBill No. 1Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
1NoOpening for window 633 x 1264m high through one brick wall (W4)
19
Breaking out for and forming openings through brick walls for new windows, including brick lintels, making good cement plaster on one side and into reveals and face brickwork on other side and into reveals and with sloping and slightly projecting brick on edge sills (new windows and making good paintwork elsewhere)
1NoOpening for window 1800 x 1245m high through one brick wall (W2)
20
1NoOpening for window 2000 x 1264m high through one brick wall (W3)
21
-200-
AlterationsBill No. 1Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 7 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 02
EARTHWORKS (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 104) unless otherwise stated
SITE CLEARANCE, ETC.
2m2
Digging up and removing rubbish, debris, vegetation, hedges, shrubs and trees not exceeding 200mm girth, bush, etc.
1
Site clearance
2m2Stripping average 100mm thick layer of top soil and carting away
2
EXCAVATION, FILLING, ETC OTHER THAN BULK
EXCAVATION, ETC.
-201-
Earthworks (Provisional)Bill No. 2Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
1m3Reduced levels under floors3
Excavation in earth not exceeding 2m deep
3m3Trenches4
Excavation in earth not exceeding 2m deep
7m3Bases5
1m3Soft rock6
Extra over trench and hole excavations in earth for excavation in
1m3Hard rock7
5m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor
8
Extra over all excavations for carting away
21m2Sides of trench and hole excavations not exceeding 1,5m deep
9
Risk of collapse of excavations
ItemKeeping excavations free of all water other than subterranean water
10
Keeping excavations free of water
FILLING ETC
3m3Backfilling to trenches, holes, etc11
Earth filling obtained from the excavations and/or prescribed stock piles on site, compacted to 95% Mod AASHTO density
2m3G6 Material under floors12
Earth filling of approved clean earth supplied by the contractor, compacted to 95% Mod AASHTO density
-202-
Earthworks (Provisional)Bill No. 2Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
1m3Under floors etc13
Coarse river sand filling supplied by the contractor
15m2
Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 95% Mod AASHTO density
14
Compaction of surfaces
WEED KILLERS, INSECTICIDES, ETC
4m2
Treat ground under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming as per clause 2.13 of specification OOG-001E with 50mm sand over poison(sand elsewhere measured, Certificate must be provided)
15
"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee
26m2To bottoms and sides of trenches etc (Certificate must be provided)
16
-203-
Earthworks (Provisional)Bill No. 2Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 7 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 03
CONCRETE, FORMWORK AND REINFORCEMENT
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 110) unless otherwise stated
REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES
2m3Strip footings1
30MPa/19mm concrete
4m3Bases2
2m3Plinth3
1m3Surface beds4
6m3Underpinning5
REINFORCED CONCRETE CAST ON/IN FORMWORK
-204-
Concrete,Formwork and ReinforcementBill No. 3Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
16m3Slabs including beams and inverted beams6
30MPa/19mm concrete
9NoMaking and testing 150 x 150 x 150mm concrete strength test cubes (Provisional)
7
TEST BLOCKS
CONCRETE SUNDRIES
22m2Plinth8
Finishing top surfaces of concrete smooth with a wood float to a non slip surface
4m2Surface beds, slabs, etc to falls9
(CPAP WORK GROUP NO. 111) unless otherwise stated
SMOOTH FORMWORK (DEGREE OF ACCURACY II)
46mPlinth not exceeding 300mm high10
Smooth formwork to sides
104m2Slabs propped up exceeding 3m and not exceeding 5m high
11
Smooth formwork to soffits
MOVEMENT JOINTS ETC
11mNot exceeding 300mm wide in Plinth (Provisional)
12
Expansion joints with 10mm softboard bitumen impregnated softboard between vertical concrete and brick surfaces
-205-
Concrete,Formwork and ReinforcementBill No. 3Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
(CPAP WORK GROUP NO. 114) unless otherwise stated
REINFORCEMENT (PROVISIONAL)
0.688tBars not exceeding 10mm diameter13
Mild steel reinforcement to structural concrete work
2.063tBars not exceeding 20mm diameter14
High tensile steel reinforcement to structural concrete work
24m2Type 193 fabric reinforcement15
Fabric reinforcement
212m2Type 617 fabric reinforcement16
-206-
Concrete,Formwork and ReinforcementBill No. 3Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 7 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO 04
PRECAST CONCRETE
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
Blocks, sills, etc measured linear shall be made in suitable lengths. Large size setting out drawings shall be prepared where necessary and submitted to the principal agent for approval before moulds are made
Sizes
Where kerbstones, blocks, etc are laid in ground descriptions shall be deemed to include necessary excavation, filling in and ramming
General
(CPAP WORK GROUP NO. 112) unless otherwise stated
PRECAST CONCRETE SLABS ETC
-207-
Precast ConcreteBill No. 4Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
Note:Price to include for the complete supply and installation including delivery, costs for the hire of a suitable crane for the duration of the installation, etc
Precast concrete left rough from the mould including bedding, jointing and pointing
RATE ONLY101m2
200mm Thick Concrete Hollow core Echo Precast Slab or equally approved including 55mm toppings as per Engineers drawings
1
-208-
Precast ConcreteBill No. 4Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 7 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 05
MASONRY
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 116) unless otherwise stated
BRICKWORK
FOUNDATIONS (PROVISIONAL)
9m2One brick walls1
Brickwork of NFX bricks (14 MPa nominal compressive strength) in class II mortar (Corobrik engineering bricks)
SUPERSTRUCTURE
51m2One brick walls of two half brick skins with inner skin bagged and sealed
2
Brickwork of NFP bricks in class II mortar
BRICKWORK SUNDRIES
-209-
MasonryBill No. 5Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
234m150mm Wide reinforcement built in horizontally 3
2,5mm Brickwork reinforcement
FACE BRICKWORK
9m2Extra over brickwork for face brickwork in foundations (Provisional)
4
Corobrik Nala Travetine "FBS", pointed with flush horizontal and vertical joints on all exposed faces
38m2Extra over brickwork for face brickwork 5
3m2Create opening on brickwork for face brickwork (remove window frame )
6
3m2Making good to opening on brickwork for face brickwork
7
-210-
MasonryBill No. 5Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 7 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 06
WATERPROOFING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 120) unless otherwise stated
WATERPROOFING TO ROOFS ETC
88m2On concrete slab and parapet walls1
One layer 4mm special polyester fully bonded waterproof membrane comprising a matrix modified with polypropylene dual reinforced with non-woven polyester cloth and glass fibre tissue, laid with 75mm side and 100mm end laps
DAMPPROOFING OF WALLS AND FLOORS
6m2Under walls2
One layer of 375 micron embossed polyethylene damp proof course (SANS 952-1985 type B)
-211-
WaterproofingBill No. 6Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
24m2Plinth3
One layer of 250 micron green polyethylene waterproof sheeting (SANS 952-1985 type C) sealed at laps with PVC self-adhesive tape
4m2Under floors4
SEALING STRIPS, JOINT SEALANTS, ETC
9m10 x 10mm In vertical expansion joints including raking out expansion joint filler as necessary
5
Two-part grey polysulphide sealing compound including backing cord, bond breaker, primer, etc
-212-
WaterproofingBill No. 6Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 7 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 07
ROOF COVERINGS ETC
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 124) unless otherwise stated
PROFILED METAL SHEETING AND ACCESSORIES
47m2Roof covering with pitches not exceeding 25 degrees1
0.8mm Z275 spelter galvanised corrugated steel sheets fixed to timber purlins or rails (Colour to Architects Specification)
47m2Refix existing roof covering with pitches not exceeding 25 degrees
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
11mHead wall flashings not exceeding 500mm girth5
-214-
Roof CoveringBill No. 7Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 7 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 08
CARPENTRY AND JOINERY
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 126) unless otherwise stated
STRUCTURAL TIMBERWORK ETC
PLATE NAILED TIMBER ROOF TRUSS CONSTRUCTION ETC
Prefabricated roof trusses etc
Item
Roof construction to monopitched roof, 10 x 9m overall on plan x 1800mm high overall, including trusses, jack rafters, permanent bracing and 50 x 76mm purlins at 1050 centres for roof covering (wall plates elsewhere)
1
The following in plate nailed timber roof trusses with a pitch not exceeding 27.5 degrees, from an approved supplier, delivered to site, hoisted into position, fixed and braced on timber wall plates
-215-
Carpentry and JoineryBill No. 8Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
22m76 x 114mm Wall plates2
Sawn softwood grade V4
EAVES, VERGES, ETC
17m
12 x 225mm Fascia boards, including aluminium H-profile fascia joiners and fixed with hot dipped galvanised drive screws and washers (no paint) (product number 041-203 and 685-195)
3
''Everite Nutech'' Medium density fibre-cement fascia boards
28m
10 x 80 x 225mm Barge boards including aluminium H-profile barge joiners and fixed with hot dipped galvanised drive screws and washers (no paint) (product number 721-800)
40mm x 2035 x 8015mm semi solid door with veneer suitable for enamel paint finish.Electronic door lock controlled from main control room.150 x 450mm view panel with 9.5mm HPR laminated glass fitted in Neoprene gaskets
1No40mm Hardwood timber glazed frame double door 1635 x 2035mm high (D1 - DD)
6
4No40mm Semi solid single door 813 x 2035mm high with veneer suitable for enamel paint finish (D7)
7
1No40mm Semi solid single door 813 x 2035mm high with veneer suitable for enamel paint finish (D8)
8
-216-
Carpentry and JoineryBill No. 8Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
FITTINGS
WORKTOP
1No32mm Worktop 600mm wide x 3200mm long with bullnose along one long edge screwed on
400mm Deep varnished meranti timber shelf on 38 x 38mm meranti timber wall brackets plugged to walls including edges sealed with clear silicone sealant
-217-
Carpentry and JoineryBill No. 8Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 7 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 09
CEILINGS, PARTITIONS AND ACCESS FLOORING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
"Isotherm" polyester high density 7-10kg/m3 thermbonded insulation blanket
SUSPENDED CEILINGS
130m2Ceilings suspended not exceeding 1 000mm below timber purlins
2
1200 x 600 x 12mm Thick PVC ceiling panel screwed to and including screw-up suspension grid
3No
Extra over ceiling 600 x 600mm trap door complete with trimmers, frame, cross branders, ceiling board, hinges, etc as described (Provisional)
3
-218-
Ceilings,Partitions and Access FlooringBill No. 9Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
110No
Extra over ceiling "Mitek Bracing Strap" or equal approved galvanised ceiling support straps, 40 x 6mm thick not exceeding 500mm long, fixed to ceiling grid system as per Architectural specification
4
182mL-shape suspended PVC ceiling hangars/supporters fixed to wall
5
Perimeter trim to suspended ceilings
ACCESS FLOORING
RAISED FLOORING
40m2On floors6
600 X 600 x 25mm steel access floor panels on adjustable steel pedestals to allow top level of floor to be 340mm above stub base concrete floor. Steel panels to be covered in melamine sheeting of approved colour
-219-
Ceilings,Partitions and Access FlooringBill No. 9Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 7 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 10
IRONMONGERY
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 132) unless otherwise stated
LOCKS
2NoBathroom indicator bolt1
"Union " or similar approved
4NoFour lever upright lockset2
PUSH PLATES AND KICK PLATES
4No300 x 75mm Push plate3
Aluminium plates countersunk screwed along edges at not exceeding 200mm centres
4No750 x 150mm Kick plate4
SIGNAGE
-220-
IronmongeryBill No. 10Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
PHOTOLUMINESCENT SIGNS
1No150 x 150mm Sign with one pictogram (Male)5
Wall mounted photoluminescent statutory signs in 150 x 150mm modules
1No150 x 150mm Sign with one pictogram (Female)6
2No150 x 150mm Sign with one pictogram (Paraplegic)7
7m20mm Diameter stainless steel curtain rod fixed to wall8
PELMETS AND CURTAIN TRACKS
2No20mm Diameter chromium plated towel rail 600mm long including end brackets, plugged
9
BATHROOM FITTINGS
2No"White" vandal proof double toilet roll holder, plugged10
2No32mm "GRDG02B" stainless steel side dogleg grab rail twice bent at 45 degree, plugged
13
15No38mm Diameter rubber door stop plugged14
SUNDRIES
-221-
IronmongeryBill No. 10Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 7 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 11
METALWORK
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 136) unless otherwise stated
HOT DIPPED GALVANISED STEEL GATES, SCREENS, ETC
STEEL SCREENS
23m26000 x 3120 x 3,15mm Weldmesh screen welded to frame
1
Welded mesh screens over turnstiles and gate as per Architects detail
HOT DIPPED GALVANISED WELDED GATES
-222-
MetalworkBill No. 11Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
2No
Single gate for opening size 1000 x 2032mm high of 30 x 30 x 3mm hollow section frame and two horizontal middle rails, filled in with 10mm square mild steel vertical bars at 100mm centres including Union 2195-76 two lever deadlock housed in and including lock box, including suitable hinges, the gate fixed in steel screen (elsewhere measured)
2
Galvanised hot dipped mild steel with 16mm intermediate bars at 100mm centres as per gate detail
HOT DIPPED GALVANISED STEEL GATE CRAWLERS
4No
Heavy duty gate crawlers suitable for 6000 x 4000mm high gate including all fittings installed on gates attached to crawl beams as per engineers specification
3
Purpose made gate crawlers as per engineers specification
HOT DIPPED GALVANISED STEEL BOLLARDS
14No
220mm Diameter galvanised mild steel "high impact" bollard, 1500mm total height, 1000mm height above ground with concrete infill laid in and including 500 x 500 x 550m deep 30mpa concrete base
4
"SA Bollards High Impact Bollard" or similar approved
HOT DIPPED GALVANISED STEEL MINOR WORK
11mU-shaped guide rail of 35 x 35 x 5mm u-channel section5
Fixing accessories for 6000 x 4000mm high steel gate
13m300 x 300mm Deep cable trench with chequer plate covering to pass through wall
6
HOT DIPPED GALVANISED STEEL CHANNELS
HOT DIPPED GALVANISED STEEL CANOPY
-223-
MetalworkBill No. 11Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
1No2000 x 400mm galvanised steel canopy7
2000 x 400mm High canopy constructed from 50 x 50mm galvanised steel square tubing and IBR Galvanised 0,8mm thick roof sheeting with Z275 spelter to both sides fixed to brick wall as per engineers details
BAFFLE EXHAUST
1NoGenerator baffle exhaust constructed from 0.6mm galvanised sheet metal as per engineers specification
8
0.6mm Hot dipped galvanised sheet metal
WORKTOP
4No
Triangular shaped bracket of 40 x 20 x 2.5mm hollow section 1500mm girth mitred and welded at angles with open ends capped and twice holed for bolts
9
Hot dipped galvanised welded worktop brackets bolted to wall
11NoM8 Expansion bolt 80mm long10
STAINLESS STEEL MINOR WORK
TURNSTILE
1No2180 x 2250mm High double three arm turnstile11
"Type 316" stainless steel "Saturn" finish double three arm turnstiles fitted to "Type 316" stainless steel framework including provision for biometric operated lock and reader on frame
HOT DIPPED GALVANISED PRESSED STEEL DOOR FRAMES
4NoFrame for door 813 x 2032mm high12
1.6mm Double rebated frames with one and half pair of 100mm steel butt hinges suitable for one brick walls
-224-
MetalworkBill No. 11Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
1NoFrame for door 1635 x 2035mm high13
1.6mm Double rebated frames with one and half pair of 100mm steel butt hinges suitable for one brick walls
1NoFrame for door 815 x 2035mm high14
Standard 1.2 single rebate mild steel doorframe with 1 pair of 100mm hinges and adjustable striking plate
6NoFrame for door 1000 x 2035mm high15
Purpose made 3mm thick single rebate steel frame to standard DCS details for one brick walls
1NoFrame for door 815 x 2035mm high16
Standard double rebate frame 1.6mm steel Transformer room doorframe
1NoFrame for door 1525 x 2135mm high17
Standard double rebate frame 1.6mm steel Transformer room doorframe
Refer to Door Schedule
HOT DIPPED GALVANISED PRESSED STEEL DOORS
1NoDoor size 1000 x 2035mm (D05)18
Hollow metal type door with view panel to DCS details and specification. Electronic door lock controlled from main control room. 150 x 450mm view panel with 9.5mmHPR laminated glass fitted in Neoprene gaskets
1NoDoor size 1000 x 2035mm (D06)19
6NoDoor size 1000 x 2035mm (D12)20
-225-
MetalworkBill No. 11Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
1NoDoor size 815 x 2035mm (D13)21
Standard door 1.6mm steel transformer door Type A. Electronic door sensors controlled from main control room.
1NoDoor size 1525 x 2135mm (D14)22
Standard double doors 1.6mm steel transformer door with fine mesh vents to DCS details. Electronic door sensors controlled from main control room.
REFIX EXISTING DOORS AND FRAMES
1NoDoor size 1000 x 2035mm (D12)23
Refix existing hollow metal type door with view panel to DCS details and specification. Electronic door lock controlled from main control room. 150 x 450mm view panel with 9.5mm HPR laminated glass fitted in Neoprene gaskets
1NoDoor size 1525 x 2135mm (D14)24
Refix existing standard double doors 1.6mm steel transformer door with fine mesh vents to DCS details. Electronic door sensors controlled from main control room.
Refer to Window Schedule
ALUMINIUM CASEMENT WINDOWS
2NoPurpose made window, 533 x 1264mm high (W04)25
Natural anodised casement window units complete with subframes, ironmongery, 4mm glass with aluminium beads, sealing, burglar bars in 25 x 25mm square tubingetc and fixing to brickwork
1NoPurpose made window, 1800 x 1245mm high (W02)26
1NoPurpose made window, 2000 x 1264mm high (W03)27
-226-
MetalworkBill No. 11Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
1NoPurpose made window, 1800 x 1245 mm high (W01)28
Natural anodised casement window units complete with subframes, ironmongery, 16mm thick bullet resistant glass, sealing, burglar bars in 25 x 25mm square tubing etc and fixing to brickwork
1NoPurpose made viewing panel, 2350 x 915mm high29
Natural anodised viewing panel complete with subframes, with 100 x 25mm aluminium meeting stiles, 30 x 20mm aluminium glass beads, ironmongery, 16mm multi laminated bullet resisting glass set in neoprene gaskets, sealing, etc and fixing to brickwork
-227-
MetalworkBill No. 11Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 7 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 12
PLASTERING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 142) unless otherwise stated
SCREEDS
174m240mm Thick on floors 1
1:3 Cement screeds steel floated, on concrete
INTERNAL PLASTER
610m2Plaster on walls2
Cement plaster steel trowelled, on brickwork
8m2Plaster on narrow widths3
6m2Plaster in patches4
-228-
PlasteringBill No. 12Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
9m2On ceilings5
Cement plaster rendering coat with gypsum skim plaster finishing coat, on concrete
11m5 x 40mm Flat section brass weather bar between different floor finishes (In 1 No)
6
CORNER PROTECTORS, DIVIDING STRIPS, ETC
-229-
PlasteringBill No. 12Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 7 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 13
TILING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
SUPPLEMENTARY PREAMBLES
Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding
Tiling described as "fixed with adhesive on power floated concrete" shall be deemed to include for approved tiling key-coat
Ceramic, porcelain, marble and granite tiles are to be fixed and grouted with suitable adhesives and grouts from the "Tal Professional" range of products as recommended by the manufacturer of the tiles
(CPAP WORK GROUP NO. 144) unless otherwise stated
WALL TILING
48m2On walls1
300 x 300 x 8mm glazed ceramic tiles fixed with adhesive to plaster (plaster elsewhere) and flush pointed with tinted grout
-230-
TilingBill No. 13Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
FLOOR TILING
138m2On floors2
300 x 300 x 8mm Porcelain floor tiles fixed with adhesive to screed (screed elsewhere) and flush pointed with epoxy grout
14m2Skirting 70mm high 3
-231-
TilingBill No. 13Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 7 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 14
PLUMBING AND DRAINAGE (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 148) unless otherwise stated
RAINWATER DISPOSAL
17m155 x 100 x 115mm Aluminium ogee roof gutters with baked enamel finish fixed with concealed brackets
1
0,6mm Chromadek seamless gutters and rainwater pipes
3NoExtra over gutter for stopped end2
3NoExtra over gutter for outlet for 100 x 75mm pipe3
14m100 x 75mm Fluted aluminium rainwater downpipes with baked enamel finish fixed as per supplier's detail
4
3NoExtra over rainwater pipe for eaves offset 900mm projection
5
-232-
Plumbing and drainage (Provisional)Bill No. 14Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
3NoExtra over rainwater pipe for shoe 6
SANITARY FITTINGS
2No
White vitreous china close coupled toilet set with doubleflap toilet seat and cistern as per Architect's Specification
7
"Vaal" or equal approved by the Architect
2No
"Vaal Pearl Paraplegic" vitreous china semi-close coupled 90 degree outlet open rim washdown pan and matching 9 litre cistern with side flush lever as per Architect's Specification
8
2No
510 x 400mm White vitreous china basin with a single tap hole as per Architect's Specification
9
2No
380 x 435mm "Vaal Hygia 703602WH " barrier free wash hand basin as per Architect's Specification
10
WASTE UNIONS ETC
4No
Chrome Pop Up Basin waste for basin with overflows as per Architect's Specification
11
"Cobra Watertech" or equal approved
4No40mm 309-40 CP anti-theft plug with spindle 12
TRAPS ETC
4No40mm 360 CP bottle trap13
"Cobra Watertech" or equal approved
TAPS, VALVES, ETC
-233-
Plumbing and drainage (Provisional)Bill No. 14Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
4No15mm Stopcock14
Brass
2No20mm Stopcock15
4No15mm Fullway gate valve16
2No22mm Fullway gate valve17
1No25mm Brass Ball-o-stop18
1No50mm Brass wheelvalve for HDPE pipes19
1No50mm Brass Ball-o-stop20
2No
15mm Basin tap cold water only as per Architect's Specification
21
"Stella pillar taps" equal approved
2No
15mm "Cobra NM-851" or equal approved elbow action basin mixer
22
"Cobra" or equal approved
SANITARY PLUMBING
17m50mm Pipes23
uPVC soil and vent pipes
11m50mm Pipes chased into concrete surface beds24
110m
110mm Pipes laid in and including trenches not exceeding 1m deep
25
11m110mm Pipes 26
-234-
Plumbing and drainage (Provisional)Bill No. 14Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
2No50mm BSP adaptor27
Extra over uPVC soil and vent pipes for fittings
2No50mm Strap on boss28
9No50mm Bend29
4No50mm Junction30
4No50mm Access bend31
4No50mm Access junction32
2No50mm Two-way vent valve33
1No50mm Rodding eye34
4No110mm Eccentric reducer35
4No110mm Pan connector36
14No110mm Bend37
2No110mm Reducing junction38
8No110mm Access bend39
2No110mm Access bend with anti-syphon horn40
2No110mm Access reducing junction41
2No110mm Two way vent valve42
ItemTesting waste pipe system43
Testing
WATER SUPPLIES
28m15mm Pipes44
Class 1 copper pipes with capillary couplings
-235-
Plumbing and drainage (Provisional)Bill No. 14Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
11m22mm Pipes45
18No15mm Fittings46
Extra over Class1 copper pipes for capillary fittings
11No22mm Fittings47
4No15mm Flexible service pipe48
33m25mm Pipes laid in and including trenches not exceeding 1m deep
49
Class 12 HDPe pipes
11m50mm Pipes laid in and including trenches not exceeding 1m deep
50
6No25mm Bend (90 degrees)51
Extra over Class 12 HDPe pipes for compression fittings
6No50mm Bend (45 degrees)52
ItemTesting water pipe system53
Testing
13m3
Extra over excavation for pipe trenches, chambers, etc for carting away surplus material to a dumping site to be located by the contractor
54
SUNDRIES
1NoTie into existing sewer line55
4No9kg Dry chemical powder fire extinguisher56
FIRE APPLIANCES ETC
4No190 x 190mm ABS plastic symbolic safety sign type plugged and screwed to wall
57
HOLES ETC
-236-
Plumbing and drainage (Provisional)Bill No. 14Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
2NoThrough one brick wall faced one side58
Core drilling hole not exceeding 50mm diameter
2NoThrough one brick wall59
Core drilling hole exceeding 50mm and not exceeding 110mm diameter
-237-
Plumbing and drainage (Provisional)Bill No. 14Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 7 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 15
GLAZING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 150) unless otherwise stated
GLAZING TO ALUMINIUM WITH CLIP-ON BEADS
11m2Panes exceeding 0,1m2 and not exceeding 0,5m21
6mm Clear float glass
TOPS, SHELVES, DOORS, MIRRORS, ETC
4NoMirror 300 x 450mm high2
4mm Silvered float glass copper backed mirrors with polished edges, holed for and fixed with chromium plated dome capped mirror screws with rubber buffers to plugs in brickwork
-238-
GlazingBill No. 15Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 7 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 16
PAINTWORK
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 152) unless otherwise stated
PAINTWORK ETC TO NEW WORK
ON INTERNAL FLOATED PLASTER SURFACES
607m2Walls1
One merit plaster primer, one coat undercoat and two coats "Wall & All" or similar approved emulsion paint (colour to be approved by Client)
176m2Ceilings and cornices including priming cover strips2
ON METAL
17m2Door frames3
One coat Merit metal primer (UC501), one coat Merit Universal Undercoat (UC1) and two coats Super Universal Enamel (NY1/G) paint
-239-
PaintworkBill No. 16Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
44m2Doors4
19m2On windows with burglar bars (both sides measured) 5
21m2Welded screens6
ON WOOD SURFACES
14m2Doors7
Three coats superior quality clear gloss varnish
ON SMOOTH CONCRETE SURFACES
9m2Ceilings8
One merit plaster primer, one coat undercoat and two coats "Wall & All" or similar approved emulsion paint (colour to be approved by Client)
22m2On floors9
One coat bonding liquid, one coat primer and two coats epoxy paint for interior and exterior use, including stopping blow holes
4m2On Skirtings10
3mm Epoxy paint floor finish turned up 100mm against wall to form skirting. Applied to the manufactures recommendation.Colour to be approved
-240-
PaintworkBill No. 16Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 7 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 17
EXTERNAL WORKS (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
SUPPLEMENTARY PREAMBLES
Descriptions of earth filling, compaction, etc shall be deemed to include for all necessary testing required in accordance with the SABS 1200 series
Testing of material and filling
COVERED WALKWAY, STEPS AND RAMPS
ALTERATIONS
TEMPORARY BARRICADES, SCREENS, ETC
4m
Dust screen 2m high between concrete floor and ceiling, of suitable timber framing with 375 micron polyethylene sheeting stapled on one side, including corners, ends, etc
1
Temporary barricades, screens, roofs, etc including removal
REMOVAL OF EXISTING WORK
4m3Steps (in sections)2
Breaking up and removing unreinforced concrete
-241-
External WorksBill No. 17Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
MAKING GOOD OF FINISHES ETC
1m3Steps3
Making good unreinforced concrete
11mEnds of one brick walls with 115mm concrete infill4
Making good face brickwork
OPENINGS THROUGH EXISTING WALLS ETC
2NoOpening for security gate with steel frame 1000 x 2000mm high overall through one brick wall
5
Breaking out for and forming openings through 335mm brick walls with 115mm concrete infill for new doors and frames, including brick lintels, making good cement plaster on one side and into reveals and face brickwork on other side and into reveals and with 20 MPa concretethresholds with steel trowelled finish (new doors and frames and making good paintwork elsewhere)
EARTHWORKS (PROVISIONAL)
EXCAVATION, FILLING, ETC OTHER THAN BULK
EXCAVATION, ETC
46m3Reduced levels under floors6
Excavation in earth not exceeding 2m deep
7m3Trenches7
Excavate in earth not exceeding 2m deep.
