BY FARMERS. FOR FARMERS RISK REGISTER FARM NAME: BY: NO. HAZARD RISKS INITIAL RISK LEVEL (H, M, L) CONTROL MEASURES RESIDUAL RISK LEVEL (H, M, L) Editable PDF 12
BY FARMERS.FOR FARMERS
RISK REGISTER
FARM NAME: BY:
NO. HAZARD RISKSINITIAL RISK LEVEL (H, M, L)
CONTROL MEASURESRESIDUAL RISK LEVEL (H, M, L)
Editable PDF 12
NO. HAZARD RISKSINITIAL RISK LEVEL (H, M, L)
CONTROL MEASURESRESIDUAL RISK LEVEL (H, M, L)
NO. HAZARD RISKSINITIAL RISK LEVEL (H, M, L)
CONTROL MEASURESRESIDUAL RISK LEVEL (H, M, L)
NO. HAZARD RISKSINITIAL RISK LEVEL (H, M, L)
CONTROL MEASURESRESIDUAL RISK LEVEL (H, M, L)
NO. HAZARD RISKSINITIAL RISK LEVEL (H, M, L)
CONTROL MEASURESRESIDUAL RISK LEVEL (H, M, L)
BY FARMERS.FOR FARMERS
Example Farm Risk Register
FARM NAME: BY:
NO. HAZARD RISKSINITIAL RISK LEVEL (H, M, L)
CONTROL MEASURESRESIDUAL RISK LEVEL (H, M, L)
VEHICLES/MACHINERY
1 Quad Bike Rollover, collision High SWP Motorbikes, Quad Bikes and Side X SidesSWP Refuelling
Medium
2 Tractor Rollover, entanglement, crushing High SWP Tractors Medium
3 Ute Rollover, collision Medium SWP Farm VehiclesSWP Refuelling
Low
LIVESTOCK
4 Yard work Crushing, impact injuries High SWP Livestock Medium
5 Moving stock Crushing, impact injuries Medium SWP Livestock, SWP Stock Movement on Public Roads, SWP Lone Worker
Low
GENERAL FARM HAZARDS
6 Hazardous Substances Fire, explosion, health effects, environmental damage
High SWP Hazardous Substances, Health Plan, Signage Medium
7 Working at height Falls High SWP Working at Height Medium
8 Slippery surfaces, holes and obstacles Slips, trips and falls Medium Adequate Lighting, Appropriate footwear, Handrails on steps, Grip on slippery surfaces
Low
9 Handling animals Impact injuries, goring, crushing, muscular skeletal injuries
High SWP Livestock Medium
10 Firewood Impact injuries, severe lacerations High SWP Manual Handling, SWP Farm Vehicles, Training and supervision
Medium
BY FARMERS.FOR FARMERS
NO. HAZARD RISKSINITIAL RISK LEVEL (H, M, L)
CONTROL MEASURESRESIDUAL RISK LEVEL (H, M, L)
11 Wool bale handling Crushing, muscular skeletal injuries Medium SWP Manual Handling Low
12 Lifting/stacking hay bales Crushing, muscular skeletal injuries High SWP Manual Handling Low
13 Feeding out Falls, muscular skeletal injuries High SWP Manual Handling, SWP Farm Vehicles Low
14 Horses Falls High SWP Farm Horses Medium
15 Rifles and shotguns Direct or indirect strike from projectiles High All users to hold appropriate, firearms license, training and supervision
Medium
16 Burn offs Uncontrolled fire High SWP Burn Offs Medium
17 Bodies of water Drowning High Supervise all children that can’t swim around water Low
Example Farm Risk Register continued