YOU ARE DOWNLOADING DOCUMENT

Please tick the box to continue:

Transcript
Page 1: SCDC Green Infrastructure Strategy - Waveney · SCDC Green Infrastructure Strategy Green Infrastructure Strategy Concept map Figure: 17 Scale: NTRS May 2011 SCDC north of Haggis

SCDC Green Infrastructure Strategy

Green Infrastructure StrategyConcept map Figure: 17

Scale: NTRS

May 2011

SCDC north of Haggis

Key Existing ANG

Rivers

Key potential Access corridors

Regional level (500ha+)

Sub-regional level (60ha+)

District level (20ha+)

Potential

Areas where searches for opportunities to create new ANG should be focussed, in order to address current and predicted deficiencies.

Key

Existing PRoW

National Cycle Route (NCR1)

Other promoted cycle routes

Related Documents