1m3Bases8
4m3Ground beam9
9m3650 x 650 x 1300mm Intermediate post base 10
-242-
External WorksBill No. 17Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
58m3Surplus material from excavations and/or stockpiles on site, to a dumping site to be located by the contractor
11
Extra over all excavations for carting away
108m2Sides of trench and hole excavations not exceeding 1,5m deep
12
Risk of collapse of excavations
ItemKeeping excavations free of all water other than subterranean water
13
Keeping excavations free of water
FILLING, ETC:
12m3Backfilling to trenches, holes, etc14
Earth filling obtained from the excavations and/or prescribed stockpiles on site compacted to 95% Mod AASHTO density
31m3Under floors15
Earth filling of G6 material supplied by the contractor, compacted to 93% Mod AASHTO density
120m2
Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material where necessary and compacting to 95% Mod AASHTO density (Certificate must be provided)
16
Compaction of surfaces
WEED KILLERS, INSECTICIDES, ETC
-243-
External WorksBill No. 17Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
120m2
Treat ground under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming as per clause 2.13 of specification OOG-001E with 50mm sand over poison(sand elsewhere measured, Certificate must be provided)
17
"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee
132m2Treat ground to bottoms and sides of trenches etc as described, (Certificate must be provided)
18
CONCRETE, FORMWORK AND REINFORCEMENT
UNREINFORCED CONCRETE
5m3Blinding19
10Mpa/19mm unreinforced concrete
REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES
3m3Strip footings20
30MPa/19mm concrete
1m3Bases21
4m3Ground beam22
9m3650 x 650 x 1300mm Intermediate post base 23
0.1m3Steps 24
2m3Ramps to entrances 25
13m3Surface beds cast in panels on waterproofing26
-244-
External WorksBill No. 17Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
2.29m3
2950 x 1300 x 100mm Thick (1000mm inside & 300mm outside the fence) plinth cast in 2950mm sections with 50mm expansion gaps filled with 19/32 mm crushed stone (elsewhere measured)
27
9NoMaking and testing 150 x 150 x 150mm concrete strength test cubes (Provisional)
28
TEST BLOCKS
CONCRETE SUNDRIES
97m2Surface beds, slabs, etc29
Finishing top surfaces of concrete smooth with a wood float to a non slip surface
23m2Plinth30
24m2Ramps31
1m2Steps 32
ROUGH FORMWORK (DEGREE OF ACCURACY III)
18m2Strip footings33
Rough formwork to sides
8m2Bases34
33m2Ground Beam35
SMOOTH FORMWORK (DEGREE OF ACCURACY II)
1m2Steps36
Smooth formwork to sides
31m2Edges, risers, ends and reveals exceeding 300mm high or wide
37
-245-
External WorksBill No. 17Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
4m22950 x 1300 x 100mm Thick plinth38
MOVEMENT JOINTS ETC
46mNot exceeding 300mm high to edges of surface beds39
Expansion joints with 10mm bitumen impregnated softboard between vertical concrete and brick surfaces
REINFORCEMENT (PROVISIONAL)
0.588tBars not exceeding 10mm diameter40
Mild steel reinforcement to structural concrete work
1.763tBars not exceeding 20mm diameter41
High tensile steel reinforcement to structural concrete work
120m2Type 193 fabric reinforcement in concrete surface beds and plinths
42
Fabric reinforcement
0.5m2Type 245 fabric reinforcement in concrete steps 43
27m2Type 617 fabric reinforcement in ramps44
MASONRY
BRICKWORK
FOUNDATIONS (PROVISIONAL)
12m2One brick walls45
Brickwork of NFP Bricks (14Mpa nominal compressive strength) in class 1 mortar
SUPERSTRUCTURE
-246-
External WorksBill No. 17Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
37m2One brick walls of two half brick skins with inner skin bagged and sealed
46
Face brickwork to be Corobrik Nala Travetine "FBX", pointed with recessed horizontal and vertical joints on all exposed faces
24m220mm coping on top of one brick wall47
Brick-on-edge header course copings, sills, etc of (Corobrick Red Leaf Rustic) face bricks, pointed with recessed joints on all exposed faces
1m220mm Bitumen impregnated fibre board built in vertically through brick walls
48
Joint forming material in movement joints
BRICKWORK SUNDRIES
143m
150mm Wide reinforcement built in horizontally in foundations
49
2.5mm Brickwork reinforcement
959m150mm Wide reinforcement built in horizontally50
WATERPROOFING
DAMP PROOFING OF WALLS AND FLOORS
6m2In walls, under cills, etc.51
One layer of 375 micron embossed polyethylene damp proof course (SANS 952-1985 type B)
120m2Under surface beds and plinth52
One layer of 250 micron green polyethylene waterproof sheeting (SANS 952-1985 type C) sealed at laps with PVC self-adhesive tape
-247-
External WorksBill No. 17Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
7.04m2Extra over for 400mm section of steel mesh dipped in bitumen as per detail
53
Bituminous emulsion based coating
ROOF COVERINGS, CLADDINGS, ETC
PROFILED METAL SHEETING AND ACCESSORIES
165m2
Roof covering with pitches not exceeding 25 degrees including cranked ends not exceeding 320 degrees to form fascia not exceeding 750mm
54
0.8mm Z275 spelter galvanised corrugated steel sheets fixed to steel purlins or rails with tek screws (Colour to Architects Specification)
111mMoulded narrow and broad rib polyethylene filler blocks59
111m Sill flashing not exceeding 500mm girth60
111mStandard narrow and broad flute closures to ridge flashing
61
STRUCTURAL STEELWORK
HOT DIPPED GALVANISED STEEL COLUMNS AND BEAMS
-248-
External WorksBill No. 17Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
1.11t100 x 100mm x 15.044kg/m hot rolled square tubing columns in heights exceeding 2m and not exceeding 4m
62
Welded columns in single lengths constructed of 100 x 100 x 5mm thick mild steel square tubing with 100 x 100 x 5mm thick flat base, cap, bearer and connection plates, bolted to concrete with 250 x 16mm diameter chemical anchor bolt
HOT DIPPED GALVANISED STEEL TRUSSES
4No
Double pitched light weight steel roof truss 2500 wide x 800mm high with roll formed U-shaped truss profile used for chords and webs, manufactured from tested and certified 0.80mm thick S550GD and galvanised Z200 coated steel assembled using a 12mm hollow core rivet including necessary truss brackets, etc
63
Lightweight steel roof trusses with flat bearer, gusset and connection plates and angle cleats, bolted to concrete
11No
Double pitched light weight steel roof truss 2600 wide x 800mm high with roll formed U-shaped truss profile used for chords and webs, manufactured from tested and certified 0.80mm thick S550GD and galvanised Z200 coated steel assembled using a 12mm hollow core rivet including necessary truss brackets, etc
64
3No
Double pitched light weight steel roof truss 2900 wide x 800mm high with roll formed U-shaped truss profile used for chords and webs, manufactured from tested and certified 0.80mm thick S550GD and galvanised Z200 coated steel assembled using a 12mm hollow core rivet including necessary truss brackets, etc
65
7No
Double pitched light weight steel roof truss 3720 wide x 800mm high with roll formed U-shaped truss profile used for chords and webs, manufactured from tested and certified 0.80mm thick S550GD and galvanised Z200 coated steel assembled using a 12mm hollow core rivet including necessary truss brackets, etc
66
HOT DIPPED GALVANISED STEEL PURLINS, GIRTS, BRACING, ETC
-249-
External WorksBill No. 17Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
1.00t75 x 50 x 20 x 3mm Thick galvanised cold-formed lipped channel purlins
67
Purlins and girts, bolted to steel
1.00t75 x 50 x 20 x 3mm Thick galvanised cold-formed lipped channel girts
68
METALWORK
HOT DIPPED GALVANISED STRAIGHT PROFILE FENCE
9No
5000mm High intermediate posts,101.6mm x 4.5mm straight profile tubular intermediate posts with 3000mm long 50 x 5mm flat steel cover plates, including post caps, anchors and all fixing materials and accessories tomake the installation complete all in accordance to manufacturer's recommendation and attached specification
69
Grade W300 hot dipped galvanised mild steel posts
HOT DIPPED GALVANISED STEEL HANDRAILS
41m50mm External diameter x 3mm thick continuous pipe rails
70
Welded handrails to ramp walls
1NoExtra over for bend across edge71
HOT DIPPED GALVANISED STEEL BALUSTRADING
-250-
External WorksBill No. 17Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
10m
Raking balustrading 1000mm high, of 50mm external diameter x 3mm thick continuous pipe handrail, 50mm diameter x 3mm thick continuous top and bottom rails, 50mm diameter x 3mm thick posts at approximately 1500mm centres with 100mm diameter footplates bolted to concrete and 25mm diameter x 2.5mm thick intermediate horizontal balusters at 100mm centres between top and bottom rails
72
Welded balustrading to ramps
9m
Raking balustrading 1000mm high, of 50mm external diameter x 3mm thick continuous pipe handrail, 50mm diameter x 3mm thick continuous top and bottom rails, 50mm diameter x 3mm thick posts at approximately 1500mm centres with 100mm diameter footplates bolted to concrete and 25mm diameter x 2.5mm thick intermediate horizontal balusters at 100mm centres between top and bottom rails
73
Welded balustrading to steps
HOT DIPPED GALVANISED STRAIGHT PROFILE FENCE
34m
3050 x 50 x 50 x 5mm Thick angle iron top rail including all fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification
74
High tensile Galfan Class A mesh panels manufactured in accordance with SANS 10244-2:2003 specification (refer to the Department of Public Works Standard Technical Specification - Perimeter Fence for Prisons May 2005 Rev01 annexed to the bid document)
37m
3000mm High straight profile mesh panel (Type 1), 1,4mm single skin with double vertical wires spaced at 76.2mm and all horizontal wires spaced at 12.7mm centre to centre including all break off bolts and all other fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification
75
-251-
External WorksBill No. 17Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
18m
5000mm High straight profile mesh panel (Type 1), 1,4mm single skin with double vertical wires spaced at 76.2mm and all horizontal wires spaced at 12.7mm centre to centre including all break off bolts and all other fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification
76
6No
Single leaf pedestrian gate 1000m wide x 2000m high including mesh panels, two 101.6mm x 4.5mm gate posts, mesh with double vertical wires, 4mm thick
77
PLASTERING
GRANOLITHIC
72m225mm Thick on floors and landings78
Untinted granolithic, on concrete
SCREEN WALLS, PLANTER BOXES AND BENCHES
EARTHWORKS (PROVISIONAL)
EXCAVATION, FILLING, ETC OTHER THAN BULK
EXCAVATION, ETC
3m3Trenches79
Excavate in earth not exceeding 2m deep.
2m3Bases80
5m3Surplus material from excavations and/or stockpiles on site, to a dumping site to be located by the contractor
81
Extra over all excavations for carting away
-252-
External WorksBill No. 17Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
22m2Sides of trench and hole excavations not exceeding 1,5m deep
82
Risk of collapse of excavations
ItemKeeping excavations free of all water other than subterranean water
83
Keeping excavations free of water
FILLING, ETC:
0.5m3Backfilling to trenches, holes, etc84
Earth filling obtained from the excavations and/or prescribed stockpiles on site compacted to 95% Mod AASHTO density
4m2
Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material where necessary and compacting to 95% Mod AASHTO density (Certificate must be provided)
85
Compaction of surfaces
WEED KILLERS, INSECTICIDES, ETC
44m2Treat ground to bottoms and sides of trenches etc as described, (Certificate must be provided)
86
"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee
CONCRETE, FORMWORK AND REINFORCEMENT
UNREINFORCED CONCRETE
-253-
External WorksBill No. 17Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
1m3Blinding87
10Mpa/19mm unreinforced concrete
REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES
1m3Strip footings88
30MPa/19mm concrete
2m3Bases89
2NoMaking and testing 150 x 150 x 150mm concrete strength test cubes (Provisional)
90
TEST BLOCKS
ROUGH FORMWORK (DEGREE OF ACCURACY III)
22m2Strip footings91
Rough formwork to sides
10m2Bases92
REINFORCEMENT (PROVISIONAL)
0.032tBars not exceeding 10mm diameter93
Mild steel reinforcement to structural concrete work
0.097tBars not exceeding 20mm diameter94
High tensile steel reinforcement to structural concrete work
8m2Type 245 fabric reinforcement95
Fabric reinforcement
PRECAST CONCRETE
-254-
External WorksBill No. 17Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
13m
600mm Diameter pipes at various lengths with concrete footings (elsewhere) and sand infill laid vertically to form planter box screen
96
Class 100D concrete pipes with interlocking joints
9m
600mm Diameter pipes at 800mm high with concrete footings (elsewhere) and sand infill laid vertically to form bench posts
97
MASONRY
BRICKWORK
FOUNDATIONS (PROVISIONAL)
11m2One brick walls98
Brickwork of NFX Bricks (14Mpa nominal compressive strength) in class 1 mortar
SUPERSTRUCTURE
34m2One brick walls of two half brick skins with inner skin bagged and sealed
99
Corobrik Nala Travetine "FBS", pointed with flush horizontal and vertical joints on all exposed faces
14mHeader course copings100
Brick-on-edge header course copings, sills, etc of "Corobrick Red Leaf Rustic" face bricks, pointed with recessed joints on all exposed faces
42mExtra over brickwork for horizontal bands one course high
101
BRICKWORK SUNDRIES
-255-
External WorksBill No. 17Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
131m
150mm Wide reinforcement built in horizontally in foundations
102
2.5mm Brickwork reinforcement
147m150mm Wide reinforcement built in horizontally103
WATERPROOFING
DAMP PROOFING OF WALLS AND FLOORS
3m2In walls, under cills, etc.104
One layer of 375 micron embossed polyethylene damp proof course (SANS 952-1985 type B)
METALWORK
BENCHES, TABLES, ETC
9No1800 x 600mm wide bench105
1800 x 600mm wide bench constructed from 38mm diameter galvanised mild steel round tubing (8 x 1800mm lengths per bench) including 75 x 75mm galvanised mild steel angle iron end brackets fixed to 600mm diameter precast concrete pipe (elsewhere measured) with galvanised M16 bolts
STORMWATER DRAINAGE
CONCRETE STORMWATER CHANNELS ETC
14m
450 x 250mm Channel with segmental channel formed therein and finished smooth on exposed surfaces including necessary excavation and formwork
106
Concrete stormwater channels
1No1200 x 450 x 150mm Thick precast concrete cover slab over stormwater channel
107
-256-
External WorksBill No. 17Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
3mExtra over for angles, intersections, ends, etc108
(CPAP WORK GROUP NO. 154) unless otherwise stated
ROADWORKS AND PARKING
EXCAVATION, FILLING, ETC OTHER THAN BULK
EXCAVATIONS ETC
61m3Over site between buildings, etc to reduce levels and dispose in prescribed stock piles on site
109
Excavation in earth not exceeding 2m deep
27m3Soft rock110
Extra over excavation in earth for excavation in
9m3Hard rock
142m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor
111
Extra over all excavations for carting away
ItemKeeping excavations free of water other than subterranean water
112
Keeping excavations free of water
LAYER WORK
40m3
Sub-grade course of 150mm thick of G1 crusher run material compacted to 88% Mod AASHTO density
113
Earth filling supplied by the contractor under parking areas, roadways, etc
-257-
External WorksBill No. 17Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
40m3
Base course of 150mm thick of C4 (G5 gravel material) stabilised with 3% cement compacted to 97% Mod AASHTO density
114
13m3Under floors etc115
Coarse river sand filling supplied by the contractor
268m2
Compaction of ground surfaces under roadworks etc, including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density (Roadbed)
116
Compaction of surfaces
WEED KILLERS, INSECTICIDES, ETC
467m2
Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming (Certificate must be provided)
117
"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee
PAVING
22m2Paving to roadworks and parking areas to falls118
80mm thick 30MPa precast concrete grey interlocking block paving blocks in accordance with SANS 1058, laid to falls on and including 25mm thick sand layer with joints filled in with sand, compacted with a vibration compactor
246m2Paving to aprons119
50mm thick 30MPa precast concrete grey interlocking block paving blocks in accordance with SANS 1058, laid to falls on and including 25mm thick sand layer with joints filled in with sand, compacted with a vibration compactor
-258-
External WorksBill No. 17Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 7 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 18
ELECTRICAL INSTALLATION
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
Descriptions of fan assemblies shall be deemed to include supports from the structure, flexible or other connections to ductwork, vibration isolation mountings and airtight inspection doors
Fans
(CPAP WORK GROUP NO. 160) unless otherwise stated
ACCESS CONTROL
2NoVehicle boom gate and spike barrier 1
ACCESS BARRIERS
2NoSpike boom barrier extension 2
2NoTwo button remotes to operate claws and boom to be handed to the Area Commissioner
3
-259-
ElectricalBill No. 18Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
2NoTemporary switch fixed to Guards Office for claw and boom operation
4
2No
Two way red and green, 12V DC Traffic light Unit including wall mounted brackets (SS), harness and interface relay
5
2No
D10 Industrial gate motor including tracks, break sensor, impact sensor, burglar proof case, anti-theft brackets etc. to make installation complete
6
"Centurion" or similar or equal approved
Item
Make the necessary provisions for security door electromagnetic door locks to be controlled from the Main Control Room
7
Provision of service infrastructure for future installations
ItemMake the necessary provisions for access barriers to be controlled from the Main Control Room
8
FANS
1No
"Xpelair CX10" or equally approved flush-mounted 329 m3/h extraction fan with 352mm round grille design, 203mm integral duct connection spigot including ducts not exceeding 2500mm with all necessary supports and accessories
9
Extraction Fan
-260-
ElectricalBill No. 18Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 7 R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
SECTION SUMMARY - S05: Sally Port and Visitors Entrance to Maximum
BillNo
PageNo
Amount
200Alterations1
203Earthworks (Provisional)2
206Concrete,Formwork and Reinforcement3
208Precast Concrete4
210Masonry5
212Waterproofing6
214Roof Covering7
217Carpentry and Joinery8
219Ceilings,Partitions and Access Flooring9
221Ironmongery10
227Metalwork11
229Plastering12
231Tiling13
237Plumbing and drainage (Provisional)14
238Glazing15
240Paintwork16
258External Works17
260Electrical18
-261-
Section No. 7
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried to Final Summary R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 01
ALTERATIONS (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 102) unless otherwise stated
REMOVAL OF EXISTING WORK
1No
Monopitched roof 7.92 x 10.6 x 1.8m high overall, of timber trusses and purlins, corrugated sheet steel covering, suspended ceilings and cornices, eaves soffit covering, fascias, barge boards, gutters and rainwater pipes and set all aside for reuse
1
Taking down and removing roofs, floors, panelling, ceilings, partitions, etc
29m2Corrugated steel roof covering including ridge capping, etc
2
Taking down and removing roofs, floors, panelling, ceilings, partitions, etc
-262-
AlterationsBill No. 1Section No. 8
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
17m2Internal plaster from walls and columns3
Hacking up/off and removing granolithic, screeds, plaster, etc from concrete or brickwork and preparing surfaces for new screed, plaster, tile finishes, etc
MAKING GOOD OF FINISHES ETC
13m
Chase out crack in top of surface bed to form groove 100mm wide and 50mm deep and fill in with 3:1 cement mortar well caulked, including finishing smooth with a steel trowel to match existing levels
4
Making good concrete floors
17m2On walls in patches5
Making good cement plaster
33m
Chase out plaster cracks to form recess 25mm wide and 20mm deep and fill with 1:4 cement mortar including floating up smooth to match existing
6
292m2Internal plastered walls7
Remove loose and flaking paint by scraping and sanding on walls, floors etc. to receive new paint
11m2Re-setting of suspended ceilings 8
Remedial work
163m2
Refix existing loose 0.8mm galvanised IBR roof covering to steel members with "SAFLOK 700" or equal approved clips, all in accordance with manufacturer's recommendations and specifications
9
2NoRealign 5300 x 4650mm high galvanised steel vehicle access sliding gates
10
110No"Pelican" or similar approved hold down clip for Pelican suspended ceiling systems
11
-263-
AlterationsBill No. 1Section No. 8
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
110No
"Mitek Bracing Strap" or equal approved galvanised ceiling support straps, 40 x 6mm thick not exceeding 500mm long, fixed to ceiling grid system as per Architectural specification
12
195No
Remove existing structural bolts and replace with galvanised carbon steel structural grade 8.8 M16 structural bolts or equal approved
13
29m
Remove existing grout around base plates and replace with "ABE Epidermix 372" or similar approved grout at an angle of no less than 15 degrees to the horizontal not exceeding 5mm wide and 3mm deep
14
OPENINGS THROUGH EXISTING WALLS ETC
1NoOpening for door with steel frame 813 x 2032mm high overall through one brick wall
15
Breaking out for and forming openings through brick walls for new doors and frames, including brick lintels, making good cement plaster on one side and into reveals and face brickwork on other side and into reveals and with 20 MPa concrete thresholds with steel trowelled finish (new doors and frames and making good paintwork elsewhere)
GENERAL MAINTENANCE
262m2External face brick walls 16
Power wash existing surfaces to remove all dirt, grime and loose particles
112m2Corrugated roof coverings17
ItemExisting building including floors, walls, windows, doors, frames, etc
18
Clean down with suitable detergent and rinse thoroughly with clean water
-264-
AlterationsBill No. 1Section No. 8
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 8 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 02
EARTHWORKS (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 104) unless otherwise stated
SITE CLEARANCE, ETC.
119m2
Digging up and removing rubbish, debris, vegetation, hedges, shrubs and trees not exceeding 200mm girth, bush, etc.
1
Site clearance
EXCAVATION, FILLING, ETC OTHER THAN BULK
EXCAVATION, ETC.
