OPJSTPP 4X600 MW

OPJSTPP 4X600 MWTURBINE ERECTIONAnchor bolt stretching

Anchor bolt stretching

2 Hydraullic jacks of 100 tons each os to be used for anchor bolt elongation. 50 ton jack may stop taking load after few mm elongation3

Breach nut heating device supplied by BHEL varanasi4

5Breach nut heating arrangement

Breach nut heating arrangement with six cylinder.

6

Lifting of IP inlet pipe

Babbit material

Grating is to be place before start of LP turbine work

Parting plane gap problem16

L ring tightening of ip casing17