Page 1: RISK REGISTER

BY FARMERS.FOR FARMERS

RISK REGISTER

FARM NAME: BY:

NO. HAZARD RISKSINITIAL RISK LEVEL (H, M, L)

CONTROL MEASURESRESIDUAL RISK LEVEL (H, M, L)

Editable PDF 12

Page 2: RISK REGISTER

NO. HAZARD RISKSINITIAL RISK LEVEL (H, M, L)

CONTROL MEASURESRESIDUAL RISK LEVEL (H, M, L)

Page 3: RISK REGISTER

NO. HAZARD RISKSINITIAL RISK LEVEL (H, M, L)

CONTROL MEASURESRESIDUAL RISK LEVEL (H, M, L)

Page 4: RISK REGISTER

NO. HAZARD RISKSINITIAL RISK LEVEL (H, M, L)

CONTROL MEASURESRESIDUAL RISK LEVEL (H, M, L)

Page 5: RISK REGISTER

NO. HAZARD RISKSINITIAL RISK LEVEL (H, M, L)

CONTROL MEASURESRESIDUAL RISK LEVEL (H, M, L)

Page 6: RISK REGISTER

BY FARMERS.FOR FARMERS

Example Farm Risk Register

FARM NAME: BY:

NO. HAZARD RISKSINITIAL RISK LEVEL (H, M, L)

CONTROL MEASURESRESIDUAL RISK LEVEL (H, M, L)

VEHICLES/MACHINERY

1 Quad Bike Rollover, collision High SWP Motorbikes, Quad Bikes and Side X SidesSWP Refuelling

Medium

2 Tractor Rollover, entanglement, crushing High SWP Tractors Medium

3 Ute Rollover, collision Medium SWP Farm VehiclesSWP Refuelling

Low

LIVESTOCK

4 Yard work Crushing, impact injuries High SWP Livestock Medium

5 Moving stock Crushing, impact injuries Medium SWP Livestock, SWP Stock Movement on Public Roads, SWP Lone Worker

Low

GENERAL FARM HAZARDS

6 Hazardous Substances Fire, explosion, health effects, environmental damage

High SWP Hazardous Substances, Health Plan, Signage Medium

7 Working at height Falls High SWP Working at Height Medium

8 Slippery surfaces, holes and obstacles Slips, trips and falls Medium Adequate Lighting, Appropriate footwear, Handrails on steps, Grip on slippery surfaces

Low

9 Handling animals Impact injuries, goring, crushing, muscular skeletal injuries

High SWP Livestock Medium

10 Firewood Impact injuries, severe lacerations High SWP Manual Handling, SWP Farm Vehicles, Training and supervision

Medium

Page 7: RISK REGISTER

BY FARMERS.FOR FARMERS

NO. HAZARD RISKSINITIAL RISK LEVEL (H, M, L)

CONTROL MEASURESRESIDUAL RISK LEVEL (H, M, L)

11 Wool bale handling Crushing, muscular skeletal injuries Medium SWP Manual Handling Low

12 Lifting/stacking hay bales Crushing, muscular skeletal injuries High SWP Manual Handling Low

13 Feeding out Falls, muscular skeletal injuries High SWP Manual Handling, SWP Farm Vehicles Low

14 Horses Falls High SWP Farm Horses Medium

15 Rifles and shotguns Direct or indirect strike from projectiles High All users to hold appropriate, firearms license, training and supervision

Medium

16 Burn offs Uncontrolled fire High SWP Burn Offs Medium

17 Bodies of water Drowning High Supervise all children that can’t swim around water Low

Example Farm Risk Register continued