1m3Reduced levels under floors2
Excavation in earth not exceeding 2m deep
-265-
Earthworks (Provisional)Bill No. 2Section No. 8
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
2m3Trenches3
Excavation in earth not exceeding 2m deep
1m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor
4
Extra over all excavations for carting away
10m2Sides of trench and hole excavations not exceeding 1,5m deep
5
Risk of collapse of excavations
ItemKeeping excavations free of all water other than subterranean water
6
Keeping excavations free of water
FILLING ETC
1m3Backfilling to trenches, holes, etc7
Earth filling obtained from the excavations and/or prescribed stock piles on site, compacted to 95% Mod AASHTO density
1m3G6 Material under floors8
Earth filling of approved clean earth supplied by the contractor, compacted to 95% Mod AASHTO density
4m2
Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 95% Mod AASHTO density
9
Compaction of surfaces
WEED KILLERS, INSECTICIDES, ETC
-266-
Earthworks (Provisional)Bill No. 2Section No. 8
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
4m2
Treat ground under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming as per clause 2.13 of specification OOG-001E with 50mm sand over poison(sand elsewhere measured, Certificate must be provided)
10
"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee
13m2To bottoms and sides of trenches etc (Certificate must be provided)
11
-267-
Earthworks (Provisional)Bill No. 2Section No. 8
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 8 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 03
CONCRETE, FORMWORK AND REINFORCEMENT
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 110) unless otherwise stated
REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES
1m3Strip footings1
30MPa/19mm concrete
0.3m3Steps2
1m3Surface beds3
6m3Underpinning4
REINFORCED CONCRETE CAST ON/IN FORMWORK
-268-
Concrete,Formwork and ReinforcementBill No. 3Section No. 8
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
16m3Slabs including beams and inverted beams5
30MPa/19mm concrete
6NoMaking and testing 150 x 150 x 150mm concrete strength test cubes (Provisional)
6
TEST BLOCKS
CONCRETE SUNDRIES
4m2Surface beds, slabs, etc to falls7
Finishing top surfaces of concrete smooth with a wood float to a non slip surface
(CPAP WORK GROUP NO. 111) unless otherwise stated
SMOOTH FORMWORK (DEGREE OF ACCURACY II)
2m2Steps8
Smooth formwork to sides
98m2Slabs propped up exceeding 3m and not exceeding 5m high
9
Smooth formwork to soffits
(CPAP WORK GROUP NO. 114) unless otherwise stated
REINFORCEMENT (PROVISIONAL)
0.550tBars not exceeding 10mm diameter10
Mild steel reinforcement to structural concrete work
-269-
Concrete,Formwork and ReinforcementBill No. 3Section No. 8
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
1.650tBars not exceeding 20mm diameter11
High tensile steel reinforcement to structural concrete work
193m2Type 617 fabric reinforcement12
Fabric reinforcement
-270-
Concrete,Formwork and ReinforcementBill No. 3Section No. 8
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 8 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 04
MASONRY
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 116) unless otherwise stated
BRICKWORK
FOUNDATIONS (PROVISIONAL)
3m2One brick walls1
Brickwork of NFX bricks (14 MPa nominal compressive strength) in class II mortar (Corobrik engineering bricks)
SUPERSTRUCTURE
93m2One brick walls of two half brick skins with inner skin bagged and sealed
2
Brickwork of NFP bricks in class II mortar
BRICKWORK SUNDRIES
-271-
MasonryBill No. 4Section No. 8
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
402m150mm Wide reinforcement built in horizontally 3
2,5mm Brickwork reinforcement
FACE BRICKWORK
3m2Extra over brickwork for face brickwork in foundations (Provisional)
4
Corobrik Nala Travetine "FBS", pointed with flush horizontal and vertical joints on all exposed faces
95m2Extra over brickwork for face brickwork 5
-272-
MasonryBill No. 4Section No. 8
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 8 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 05
WATERPROOFING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 120) unless otherwise stated
DAMPPROOFING OF WALLS AND FLOORS
1m2Under walls1
One layer of 375 micron embossed polyethylene damp proof course (SANS 952-1985 type B)
4m2Under floors2
One layer of 250 micron green polyethylene waterproof sheeting (SANS 952-1985 type C) sealed at laps with PVC self-adhesive tape
WATERPROOFING TO ROOFS ETC
-273-
WaterproofingBill No. 5Section No. 8
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
38m2On parapet walls3
One layer 4mm special polyester fully bonded waterproof membrane comprising a matrix modified with polypropylene dual reinforced with non-woven polyester cloth and glass fibre tissue, laid with 75mm side and 100mm end laps
SEALING STRIPS, JOINT SEALANTS, ETC
9m10 x 10mm In vertical expansion joints including raking out expansion joint filler as necessary
4
Two-part grey polysulphide sealing compound including backing cord, bond breaker, primer, etc
-274-
WaterproofingBill No. 5Section No. 8
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 8 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 06
ROOF COVERINGS ETC
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 124) unless otherwise stated
PROFILED METAL SHEETING AND ACCESSORIES
75m2Roof covering with pitches not exceeding 25 degrees1
0.8mm Z275 spelter galvanised corrugated steel sheets fixed to existing timber purlins or rails (Colour to Architects Specification)
46m2Refix existing roof covering with pitches not exceeding 25 degrees
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
23mSide wall flashings not exceeding 500mm girth5
9mHead wall flashings not exceeding 500mm girth6
-276-
Roof CoveringsBill No. 6Section No. 8
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 8 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 07
CARPENTRY AND JOINERY
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 126) unless otherwise stated
STRUCTURAL TIMBERWORK ETC
PLATE NAILED TIMBER ROOF TRUSS CONSTRUCTION ETC
Prefabricated roof trusses etc
Item
Roof construction to monopitched roof, 10.6 x 7.92m overall on plan x 1800mm high overall, including trusses, jack rafters, permanent bracing and 50 x 76mm purlins at 1050 centres for roof covering (wall plates elsewhere)
1
The following in plate nailed timber roof trusses with a pitch not exceeding 27.5 degrees, from an approved supplier, delivered to site, hoisted into position, fixed and braced on timber wall plates
-277-
Carpentry and JoineryBill No. 7Section No. 8
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
17m76 x 114mm Wall plates2
Sawn softwood grade V4
EAVES, VERGES, ETC
17m
12 x 225mm Fascia boards, including aluminium H-profile fascia joiners and fixed with hot dipped galvanised drive screws and washers (no paint) (product number 041-203 and 685-195)
3
''Everite Nutech'' Medium density fibre-cement fascia boards
23m
10 x 80 x 225mm Barge boards including aluminium H-profile barge joiners and fixed with hot dipped galvanised drive screws and washers (no paint) (product number 721-800)
1No40mm Semi solid single door 900 x 2035mm high with veneer suitable for enamel paint finish
5
40mm x 2035 x 8015mm semi solid door with veneer suitable for enamel paint finish.Electronic door lock controlled from main control room.150 x 450mm view panel with 9.5mm HPR laminated glass fitted in Neoprene gaskets
FITTINGS
SHELVING
-278-
Carpentry and JoineryBill No. 7Section No. 8
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
13m600 x 25mm Timber shelf6
400mm Deep varnished meranti timber shelf on 38 x 38mm meranti timber wall brackets plugged to walls including edges sealed with clear silicone sealant
-279-
Carpentry and JoineryBill No. 7Section No. 8
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 8 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 08
CEILINGS, PARTITIONS AND ACCESS FLOORING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
Ceilings,Partitions and Access FlooringBill No. 8Section No. 8
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
22mL-shape suspended PVC ceiling hangars/supporters fixed to wall
4
Perimeter trim to suspended ceilings
ACCESS FLOORING
RAISED FLOORING
53m2On floors 5
600 x 600 x 25mm Steel access floor panels on adjustable steel pedestals to allow top level of floor to be 340mm above sub base concrete floor. Steel panels to be covered in melamine sheeting of approved colour
-281-
Ceilings,Partitions and Access FlooringBill No. 8Section No. 8
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 8 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 09
IRONMONGERY
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 132) unless otherwise stated
3No
Electromagnetic door lock for security door with temporary control switch fixed to wall not exceeding 10m, as per ironmongery schedule. Provisions to be made for control from the Main Control Room (elsewhere measured)
1
LOCKS
1NoFour lever upright lockset2
"Union " or similar approved
PUSH PLATES AND KICK PLATES
2No300 x 75mm Push plate3
Aluminium plates countersunk screwed along edges at not exceeding 200mm centres
-282-
IronmongeryBill No. 9Section No. 8
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
2No750 x 150mm Kick plate4
9No100mm High anodised aluminium letter or numeral5
LETTERS, NAMEPLATES, ETC
PHOTOLUMINESCENT SIGNS
1No150 x 150mm Sign with one pictogram (Paraplegic)6
Wall mounted photoluminescent statutory signs in 150 x 150mm modules
2No20mm Diameter chromium plated towel rail 600mm long including end brackets, plugged
7
BATHROOM FITTINGS
2No"White" vandal proof double toilet roll holder, plugged8
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 10
METALWORK
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 136) unless otherwise stated
GALVANISED STEEL GATES, SCREENS, ETC
HOT DIPPED GALVANISED STRAIGHT PROFILE FENCE
7m
3050 x 50 x 50 x 5mm Thick angle iron top rail including all fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification
1
High tensile Galfan Class A mesh panels manufactured in accordance with SANS 10244-2:2003 specification (refer to the Department of Public Works Standard Technical Specification - Perimeter Fence for Prisons May 2005 Rev01 annexed to the bid document)
-284-
MetalworkBill No. 10Section No. 8
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
7m
5000 x 3050mm Wide straight profile mesh panel (Type 1), 1,4mm single skin with double vertical wires spaced at 76.2mm and all horizontal wires spaced at 12.7mm centre to centre including all break off bolts and all other fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification
2
HOT DIPPED GALVANISED STEEL GATE CRAWLERS
4No
Heavy duty gate crawlers suitable for gate size 6000 x 4000mm high including all fittings installed on gates attached to crawl beams as per engineers specification
3
Purpose made gate crawlers as per engineers specification
HOT DIPPED GALVANISED STEEL BOLLARDS
13No
220mm Diameter galvanised mild steel "high impact" bollard, 1500mm total height, 1000mm height above ground with concrete infill laid in and including 500 x 500 x 550m deep 30mpa concrete base
4
"SA Bollards High Impact Bollard" or similar approved
HOT DIPPED GALVANISED STEEL MINOR WORK
2NoGoose neck post 1200mm high including base plates, fittings etc. with necessary provisions for intercom
5
Galvanised hot dipped mild steel posts including base plate, fittings etc.
11mU-shaped guide rail of 35 x 35 x 5mm u-channel section6
Fixing accessories for 6000 x 4000mm high steel gate
2No2000 x 100 x 300mm Deep channel under UPS7
HOT DIPPED GALVANISED STEEL CHANNELS
-285-
MetalworkBill No. 10Section No. 8
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
8m300 x 300mm Deep cable trench with chequer plate covering to pass through wall
8
BAFFLE EXHAUST
1NoGenerator baffle exhaust constructed from 0.6mm galvanised sheet metal as per engineers specification
9
0.6mm Hot dipped galvanised sheet metal
HOT DIPPED GALVANISED PRESSED STEEL DOOR FRAMES
1NoFrame for door 813 x 2032mm high10
1.6mm Double rebated frames with one and half pair of 100mm steel butt hinges suitable for one brick walls
Refer to Window Schedule
ALUMINIUM CASEMENT WINDOWS
1NoPurpose made window, 533 x 1264mm high (W04)11
Natural anodised casement window units complete with subframes, ironmongery, 4mm glass with aluminium beads, sealing, burglar bars in 25 x 25mm square tubingetc and fixing to brickwork
-286-
MetalworkBill No. 10Section No. 8
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 8 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 11
PLASTERING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 142) unless otherwise stated
SCREEDS
7m240mm Thick on floors 1
1:3 Cement screeds steel floated, on concrete
INTERNAL PLASTER
24m2On walls2
Cement plaster steel trowelled, on brickwork
58m2On walls in patches3
4m2On ceilings4
Cement plaster rendering coat with gypsum skim plaster finishing coat, on concrete
-287-
PlasteringBill No. 11Section No. 8
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 8 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 12
TILING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
SUPPLEMENTARY PREAMBLES
Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding
Tiling described as "fixed with adhesive on power floated concrete" shall be deemed to include for approved tiling key-coat
Ceramic, porcelain, marble and granite tiles are to be fixed and grouted with suitable adhesives and grouts from the "Tal Professional" range of products as recommended by the manufacturer of the tiles
(CPAP WORK GROUP NO. 144) unless otherwise stated
WALL TILING
24m2On walls1
300 x 300 x 8mm glazed ceramic tiles fixed with adhesive to plaster (plaster elsewhere) and flush pointed with tinted grout
-288-
TilingBill No. 12Section No. 8
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
FLOOR TILING
8m2On floors in patches2
300 x 300 x 8mm Porcelain floor tiles fixed with adhesive to screed (screed elsewhere) and flush pointed with epoxy grout
13mSkirting 70mm high 3
-289-
TilingBill No. 12Section No. 8
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 8 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 13
PLUMBING AND DRAINAGE (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 148) unless otherwise stated
RAINWATER DISPOSAL
13m155 x 100 x 115mm Aluminium ogee roof gutters with baked enamel finish fixed with concealed brackets
1
0,6mm Chromadek seamless gutters and rainwater pipes
4NoExtra over gutter for stopped end2
4NoExtra over gutter for outlet for 100 x 75mm pipe3
11m100 x 75mm Fluted aluminium rainwater downpipes with baked enamel finish fixed as per supplier's detail
4
4NoExtra over rainwater pipe for eaves offset 900mm projection
5
-290-
Plumbing and drainage (Provisional)Bill No. 13Section No. 8
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
4NoExtra over rainwater pipe for shoe 6
SANITARY FITTINGS
1No
"Vaal Pearl Paraplegic" vitreous china semi-close coupled 90 degree outlet open rim washdown pan and matching 9 litre cistern with side flush lever as per Architect's Specification
7
"Vaal" or equal approved by the Architect
1No
380 x 435mm "Vaal Hygia 703602WH " barrier free wash hand basin as per Architect's Specification
8
WASTE UNIONS ETC
1No
Chrome Pop Up Basin waste for basin with overflows as per Architect's Specification
9
"Cobra Watertech" or equal approved
TRAPS ETC
1No40mm 360 CP bottle trap10
"Cobra Watertech" or equal approved
TAPS, VALVES, ETC
4No15mm Stopcock11
Brass
2No20mm Stopcock12
4No15mm Fullway gate valve13
2No22mm Fullway gate valve14
1No25mm Brass Ball-o-stop15
-291-
Plumbing and drainage (Provisional)Bill No. 13Section No. 8
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
1No50mm Brass wheelvalve for HDPE pipes16
1No50mm Brass Ball-o-stop17
1No
15mm "Cobra NM-851" or equal approved elbow action basin mixer
18
"Cobra" or equal approved
SANITARY PLUMBING
13m50mm Pipes19
uPVC soil and vent pipes
2m50mm Pipes chased into concrete surface beds20
19m
110mm Pipes laid in and including trenches not exceeding 1m deep
21
7m110mm Pipes 22
3No50mm Bend23
Extra over uPVC soil and vent pipes for fittings
3No50mm Access bend24
1No50mm Rodding eye25
3No110mm Bend26
3No110mm Access bend27
ItemTesting waste pipe system28
Testing
WATER SUPPLIES
-292-
Plumbing and drainage (Provisional)Bill No. 13Section No. 8
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
28m15mm Pipes29
Class 1 copper pipes with capillary couplings
11m22mm Pipes30
18No15mm Fittings31
Extra over Class1 copper pipes for capillary fittings
11No22mm Fittings32
4No15mm Flexible service pipe33
33m25mm Pipes laid in and including trenches not exceeding 1m deep
34
Class 12 HDPe pipes
11m50mm Pipes laid in and including trenches not exceeding 1m deep
35
6No25mm Bend (90 degrees)36
Extra over Class 12 HDPe pipes for compression fittings
6No50mm Bend (45 degrees)37
ItemTesting water pipe system38
Testing
13m3
Extra over excavation for pipe trenches, chambers, etc for carting away surplus material to a dumping site to be located by the contractor
39
SUNDRIES
1NoTie into existing sewer line40
2No4.5kg Dry chemical powder fire extinguisher41
FIRE APPLIANCES ETC
-293-
Plumbing and drainage (Provisional)Bill No. 13Section No. 8
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
3No4.5kg Carbon dioxide fire extinguisher42
30No190 x 190mm ABS plastic symbolic safety sign plugged and screwed to wall
43
-294-
Plumbing and drainage (Provisional)Bill No. 13Section No. 8
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 8 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 14
GLAZING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 150) unless otherwise stated
GLAZING TO ALUMINIUM WITH CLIP-ON BEADS
3m2Panes exceeding 0,1m2 and not exceeding 0,5m21
4mm Clear float glass with aluminium beads
TOPS, SHELVES, DOORS, MIRRORS, ETC
3NoMirror 300 x 450mm high2
4mm Silvered float glass copper backed mirrors with polished edges, holed for and fixed with chromium plated dome capped mirror screws with rubber buffers to plugs in brickwork
-295-
GlazingBill No. 14Section No. 8
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 8 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 15
PAINTWORK
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
All painting shall be done in accordance with the Architects specifications and condition assessment reports unless otherwise described
PAINT SPECIFICATIONS
(CPAP WORK GROUP NO. 152) unless otherwise stated
PAINTWORK ETC TO EXISTING SURFACES
ON EXTERNAL FLOATED PLASTER SURFACES
120m2Parapet walls1
One merit plaster primer, one coat undercoat and two coats "Wall & All" or similar approved emulsion paint (colour to be approved by Client)
ON INTERNAL FLOATED PLASTER SURFACES
-296-
PaintworkBill No. 15Section No. 8
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
316m2Walls2
One merit plaster primer, one coat undercoat and two coats "Wall & All" or similar approved emulsion paint (colour to be approved by Client)
17m2Walls3
Two coats "Plascon Dampseal" or similar approved waterproof sealer
ON SMOOTH CONCRETE SURFACES
23m2Floors4
One coat bonding liquid, one coat primer and two coats epoxy paint for interior and exterior use, including stopping blow holes
60m2Ceilings5
One merit plaster primer, one coat undercoat and two coats "Wall & All" or similar approved emulsion paint (colour to be approved by Client)
ON METAL SURFACES
15m2Security door6
One coat self etching primer and two coats premium quality polyurethane enamel paint, on galvanised steel. Prepare and treat with anti rust compound suitable for coastal conditions
11m2Transformer door7
-297-
PaintworkBill No. 15Section No. 8
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 8 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 16
EXTERNAL WORKS (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
SUPPLEMENTARY PREAMBLES
Descriptions of earth filling, compaction, etc shall be deemed to include for all necessary testing required in accordance with the SABS 1200 series
Testing of material and filling
(CPAP WORK GROUP NO. 154) unless otherwise stated
ROADWORKS AND PARKING
EXCAVATION, FILLING, ETC OTHER THAN BULK
EXCAVATIONS ETC
61m3Over site between buildings, etc to reduce levels and dispose in prescribed stock piles on site
1
Excavation in earth not exceeding 2m deep
27m3Soft rock2
Extra over excavation in earth for excavation in
-298-
External WorksBill No. 16Section No. 8
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
9m3Hard rock3
142m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor
4
Extra over all excavations for carting away
ItemKeeping excavations free of water other than subterranean water
5
Keeping excavations free of water
LAYER WORK
40m3
Sub-grade course of 150mm thick of G1 crusher run material compacted to 88% Mod AASHTO density
6
Earth filling supplied by the contractor under parking areas, roadways, etc
40m3
Base course of 150mm thick of C4 (G5 gravel material) stabilised with 3% cement compacted to 97% Mod AASHTO density
7
13m3Under floors etc8
Coarse river sand filling supplied by the contractor
268m2
Compaction of ground surfaces under roadworks etc, including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density (Roadbed)
9
Compaction of surfaces
WEED KILLERS, INSECTICIDES, ETC
-299-
External WorksBill No. 16Section No. 8
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
467m2
Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming (Certificate must be provided)
10
"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee
PAVING
22m2Paving to roadworks and parking areas to falls11
80mm thick 30MPa precast concrete grey interlocking block paving blocks in accordance with SANS 1058, laid to falls on and including 25mm thick sand layer with joints filled in with sand, compacted with a vibration compactor
246m2Paving to aprons12
50mm thick 30MPa precast concrete grey interlocking block paving blocks in accordance with SANS 1058, laid to falls on and including 25mm thick sand layer with joints filled in with sand, compacted with a vibration compactor
-300-
External WorksBill No. 16Section No. 8
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 8 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 17
ELECTRICAL INSTALLATION
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 160) unless otherwise stated
ACCESS CONTROL
2NoVehicle boom gate and spike barrier 1
ACCESS BARRIERS
2NoSpike boom barrier extension 2
2NoTwo button remotes to operate claws and boom to be handed to the Area Commissioner
3
2NoTemporary switch fixed to Guards Office for claw and boom operation
4
2No
Two way red and green, 12V DC Traffic light Unit including wall mounted brackets (SS), harness and interface relay
5
-301-
ElectricalBill No. 17Section No. 8
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
2No
D10 Industrial gate motor including tracks, break sensor, impact sensor, burglar proof case, anti-theft brackets etc. to make installation complete
6
"Centurion" or similar or equal approved
Item
Make the necessary provisions for security door electromagnetic door locks to be controlled from the Main Control Room
7
Provision of service infrastructure for future installations
ItemMake the necessary provisions for access barriers to be controlled from the Main Control Room
8
FANS
1No
"Xpelair CX10" or equally approved flush-mounted 329 m3/h extraction fan with 352mm round grille design, 203mm integral duct connection spigot including ducts not exceeding 2500mm with all necessary supports and accessories
9
Extraction Fan
-302-
ElectricalBill No. 17Section No. 8
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 8 R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
SECTION SUMMARY - S06: Sally Port to Main Control
BillNo
PageNo
Amount
264Alterations1
267Earthworks (Provisional)2
270Concrete,Formwork and Reinforcement3
272Masonry4
274Waterproofing5
276Roof Coverings6
279Carpentry and Joinery7
281Ceilings,Partitions and Access Flooring8
283Ironmongery9
286Metalwork10
287Plastering11
289Tiling12
294Plumbing and drainage (Provisional)13
295Glazing14
297Paintwork15
300External Works16
302Electrical17
-303-
Section No. 8
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried to Final Summary R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 01
EARTHWORKS (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 104) unless otherwise stated
SITE CLEARANCE, ETC.
216m2
Digging up and removing rubbish, debris, vegetation, hedges, shrubs and trees not exceeding 200mm girth, bush, etc.
1
Site clearance
216m2Stripping average 100mm thick layer of top soil and carting away
2
EXCAVATION, FILLING, ETC OTHER THAN BULK
EXCAVATION, ETC.
-304-
Earthworks (Provisional)Bill No. 1Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
22m3Reduced levels under floors3
Excavation in earth not exceeding 2m deep
43m3Trenches4
9m3Soft rock5
Extra over trench and hole excavations in earth for excavation in
6m3Hard rock6
15m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor
7
Extra over all excavations for carting away
143m2Sides of trench and hole excavations not exceeding 1,5m deep
8
Risk of collapse of excavations
ItemKeeping excavations free of all water other than subterranean water
9
Keeping excavations free of water
FILLING ETC
15m3Backfilling to trenches, holes, etc10
Earth filling obtained from the excavations and/or prescribed stock piles on site, compacted to 95% Mod AASHTO density
22m3G6 Material under floors11
Earth filling of approved clean earth supplied by the contractor, compacted to 95% Mod AASHTO density
11m3Under floors etc12
Coarse river sand filling supplied by the contractor
-305-
Earthworks (Provisional)Bill No. 1Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
216m2
Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 95% Mod AASHTO density
13
Compaction of surfaces
WEED KILLERS, INSECTICIDES, ETC
216m2
Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming (Certificate must be provided)
14
"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee
143m2To bottoms and sides of trenches etc (Certificate must be provided)
15
-306-
Earthworks (Provisional)Bill No. 1Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 9 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 02
CONCRETE, FORMWORK AND REINFORCEMENT
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 110) unless otherwise stated
REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES
18m3Strip footings1
30MPa/19mm concrete
17m3Surface beds on waterproofing (power floated finished concrete)
2
11m3Surface beds cast in panels on waterproofing (Aprons and V - channels)
3
REINFORCED CONCRETE CAST ON/IN FORMWORK
-307-
Concrete,Formwork and ReinforcementBill No. 2Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
19m3Slabs4
30MPa/19mm concrete
4m3Ramps and stairs5
9NoMaking and testing 150 x 150 x 150mm concrete strength test cubes (Provisional)
6
TEST BLOCKS
CONCRETE SUNDRIES
297m2Surface bed to falls , aprons , v - channels and ramps7
Finishing top surfaces of concrete smooth with a wood float to a non slip surface
(CPAP WORK GROUP NO. 111) unless otherwise stated
SMOOTH FORMWORK (DEGREE OF ACCURACY II)
111mAprons and V - Channels not exceeding 300mm high8
Smooth formwork to sides
137m2Slabs propped up exceeding 3m and not exceeding 5m high
9
Smooth formwork to soffits
MOVEMENT JOINTS ETC
11mNot exceeding 300mm wide in Aprons and V - Channels (Provisional)
10
Expansion joints with 10mm softboard bitumen impregnated softboard between vertical concrete and brick surfaces
-308-
Concrete,Formwork and ReinforcementBill No. 2Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
(CPAP WORK GROUP NO. 114) unless otherwise stated
REINFORCEMENT (PROVISIONAL)
2.991tBars not exceeding 10mm diameter11
Mild steel reinforcement to structural concrete work
2.372tBars not exceeding 20mm diameter12
High tensile steel reinforcement to structural concrete work
297m2Type 193 fabric reinforcement13
Fabric reinforcement
66m2Type 617 fabric reinforcement14
-309-
Concrete,Formwork and ReinforcementBill No. 2Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 9 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 03
MASONRY
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 116) unless otherwise stated
BRICKWORK
FOUNDATIONS (PROVISIONAL)
59m2One brick walls1
Brickwork of NFX bricks (14 MPa nominal compressive strength) in class II mortar (Corobrik engineering bricks)
SUPERSTRUCTURE
17m2Half brick walls in beamfilling2
Brickwork of NFP bricks in class II mortar
24m2Half brick walls 3
396m2One brick walls of two half brick skins with inner skin bagged and sealed
4
-310-
MasonryBill No. 3Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BRICKWORK SUNDRIES
97m75mm Wide reinforcement built in horizontally 5
2,5mm Brickwork reinforcement
1,584m150mm Wide reinforcement built in horizontally 6
19m220mm Wide turning pieces7
Turning pieces to soffit of lintels etc
33No30 x 1,6mm Roof tie 1,5m long with one end fixed to timber and other end built into brickwork
8
Galvanised hoop iron cramps, ties, etc
FACE BRICKWORK
11m2Extra over brickwork for face brickwork in foundations (Provisional)
9
Corobrik Nala Travetine "FBS", pointed with flush horizontal and vertical joints on all exposed faces
308m2Extra over brickwork for face brickwork 10
17mExtra over brickwork for brick-on-edge header course lintels
11
17mExtra over brickwork for brick-on-edge header course bands one course high
12
22mFair raking cutting13
FIBRE-CEMENT WINDOW SILLS
17m15 x 150mm Wide sills set sloping and slightly projecting14
"Everite-Nutec"
-311-
MasonryBill No. 3Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 9 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 04
WATERPROOFING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 120) unless otherwise stated
WATERPROOFING TO ROOFS ETC
132m2On concrete slab and parapet walls1
One layer 4mm special polyester fully bonded waterproof membrane comprising a matrix modified with polypropylene dual reinforced with non-woven polyester cloth and glass fibre tissue, laid with 75mm side and 100mm end laps
DAMPPROOFING OF WALLS AND FLOORS
33m2Under walls2
One layer of 375 micron embossed polyethylene damp proof course (SANS 952-1985 type B)
22m2Under sills3
-312-
WaterproofingBill No. 4Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
222m2Under surface beds4
One layer of 250 micron green polyethylene waterproof sheeting (SANS 952-1985 type C) sealed at laps with PVC self-adhesive tape
SEALING STRIPS, JOINT SEALANTS, ETC
33m10 x 10mm In vertical expansion joints including raking out expansion joint filler as necessary
5
Two-part grey polysulphide sealing compound including backing cord, bond breaker, primer, etc
-313-
WaterproofingBill No. 4Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 9 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 05
ROOF COVERINGS ETC
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 124) unless otherwise stated
PROFILED METAL SHEETING AND ACCESSORIES
68m2Roof covering with pitches not exceeding 25 degrees with side laps seam stitched
1
0.8mm Z275 spelter galvanised corrugated steel sheets fixed to timber purlins or rails (Colour to Architects Specification)
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
68m2
Insulation sheeting laid taut over purlins and fixed concurrent with roof covering with minimum 150mm stapled laps including steel straining wires at not exceeding 400mm centres and double-sided tape at edges where required
3
"Sisalation 420" heavy industrial grade aluminium foil based insulation
-315-
Roof CoveringBill No. 5Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 9 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 06
CARPENTRY AND JOINERY
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 126) unless otherwise stated
STRUCTURAL TIMBERWORK ETC
PLATE NAILED TIMBER ROOF TRUSS CONSTRUCTION ETC
Prefabricated roof trusses etc
Item
Prefabricated double pitched roof trusses approximately 14100mm X 11000 mm span with 800mm pitch and (7.5 degrees) with 500mm overhang on both sides for roof
1
The following in plate nailed timber roof trusses with a pitch not exceeding 27.5 degrees, from an approved supplier, delivered to site, hoisted into position, fixed and braced on timber wall plates
31m38 x 114mm Wall plates2
Sawn treated softwood grade V4
-316-
Carpentry and JoineryBill No. 6Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
17m38 x 228mm Gangboards3
185m50 x 76mm Purlins4
13m38 x 76mm Trimmers5
Wrought treated softwood grade V4
17m38 x 114mm Sprockets6
28m50 x 76mm Purlins7
17m76 x 76mm Splayed eaves purlins8
6m2Wrought faces on sawn timbers9
SUNDRIES
28m2Two coats creosote "ABE Provonite" paint on exposed roof timbers and wall plates
10
94No"Teco" two way hurricane clips11
EAVES, VERGES, ETC
17m
12 x 225mm Fascia boards, including aluminium H-profile fascia joiners and fixed with hot dipped galvanised drive screws and washers (no paint) (product number 041-203 and 685-195)
12
''Everite Nutech'' Medium density fibre-cement fascia boards
28m
10 x 80 x 225mm Barge boards including aluminium H-profile barge joiners and fixed with hot dipped galvanised drive screws and washers (no paint) (product number 721-800)
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
Refer to Door Schedule
DOORS ETC
1NoDoor size 40mm x 2035 x 815 mm (D04)14
40mm x 2035 x 8015mm semi solid door with veneer suitable for enamel paint finish.Electronic door lock controlled from main control room.150 x 450mm view panel with 9.5mm HPR laminated glass fitted in Neoprene gaskets
1No40mm Semi solid single door 813 x 2035mm high with veneer suitable for enamel paint finish (D7)
15
1No40mm Semi solid single door 813 x 2035mm high with veneer suitable for enamel paint finish (D8)
16
1No40mm Hardwood timber glazed frame double door 1635 x 2035mm high (D1 - DD)
17
FITTINGS
WORKTOP
1No32mm Worktop 600mm wide x 3200mm long with bullnose along one long edge screwed on
400mm Deep varnished meranti timber shelf on 38 x 38mm meranti timber wall brackets plugged to walls including edges sealed with clear silicone sealant
-318-
Carpentry and JoineryBill No. 6Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 9 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 07
CEILINGS, PARTITIONS AND ACCESS FLOORING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
"Isotherm" polyester high density 7-10kg/m3 thermbonded insulation blanket
SUSPENDED CEILINGS
130m2Ceilings suspended not exceeding 1 000mm below timber purlins in patches
2
1200 x 600 x 12mm Thick PVC ceiling panel screwed to and including screw-up suspension grid
3No
Extra over ceiling 600 x 600mm trap door complete with trimmers, frame, cross branders, ceiling board, hinges, etc as described (Provisional)
3
-319-
Ceilings,Partitions and Access FlooringBill No. 7Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
110No
Extra over ceiling "Mitek Bracing Strap" or equal approved galvanised ceiling support straps, 40 x 6mm thick not exceeding 500mm long, fixed to ceiling grid system as per Architectural specification
4
182mL-shape suspended PVC ceiling hangars/supporters fixed to wall
5
Perimeter trim to suspended ceilings
ACCESS FLOORING
RAISED FLOORING
40m2On floors6
600 X 600 x 25mm steel access floor panels on adjustable steel pedestals to allow top level of floor to be 340mm above stub base concrete floor.Steel panels to be covered in melamine sheeting of approved colour.
-320-
Ceilings,Partitions and Access FlooringBill No. 7Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 9 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 08
IRONMONGERY
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 132) unless otherwise stated
LOCKS
2NoBathroom indicator bolt1
"Union " or similar approved
2NoFour lever upright lockset2
PHOTOLUMINESCENT SIGNS
1No150 x 150mm Sign with one pictogram (Male)3
Wall mounted photoluminescent statutory signs in 150 x 150mm modules
1No150 x 150mm Sign with one pictogram (Female)4
-321-
IronmongeryBill No. 8Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
7m20mm Diameter stainless steel curtain rod fixed to wall5
PELMETS AND CURTAIN TRACKS
2No20mm Diameter chromium plated towel rail 600mm long including end brackets, plugged
6
BATHROOM FITTINGS
2No"White" vandal proof double toilet roll holder, plugged7
2NoChromium plated coat hook, plugged8
2No
'Rodan' waste bin for wall mounting RODX605 (code:359983) in 0.8mm stainless steel with satin finished surface, cylinder lock with Franke standard key , 23 litres capacity including stainless steel screws and dowels
9
"Kimberly-Clark" or similar approved
2No"Ref 427518" soap dispenser, plugged10
2No"Ref 426213" disposal bin, plugged11
2NoStainless steel 'Vandal' proof toilet roll holder12
Stainless Steel
2No32mm "Ref SR2"stainless steel back grab rail 800mm long, plugged
13
"Chairman industries" or similar approved
2No32mm"Ref DL2"stainless steel dogleg side grab rail 900mm girth, plugged
14
13No38mm Diameter rubber door stop plugged15
SUNDRIES
-322-
IronmongeryBill No. 8Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 9 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 09
METALWORK
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 136) unless otherwise stated
HOT DIPPED GALVANISED STEEL GATES, SCREENS, ETC
STEEL SCREENS
21m26000 x 3120 x 3,15mm Weldmesh screen welded to frame
1
Welded mesh screens over turnstiles and gate as per Architects detail
HOT DIPPED GALVANISED WELDED GATES
-323-
MetalworkBill No. 9Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
2No
Single gate for opening size 1000 x 2032mm high of 30 x 30 x 3mm hollow section frame and two horizontal middle rails, filled in with 10mm square mild steel vertical bars at 100mm centres including Union 2195-76 two lever deadlock housed in and including lock box, including suitable hinges, the gate fixed in steel screen (elsewhere measured)
2
Galvanised hot dipped mild steel with 16mm intermediate bars at 100mm centres as per gate detail
HOT DIPPED GALVANISED STEEL MINOR WORK
13m300 x 300mm Deep cable trench with chequer plate covering to pass through wall
3
HOT DIPPED GALVANISED STEEL CHANNELS
WORKTOP
4No
Triangular shaped bracket of 40 x 20 x 2.5mm hollow section 1500mm girth mitred and welded at angles with open ends capped and twice holed for bolts
4
Hot dipped galvanised welded worktop brackets bolted to wall
11NoM8 Expansion bolt 80mm long5
STAINLESS STEEL MINOR WORK
TURNSTILE
1No2180 x 2250mm High double three arm turnstile6
"Type 316" stainless steel "Saturn" finish double three arm turnstiles fitted to "Type 316" stainless steel framework including provision for biometric operated lock and reader on frame
HOT DIPPED GALVANISED PRESSED STEEL DOOR FRAMES
-324-
MetalworkBill No. 9Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
1NoFrame for door 1635 x 2035mm high7
1.6mm Double rebated frames with one and half pair of 100mm steel butt hinges suitable for one brick walls
2NoFrame for door 813 x 2032mm high8
1.6mm Double rebated frames with one and half pair of 100mm steel butt hinges suitable for one brick walls
4NoFrame for door 1000 x 2035mm high9
Purpose made 3mm thick single rebate steel frame to standard DCS details for one brick walls
1NoFrame for door 1525 x 2135mm high10
Standard double rebate frame 1.6mm steel Transformer room doorframe
1NoFrame for door 815 x 2035mm high11
Standard double rebate frame 1.6mm steel Transformer room doorframe
1NoFrame for door 815 x 2035mm high12
Standard 1.2 single rebate mild steel doorframe with 1 pair of 100mm hinges and adjustable striking plate
Refer to Door Schedule
HOT DIPPED GALVANISED PRESSED STEEL DOORS
1NoDoor size 1000 x 2035mm (D06)13
Hollow metal type door with view panel to DCS details .Electronic door lock controlled from main control room.150 x 450mm view panel with 9.5mm HPR laminated glass fitted in Neoprene gaskets
-325-
MetalworkBill No. 9Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
3NoDoor size 1000 x 2035mm (D12)14
Hollow metal type door with view panel to DCS details .Electronic door lock controlled from main control room.150 x 450mm view panel with 9.5mm HPR laminated glass fitted in Neoprene gaskets
1NoDoor size 815 x 2035mm (D13)15
Standard door 1.6mm steel transformer door Type A to DCS details .Electronic door sensors controlled from main control room.
1NoDoor size 1525 x 2135mm (D14)16
Standard double doors 1.6mm steel transformer door with fine mesh vents to DCS details .Electronic door sensors controlled from main control room.
Refer to Window Schedule
ALUMINIUM CASEMENT WINDOWS
1NoPurpose made window, 533 x 654mm high (W06)17
Natural anodised casement window units complete with subframes, ironmongery, 4mm glass with aluminium beads, sealing, burglar bars in 25 x 25mm square tubingetc and fixing to brickwork
1NoPurpose made window, 533 x 1264mm high (W04)18
2NoPurpose made window, 1511 x 1245mm high (W07)19
1NoPurpose made window, 1800 x 1245mm high (W01)20
1NoPurpose made viewing panel, 2350 x 915mm high21
Natural anodised viewing panel complete with subframes, with 100 x 25mm aluminium meeting stiles, 30 x 20mm aluminium glass beads, ironmongery, 16mm multi laminated bullet resisting glass set in neoprene gaskets, sealing, etc and fixing to brickwork
-326-
MetalworkBill No. 9Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 9 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 10
PLASTERING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 142) unless otherwise stated
SCREEDS
169m240mm Thick on floors 1
1:3 Cement screeds steel floated, on concrete
INTERNAL PLASTER
549m2On walls2
Cement plaster steel trowelled, on brickwork
8m2On narrow widths3
11m5 x 40mm Flat section brass weather bar between different floor finishes (In 1 No)
4
CORNER PROTECTORS, DIVIDING STRIPS, ETC
-327-
PlasteringBill No. 10Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 9 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 11
TILING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
SUPPLEMENTARY PREAMBLES
Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding
Tiling described as "fixed with adhesive on power floated concrete" shall be deemed to include for approved tiling key-coat
Ceramic, porcelain, marble and granite tiles are to be fixed and grouted with suitable adhesives and grouts from the "Tal Professional" range of products as recommended by the manufacturer of the tiles
(CPAP WORK GROUP NO. 144) unless otherwise stated
WALL TILING
48m2On walls1
300 x 300 x 8mm glazed ceramic tiles fixed with adhesive to plaster (plaster elsewhere) and flush pointed with tinted grout
-328-
TilingBill No. 11Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
FLOOR TILING
130m2On floors2
300 x 300 x 8mm Porcelain floor tiles fixed with adhesive to screed (screed elsewhere) and flush pointed with epoxy grout
13m2Skirting 70mm high 3
-329-
TilingBill No. 11Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 9 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 12
PLUMBING AND DRAINAGE (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 148) unless otherwise stated
RAINWATER DISPOSAL
17m155 x 100 x 115mm Aluminium ogee roof gutters with baked enamel finish fixed with concealed brackets
1
0,6mm Chromadek seamless gutters and rainwater pipes
2NoExtra over gutter for stopped end2
2NoExtra over gutter for outlet for 100 x 75mm pipe3
11m100 x 75mm Fluted aluminium rainwater downpipes with baked enamel finish fixed as per supplier's detail
4
2NoExtra over rainwater pipe for eaves offset 900mm projection
5
-330-
Plumbing and drainage (Provisional)Bill No. 12Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
2NoExtra over rainwater pipe for shoe 6
SANITARY FITTINGS
2No
White vitreous china close coupled toilet set with doubleflap toilet seat and cistern as per Architect's Specification
7
"Vaal" or equal approved by the Architect
2No
510 x 400mm White vitreous china basin with a single tap hole as per Architect's Specification
8
2No
White vitreous china Urinal complete with L.P flushing valves including fixations as per Architect's Specification
9
2No
"Vaal Pearl Paraplegic" vitreous china semi-close coupled 90 degree outlet open rim washdown pan and matching 9 litre cistern with side flush lever as per Architect's Specification
10
2No
380 x 435mm "Vaal Hygia 703602WH " barrier free wash hand basin as per Architect's Specification
11
2NoDouble flap toilet seat12
WASTE UNIONS ETC
2No
Chrome Pop Up Basin waste for basin with overflows as per Architect's Specification
13
"Cobra Watertech" or equal approved
2No40mm 309-40 CP anti-theft plug with spindle 14
TRAPS ETC
-331-
Plumbing and drainage (Provisional)Bill No. 12Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
2No38mm "P" or "S" trap15
uPVC
2No40mm 360 CP bottle trap16
"Cobra Watertech" or equal approved
TAPS, VALVES, ETC
4No15mm Stopcock17
Brass
2No20mm Stopcock18
4No15mm Fullway gate valve19
2No22mm Fullway gate valve20
1No25mm Brass Ball-o-stop21
1No50mm Brass wheelvalve for HDPE pipes22
1No50mm Brass Ball-o-stop23
2No
15mm Basin tap cold water only as per Architect's Specification
24
"Stella pillar taps" equal approved
SANITARY PLUMBING
17m50mm Pipes25
uPVC soil and vent pipes
11m50mm Pipes chased into concrete surface beds26
33m
110mm Pipes laid in and including trenches not exceeding 1m deep
27
-332-
Plumbing and drainage (Provisional)Bill No. 12Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
11m110mm Pipes 28
2No50mm BSP adaptor29
Extra over uPVC soil and vent pipes for fittings
2No50mm Strap on boss30
9No50mm Bend31
4No50mm Junction32
4No50mm Access bend33
4No50mm Access junction34
2No50mm Two-way vent valve35
2No110mm Eccentric reducer36
2No110mm Pan connector37
4No110mm Bend38
2No110mm Reducing junction39
2No110mm Access bend40
2No110mm Access bend with anti-syphon horn41
2No110mm Access reducing junction42
2No110mm Two way vent valve43
ItemTesting waste pipe system44
Testing
WATER SUPPLIES
28m15mm Pipes45
Class 1 copper pipes with capillary couplings
-333-
Plumbing and drainage (Provisional)Bill No. 12Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
11m22mm Pipes46
18No15mm Fittings47
Extra over Class1 copper pipes for capillary fittings
11No22mm Fittings48
4No15mm Flexible service pipe49
33m25mm Pipes laid in and including trenches not exceeding 1m deep
50
Class 12 HDPe pipes
11m50mm Pipes laid in and including trenches not exceeding 1m deep
51
6No25mm Bend (90 degrees)52
Extra over Class 12 HDPe pipes for compression fittings
6No50mm Bend (45 degrees)53
13m3
Extra over excavation for pipe trenches, chambers, etc for carting away surplus material to a dumping site to be located by the contractor
54
SUNDRIES
1NoTie into existing sewer line55
ItemTesting water pipe system56
Testing
4No9kg Dry chemical powder fire extinguisher57
FIRE APPLIANCES ETC
4No190 x 190mm ABS plastic symbolic safety sign type plugged and screwed to wall
58
HOLES ETC
-334-
Plumbing and drainage (Provisional)Bill No. 12Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
2NoThrough one brick wall faced one side59
Core drilling hole not exceeding 50mm diameter
2NoThrough one brick wall60
Core drilling hole exceeding 50mm and not exceeding 110mm diameter
-335-
Plumbing and drainage (Provisional)Bill No. 12Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 9 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 13
GLAZING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 150) unless otherwise stated
GLAZING TO ALUMINIUM WITH CLIP-ON BEADS
11m2Panes exceeding 0,1m2 and not exceeding 0,5m21
6mm Clear float glass
TOPS, SHELVES, DOORS, MIRRORS, ETC
2NoMirror 300 x 450mm high2
4mm Silvered float glass copper backed mirrors with polished edges, holed for and fixed with chromium plated dome capped mirror screws with rubber buffers to plugs in brickwork
-336-
GlazingBill No. 13Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 9 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 14
PAINTWORK
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 152) unless otherwise stated
PAINTWORK ETC TO NEW WORK
ON INTERNAL FLOATED PLASTER SURFACES
558m2Walls1
One merit plaster primer, one coat undercoat and two coats "Wall & All" or similar approved emulsion paint (colour to be approved by Client)
176m2Ceilings and cornices including priming cover strips2
ON METAL
17m2Door frames3
One coat Merit metal primer (UC501), one coat Merit Universal Undercoat (UC1) and two coats Super Universal Enamel (NY1/G) paint
-337-
PaintworkBill No. 14Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
44m2Doors4
19m2On windows with burglar bars (both sides measured) 5
21m2Welded screens6
ON WOOD SURFACES
14m2Doors7
Three coats superior quality clear gloss varnish
ON SMOOTH CONCRETE SURFACES
22m2On floors8
One coat bonding liquid, one coat primer and two coats epoxy paint for interior and exterior use, including stopping blow holes
4m2On Skirtings9
3mm Epoxy paint floor finish turned up 100mm against wall to form skirting. Applied to the manufactures recommendation.Colour to be approved
-338-
PaintworkBill No. 14Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 9 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 15
EXTERNAL WORKS (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
SUPPLEMENTARY PREAMBLES
Descriptions of earth filling, compaction, etc shall be deemed to include for all necessary testing required in accordance with the SABS 1200 series
Testing of material and filling
COVERED WALKWAY, STEPS AND RAMPS
ALTERATIONS
TEMPORARY BARRICADES, SCREENS, ETC
136m
Dust screen 2m high between concrete floor and ceiling, of suitable timber framing with 375 micron polyethylene sheeting stapled on one side, including corners, ends, etc
1
Temporary barricades, screens, roofs, etc including removal
7mEnds of one brick walls with 115mm concrete infill2
Making good face brickwork
OPENINGS THROUGH EXISTING WALLS ETC
-339-
External WorksBill No. 15Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
1NoOpening for single door with steel frame 1000 x 2000mm high overall through one brick wall
3
Breaking out for and forming openings through 335mm brick walls with 115mm concrete infill for new doors and frames, including brick lintels, making good cement plaster on one side and into reveals and face brickwork on other side and into reveals and with 20 MPa concretethresholds with steel trowelled finish (new doors and frames and making good paintwork elsewhere)
EXCAVATION, FILLING, ETC OTHER THAN BULK
EXCAVATION, ETC
34m3Reduced levels under floors4
Excavation in earth not exceeding 2m deep
5m3300 x 300 x 500mm Intermediate post base 5
Excavate in earth not exceeding 2m deep.
6m3Surplus material from excavations and/or stockpiles on site, to a dumping site to be located by the contractor
6
Extra over all excavations for carting away
6m2Sides of trench and hole excavations not exceeding 1,5m deep
7
Risk of collapse of excavations
ItemKeeping excavations free of all water other than subterranean water
8
Keeping excavations free of water
FILLING, ETC:
-340-
External WorksBill No. 15Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
32m3Under floors9
Earth filling of G6 material supplied by the contractor, compacted to 93% Mod AASHTO density
340m2
Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material where necessary and compacting to 95% Mod AASHTO density (Certificate must be provided)
10
Compaction of surfaces
WEED KILLERS, INSECTICIDES, ETC
340m2
Treat ground under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming as per clause 2.13 of specification OOG-001E with 50mm sand over poison(sand elsewhere measured, Certificate must be provided)
11
"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee
340m2Treat ground to bottoms and sides of trenches etc as described, (Certificate must be provided)
12
UNREINFORCED CONCRETE
3m3Blinding13
10Mpa/19mm unreinforced concrete
REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES
5m3Bases14
30MPa/19mm concrete
-341-
External WorksBill No. 15Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
29m3Surface beds cast in panels on waterproofing15
6.60m3
2950 x 1300 x 100mm Thick (1000mm inside & 300mm outside the fence) plinth cast in 2950mm sections with 50mm expansion gaps filled with 19/32 mm crushed stone (elsewhere measured)
16
30NoMaking and testing 150 x 150 x 150mm concrete strength test cubes (Provisional)
17
TEST BLOCKS
CONCRETE SUNDRIES
340m2Surface beds, slabs, etc18
Finishing top surfaces of concrete smooth with a wood float to a non slip surface
SMOOTH FORMWORK (DEGREE OF ACCURACY II)
81m2Edges, risers, ends and reveals exceeding 300mm high or wide
19
Smooth formwork to sides
MOVEMENT JOINTS ETC
156mNot exceeding 300mm high to edges of surface beds20
Expansion joints with 10mm bitumen impregnated softboard between vertical concrete and brick surfaces
REINFORCEMENT (PROVISIONAL)
0.894tBars not exceeding 10mm diameter21
Mild steel reinforcement to structural concrete work
2.681tBars not exceeding 20mm diameter22
High tensile steel reinforcement to structural concrete work
-342-
External WorksBill No. 15Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
341m2Type 193 fabric reinforcement23
Fabric reinforcement
BRICKWORK
SUPERSTRUCTURE
4m2One brick walls of two half brick skins with inner skin bagged and sealed
24
Corobrik Nala Travetine "FBS", pointed with flush horizontal and vertical joints on all exposed faces
2m220mm coping on top of one brick wall25
Brick-on-edge header course copings, sills, etc of "Corobrick Red Leaf Rustic" face bricks, pointed with recessed joints on all exposed faces
BRICKWORK SUNDRIES
13m150mm Wide reinforcement built in horizontally26
2.5mm Brickwork reinforcement
WATERPROOFING
DAMP PROOFING OF WALLS AND FLOORS
341m2Under surface beds and plinth27
One layer of 250 micron green polyethylene waterproof sheeting (SANS 952-1985 type C) sealed at laps with PVC self-adhesive tape
29.03m2Extra over for 400mm section of steel mesh dipped in bitumen as per detail
28
Bituminous emulsion based coating
ROOF COVERINGS, CLADDINGS, ETC
-343-
External WorksBill No. 15Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
PROFILED METAL SHEETING AND ACCESSORIES
367m2
Roof covering with pitches not exceeding 25 degrees including cranked ends not exceeding 320 degrees to form fascia not exceeding 750mm
29
0.8mm Z275 spelter galvanised corrugated steel sheets fixed to steel purlins or rails (Colour to Architects Specification)
238mMoulded narrow and broad rib polyethylene filler blocks34
STRUCTURAL STEELWORK
HOT DIPPED GALVANISED STEEL COLUMNS AND BEAMS
1.82t100 x 100mm x 15.044kg/m hot rolled square tubing columns in heights exceeding 2m and not exceeding 4m
35
Welded columns in single lengths constructed of 100 x 100 x 5mm thick mild steel square tubing with 100 x 100 x 5mm thick flat base, cap, bearer and connection plates, bolted to concrete with 250 x 16mm diameter chemical anchor bolt
HOT DIPPED GALVANISED STEEL TRUSSES
-344-
External WorksBill No. 15Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
53No
Double pitched light weight steel roof truss 2500 wide x 800mm high with roll formed U-shaped truss profile used for chords and webs, manufactured from tested and certified 0.80mm thick S550GD and galvanised Z200 coated steel assembled using a 12mm hollow core rivet including necessary truss brackets, etc
36
Lightweight steel roof trusses with flat bearer, gusset and connection plates and angle cleats, bolted to concrete
3No
Double pitched light weight steel roof truss 2600 wide x 800mm high with roll formed U-shaped truss profile used for chords and webs, manufactured from tested and certified 0.80mm thick S550GD and galvanised Z200 coated steel assembled using a 12mm hollow core rivet including necessary truss brackets, etc
37
4No
Double pitched light weight steel roof truss 4300 wide x 800mm high with roll formed U-shaped truss profile used for chords and webs, manufactured from tested and certified 0.80mm thick S550GD and galvanised Z200 coated steel assembled using a 12mm hollow core rivet including necessary truss brackets, etc
38
HOT DIPPED GALVANISED STEEL PURLINS, GIRTS, BRACING, ETC
3.55t75 x 50 x 20 x 3mm Thick galvanised cold-formed lipped channel purlins
39
Purlins and girts, bolted to steel
METALWORK
HOT DIPPED GALVANISED STRAIGHT PROFILE FENCE
-345-
External WorksBill No. 15Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
121No
3200mm High intermediate posts,101.6mm x 4.5mm straight profile tubular intermediate posts with 3000mm long 50 x 5mm flat steel cover plates, including post caps, anchors and all fixing materials and accessories tomake the installation complete all in accordance to manufacturer's recommendation and attached specification
40
Grade W300 hot dipped galvanised mild steel posts (refer to the Department of Public Works Standard Technical Specification - Perimeter Fence for Prisons May 2005 Rev01 annexed to the bid document)
HOT DIPPED GALVANISED STRAIGHT PROFILE FENCE
239m
3050 x 50 x 50 x 5mm Thick angle iron top rail including all fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification
41
High tensile Galfan Class A mesh panels manufactured in accordance with SANS 10244-2:2003 specification (refer to the Department of Public Works Standard Technical Specification - Perimeter Fence for Prisons May 2005 Rev01 annexed to the bid document)
239m
2700mm High straight profile mesh panel (Type 1), 1,4mm single skin with double vertical wires spaced at 76.2mm and all horizontal wires spaced at 12.7mm centre to centre including all break off bolts and all other fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification
42
2No
Single leaf pedestrian gate 1000m wide x 2000m high including mesh panels, two 101.6mm x 4.5mm gate posts, mesh with double vertical wires, 4mm thick
43
-346-
External WorksBill No. 15Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 9 R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
SECTION SUMMARY - S07: Visitors Entrance to Medium A
BillNo
PageNo
Amount
306Earthworks (Provisional)1
309Concrete,Formwork and Reinforcement2
311Masonry3
313Waterproofing4
315Roof Covering5
318Carpentry and Joinery6
320Ceilings,Partitions and Access Flooring7
322Ironmongery8
326Metalwork9
327Plastering10
329Tiling11
335Plumbing and drainage (Provisional)12
336Glazing13
338Paintwork14
346External Works 15
-347-
Section No. 9
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried to Final Summary R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 01
ALTERATIONS
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
Before submitting his tender the tenderer shall visit the site and satisfy himself as to the nature and extent of the work to be done and the value of the materials salvageable from the alterations. No claim for any variations of the contract sum in respect of the nature and extent of the work or of inferior or damaged materials will be entertained
View site
The contractor shall carry out the whole of the works with as little mess and noise as possible and with a minimum of disturbance to tenants in the building and to adjoining premises and their tenants. He shall provide proper protection and provide, erect and remove when directed, any temporary tarpaulins that may be necessary during the progress of the works, all to the satisfaction of the principal agent
General
-348-
AlterationsBill No. 1Section No. 10
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
The contractor will be required to take all dimensions affecting the existing buildings on the site and he will be held solely responsible for the accuracy of all such dimensions where used in the manufacture of new items (doors, windows, fittings, etc)
(CPAP WORK GROUP NO. 102) unless otherwise stated
REMOVAL OF EXISTING WORK
21m2Half brick walls1
Breaking down and removing brickwork etc
178m2One brick walls2
-349-
AlterationsBill No. 1Section No. 10
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 10 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 02
EARTHWORKS (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 104) unless otherwise stated
SITE CLEARANCE, ETC.
101m2
Digging up and removing rubbish, debris, vegetation, hedges, shrubs and trees not exceeding 200mm girth, bush, etc.
1
Site clearance
EXCAVATION, FILLING, ETC OTHER THAN BULK
EXCAVATION, ETC.
10m3Reduced levels under floors2
Excavation in earth not exceeding 2m deep
-350-
Earthworks (Provisional)Bill No. 2Section No. 10
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
10m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor
3
Extra over all excavations for carting away
ItemKeeping excavations free of all water other than subterranean water
4
Keeping excavations free of water
101m2
Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 95% Mod AASHTO density
5
Compaction of surfaces
WEED KILLERS, INSECTICIDES, ETC
101m2
Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming (Certificate must be provided)
6
"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee
-351-
Earthworks (Provisional)Bill No. 2Section No. 10
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 10 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 03
CONCRETE, FORMWORK AND REINFORCEMENT
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 110) unless otherwise stated
REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES
11m3Surface beds cast in panels on waterproofing (Aprons and V - channels)
1
30MPa/19mm concrete
2NoMaking and testing 150 x 150 x 150mm concrete strength test cubes (Provisional)
2
TEST BLOCKS
CONCRETE SUNDRIES
-352-
Concrete,Formwork and ReinforcementBill No. 3Section No. 10
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
101m2Surface bed to falls (Aprons and V - channels)3
Finishing top surfaces of concrete smooth with a wood float to a non slip surface
(CPAP WORK GROUP NO. 111) unless otherwise stated
SMOOTH FORMWORK (DEGREE OF ACCURACY II)
101mAprons and V - Channels not exceeding 300mm high4
Smooth formwork to sides
MOVEMENT JOINTS ETC
11mNot exceeding 300mm wide in Aprons and V - Channels (Provisional)
5
Expansion joints with 10mm softboard bitumen impregnated softboard between vertical concrete and brick surfaces
(CPAP WORK GROUP NO. 114) unless otherwise stated
REINFORCEMENT (PROVISIONAL)
101m2Type 193 fabric reinforcement6
Fabric reinforcement
-353-
Concrete,Formwork and ReinforcementBill No. 3Section No. 10
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 10 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 04
MASONRY
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 116) unless otherwise stated
BRICKWORK
SUPERSTRUCTURE
25m2Half brick walls in beamfilling1
Brickwork of NFP bricks in class II mortar
30m2Half brick walls 2
165m2One brick walls of two half brick skins with inner skin bagged and sealed
3
BRICKWORK SUNDRIES
-354-
MasonryBill No. 4Section No. 10
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
154m150mm Wide reinforcement built in horizontally in foundations (Provisional)
4
2,5mm Brickwork reinforcement
864m150mm Wide reinforcement built in horizontally 5
25m220mm Wide turning pieces6
Turning pieces to soffit of lintels etc
35No30 x 1,6mm Roof tie 1,5m long with one end fixed to timber and other end built into brickwork
7
Galvanised hoop iron cramps, ties, etc
FACE BRICKWORK
139m2Extra over brickwork for face brickwork 8
Corobrik Nala Travetine "FBS", pointed with flush horizontal and vertical joints on all exposed faces
25mExtra over brickwork for brick-on-edge header course lintels
9
35mFair raking cutting10
FIBRE-CEMENT WINDOW SILLS
25m15 x 150mm Wide sills set sloping and slightly projecting11
"Everite-Nutec"
-355-
MasonryBill No. 4Section No. 10
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 10 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 05
WATERPROOFING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 120) unless otherwise stated
DAMPPROOFING OF WALLS AND FLOORS
6m2Under walls1
One layer of 375 micron embossed polyethylene damp proof course (SANS 952-1985 type B)
17m2Under sills2
SEALING STRIPS, JOINT SEALANTS, ETC
11m10 x 10mm In vertical expansion joints including raking out expansion joint filler as necessary
3
Two-part grey polysulphide sealing compound including backing cord, bond breaker, primer, etc
-356-
WaterproofingBill No. 5Section No. 10
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
11m
10 x 10mm In vertical expansion joints including raking out expansion joint filler as necessary in foundations (Provisional)
4
-357-
WaterproofingBill No. 5Section No. 10
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 10 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 06
ROOF COVERINGS ETC
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 124) unless otherwise stated
PROFILED METAL SHEETING AND ACCESSORIES
138m2Roof covering with pitches not exceeding 25 degrees with side laps seam stitched
1
0.8mm Z275 spelter galvanised corrugated steel sheets fixed to timber purlins or rails (Colour to Architects Specification)
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
138m2
Insulation sheeting laid taut over purlins and fixed concurrent with roof covering with minimum 150mm stapled laps including steel straining wires at not exceeding 400mm centres and double-sided tape at edges where required
3
"Sisalation 420" heavy industrial grade aluminium foil based insulation
-359-
Roof CoveringBill No. 6Section No. 10
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 10 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 07
CARPENTRY AND JOINERY
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 126) unless otherwise stated
STRUCTURAL TIMBERWORK ETC
PLATE NAILED TIMBER ROOF TRUSS CONSTRUCTION ETC
Prefabricated roof trusses etc
Item
Prefabricated double pitched roof trusses approximately 14100mm X 8500 mm span with 800mm pitch and (7.5 degrees) with 500mm overhang on both sides for roof
1
The following in plate nailed timber roof trusses with a pitch not exceeding 27.5 degrees, from an approved supplier, delivered to site, hoisted into position, fixed and braced on timber wall plates
31m38 x 114mm Wall plates2
Sawn treated softwood grade V4
-360-
Carpentry and JoineryBill No. 7Section No. 10
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
31m38 x 228mm Gangboards3
190m50 x 76mm Purlins4
13m38 x 76mm Trimmers5
Wrought treated softwood grade V4
11m38 x 114mm Sprockets6
18m50 x 76mm Purlins7
26m2Two coats creosote "ABE Provonite" paint on exposed roof timbers and wall plates
8
SUNDRIES
79No"Teco" two way hurricane clips9
EAVES, VERGES, ETC
33m
12 x 225mm Fascia boards, including aluminium H-profile fascia joiners and fixed with hot dipped galvanised drive screws and washers (no paint) (product number 041-203 and 685-195)
10
''Everite Nutech'' Medium density fibre-cement fascia boards
22m
10 x 80 x 225mm Barge boards including aluminium H-profile barge joiners and fixed with hot dipped galvanised drive screws and washers (no paint) (product number 721-800)
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
4No
40mm Ledged and braced batten single door 813 x 2035mm high with 6mm plywood finish panel at back . 20 x 150mm middle ledged, 20 x 225mm bottom ledged and 20 x 110mm braces (D5)
12
Wrought meranti doors
7No40mm Semi solid single door 813 x 2035mm high with veneer suitable for enamel paint finish (D7)
13
FITTINGS
22No
2600 x 450 x 450mm High wrought hardwood benches with 72 x 35mm slats including 50 x 50 x 5mm angle iron framework, fixed with 8mm diameter rawl bolts
14
BENCHES
-362-
Carpentry and JoineryBill No. 7Section No. 10
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 10 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 08
CEILINGS, PARTITIONS AND ACCESS FLOORING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
"Isotherm" polyester high density 7-10kg/m3 thermbonded insulation blanket
NAILED-UP CEILINGS
24m2
1200 x 6mm thick Nutec Fibre cement ceiling board complete with "H" profilejunction strips. Fix with serrated 32mm galvanised nails to 50 x 38mm ceiling battens on edge fixed at right angles to trusses at max. 600mm centres. Treat nails and joiners with a metal primer
2
''Everite Nutec'' Fibre Cement Ceiling Board
-363-
Ceilings,Partitions and Access FlooringBill No. 8Section No. 10
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
2No
Extra over ceiling for 600 x 600mm Hinged, pressed metal ceiling trap door of 38 x 50mm S.A pine braced framing with one cross brander, covered with ceiling board and fitted flush in opening, including necessary trimmers around
3
40m
75mm Nutec fibre cement cornices as per Architect's Specification
4
Nutec Fibre Cement Cornices
SUSPENDED CEILINGS
133m2Ceilings suspended not exceeding 1 000mm below timber purlins
5
1200 x 600 x 12mm Thick PVC ceiling panel screwed to and including screw-up suspension grid
1No
Extra over ceiling 600 x 600mm trap door complete with trimmers, frame, cross branders, ceiling board, hinges, etc as described (Provisional)
6
110No
Extra over ceiling "Mitek Bracing Strap" or equal approved galvanised ceiling support straps, 40 x 6mm thick not exceeding 500mm long, fixed to ceiling grid system as per Architectural specification
7
94m L-shape suspended PVC ceiling hangars/supporters fixed to wall
8
Perimeter trim to suspended ceilings
-364-
Ceilings,Partitions and Access FlooringBill No. 8Section No. 10
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 10 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 09
IRONMONGERY
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 132) unless otherwise stated
LOCKS
7NoBathroom indicator bolt1
"Union " or similar approved
4NoFour lever upright lockset2
PHOTOLUMINESCENT SIGNS
1No150 x 150mm Sign with one pictogram (Male)3
Wall mounted photoluminescent statutory signs in 150 x 150mm modules
1No150 x 150mm Sign with one pictogram (Female)4
2No150 x 150mm Sign with one pictogram (Paraplegic)5
-365-
IronmongeryBill No. 9Section No. 10
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
1No20mm Diameter chromium plated towel rail 600mm long including end brackets, plugged
6
BATHROOM FITTINGS
4No"White" vandal proof double toilet roll holder, plugged7
1No32mm "GRDG02B" stainless steel side dogleg grab rail twice bent at 45 degree, plugged
10
11No38mm Diameter rubber door stop plugged11
SUNDRIES
-366-
IronmongeryBill No. 9Section No. 10
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 10 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 10
METALWORK
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 136) unless otherwise stated
HOT DIPPED GALVANISED PRESSED STEEL DOOR FRAMES
4NoFrame for door 813 x 2032mm high1
1.6mm Double rebated frames with one and half pair of 100mm steel butt hinges suitable for one brick walls
7NoFrame for door 813 x 2032mm high2
1.6mm Double rebated frames with one and half pair of 100mm steel butt hinges suitable for half brick walls
Refer to Window Schedule
ALUMINIUM CASEMENT WINDOWS
-367-
MetalworkBill No. 10Section No. 10
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
8NoPurpose made window, 533 x 654mm high (W06)3
Natural anodised casement window units complete with subframes, ironmongery, 4mm glass with aluminium beads, sealing, burglar bars in 25 x 25mm square tubingetc and fixing to brickwork
9NoPurpose made window, 1511 x 1245mm high (W07)4
-368-
MetalworkBill No. 10Section No. 10
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 10 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 11
PLASTERING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 142) unless otherwise stated
SCREEDS
133m240mm Thick on floors 1
1:3 Cement screeds steel floated, on concrete
INTERNAL PLASTER
254m2On walls2
Cement plaster steel trowelled, on brickwork
25m2On narrow widths3
8m5 x 40mm Flat section brass weather bar between different floor finishes (In 1 No)
4
CORNER PROTECTORS, DIVIDING STRIPS, ETC
-369-
PlasteringBill No. 11Section No. 10
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 10 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 12
TILING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
SUPPLEMENTARY PREAMBLES
Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding
Tiling described as "fixed with adhesive on power floated concrete" shall be deemed to include for approved tiling key-coat
Ceramic, porcelain, marble and granite tiles are to be fixed and grouted with suitable adhesives and grouts from the "Tal Professional" range of products as recommended by the manufacturer of the tiles
(CPAP WORK GROUP NO. 144) unless otherwise stated
FLOOR TILING
133m2On floors1
300 x 300 x 8mm Porcelain floor tiles fixed with adhesive to screed (screed elsewhere) and flush pointed with epoxy grout
-370-
TilingBill No. 12Section No. 10
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
94m2Skirting 70mm high 2
-371-
TilingBill No. 12Section No. 10
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 10 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 13
PLUMBING AND DRAINAGE (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 148) unless otherwise stated
RAINWATER DISPOSAL
32m155 x 100 x 115mm Aluminium ogee roof gutters with baked enamel finish fixed with concealed brackets
1
0,6mm Chromadek seamless gutters and rainwater pipes
4NoExtra over gutter for stopped end2
4NoExtra over gutter for outlet for 100 x 75mm pipe3
17m100 x 75mm Fluted aluminium rainwater downpipes with baked enamel finish fixed as per supplier's detail
4
4NoExtra over rainwater pipe for eaves offset 900mm projection
5
-372-
Plumbing and drainage (Provisional)Bill No. 13Section No. 10
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
4NoExtra over rainwater pipe for shoe 6
SANITARY FITTINGS
4No
White vitreous china close coupled toilet set with doubleflap toilet seat and cistern as per Architect's Specification
7
"Vaal" or equal approved by the Architect
6No
510 x 400mm White vitreous china basin with a single tap hole as per Architect's Specification
8
2No
White vitreous china Urinal complete with L.P flushing valves including fixations as per Architect's Specification
9
WASTE UNIONS ETC
6No
Chrome Pop Up Basin waste for basin with overflows as per Architect's Specification
10
"Cobra Watertech" or equal approved
6No40mm 309-40 CP anti-theft plug with spindle 11
TRAPS ETC
8No40mm 360 CP bottle trap12
"Cobra Watertech" or equal approved
TAPS, VALVES, ETC
4No15mm Stopcock13
Brass
2No20mm Stopcock14
-373-
Plumbing and drainage (Provisional)Bill No. 13Section No. 10
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
4No15mm Fullway gate valve15
2No22mm Fullway gate valve16
1No25mm Brass Ball-o-stop17
1No50mm Brass wheelvalve for HDPE pipes18
1No50mm Brass Ball-o-stop19
6No
15mm Basin tap cold water only as per Architect's Specification
20
"Stella pillar taps" equal approved
SANITARY PLUMBING
11m50mm Pipes21
uPVC soil and vent pipes
6m50mm Pipes chased into concrete surface beds22
39m
110mm Pipes laid in and including trenches not exceeding 1m deep
23
6m110mm Pipes 24
8No50mm BSP adaptor25
Extra over uPVC soil and vent pipes for fittings
8No50mm Strap on boss26
17No50mm Bend27
8No50mm Junction28
8No50mm Access bend29
8No50mm Access junction30
-374-
Plumbing and drainage (Provisional)Bill No. 13Section No. 10
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
4No50mm Two-way vent valve31
4No110mm Eccentric reducer32
4No110mm Pan connector33
9No110mm Bend34
4No110mm Reducing junction35
4No110mm Access bend36
4No110mm Access bend with anti-syphon horn37
4No110mm Access reducing junction38
4No110mm Two way vent valve39
ItemTesting waste pipe system40
Testing
WATER SUPPLIES
22m15mm Pipes41
Class 1 copper pipes with capillary couplings
11m22mm Pipes42
61No15mm Fittings43
Extra over Class1 copper pipes for capillary fittings
17No22mm Fittings44
12No15mm Flexible service pipe45
22m25mm Pipes laid in and including trenches not exceeding 1m deep
46
Class 12 HDPe pipes
-375-
Plumbing and drainage (Provisional)Bill No. 13Section No. 10
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
11m50mm Pipes laid in and including trenches not exceeding 1m deep
47
6No25mm Bend (90 degrees)48
Extra over Class 12 HDPe pipes for compression fittings
6No50mm Bend (45 degrees)49
ItemTesting water pipe system50
Testing
8m3
Extra over excavation for pipe trenches, chambers, etc for carting away surplus material to a dumping site to be located by the contractor
51
SUNDRIES
1NoTie into existing sewer line52
2No9kg Dry chemical powder fire extinguisher53
FIRE APPLIANCES ETC
2No190 x 190mm ABS plastic symbolic safety sign type plugged and screwed to wall
54
HOLES ETC
8NoThrough one brick wall faced one side55
Core drilling hole not exceeding 50mm diameter
4NoThrough one brick wall56
Core drilling hole exceeding 50mm and not exceeding 110mm diameter
-376-
Plumbing and drainage (Provisional)Bill No. 13Section No. 10
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 10 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 14
GLAZING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 150) unless otherwise stated
GLAZING TO ALUMINIUM WITH CLIP-ON BEADS
22m2Panes exceeding 0,1m2 and not exceeding 0,5m21
6mm Clear float glass
TOPS, SHELVES, DOORS, MIRRORS, ETC
6NoMirror 300 x 450mm high2
4mm Silvered float glass copper backed mirrors with polished edges, holed for and fixed with chromium plated dome capped mirror screws with rubber buffers to plugs in brickwork
-377-
GlazingBill No. 14Section No. 10
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 10 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 15
PAINTWORK
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 152) unless otherwise stated
PAINTWORK ETC TO NEW WORK
ON INTERNAL FLOATED PLASTER SURFACES
279m2Walls1
One merit plaster primer, one coat undercoat and two coats "Wall & All" or similar approved emulsion paint (colour to be approved by Client)
154m2Ceilings and cornices including priming cover strips2
ON METAL
11m2Door frames3
One coat Merit metal primer (UC501), one coat Merit Universal Undercoat (UC1) and two coats Super Universal Enamel (NY1/G) paint
-378-
PaintworkBill No. 15Section No. 10
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
22m2On windows with burglar bars (both sides measured) 4
ON WOOD SURFACES
33m2Doors5
Three coats superior quality clear gloss varnish
-379-
PaintworkBill No. 15Section No. 10
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 10 R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
SECTION SUMMARY - Waiting Area to Medium A
BillNo
PageNo
Amount
349Alterations1
351Earthworks (Provisional)2
353Concrete,Formwork and Reinforcement3
355Masonry4
357Waterproofing5
359Roof Covering6
362Carpentry and Joinery7
364Ceilings,Partitions and Access Flooring8
366Ironmongery9
368Metalwork10
369Plastering11
371Tiling12
376Plumbing and drainage (Provisional)13
377Glazing14
379Paintwork15
-380-
Section No. 10
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried to Final Summary R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 01
ALTERATIONS (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 102) unless otherwise stated
MAKING GOOD OF FINISHES ETC
6m
Chase out plaster cracks to form recess 25mm wide and 20mm deep and fill with 1:4 cement mortar including floating up smooth to match existing
1
Making good cement plaster
54m2Internal plastered walls2
Remove loose and flaking paint by scraping and sanding on walls, floors etc. to receive new paint
4m2Re-setting of suspended ceilings 3
Remedial work
-381-
AlterationsBill No. 1Section No. 11
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
36m2
Refix existing loose 0.8mm galvanised IBR roof covering to steel members with "SAFLOK 700" or equal approved clips, all in accordance with manufacturer's recommendations and specifications
4
2NoRealign 5300 x 4650mm high galvanised steel vehicle access sliding gates
5
110No"Pelican" or similar approved hold down clip for Pelican suspended ceiling systems
6
110No
"Mitek Bracing Strap" or equal approved galvanised ceiling support straps, 40 x 6mm thick not exceeding 500mm long, fixed to ceiling grid system as per Architectural specification
7
67No
Remove existing structural bolts and replace with galvanised carbon steel structural grade 8.8 M16 structural bolts or equal approved
8
10m
Remove existing grout around base plates and replace with "ABE Epidermix 372" or similar approved grout at an angle of no less than 15 degrees to the horizontal not exceeding 5mm wide and 3mm deep
9
GENERAL MAINTENANCE
81m2External face brick walls 10
Power wash existing surfaces to remove all dirt, grime and loose particles
19m2Corrugated roof coverings11
ItemExisting building including floors, walls, windows, doors, frames, etc
12
Clean down with suitable detergent and rinse thoroughly with clean water
-382-
AlterationsBill No. 1Section No. 11
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 11 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 02
EARTHWORKS (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 104) unless otherwise stated
28m2
Digging up and removing rubbish, debris, vegetation, hedges, shrubs and trees not exceeding 200mm girth, bush, etc.
1
SITE CLEARANCE, ETC.
-383-
Earthworks (Provisional)Bill No. 2Section No. 11
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 11 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 03
CONCRETE, FORMWORK AND REINFORCEMENT
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 110) unless otherwise stated
REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES
0.3m3Steps1
30MPa/19mm concrete
2NoMaking and testing 150 x 150 x 150mm concrete strength test cubes (Provisional)
2
TEST BLOCKS
(CPAP WORK GROUP NO. 111) unless otherwise stated
SMOOTH FORMWORK (DEGREE OF ACCURACY II)
-384-
Concrete,Formwork and ReinforcementBill No. 3Section No. 11
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
2m2Steps3
Smooth formwork to sides
(CPAP WORK GROUP NO. 114) unless otherwise stated
REINFORCEMENT (PROVISIONAL)
0.034tBars not exceeding 10mm diameter4
Mild steel reinforcement to structural concrete work
0.103tBars not exceeding 20mm diameter5
High tensile steel reinforcement to structural concrete work
-385-
Concrete,Formwork and ReinforcementBill No. 3Section No. 11
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 11 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 04
MASONRY
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 116) unless otherwise stated
FACE BRICKWORK
6mExtra over brickwork for brick-on-edge header course lintels 2 courses high, pointed on face and 220mm soffit
1
Corobrik Nala Travetine "FBS", pointed with flush horizontal and vertical joints on all exposed faces
-386-
MasonryBill No. 4Section No. 11
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 11 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 05
WATERPROOFING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 120) unless otherwise stated
WATERPROOFING TO ROOFS ETC
6m2On parapet walls1
One layer 4mm special polyester fully bonded waterproof membrane comprising a matrix modified with polypropylene dual reinforced with non-woven polyester cloth and glass fibre tissue, laid with 75mm side and 100mm end laps
-387-
WaterproofingBill No. 5Section No. 11
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 11 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 06
CEILINGS, PARTITIONS AND ACCESS FLOORING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 129) unless otherwise stated
CEILING TIMBERS, BEADS, INSULATION, ETC
19m2120mm Thick insulation fitted above ceilings1
"Isotherm" polyester high density 7-10kg/m3 thermbonded insulation blanket
SUSPENDED CEILINGS
4m2Ceilings suspended not exceeding 1 000mm below timber purlins in patches
2
1200 x 600 x 12mm Thick PVC ceiling panel screwed to and including screw-up suspension grid
-388-
Ceilings,Partitions and Access FlooringBill No. 6Section No. 11
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
4mL-shape suspended PVC ceiling hangars/supporters fixed to wall
3
Perimeter trim to suspended ceilings
-389-
Ceilings,Partitions and Access FlooringBill No. 6Section No. 11
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 11 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 07
IRONMONGERY
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 132) unless otherwise stated
1No
"Parrot" or similar approved pinning board 1000 x 1000mm high with green pinning material and aluminium frame, plugged
1No20mm Diameter chromium plated towel rail 600mm long including end brackets, plugged
2
BATHROOM FITTINGS
1No"White" vandal proof double toilet roll holder, plugged3
1NoChromium plated coat hook, plugged4
2No38mm Diameter rubber door stop plugged5
SUNDRIES
-390-
IronmongeryBill No. 7Section No. 11
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 11 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 08
METALWORK
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 136) unless otherwise stated
GALVANISED STEEL GATES, SCREENS, ETC
HOT DIPPED GALVANISED STRAIGHT PROFILE FENCE
6m
3050 x 50 x 50 x 5mm Thick angle iron top rail including all fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification
1
High tensile Galfan Class A mesh panels manufactured in accordance with SANS 10244-2:2003 specification (refer to the Department of Public Works Standard Technical Specification - Perimeter Fence for Prisons May 2005 Rev01 annexed to the bid document)
-391-
MetalworkBill No. 8Section No. 11
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
6m
5000 x 3050mm Wide straight profile mesh panel (Type 1), 1,4mm single skin with double vertical wires spaced at 76.2mm and all horizontal wires spaced at 12.7mm centre to centre including all break off bolts and all other fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification
2
HOT DIPPED GALVANISED STEEL MINOR WORK
2NoGoose neck post 1200mm high including base plates, fittings etc. with necessary provisions for intercom
3
Galvanised hot dipped mild steel posts including base plate, fittings etc.
11mU-shaped guide rail of 35 x 35 x 5mm u-channel section4
Fixing accessories for 6000 x 4000mm high steel gate
HOT DIPPED GALVANISED STEEL GATE CRAWLERS
4No
Heavy duty gate crawlers suitable for gate size 6000 x 4000mm high including all fittings installed on gates attached to crawl beams as per engineers specification
5
Purpose made gate crawlers as per engineers specification
HOT DIPPED GALVANISED STEEL BOLLARDS
13No
220mm Diameter galvanised mild steel "high impact" bollard, 1500mm total height, 1000mm height above ground with concrete infill laid in and including 500 x 500 x 550m deep 30mpa concrete base
6
"SA Bollards High Impact Bollard" or similar approved
-392-
MetalworkBill No. 8Section No. 11
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 11 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 09
PLUMBING AND DRAINAGE (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 148) unless otherwise stated
RAINWATER DISPOSAL
4m155 x 100 x 115mm Aluminium ogee roof gutters with baked enamel finish fixed with concealed brackets
1
0,6mm Chromadek seamless gutters and rainwater pipes
2NoExtra over gutter for stopped end2
2NoExtra over gutter for outlet for 100 x 75mm pipe3
5m100 x 75mm Fluted aluminium rainwater downpipes with baked enamel finish fixed as per supplier's detail
4
2NoExtra over rainwater pipe for eaves offset 900mm projection
5
-393-
Plumbing and drainage (Provisional)Bill No. 9Section No. 11
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
2NoExtra over rainwater pipe for shoe 6
SANITARY PLUMBING
2m50mm Pipes7
uPVC soil and vent pipes
1m50mm Pipes chased into concrete surface beds8
2m
110mm Pipes laid in and including trenches not exceeding 1m deep
9
1m110mm Pipes 10
1No50mm Bend11
Extra over uPVC soil and vent pipes for fittings
1No50mm Access bend12
1No50mm Rodding eye13
1No110mm Bend14
1No110mm Access bend15
6No4.5kg Dry chemical powder fire extinguisher16
FIRE APPLIANCES ETC
6No190 x 190mm ABS plastic symbolic safety sign plugged and screwed to wall
17
-394-
Plumbing and drainage (Provisional)Bill No. 9Section No. 11
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 11 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 10
GLAZING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 150) unless otherwise stated
GLAZING TO ALUMINIUM WITH CLIP-ON BEADS
1m2Panes exceeding 0,1m2 and not exceeding 0,5m21
4mm Clear float glass with aluminium beads
TOPS, SHELVES, DOORS, MIRRORS, ETC
1NoMirror 300 x 450mm high2
4mm Silvered float glass copper backed mirrors with polished edges, holed for and fixed with chromium plated dome capped mirror screws with rubber buffers to plugs in brickwork
-395-
GlazingBill No. 10Section No. 11
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 11 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 11
PAINTWORK
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
All painting shall be done in accordance with the Architects specifications and condition assessment reports unless otherwise described
PAINT SPECIFICATIONS
(CPAP WORK GROUP NO. 152) unless otherwise stated
PAINTWORK ETC TO EXISTING SURFACES
ON EXTERNAL FLOATED PLASTER SURFACES
37m2Parapet walls1
One merit plaster primer, one coat undercoat and two coats Wall & All emulsion paint (colour to be approved by Client)
ON INTERNAL FLOATED PLASTER SURFACES
-396-
PaintworkBill No. 11Section No. 11
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
54m2Walls2
One merit plaster primer, one coat undercoat and two coats Wall & All emulsion paint (colour to be approved by Client)
-397-
PaintworkBill No. 11Section No. 11
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 11 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 12
EXTERNAL WORKS (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
SUPPLEMENTARY PREAMBLES
Descriptions of earth filling, compaction, etc shall be deemed to include for all necessary testing required in accordance with the SABS 1200 series
Testing of material and filling
(CPAP WORK GROUP NO. 154) unless otherwise stated
ROADWORKS AND PARKING
EXCAVATION, FILLING, ETC OTHER THAN BULK
EXCAVATIONS ETC
66m3Over site between buildings, etc to reduce levels and dispose in prescribed stock piles on site
1
Excavation in earth not exceeding 2m deep
12m3Soft rock2
Extra over excavation in earth for excavation in
-398-
External WorksBill No. 12Section No. 11
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
4m3Hard rock3
66m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor
4
Extra over all excavations for carting away
ItemKeeping excavations free of water other than subterranean water
5
Keeping excavations free of water
LAYER WORK
19m3
Sub-grade course of 150mm thick of G1 crusher run material compacted to 88% Mod AASHTO density
6
Earth filling supplied by the contractor under parking areas, roadways, etc
19m3
Base course of 150mm thick of C4 (G5 gravel material) stabilised with 3% cement compacted to 97% Mod AASHTO density
7
6m3Under floors etc8
Coarse river sand filling supplied by the contractor
125m2
Compaction of ground surfaces under roadworks etc, including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density (Roadbed)
9
Compaction of surfaces
WEED KILLERS, INSECTICIDES, ETC
-399-
External WorksBill No. 12Section No. 11
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
125m2
Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming (Certificate must be provided)
10
"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee
PAVING
96m2Paving to roadworks and parking areas to falls11
80mm thick 30MPa precast concrete grey interlocking block paving blocks in accordance with SANS 1058, laid to falls on and including 25mm thick sand layer with joints filled in with sand, compacted with a vibration compactor
28m2Paving to aprons12
50mm thick 30MPa precast concrete grey interlocking block paving blocks in accordance with SANS 1058, laid to falls on and including 25mm thick sand layer with joints filled in with sand, compacted with a vibration compactor
-400-
External WorksBill No. 12Section No. 11
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 11 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 13
ELECTRICAL INSTALLATION
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 160) unless otherwise stated
ACCESS CONTROL
2NoVehicle boom gate and spike barrier 1
ACCESS BARRIERS
2NoSpike boom barrier extension 2
2NoTwo button remotes to operate claws and boom to be handed to the Area Commissioner
3
2NoTemporary switch fixed to Guards Office for claw and boom operation
4
2No
Two way red and green, 12V DC Traffic light Unit including wall mounted brackets (SS), harness and interface relay
5
-401-
ElectricalBill No. 13Section No. 11
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
2No
D10 Industrial gate motor including tracks, break sensor, impact sensor, burglar proof case, anti-theft brackets etc. to make installation complete
6
"Centurion" or similar or equal approved
ItemMake the necessary provisions for access barriers to be controlled from the Main Control Room
7
Provision of service infrastructure for future installations
-402-
ElectricalBill No. 13Section No. 11
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 11 R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
SECTION SUMMARY - S08: Sally Port to Medium A
BillNo
PageNo
Amount
382Alterations1
383Earthworks (Provisional)2
385Concrete,Formwork and Reinforcement3
386Masonry4
387Waterproofing5
389Ceilings,Partitions and Access Flooring6
390Ironmongery7
392Metalwork8
394Plumbing and drainage (Provisional)9
395Glazing10
397Paintwork11
400External Works12
402Electrical13
-403-
Section No. 11
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried to Final Summary R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 01
ALTERATIONS (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 102) unless otherwise stated
REMOVAL OF EXISTING WORK
4m2One brick walls1
Breaking down and removing brickwork etc
8m240mm Screed from floors2
Hacking up/off and removing granolithic, screeds, plaster, etc from concrete or brickwork and preparing surfaces for new screed, plaster, tile finishes, etc
8m2Tiles to floors3
Hacking up/off and removing ceramic tiles including removing mortar bed or adhesive from concrete or brickwork and preparing surfaces for new screed, plaster, tile finish, etc
-404-
AlterationsBill No. 1Section No. 12
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BUILDING UP OPENINGS
7m2One brick walls4
Brickwork in NFP bricks in class II mortar in building up openings
MAKING GOOD OF FINISHES ETC
4mEnds of one brick walls5
Making good face brickwork
6m
Chase out crack in top of surface bed to form groove 100mm wide and 50mm deep and fill in with 3:1 cement mortar well caulked, including finishing smooth with a steel trowel to match existing levels
6
Making good concrete floors
22m
Chase out plaster cracks to form recess 25mm wide and 20mm deep and fill with 1:4 cement mortar including floating up smooth to match existing
7
Making good cement plaster
54m2Internal plastered walls8
Remove loose and flaking paint by scraping and sanding on walls, floors etc. to receive new paint
9m2Re-setting of suspended ceilings 9
Remedial work
71m2
Refix existing loose 0.8mm galvanised IBR roof covering to steel members with "SAFLOK 700" or equal approved clips, all in accordance with manufacturer's recommendations and specifications
10
2NoRealign 5300 x 4650mm high galvanised steel vehicle access sliding gates
11
-405-
AlterationsBill No. 1Section No. 12
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
110No"Pelican" or similar approved hold down clip for Pelican suspended ceiling systems
12
110No
"Mitek Bracing Strap" or equal approved galvanised ceiling support straps, 40 x 6mm thick not exceeding 500mm long, fixed to ceiling grid system as per Architectural specification
13
107No
Remove existing structural bolts and replace with galvanised carbon steel structural grade 8.8 M16 structural bolts or equal approved
14
16m
Remove existing grout around base plates and replace with "ABE Epidermix 372" or similar approved grout at an angle of no less than 15 degrees to the horizontal not exceeding 5mm wide and 3mm deep
15
GENERAL MAINTENANCE
252m2External face brick walls 16
Power wash existing surfaces to remove all dirt, grime and loose particles
68m2Corrugated roof coverings17
ItemExisting building including floors, walls, windows, doors, frames, etc
18
Clean down with suitable detergent and rinse thoroughly with clean water
-406-
AlterationsBill No. 1Section No. 12
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 12 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 02
EARTHWORKS (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 104) unless otherwise stated
SITE CLEARANCE, ETC.
74m2
Digging up and removing rubbish, debris, vegetation, hedges, shrubs and trees not exceeding 200mm girth, bush, etc.
1
Site clearance
EXCAVATION, FILLING, ETC OTHER THAN BULK
EXCAVATION, ETC.
5m3Trenches2
Excavation in earth not exceeding 2m deep
1m3Bases3
-407-
Earthworks (Provisional)Bill No. 2Section No. 12
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
1m3Soft rock4
Extra over trench and hole excavations in earth for excavation in
0.3m3Hard rock5
2m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor
6
Extra over all excavations for carting away
10m2Sides of trench and hole excavations not exceeding 1,5m deep
7
Risk of collapse of excavations
ItemKeeping excavations free of all water other than subterranean water
8
Keeping excavations free of water
FILLING ETC
2m3Backfilling to trenches, holes, etc9
Earth filling obtained from the excavations and/or prescribed stock piles on site, compacted to 95% Mod AASHTO density
2m3G6 Material under floors10
Earth filling of approved clean earth supplied by the contractor, compacted to 95% Mod AASHTO density
13m2
Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 95% Mod AASHTO density
11
Compaction of surfaces
WEED KILLERS, INSECTICIDES, ETC
-408-
Earthworks (Provisional)Bill No. 2Section No. 12
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
13m2
Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming (Certificate must be provided)
12
"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee
25m2To bottoms and sides of trenches etc (Certificate must be provided)
13
-409-
Earthworks (Provisional)Bill No. 2Section No. 12
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 12 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 03
CONCRETE, FORMWORK AND REINFORCEMENT
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 110) unless otherwise stated
REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES
2m3Strip footings1
30MPa/19mm concrete
1m3Bases2
1m3Ramps3
0.3m3Steps4
9NoMaking and testing 150 x 150 x 150mm concrete strength test cubes (Provisional)
5
TEST BLOCKS
-410-
Concrete,Formwork and ReinforcementBill No. 3Section No. 12
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
CONCRETE SUNDRIES
13m2Surface beds, slabs, etc6
Finishing top surfaces of concrete smooth with a wood float
(CPAP WORK GROUP NO. 111) unless otherwise stated
SMOOTH FORMWORK (DEGREE OF ACCURACY II)
2m2Steps7
Smooth formwork to sides
MOVEMENT JOINTS ETC
3mNot exceeding 300mm wide 8
Expansion joints with 10mm softboard bitumen impregnated softboard between vertical concrete and brick surfaces
(CPAP WORK GROUP NO. 114) unless otherwise stated
REINFORCEMENT (PROVISIONAL)
0.261tBars not exceeding 10mm diameter9
Mild steel reinforcement to structural concrete work
0.784tBars not exceeding 20mm diameter10
High tensile steel reinforcement to structural concrete work
13m2Type 193 fabric reinforcement11
Fabric reinforcement
-411-
Concrete,Formwork and ReinforcementBill No. 3Section No. 12
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 12 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 04
MASONRY
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 116) unless otherwise stated
BRICKWORK
FOUNDATIONS (PROVISIONAL)
6m2One brick walls1
Brickwork of NFX bricks (14 MPa nominal compressive strength) in class II mortar (Corobrik engineering bricks)
BRICKWORK SUNDRIES
70m150mm Wide reinforcement built in horizontally in foundations (Provisional)
2
2,5mm Brickwork reinforcement
84m150mm Wide reinforcement built in horizontally 3
-412-
MasonryBill No. 4Section No. 12
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
FACE BRICKWORK
6m2Extra over brickwork for face brickwork in foundations (Provisional)
4
Corobrik Nala Travetine "FBS", pointed with flush horizontal and vertical joints on all exposed faces
28m2Extra over brickwork for face brickwork 5
-413-
MasonryBill No. 4Section No. 12
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 12 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 05
WATERPROOFING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 120) unless otherwise stated
DAMPPROOFING OF WALLS AND FLOORS
3m2Under walls1
One layer of 375 micron embossed polyethylene damp proof course (SANS 952-1985 type B)
13m2Under surface beds2
One layer of 250 micron green polyethylene waterproof sheeting (SANS 952-1985 type C) sealed at laps with PVC self-adhesive tape
WATERPROOFING TO ROOFS ETC
-414-
WaterproofingBill No. 5Section No. 12
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
18m2On parapet walls3
One layer 4mm special polyester fully bonded waterproof membrane comprising a matrix modified with polypropylene dual reinforced with non-woven polyester cloth and glass fibre tissue, laid with 75mm side and 100mm end laps
SEALING STRIPS, JOINT SEALANTS, ETC
5m10 x 10mm In vertical expansion joints including raking out expansion joint filler as necessary
4
Two-part grey polysulphide sealing compound including backing cord, bond breaker, primer, etc
-415-
WaterproofingBill No. 5Section No. 12
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 12 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 06
ROOF COVERINGS ETC
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 124) unless otherwise stated
PROFILED METAL SHEETING AND ACCESSORIES
13m2Roof covering with pitches not exceeding 25 degrees1
0.8mm Z275 spelter galvanised corrugated steel sheets fixed to timber purlins or rails (Colour to Architectural Specification)
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 07
CARPENTRY AND JOINERY
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 126) unless otherwise stated
STRUCTURAL TIMBERWORK ETC
EAVES, VERGES, ETC
6m
12 x 225mm Fascia boards, including aluminium H-profile fascia joiners and fixed with hot dipped galvanised drive screws and washers (no paint) (product number 041-203 and 685-195)
1
''Everite Nutech'' Medium density fibre-cement fascia boards
FITTINGS
SHELVING
-417-
Carpentry and JoineryBill No. 7Section No. 12
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
8m600 x 25mm Timber shelf2
400mm Deep varnished meranti timber shelf on 38 x 38mm meranti timber wall brackets plugged to walls including edges sealed with clear silicone sealant
-418-
Carpentry and JoineryBill No. 7Section No. 12
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 12 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 08
CEILINGS, PARTITIONS AND ACCESS FLOORING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 129) unless otherwise stated
CEILING TIMBERS, BEADS, INSULATION, ETC
75m2120mm Thick insulation fitted above ceilings1
"Isotherm" polyester high density 7-10kg/m3 thermbonded insulation blanket
SUSPENDED CEILINGS
14m2Ceilings suspended not exceeding 1 000mm below timber purlins in patches
2
1200 x 600 x 12mm Thick PVC ceiling panel screwed to and including screw-up suspension grid
-419-
Ceilings,Partitions and Access FlooringBill No. 8Section No. 12
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
24mL-shape suspended PVC ceiling hangars/supporters fixed to wall
3
Perimeter trim to suspended ceilings
-420-
Ceilings,Partitions and Access FlooringBill No. 8Section No. 12
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 12 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 09
IRONMONGERY
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 132) unless otherwise stated
1No
Electromagnetic door lock for security door with temporary control switch fixed to wall not exceeding 10m, as per ironmongery schedule. Provisions to be made for control from the Main Control Room (elsewhere measured)
1
LOCKS
8No20mm Diameter stainless steel curtain rod fixed to wall2
PELMETS AND CURTAIN TRACKS
1No
"Parrot" or similar approved pinning board 1000 x 1000mm high with green pinning material and aluminium frame, plugged
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
1No20mm Diameter chromium plated towel rail 600mm long including end brackets, plugged
4
BATHROOM FITTINGS
1No"White" vandal proof double toilet roll holder, plugged5
1NoChromium plated coat hook, plugged6
3No38mm Diameter rubber door stop plugged7
SUNDRIES
-422-
IronmongeryBill No. 9Section No. 12
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 12 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 10
STRUCTURAL STEEL (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
STRUCTURAL STEELWORK
(CPAP WORK GROUP NO. 134) unless otherwise stated
GALVANISED STEEL COLUMNS AND BEAMS
0.73t100 x 100mm x 15.044kg/m hot rolled square tubing columns in heights exceeding 2m and not exceeding 4m
1
Welded columns in single lengths constructed of 100 x 100 x 5mm thick mild steel square tubing with 100 x 100 x 5mm thick flat base, cap, bearer and connection plates, bolted to concrete with 250 x 16mm diameter chemical anchor bolt
GALVANISED STEEL PURLINS, GIRTS, BRACING, ETC
-423-
Structural SteelBill No. 10Section No. 12
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
0.13t75 x 50 x 20 x 3mm Thick galvanised cold-formed lipped channel purlins
2
Purlins and girts, bolted to steel
-424-
Structural SteelBill No. 10Section No. 12
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 12 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 11
METALWORK
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 136) unless otherwise stated
GALVANISED STEEL GATES, SCREENS, ETC
HOT DIPPED GALVANISED STRAIGHT PROFILE FENCE
6m
3050 x 50 x 50 x 5mm Thick angle iron top rail including all fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification
1
High tensile Galfan Class A mesh panels manufactured in accordance with SANS 10244-2:2003 specification (refer to the Department of Public Works Standard Technical Specification - Perimeter Fence for Prisons May 2005 Rev01 annexed to the bid document)
-425-
MetalworkBill No. 11Section No. 12
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
6m
5000 x 3050mm Wide straight profile mesh panel (Type 1), 1,4mm single skin with double vertical wires spaced at 76.2mm and all horizontal wires spaced at 12.7mm centre to centre including all break off bolts and all other fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification
2
HOT DIPPED GALVANISED STEEL MINOR WORK
2NoGoose neck post 1200mm high including base plates, fittings etc. with necessary provisions for intercom
3
Galvanised hot dipped mild steel posts including base plate, fittings etc.
11mU-shaped guide rail of 35 x 35 x 5mm u-channel section4
Fixing accessories for 6000 x 4000mm high steel gate
HOT DIPPED GALVANISED STEEL GATE CRAWLERS
4No
Heavy duty gate crawlers suitable for gate size 6000 x 4000mm high including all fittings installed on gates attached to crawl beams as per engineers specification
5
Purpose made gate crawlers as per engineers specification
HOT DIPPED GALVANISED STEEL BOLLARDS
13No
220mm Diameter galvanised mild steel "high impact" bollard, 1500mm total height, 1000mm height above ground with concrete infill laid in and including 500 x 500 x 550m deep 30mpa concrete base
6
"SA Bollards High Impact Bollard" or similar approved
STAINLESS STEEL MINOR WORK
TURNSTILE
-426-
MetalworkBill No. 11Section No. 12
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
1No2180 x 2250mm High double three arm turnstile7
"Type 316" stainless steel "Saturn" finish double three arm turnstiles fitted to "Type 316"stainless steel framework including provision for biometric operated lock and reader on frame
-427-
MetalworkBill No. 11Section No. 12
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 12 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 12
PLASTERING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 142) unless otherwise stated
SCREEDS
17m240mm Thick on floors 1
1:3 Cement screeds steel floated, on concrete
8m250mm Thick on floors 2
INTERNAL PLASTER
31m2On walls in patches3
Cement plaster steel trowelled, on brickwork
-428-
PlasteringBill No. 12Section No. 12
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
3m
50 x 50 x 3mm L-section galvanised mild steel dividing strips between differing floor finishes fixed with galvanised M10 bolts
4
CORNER PROTECTORS, DIVIDING STRIPS, ETC
-429-
PlasteringBill No. 12Section No. 12
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 12 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 13
TILING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
SUPPLEMENTARY PREAMBLES
Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding
Tiling described as "fixed with adhesive on power floated concrete" shall be deemed to include for approved tiling key-coat
Ceramic, porcelain, marble and granite tiles are to be fixed and grouted with suitable adhesives and grouts from the "Tal Professional" range of products as recommended by the manufacturer of the tiles
(CPAP WORK GROUP NO. 144) unless otherwise stated
FLOOR TILING
25m2On floors in patches1
300 x 300 x 8mm Porcelain floor tiles fixed with adhesive to screed (screed elsewhere) and flush pointed with epoxy grout
-430-
TilingBill No. 13Section No. 12
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
28mSkirting 70mm high 2
-431-
TilingBill No. 13Section No. 12
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 12 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 14
PLUMBING AND DRAINAGE (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 148) unless otherwise stated
RAINWATER DISPOSAL
17m155 x 100 x 115mm Aluminium ogee roof gutters with baked enamel finish fixed with concealed brackets
1
0,6mm Chromadek seamless gutters and rainwater pipes
4NoExtra over gutter for stopped end2
4NoExtra over gutter for outlet for 100 x 75mm pipe3
11m100 x 75mm Fluted aluminium rainwater downpipes with baked enamel finish fixed as per supplier's detail
4
4NoExtra over rainwater pipe for eaves offset 900mm projection
5
-432-
Plumbing and drainage (Provisional)Bill No. 14Section No. 12
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
4NoExtra over rainwater pipe for shoe 6
1No4.5kg Dry chemical powder fire extinguisher7
FIRE APPLIANCES ETC
1No4.5kg Carbon dioxide fire extinguisher8
19No190 x 190mm ABS plastic symbolic safety sign plugged and screwed to wall
9
-433-
Plumbing and drainage (Provisional)Bill No. 14Section No. 12
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 12 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 15
GLAZING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 150) unless otherwise stated
GLAZING TO ALUMINIUM WITH CLIP-ON BEADS
1m2Panes exceeding 0,1m2 and not exceeding 0,5m21
4mm Clear float glass with aluminium beads
TOPS, SHELVES, DOORS, MIRRORS, ETC
1NoMirror 300 x 450mm high2
4mm Silvered float glass copper backed mirrors with polished edges, holed for and fixed with chromium plated dome capped mirror screws with rubber buffers to plugs in brickwork
-434-
GlazingBill No. 15Section No. 12
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 12 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 16
PAINTWORK
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
All painting shall be done in accordance with the Architects specifications and condition assessment reports unless otherwise described
PAINT SPECIFICATIONS
(CPAP WORK GROUP NO. 152) unless otherwise stated
PAINTWORK ETC TO EXISTING SURFACES
ON EXTERNAL FLOATED PLASTER SURFACES
96m2Parapet walls1
One merit plaster primer, one coat undercoat and two coats Wall & All emulsion paint (colour to be approved by Client)
ON INTERNAL FLOATED PLASTER SURFACES
-435-
PaintworkBill No. 16Section No. 12
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
293m2Walls2
One merit plaster primer, one coat undercoat and two coats Wall & All emulsion paint (colour to be approved by Client)
ON METAL SURFACES
5m2Security door3
One coat self etching primer and two coats premium quality polyurethane enamel paint, on galvanised steel. Prepare and treat with anti rust compound suitable for coastal conditions
-436-
PaintworkBill No. 16Section No. 12
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 12 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 17
EXTERNAL WORKS (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
SUPPLEMENTARY PREAMBLES
Descriptions of earth filling, compaction, etc shall be deemed to include for all necessary testing required in accordance with the SABS 1200 series
Testing of material and filling
(CPAP WORK GROUP NO. 154) unless otherwise stated
ROADWORKS AND PARKING
EXCAVATION, FILLING, ETC OTHER THAN BULK
EXCAVATIONS ETC
107m3Over site between buildings, etc to reduce levels and dispose in prescribed stock piles on site
1
Excavation in earth not exceeding 2m deep
20m3Soft rock2
Extra over excavation in earth for excavation in
-437-
External WorksBill No. 17Section No. 12
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
7m3Hard rock3
107m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor
4
Extra over all excavations for carting away
ItemKeeping excavations free of water other than subterranean water
5
Keeping excavations free of water
LAYER WORK
30m3
Sub-grade course of 150mm thick of G1 crusher run material compacted to 88% Mod AASHTO density
6
Earth filling supplied by the contractor under parking areas, roadways, etc
30m3
Base course of 150mm thick of C4 (G5 gravel material) stabilised with 3% cement compacted to 97% Mod AASHTO density
7
10m3Under floors etc8
Coarse river sand filling supplied by the contractor
202m2
Compaction of ground surfaces under roadworks etc, including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density (Roadbed)
9
Compaction of surfaces
WEED KILLERS, INSECTICIDES, ETC
-438-
External WorksBill No. 17Section No. 12
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
202m2
Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming (Certificate must be provided)
10
"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee
PAVING
128m2Paving to roadworks and parking areas to falls11
80mm thick 30MPa precast concrete grey interlocking block paving blocks in accordance with SANS 1058, laid to falls on and including 25mm thick sand layer with joints filled in with sand, compacted with a vibration compactor
74m2Paving to aprons12
50mm thick 30MPa precast concrete grey interlocking block paving blocks in accordance with SANS 1058, laid to falls on and including 25mm thick sand layer with joints filled in with sand, compacted with a vibration compactor
-439-
External WorksBill No. 17Section No. 12
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 12 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 18
ELECTRICAL INSTALLATION
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 160) unless otherwise stated
ACCESS CONTROL
2NoVehicle boom gate and spike barrier 1
ACCESS BARRIERS
2NoSpike boom barrier extension 2
2NoTwo button remotes to operate claws and boom to be handed to the Area Commissioner
3
2NoTemporary switch fixed to Guards Office for claw and boom operation
4
2No
Two way red and green, 12V DC Traffic light Unit including wall mounted brackets (SS), harness and interface relay
5
-440-
ElectricalBill No. 18Section No. 12
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
2No
D10 Industrial gate motor including tracks, break sensor, impact sensor, burglar proof case, anti-theft brackets etc. to make installation complete
6
"Centurion" or similar or equal approved
Item
Make the necessary provisions for security door electromagnetic door locks to be controlled from the Main Control Room
7
Provision of service infrastructure for future installations
ItemMake the necessary provisions for access barriers to be controlled from the Main Control Room
8
-441-
ElectricalBill No. 18Section No. 12
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 12 R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
SECTION SUMMARY - S09: Work Teams Outlet to Medium A
BillNo
PageNo
Amount
406Alterations1
409Earthworks (Provisional)2
411Concrete,Formwork and Reinforcement3
413Masonry4
415Waterproofing5
416Roof Covering6
418Carpentry and Joinery7
420Ceilings,Partitions and Access Flooring8
422Ironmongery9
424Structural Steel10
427Metalwork11
429Plastering12
431Tiling13
433Plumbing and drainage (Provisional)14
434Glazing15
436Paintwork16
439External Works17
441Electrical18
-442-
Section No. 12
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried to Final Summary R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 01
ALTERATIONS (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 102) unless otherwise stated
REMOVAL OF EXISTING WORK
76m2Corrugated steel roof covering including ridge capping, etc
1
Taking down and removing roofs, floors, panelling, ceilings, partitions, etc
14m2Internal plaster from walls and columns2
Hacking up/off and removing granolithic, screeds, plaster, etc from concrete or brickwork and preparing surfaces for new screed, plaster, tile finishes, etc
8m240mm Screed from floors3
-443-
AlterationsBill No. 1Section No. 13
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
8m2Tiles to floors4
Hacking up/off and removing ceramic tiles including removing mortar bed or adhesive from concrete or brickwork and preparing surfaces for new screed, plaster, tile finish, etc
1PairsHandles5
Carefully taking out and removing existing ironmongery and set aside for re-use
1NoLocksets6
2NoHinges7
BUILDING UP OPENINGS
7m2One brick walls8
Brickwork in NFP bricks in class II mortar in building up openings
MAKING GOOD OF FINISHES ETC
6m
Chase out crack in top of surface bed to form groove 100mm wide and 50mm deep and fill in with 3:1 cement mortar well caulked, including finishing smooth with a steel trowel to match existing levels
9
Making good concrete floors
14m2On walls in patches10
Making good cement plaster
39m
Chase out plaster cracks to form recess 25mm wide and 20mm deep and fill with 1:4 cement mortar including floating up smooth to match existing
11
54m2Internal plastered walls12
Remove loose and flaking paint by scraping and sanding on walls, floors etc. to receive new paint
-444-
AlterationsBill No. 1Section No. 13
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
14m2Re-setting of suspended ceilings 13
Remedial work
71m2
Refix existing loose 0.8mm galvanised IBR roof covering to steel members with "SAFLOK 700" or equal approved clips, all in accordance with manufacturer's recommendations and specifications
14
2NoRealign 5300 x 4650mm high galvanised steel vehicle access sliding gates
15
110No"Pelican" or similar approved hold down clip for Pelican suspended ceiling systems
16
110No
"Mitek Bracing Strap" or equal approved galvanised ceiling support straps, 40 x 6mm thick not exceeding 500mm long, fixed to ceiling grid system as per Architectural specification
17
107No
Remove existing structural bolts and replace with galvanised carbon steel structural grade 8.8 M16 structural bolts or equal approved
18
16m
Remove existing grout around base plates and replace with "ABE Epidermix 372" or similar approved grout at an angle of no less than 15 degrees to the horizontal not exceeding 5mm wide and 3mm deep
19
GENERAL MAINTENANCE
252m2External face brick walls 20
Power wash existing surfaces to remove all dirt, grime and loose particles
68m2Corrugated roof coverings21
ItemExisting building including floors, walls, windows, doors, frames, etc
22
Clean down with suitable detergent and rinse thoroughly with clean water
-445-
AlterationsBill No. 1Section No. 13
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 13 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 02
EARTHWORKS (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 104) unless otherwise stated
SITE CLEARANCE, ETC.
74m2
Digging up and removing rubbish, debris, vegetation, hedges, shrubs and trees not exceeding 200mm girth, bush, etc.
1
Site clearance
EXCAVATION, FILLING, ETC OTHER THAN BULK
EXCAVATION, ETC.
3m3Trenches2
Excavation in earth not exceeding 2m deep
1m3Bases3
-446-
Earthworks (Provisional)Bill No. 2Section No. 13
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
0.4m3Soft rock4
Extra over trench and hole excavations in earth for excavation in
0.1m3Hard rock5
1m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor
6
Extra over all excavations for carting away
6m2Sides of trench and hole excavations not exceeding 1,5m deep
7
Risk of collapse of excavations
ItemKeeping excavations free of all water other than subterranean water
8
Keeping excavations free of water
FILLING ETC
1m3Backfilling to trenches, holes, etc9
Earth filling obtained from the excavations and/or prescribed stock piles on site, compacted to 95% Mod AASHTO density
2m3G6 Material under floors10
Earth filling of approved clean earth supplied by the contractor, compacted to 95% Mod AASHTO density
13m2
Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 95% Mod AASHTO density
11
Compaction of surfaces
WEED KILLERS, INSECTICIDES, ETC
-447-
Earthworks (Provisional)Bill No. 2Section No. 13
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
13m2
Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming (Certificate must be provided)
12
"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee
13m2To bottoms and sides of trenches etc (Certificate must be provided)
13
-448-
Earthworks (Provisional)Bill No. 2Section No. 13
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 13 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 03
CONCRETE, FORMWORK AND REINFORCEMENT
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 110) unless otherwise stated
REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES
1m3Strip footings1
30MPa/19mm concrete
1m3Bases2
1m3Ramps3
0.3m3Steps4
7NoMaking and testing 150 x 150 x 150mm concrete strength test cubes (Provisional)
5
TEST BLOCKS
-449-
Concrete,Formwork and ReinforcementBill No. 3Section No. 13
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
CONCRETE SUNDRIES
13m2Surface beds, slabs, etc6
Finishing top surfaces of concrete smooth with a wood float
(CPAP WORK GROUP NO. 111) unless otherwise stated
SMOOTH FORMWORK (DEGREE OF ACCURACY II)
2m2Steps7
Smooth formwork to sides
MOVEMENT JOINTS ETC
3mNot exceeding 300mm wide 8
Expansion joints with 10mm softboard bitumen impregnated softboard between vertical concrete and brick surfaces
(CPAP WORK GROUP NO. 114) unless otherwise stated
REINFORCEMENT (PROVISIONAL)
0.113tBars not exceeding 10mm diameter9
Mild steel reinforcement to structural concrete work
0.340tBars not exceeding 20mm diameter10
High tensile steel reinforcement to structural concrete work
13m2Type 193 fabric reinforcement11
Fabric reinforcement
-450-
Concrete,Formwork and ReinforcementBill No. 3Section No. 13
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 13 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 04
MASONRY
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 116) unless otherwise stated
BRICKWORK
FOUNDATIONS (PROVISIONAL)
3m2One brick walls1
Brickwork of NFX bricks (14 MPa nominal compressive strength) in class II mortar (Corobrik engineering bricks)
BRICKWORK SUNDRIES
35m150mm Wide reinforcement built in horizontally in foundations (Provisional)
2
2,5mm Brickwork reinforcement
42m150mm Wide reinforcement built in horizontally 3
-451-
MasonryBill No. 4Section No. 13
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
FACE BRICKWORK
3m2Extra over brickwork for face brickwork in foundations (Provisional)
4
Corobrik Nala Travetine "FBS", pointed with flush horizontal and vertical joints on all exposed faces
14m2Extra over brickwork for face brickwork 5
-452-
MasonryBill No. 4Section No. 13
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 13 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 05
WATERPROOFING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 120) unless otherwise stated
DAMPPROOFING OF WALLS AND FLOORS
1m2Under walls1
One layer of 375 micron embossed polyethylene damp proof course (SANS 952-1985 type B)
13m2Under surface beds2
One layer of 250 micron green polyethylene waterproof sheeting (SANS 952-1985 type C) sealed at laps with PVC self-adhesive tape
WATERPROOFING TO ROOFS ETC
-453-
WaterproofingBill No. 5Section No. 13
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
18m2On parapet walls3
One layer 4mm special polyester fully bonded waterproof membrane comprising a matrix modified with polypropylene dual reinforced with non-woven polyester cloth and glass fibre tissue, laid with 75mm side and 100mm end laps
SEALING STRIPS, JOINT SEALANTS, ETC
3m10 x 10mm In vertical expansion joints including raking out expansion joint filler as necessary
4
Two-part grey polysulphide sealing compound including backing cord, bond breaker, primer, etc
-454-
WaterproofingBill No. 5Section No. 13
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 13 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 06
ROOF COVERINGS ETC
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 124) unless otherwise stated
PROFILED METAL SHEETING AND ACCESSORIES
89m2Roof covering with pitches not exceeding 25 degrees1
0.8mm Z275 spelter galvanised corrugated steel sheets fixed to timber purlins or rails (Colour to Architects Specification)
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 07
CARPENTRY AND JOINERY
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 126) unless otherwise stated
TIMBER DOORS, WINDOWS, ETC
DOORS ETC
1No
44mm Hardwood timber battened, ledged and framed single door, overall size 813 x 2032mm high as per door schedule (D10)
1
Wrought meranti doors
FITTINGS
SHELVING
8m600 x 25mm Timber shelf2
400mm Deep varnished meranti timber shelf on 38 x 38mm meranti timber wall brackets plugged to walls including edges sealed with clear silicone sealant
-456-
Carpentry and JoineryBill No. 7Section No. 13
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 13 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 08
CEILINGS, PARTITIONS AND ACCESS FLOORING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 129) unless otherwise stated
CEILING TIMBERS, BEADS, INSULATION, ETC
75m2120mm Thick insulation fitted above ceilings1
"Isotherm" polyester high density 7-10kg/m3 thermbonded insulation blanket
SUSPENDED CEILINGS
19m2Ceilings suspended not exceeding 1 000mm below timber purlins in patches
2
1200 x 600 x 12mm Thick PVC ceiling panel screwed to and including screw-up suspension grid
-457-
Ceilings,Partitions and Access FlooringBill No. 8Section No. 13
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
34mL-shape suspended PVC ceiling hangars/supporters fixed to wall
3
Perimeter trim to suspended ceilings
-458-
Ceilings,Partitions and Access FlooringBill No. 8Section No. 13
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 13 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 09
IRONMONGERY
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 132) unless otherwise stated
1No
Electromagnetic door lock for security door with temporary control switch fixed to wall not exceeding 10m, as per ironmongery schedule. Provisions to be made for control from the Main Control Room (elsewhere measured)
1
LOCKS
1PairsHandles2
Re-fit existing ironmongery and ensure good working order
1NoLocksets3
2NoHinges4
-459-
IronmongeryBill No. 9Section No. 13
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
8No20mm Diameter stainless steel curtain rod fixed to wall5
PELMETS AND CURTAIN TRACKS
1No
"Parrot" or similar approved pinning board 1000 x 1000mm high with green pinning material and aluminium frame, plugged
1No20mm Diameter chromium plated towel rail 600mm long including end brackets, plugged
7
BATHROOM FITTINGS
1No"White" vandal proof double toilet roll holder, plugged8
1NoChromium plated coat hook, plugged9
3No38mm Diameter rubber door stop plugged10
SUNDRIES
-460-
IronmongeryBill No. 9Section No. 13
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 13 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 10
STRUCTURAL STEEL (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 134) unless otherwise stated
GALVANISED STEEL COLUMNS AND BEAMS
0.73t100 x 100mm x 15.044kg/m hot rolled square tubing columns in heights exceeding 2m and not exceeding 4m
1
Welded columns in single lengths constructed of 100 x 100 x 5mm thick mild steel square tubing with 100 x 100 x 5mm thick flat base, cap, bearer and connection plates, bolted to concrete with 250 x 16mm diameter chemical anchor bolt
GALVANISED STEEL PURLINS, GIRTS, BRACING, ETC
0.13t75 x 50 x 20 x 3mm Thick galvanised cold-formed lipped channel purlins
2
Purlins and girts, bolted to steel
-461-
Structural SteelBill No. 10Section No. 13
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 13 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 11
METALWORK
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 136) unless otherwise stated
GALVANISED STEEL GATES, SCREENS, ETC
HOT DIPPED GALVANISED STRAIGHT PROFILE FENCE
6m
3050 x 50 x 50 x 5mm Thick angle iron top rail including all fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification
1
High tensile Galfan Class A mesh panels manufactured in accordance with SANS 10244-2:2003 specification (refer to the Department of Public Works Standard Technical Specification - Perimeter Fence for Prisons May 2005 Rev01 annexed to the bid document)
-462-
MetalworkBill No. 11Section No. 13
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
6m
5000 x 3050mm Wide straight profile mesh panel (Type 1), 1,4mm single skin with double vertical wires spaced at 76.2mm and all horizontal wires spaced at 12.7mm centre to centre including all break off bolts and all other fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification
2
HOT DIPPED GALVANISED STEEL GATE CRAWLERS
4No
Heavy duty gate crawlers suitable for gate size 6000 x 4000mm high including all fittings installed on gates attached to crawl beams as per engineers specification
3
Purpose made gate crawlers as per engineers specification
HOT DIPPED GALVANISED STEEL BOLLARDS
13No
220mm Diameter galvanised mild steel "high impact" bollard, 1500mm total height, 1000mm height above ground with concrete infill laid in and including 500 x 500 x 550m deep 30mpa concrete base
4
"SA Bollards High Impact Bollard" or similar approved
HOT DIPPED GALVANISED STEEL MINOR WORK
2NoGoose neck post 1200mm high including base plates, fittings etc. with necessary provisions for intercom
5
Galvanised hot dipped mild steel posts including base plate, fittings etc.
11mU-shaped guide rail of 35 x 35 x 5mm u-channel section6
Fixing accessories for 6000 x 4000mm high steel gate
STAINLESS STEEL MINOR WORK
TURNSTILE
-463-
MetalworkBill No. 11Section No. 13
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
1No2180 x 2250mm High double three arm turnstile7
"Type 316" stainless steel "Saturn" finish double three arm turnstiles fitted to "Type 316"stainless steel framework including provision for biometric operated lock and reader on frame
Refer to Window Schedule
ALUMINIUM CASEMENT WINDOWS
1NoPurpose made window, 1800 x 1245mm high (W01)8
Natural anodised casement window units complete with subframes, ironmongery, 16mm thick bullet resistant glass, sealing, burglar bars in 25 x 25mm square tubing etc and fixing to brickwork
-464-
MetalworkBill No. 11Section No. 13
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 13 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 12
PLASTERING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 142) unless otherwise stated
SCREEDS
17m240mm Thick on floors 1
1:3 Cement screeds steel floated, on concrete
8m250mm Thick on floors 2
INTERNAL PLASTER
79m2On walls in patches3
Cement plaster steel trowelled, on brickwork
-465-
PlasteringBill No. 12Section No. 13
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
3m
50 x 50 x 3mm L-section galvanised mild steel dividing strips between differing floor finishes fixed with galvanised M10 bolts
4
CORNER PROTECTORS, DIVIDING STRIPS, ETC
-466-
PlasteringBill No. 12Section No. 13
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 13 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 13
TILING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
SUPPLEMENTARY PREAMBLES
Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding
Tiling described as "fixed with adhesive on power floated concrete" shall be deemed to include for approved tiling key-coat
Ceramic, porcelain, marble and granite tiles are to be fixed and grouted with suitable adhesives and grouts from the "Tal Professional" range of products as recommended by the manufacturer of the tiles
(CPAP WORK GROUP NO. 144) unless otherwise stated
FLOOR TILING
25m2On floors in patches1
300 x 300 x 8mm Porcelain floor tiles fixed with adhesive to screed (screed elsewhere) and flush pointed with epoxy grout
-467-
TilingBill No. 13Section No. 13
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
28mSkirting 70mm high 2
-468-
TilingBill No. 13Section No. 13
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 13 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 14
PLUMBING AND DRAINAGE (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 148) unless otherwise stated
RAINWATER DISPOSAL
17m155 x 100 x 115mm Aluminium ogee roof gutters with baked enamel finish fixed with concealed brackets
1
0,6mm Chromadek seamless gutters and rainwater pipes
4NoExtra over gutter for stopped end2
4NoExtra over gutter for outlet for 100 x 75mm pipe3
12m100 x 75mm Fluted aluminium rainwater downpipes with baked enamel finish fixed as per supplier's detail
4
4NoExtra over rainwater pipe for eaves offset 900mm projection
5
-469-
Plumbing and drainage (Provisional)Bill No. 14Section No. 13
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
4NoExtra over rainwater pipe for shoe 6
SANITARY PLUMBING
2m50mm Pipes7
uPVC soil and vent pipes
1m50mm Pipes chased into concrete surface beds8
2m
110mm Pipes laid in and including trenches not exceeding 1m deep
9
1m110mm Pipes 10
1No50mm Bend11
Extra over uPVC soil and vent pipes for fittings
1No50mm Access bend12
1No50mm Rodding eye13
1No110mm Bend14
1No110mm Access bend15
1No4.5kg Dry chemical powder fire extinguisher16
FIRE APPLIANCES ETC
1No4.5kg Carbon dioxide fire extinguisher17
19No190 x 190mm ABS plastic symbolic safety sign plugged and screwed to wall
18
-470-
Plumbing and drainage (Provisional)Bill No. 14Section No. 13
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 13 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 15
GLAZING
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 150) unless otherwise stated
GLAZING TO ALUMINIUM WITH CLIP-ON BEADS
1m2Panes exceeding 0,1m2 and not exceeding 0,5m21
4mm Clear float glass with aluminium beads
TOPS, SHELVES, DOORS, MIRRORS, ETC
1NoMirror 300 x 450mm high2
4mm Silvered float glass copper backed mirrors with polished edges, holed for and fixed with chromium plated dome capped mirror screws with rubber buffers to plugs in brickwork
-471-
GlazingBill No. 15Section No. 13
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 13 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 16
PAINTWORK
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 152) unless otherwise stated
PAINTWORK ETC TO EXISTING SURFACES
ON EXTERNAL FLOATED PLASTER SURFACES
96m2Parapet walls1
One merit plaster primer, one coat undercoat and two coats Wall & All emulsion paint (colour to be approved by Client)
ON INTERNAL FLOATED PLASTER SURFACES
293m2Walls2
One merit plaster primer, one coat undercoat and two coats Wall & All emulsion paint (colour to be approved by Client)
-472-
PaintworkBill No. 16Section No. 13
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
14m2Walls3
Two coats "Plascon Dampseal" or similar approved waterproof sealer
ON METAL SURFACES
5m2Security door4
One coat self etching primer and two coats premium quality polyurethane enamel paint, on galvanised steel. Prepare and treat with anti rust compound suitable for coastal conditions
ON WOOD SURFACES
4m2Timber doors5
One coat alkyd based universal undercoat and two coat superior quality universal enamel paint. Preparation as per Supplementary Preamble and Architects Specification
-473-
PaintworkBill No. 16Section No. 13
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 13 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 17
EXTERNAL WORKS (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
SUPPLEMENTARY PREAMBLES
Descriptions of earth filling, compaction, etc shall be deemed to include for all necessary testing required in accordance with the SABS 1200 series
Testing of material and filling
(CPAP WORK GROUP NO. 154) unless otherwise stated
ROADWORKS AND PARKING
EXCAVATION, FILLING, ETC OTHER THAN BULK
EXCAVATIONS ETC
107m3Over site between buildings, etc to reduce levels and dispose in prescribed stock piles on site
1
Excavation in earth not exceeding 2m deep
20m3Soft rock2
Extra over excavation in earth for excavation in
-474-
External WorksBill No. 17Section No. 13
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
7m3Hard rock
107m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor
3
Extra over all excavations for carting away
ItemKeeping excavations free of water other than subterranean water
4
Keeping excavations free of water
LAYER WORK
30m3
Sub-grade course of 150mm thick of G1 crusher run material compacted to 88% Mod AASHTO density
5
Earth filling supplied by the contractor under parking areas, roadways, etc
30m3
Base course of 150mm thick of C4 (G5 gravel material) stabilised with 3% cement compacted to 97% Mod AASHTO density
6
10m3Under floors etc7
Coarse river sand filling supplied by the contractor
202m2
Compaction of ground surfaces under roadworks etc, including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density (Roadbed)
8
Compaction of surfaces
WEED KILLERS, INSECTICIDES, ETC
-475-
External WorksBill No. 17Section No. 13
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
202m2
Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming (Certificate must be provided)
9
"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee
PAVING
128m2Paving to roadworks and parking areas to falls10
80mm thick 30MPa precast concrete grey interlocking block paving blocks in accordance with SANS 1058, laid to falls on and including 25mm thick sand layer with joints filled in with sand, compacted with a vibration compactor
74m2Paving to aprons11
50mm thick 30MPa precast concrete grey interlocking block paving blocks in accordance with SANS 1058, laid to falls on and including 25mm thick sand layer with joints filled in with sand, compacted with a vibration compactor
-476-
External WorksBill No. 17Section No. 13
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 13 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 18
ELECTRICAL INSTALLATION
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 160) unless otherwise stated
ACCESS CONTROL
2NoVehicle boom gate and spike barrier 1
ACCESS BARRIERS
2NoSpike boom barrier extension 2
2NoTwo button remotes to operate claws and boom to be handed to Area Commissioner
3
2NoTemporary switch fixed to Guards Office for claw and boom operation
4
2No
Two way red and green, 12V DC Traffic light Unit including wall mounted brackets (SS), harness and interface relay
5
-477-
ElectricalBill No. 18Section No. 13
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
2No
D10 Industrial gate motor including tracks, break sensor, impact sensor, burglar proof case, anti-theft brackets etc. to make installation complete
6
"Centurion" or similar or equal approved
Item
Make the necessary provisions for security door electromagnetic door locks to be controlled from the Main Control Room
7
Provision of service infrastructure for future installations
ItemMake the necessary provisions for access barriers to be controlled from the Main Control Room
8
-478-
ElectricalBill No. 18Section No. 13
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 13 R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
SECTION SUMMARY - S10: Work Teams Outlet to Medium B
BillNo
PageNo
Amount
445Alterations1
448Earthworks (Provisional)2
450Concrete,Formwork and Reinforcement3
452Masonry4
454Waterproofing5
455Roof Covering6
456Carpentry and Joinery7
458Ceilings,Partitions and Access Flooring8
460Ironmongery9
461Structural Steel10
464Metalwork11
466Plastering12
468Tiling13
470Plumbing and drainage (Provisional)14
471Glazing15
473Paintwork16
476External Works17
478Electrical18
-479-
Section No. 13
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried to Final Summary R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 01
PERIMETER SECURITY FENCE
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 102) unless otherwise stated
ALTERATIONS
REMOVAL OF EXISTING WORK
11m230mm Thick premix medium grade to roadways 1
Breaking up and removing bituminous premix road surfacing
MAKING GOOD OF FINISHES ETC
12,543No
Remove existing structural bolts and replace with galvanised carbon steel structural grade 8.8 M16 structural bolts or equal approved
2
Remedial work
-480-
Perimeter Security FenceBill No. 1Section No. 14
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
1,881m
Remove existing grout around base plates and replace with "ABE Epidermix 372" or similar approved grout at an angle of no less than 15 degrees to the horizontal not exceeding 5mm wide and 3mm deep
3
(CPAP WORK GROUP NO. 104) unless otherwise stated
EARTHWORKS (PROVISIONAL)
SITE CLEARANCE, ETC.
11,515m2
Digging up and removing rubbish, debris, vegetation, hedges, shrubs and trees not exceeding 200mm girth, bush, etc.
4
Site clearance
EXCAVATION, FILLING, ETC OTHER THAN BULK
EXCAVATION, ETC.
97m3Reduced levels under floors5
Excavation in earth not exceeding 2m deep
4m3650 x 650 x 1300mm Corner post base 6
23m3650 x 650 x 1300mm Intermediate post base 7
759m31000 x 1000 x 2000mm Gate post base 8
12.63m3300 x 400mm Sleeve trench 9
18.95m3300 x 600mm Earthing trench10
30.88m3Extra over for soft rock11
Extra over trench and hole excavations in earth for excavation in
10.29m3Extra over for hard rock12
-481-
Perimeter Security FenceBill No. 1Section No. 14
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
133m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor
13
Extra over all excavations for carting away
404m2Sides of trench and hole excavations not exceeding 1,5m deep
14
Risk of collapse of excavations
ItemKeeping excavations free of all water other than subterranean water
15
Keeping excavations free of water
FILLING ETC
25m3Backfilling to trenches, holes, etc16
Earth filling obtained from the excavations and/or prescribed stock piles on site, compacted to 95% Mod AASHTO density
21m3G6 Material under floors17
Earth filling of approved clean earth supplied by the contractor, compacted to 95% Mod AASHTO density
23m3Under floors etc18
Coarse river sand filling supplied by the contractor
558m2
Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 95% Mod AASHTO density
19
Compaction of surfaces
FILTER FABRIC
-482-
Perimeter Security FenceBill No. 1Section No. 14
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
557.93m2Around stone filling between the inner and the outer fence
20
"Kaymat U34" or equally approved 2.6mm thick non-woven continuous filament needle punch polyester geotextile filter fabric blanket with minimum 19.5 kN/m typical tensile strength, with 500mm laps
WEED KILLERS, INSECTICIDES, ETC
492m2To bottoms and sides of trenches etc (Certificate must be provided)
21
"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee
18,546m2
Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming (Certificate must be provided)
22
(CPAP WORK GROUP NO. 110) unless otherwise stated
CONCRETE, FORMWORK AND REINFORCEMENT
REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES
4m3650 x 650 x 1300mm Corner post base 23
30MPa/19mm concrete
23m3650 x 650 x 1300mm Intermediate post base 24
9m31000 x 1000 x 2000mm Gate post base 25
4.36m31300 x 200 x 300mm Erosion block under plinths every 2900mm
26
-483-
Perimeter Security FenceBill No. 1Section No. 14
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
13.68m3
2950 x 1300 x 100mm Thick (1000mm inside & 300mm outside the fence) plinth cast in 2950mm sections with 50mm expansion gaps filled with 19/32 mm crushed stone (elsewhere measured)
27
42.58m3100mm Thick 19/32mm crushed stone bedding between the inner and outer fence plinths
28
CONCRETE SUNDRIES
(CPAP WORK GROUP NO. 111) unless otherwise stated
SMOOTH FORMWORK (DEGREE OF ACCURACY II)
30m22950 x 1300 x 100mm Thick plinth29
Smooth formwork to sides
(CPAP WORK GROUP NO. 114) unless otherwise stated
REINFORCEMENT (PROVISIONAL)
0.881tBars not exceeding 10mm diameter30
Mild steel reinforcement to structural concrete work
3.520tBars not exceeding 20mm diameter31
High tensile steel reinforcement to structural concrete work
137m2Type 193 fabric reinforcement32
Fabric reinforcement
(CPAP WORK GROUP NO. 120) unless otherwise stated
WATERPROOFING
-484-
Perimeter Security FenceBill No. 1Section No. 14
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
DAMPPROOFING OF WALLS AND FLOORS
137m2Under surface beds33
One layer of 250 micron green polyethylene waterproof sheeting (SANS 952-1985 type C) sealed at laps with PVC self-adhesive tape
84.21m2Extra over for 400mm section of steel mesh dipped in bitumen as per detail
34
(CPAP WORK GROUP NO. 136) unless otherwise stated
METALWORK
FENCING
HOT DIPPED GALVANISED BOWED PROFILE FENCE
3No
6800mm high Corner posts , 101.6mm x 4.5mm bowed profile tubular corner posts with 5800mm long 50 x 5mm flat steel cover plates, including post caps, anchors and all fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification
35
Grade W 300 hot dipped galvanised mild steel posts (refer to the Department of Public Works Standard Technical Specification - Perimeter Fence for Prisons May 2005 Rev01 annexed to the bid document)
26No
6800mm high Intermediate posts, 101.6mm x 4.5mm bowed profile tubular intermediate posts with 5800mm long 50 x 5mm flat steel cover plates including post caps, anchors & all fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification
36
-485-
Perimeter Security FenceBill No. 1Section No. 14
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
2No
6500mm high Gate posts, 219mm x 5.5mm tubular gate posts with 4500mm long 50 x 5mm flat steel cover plates including post caps, anchors and all fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification
37
41m
ID 103.6mm diameter class 6 PVC sleeves, 11mm hole drilled 1m from the top, 1300mm long and cast into concrete, incl galvanized holding pin, 300 x 10mm roundbar all in accordance to manufacturer's recommendation and attached specification
38
68m
3050 x 50 x 50 x 5mm angle iron top rail including all fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification
39
High tensile Galfan Class A mesh panels manufactured in accordance with SANS 10244-2:2003 specification (refer to the Department of Public Works Standard Technical Specification - Perimeter Fence for Prisons May 2005 Rev01 annexed to the bid document)
68m
6000 x 3050mm Wide bowed profile mesh panel (Type 1),1, 4mm single skin with double vertical wires spaced at 76.2mm and all horizontal wires spaced at 12.7mm centre to centre including all break off bolts and all other fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification
40
HOT DIPPED GALVANISED STRAIGHT PROFILE FENCE
3No
5000mm High corner posts,101.6mm x 4.5mm straight profile tubular corner posts with 3000mm long 50 x 5mm flat steel cover plates, including post caps, anchors & all fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification
41
Grade W300 hot dipped galvanised mild steel posts (refer to the Department of Public Works Standard Technical Specification - Perimeter Fence for Prisons May 2005 Rev01 annexed to the bid document)
-486-
Perimeter Security FenceBill No. 1Section No. 14
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
16No
5000mm High intermediate posts,101.6mm x 4.5mm straight profile tubular intermediate posts with 3000mm long 50 x 5mm flat steel cover plates, including post caps, anchors and all fixing materials and accessories tomake the installation complete all in accordance to manufacturer's recommendation and attached specification
42
2No
5000mm High gate posts, 219mm x 5.5mm tubular gate posts with 3000mm long 50 x 5mm flat steel cover plates including post caps, anchors and all fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification
43
29m
ID 103.6mm diameter class 6 PVC sleeves, 11mm hole drilled 1m from the top, 1300mm long and cast into concrete, incl galvanized holding pin, 300 x 10mm roundbar all in accordance to manufacturer's recommendation and attached specification
44
38m
3050 x 50 x 50 x 5mm angle iron top rail including all fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification
45
High tensile Galfan Class A mesh panels manufactured in accordance with SANS 10244-2:2003 specification (refer to the Department of Public Works Standard Technical Specification - Perimeter Fence for Prisons May 2005 Rev01 annexed to the bid document)
38m
5000 x 3050mm Wide straight profile mesh panel (Type 1), 1,4mm single skin with double vertical wires spaced at 76.2mm and all horizontal wires spaced at 12.7mm centre to centre including all break off bolts and all other fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification
46
HOT DIPPED GALVANISED GATES
-487-
Perimeter Security FenceBill No. 1Section No. 14
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
2No
6000 x 4500mm High sliding gate high including mesh panels, frame to be constructed of 60 x 40 x 2mm rectangular steel tubing, two 219mm x 5.0mm gateposts and box structure above gate and single skin mesh with double vertical wires, 4mm thick all in accordance to manufacturer's recommendation and attached specification
47
Hot dipped galvanised mild steel gates in accordance ISO 1461 (minimum 45 micron) (refer to the Department of Public Works Standard Technical Specification - Perimeter Fence for Prisons May 2005 Rev01 annexed to the bid document)
2No
1000 x 2000mm High single leaf pedestrian gate including mesh panels, two 101.6mm x 4.5mm gate posts mesh with double vertical wires, 4mm thick all in accordance to manufacturer's recommendation and attached specification
48
(CPAP WORK GROUP NO. 160) unless otherwise stated
ELECTRICAL INSTALLATION
GENERAL LIGHTING AND POWER
105.27m
Earthing trench using 70 mm² BCC. The installation shall comply with SABS 03. All connections shall be CAD welded including builders work
49
EARTH CONDUCTORS
14No
Earthing connection from every 3rd Fence Post to a 1.2 m X 14.5 mm earth rod using 70 mm² BCC. The installation shall comply with SABS 03. All connections shall be CAD welded or Hexagon Crimped. Shall also be connected with 70mm² BCC to connect to earth ring (Supplied, Installed and Commissioned).
50
EARTHING
CONDUITS ETC
-488-
Perimeter Security FenceBill No. 1Section No. 14
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
105.27m75mm Diameter "Kabelflex" PVC sleeves installed as specified including bends and saddles
51
Flexible conduits
-489-
Perimeter Security FenceBill No. 1Section No. 14
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried to Final Summary R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 01
SITE CLEARANCE
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL
SUPPLEMENTARY PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
(CPAP WORK GROUP NO. 102) unless otherwise stated
ALTERATIONS
REMOVAL OF EXISTING WORK
516mExisting BTC coil fence including posts, straining wire, etc
1
Removal of existing BTC Coils
-490-
Site ClearanceBill No. 1Section No. 15
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 15 R
AmountItemNo
Quantity Rate
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO. 02
ROADWORKS AND PARKING (PROVISIONAL)
For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________
PREAMBLES
This Bill of Quantities must be read in conjunction with the attached specifications and details
SUPPLEMENTARY PREAMBLES
Descriptions of earth filling, compaction, etc shall be deemed to include for all necessary testing required in accordance with the SABS 1200 series
Testing of material and filling
(CPAP WORK GROUP NO. 154) unless otherwise stated
ROADWORKS AND PARKING
EXCAVATION, FILLING, ETC
EXCAVATIONS ETC
4,889m3Over site between buildings, etc to reduce levels and dispose in prescribed stock piles on site
1
Excavation in earth not exceeding 2m deep
44m3Trenches2
Excavation in earth not exceeding 2m deep
-491-
Roadworks and ParkingBill No. 2Section No. 15
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
532m3Soft rock3
Extra over excavation in earth for excavation in
212m3Hard rock4
4,889m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor
5
Extra over all excavations for carting away
ItemKeeping excavations free of water other than subterranean water
6
Keeping excavations free of water
LAYER WORK
1,904m3
Sub-grade course of 150mm thick of G1 crusher run material compacted to 88% Mod AASHTO density
7
Earth filling supplied by the contractor under parking areas, roadways, etc
1,904m3
Base course of 150mm thick of C4 (G5 gravel material) stabilised with 3% cement compacted to 97% Mod AASHTO density
8
12,661m2
Compaction of ground surfaces under roadworks etc, including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density (Roadbed)
9
Compaction of surfaces
WEED KILLERS, INSECTICIDES, ETC
-492-
Roadworks and ParkingBill No. 2Section No. 15
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
12,661m2
Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming (Certificate must be provided)
10
"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee
REINFORCED CONCRETE CAST ON/IN FORMWORK
36m3Strip footings11
30MPa/19mm concrete
4,741m230mm Thick premix medium grade to parking areas, roadways including prime coat, tack coat etc
12
Bituminous premix road surfacing
DAMPPROOFING OF WALLS AND FLOORS
7,920m2Under paving13
One layer of 250 micron green polyethylene waterproof sheeting (SANS 952-1985 type C) sealed at laps with PVC self-adhesive tape
PAVING
7,920m2Paving to roadworks and parking areas to falls14
80mm thick 30MPa precast concrete grey interlocking block paving blocks in accordance with SANS 1058, laid to falls on and including 25mm thick sand layer with joints filled in with sand, compacted with a vibration compactor
-493-
Roadworks and ParkingBill No. 2Section No. 15
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
2,273m
150 x 300mm High kerbs (SANS 927 fig 3) with 150 x 150 x 300mm unreinforced concrete haunching at back of each joint, including excavation, backfilling, etc
15
Precast concrete finished smooth on exposed surfaces, including bedding, jointing and pointing
4No
Standard "STOP, DIRECTION" sign with 50mm diameter galvanised mild steel post bedded in and including unreinforced concrete base, including any necessary excavation, paint finish, etc
16
Road signs
Paintwork
1,010m100mm Wide line17
Prepare and apply one coat white reflective road marking paint on precast concrete paving blocks
4NoStandard directional arrow signs not exceeding 2m2 18
-494-
Roadworks and ParkingBill No. 2Section No. 15
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward to Summary of Section No. 15 R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
SECTION SUMMARY - External Works
BillNo
PageNo
Amount
490Site Clearance1
494Roadworks and Parking2
-495-
Section No. 15
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried to Final Summary R
AmountItemNo
Quantity RateUnit
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO 01
BUDGETARY ALLOWANCES
This Bill of Quantities must be read in conjunction with the attached specifications and details
SUPPLEMENTARY PREAMBLES
Work for which budgetary allowances are provided will be measured and valued in accordance with the relevant?building agreement? ?building contract? and deducted in whole or in part if not required without any compensation for loss of profit on the said allowances
General
Prime cost amounts and provisional sums are net. Prime cost amounts shall include for delivery to site of all articles concerned
Provisional sums are for material and equipment supplied and installed complete by firms of specialists
Where stated, the contractor may allow for profit if required
Profit
Builder's work in connection with specialist services is given elsewhere in these bills of quantities
Builder's work
All subcontractors shall be nominated and shall be appointed in terms of the n/s subcontract agreement
Nominated Subcontractor
BUDGETARY ALLOWANCES
-496-
Budgetary AllowanceBill No. 1Section No. 16
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
750,000.00Item
Provide the sum of R750,000.00 (Seven Hundred and Fifty Thousand) for remedial work to the subsoil drainage
1
Subsoil Drainage
50,000.00Item
Provide the sum of R50,000.00 (Fifty Thousand) for supplying and installing of office equipment and furniture as per the approved specification by the Architect
2
Office Equipment and Furniture
500,000.00Item
Provide the sum of R500,000.00 (Five Hundred Thousand) for remedial works to works carried out by the previous contractor
3
Remedial Works
195,000.00Item
Provide the sum of R195,000.00 (One Hundred and Ninety Five Thousand) for the appointment of a Community Liaison Officer for the duration of the contract
4
Community Liaison Officer
COMPLIANCE
427,000.00Item
Provide the sum of R427,000.00 (Four Hundred and Twenty Seven Thousand) for securing loose steel fence panels
5
Secure loose steel fence panels
194,000.00Item
Provide the sum of R194,000.00 (One Hundred and Ninety Four Thousand) for shearing all steel bolts along the security fence
6
Shearing Bolts
RATES
REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES
-497-
Budgetary AllowanceBill No. 1Section No. 16
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
RATE ONLYm3Strip footings7
25MPa/19mm concrete
RATE ONLYm3Surface beds8
REINFORCED CONCRETE CAST ON/IN FORMWORK
RATE ONLYm3Slabs 9
25MPa/19mm concrete
RATE ONLYm3Ramps and steps10
The following shall be applicable to all budgetary allowances:
Works of a similar character executed under similar conditions shall be priced at the rates in the priced document.
Works not of a similar character shall be priced at rates based on those in the priced document and adjusted to suit the changed circumstance.
If the above methods do not apply, work shall be priced at rates based on the necessary use of labour construction equipment and/or materials and goods for executing the works. These rates must be approved by the quantity surveyor prior to the execution of works. An allowance will be made for profit and attendance. The percentage for profit and attendance must be indicated below
PROFIT AND ATTENDANCE
RATE ONLY%Profit11
RATE ONLY%Attendance12
-498-
Budgetary AllowanceBill No. 1Section No. 16
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried to Final Summary R
AmountItemNo
Quantity RateUnit
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
BILL NO 01
PROVISIONAL SUMS
This Bill of Quantities must be read in conjunction with the attached specifications and details
SUPPLEMENTARY PREAMBLES
Work for which budgetary allowances are provided will be measured and valued in accordance with the relevant?building agreement? ?building contract? and deducted in whole or in part if not required without any compensation for loss of profit on the said allowances
General
Prime cost amounts and provisional sums are net. Prime cost amounts shall include for delivery to site of all articles concerned
Provisional sums are for material and equipment supplied and installed complete by firms of specialists
Where stated, the contractor may allow for profit if required
Profit
Builder's work in connection with specialist services is given elsewhere in these bills of quantities
Builder's work
All subcontractors shall be nominated and shall be appointed in terms of the n/s subcontract agreement
Nominated Subcontractor
PROVISIONAL SUMS FOR NOMINATED SUBCONTRACT WORKS
-499-
Provisional SumsBill No. 1Section No. 17
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
100,000.00Item
Provide the sum of R100,000.00 (One Hundred Thousand) for the electronic location, re-routing and repairs to existing services
1
Existing Services
%Profit2
%Attendance 3
318,150.00Item
Provide the sum of R318,150.00 (Three Hundred and Eighteen Thousand One Hundred and Fifty) for use as directed by the Electronics Engineer for preparatory electronic works
4
Preparatory Electronic Works
%Profit5
%Attendance 6
862,000.00Item
Provide the sum of R862,000.00 (Eight Hundred and Sixty Two Thousand) for Electrical Installation for use as directed by the Electrical Engineer
7
Electrical Installation
%Profit8
%Attendance 9
500,000.00Item
Provide the sum of R500,000.00 (Five Hundred Thousand) for Mechanical installation, rectification of snags and training to DCS personnel as directed for use by the mechanical engineer
10
Mechanical Installation
%Profit11
%Attendance12
-500-
Provisional SumsBill No. 1Section No. 17
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
Brought Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
100,000.00Item
Provide the sum of R100,000.00 (One Hundred Thousand) for the de-establishment of the previous contractor's site camp
13
De-establishment of existing site camp
%Profit14
%Attendance15
16,500.00Item
Provide the sum of R16,500.00 (Sixteen Thousand Five Hundred) for any concrete and soil tests to existing foundations as required and specified by the engineer.
16
Compliance tests of existing works
%Profit17
%Attendance18
30,000.00Item
Provide the sum of R30,000.00 (Thirty Thousand) for the supply and installation of signage to all facilities as per Architectural Specification
19
Signage to all facilities
%Profit20
%Attendance21
-501-
Provisional SumsBill No. 1Section No. 17
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried to Final Summary R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works
Tender No: DCS05ECAN002/WP0/C2
PageNo
FINAL SUMMARY
SectionNo
Amount
38Preliminary and General1
77S01: Work Teams and Workshop Outlet to Maximum2
125S02: Visitors Entrance to Medium B3
157Waiting Area to Medium B4
183S03: Sally Port to Medium B5
195S04: Sally Port to Ash and Ambulance6
261S05: Sally Port and Visitors Entrance to Maximum7
303S06: Sally Port to Main Control8
347S07: Visitors Entrance to Medium A9
380Waiting Area to Medium A10
403S08: Sally Port to Medium A11
442S09: Work Teams Outlet to Medium A12
479S10: Work Teams Outlet to Medium B13
489Perimeter Security Fence14
495External Works15
498Budgetary Allowance16
501Provisional Sums17
RSub Total
SUMCredit for free issue material
Free Issue Material
SUMTransportation expenses
-502-
Bespoke Global EfficacyRamgoolam (Pty) Ltd
Carried Forward R
at St Albans Correctional Facility, Eastern Cape
Completion of the Construction of Fencing and Building Works