KSKMAHANADIPOWER COMPANYLTD. 6x600MWCoal BasedThermalPowerPlant)At Nariyara–Village,Janjgir- Champa-District.,Chhattisgarh SIX MONTHLY COMPLIANCE REPORT OF SPECIFIC CONDITIONS 13012/44/082007-A.II(T) Dated 19th Oct, 2009 FOR PERIOD: FOR PERIOD: FOR PERIOD: FOR PERIOD: JUNE,2013 TO JUNE,2013 TO JUNE,2013 TO JUNE,2013 TO NOV ,2013 NOV ,2013 NOV ,2013 NOV ,2013
62
Embed
KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
KSKMAHANADIPOWER
COMPANYLTD.6x600MWCoal
BasedThermalPowerPlant)At
Nariyara–Village,Janjgir-
Champa-District.,Chhattisgarh
SIX MONTHLY COMPLIANCE REPORT OF SPECIFIC CONDITIONS
13012/44/082007-A.II(T) Dated 19th Oct, 2009
FOR PERIOD: FOR PERIOD: FOR PERIOD: FOR PERIOD:
JUNE,2013 TO JUNE,2013 TO JUNE,2013 TO JUNE,2013 TO
NOV ,2013NOV ,2013NOV ,2013NOV ,2013
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 1 of 61
S.
No. Condition Compliance
1 Two tri-flue stacks of 275 m height
should be provided.
Noted and is being complied.
Tri Flue Chimney No.1: Flue-can, for
discharge of flue gas from Unit No.1,is
commissioned ; erection of balance flue cans
is under progress.(275mtr.-Ht.)
Tri-flue Chimney No.2: Flue-can, for
discharge of flue gas from Unit No.2,is ready
to get commisioned ; erection of balance flue
cans are under progress.(275mtr.-Ht.)
2
COC of 5 shall be maintained
Being maintained
3 To utilize fly ash generation from power
plant, the proponent should explore the
possibility of setting up either its own
cement plant /grinding unit and/or a
brick manufacturing unit of
50,000/1,00,000 bricks/day capacity,
and explore other possibilities of utilizing the fly ash in full form the
plantation have been targeted. Photos of the Greenbelt developed at site is
attached as Annexure-I.
7
An amount of 64 crore as capital and
Rs. 10 crore/annum as recurring should
be earmarked for the activities to be
taken up under CSR by the above
Details of CSR activities undertaken is
enclosed as Annexure-II
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 2 of 61
S.
No. Condition Compliance
proponent. Details of activities to be
undertaken in this regard should be
submitted.
8 High efficiency of Electrostatic
Precipitator (ESP) with spare fields shall
be installed to ensure that particulate
emission does not exceed 50 mg/Nm3.
High efficiency ESP + Fabric Filter
combination, with 99.9% efficiency is being
installed.
Note: ESP +FF combination is ready to get
commissioned, along with commissioning of Unit-3 (1 x 600MW)
9
Space provision shall be kept for
retrofitting of FGD system, if required at
a later date.
Space provision has been kept for retrofitting
of FGD system in Project lay out.
10 Adequate dust extraction such as cyclones/bag filters and water spray
system in dusty areas such as in coal
handling and ash handling points,
transfer areas and other vulnerable
dusty areas shall be provided.
Following provisions have been made to control the dust:
� 8 no’s of Pulse Jet type bag –filters will
be installed at Transfer-points meant
for Coal transport from CHP area to
boiler area.
� Water spray system is under
installation for Coal yard area.
� Fly ash silo top is mounted with 2 No’s
of Bag filters to arrest fugitive dust
11
A Sewage treatment plant shall be
provided and the treated sewage shall
be used for raising greenbelt/plantation.
STP having capacity of 27m3/Hr, is ready for
its commissioning for treating Domestic waste
water.
The treated waste water will be reused for
green belt and horticulture purpose.
12
Rainwater harvesting should be
adopted. Central Ground Water
Authority/board is consulted for
finalization of appropriate rain water
harvesting technology within a period of
three months from the date of clearance
and details shall be furnished.
Rain water harvesting structures have been
constructed as per approved plan of CGW
Rainwater harvesting pond has been created
wih a capacity of 60 CUM, abandoned bore
wells have been converted in to rain water
recharge wells and percolation structures have
been constructed in low lying areas
13
Adequate safety measures shall be provided in the plant area to check
/minimize spontaneous fires in coal
yard, especially during summer season.
Adequate provision for dust suppression system-water sprinkling arrangement has
been incorporated in the project in all dust
vulnerable areas including coal storage yard.
All safety measures will be adopted to check /
minimize any incidents of fire and especially in
summer season. Two full-fledged fire tenders
are available at site.
14 Storage facilities for auxiliary liquid fuel such as LDO/HFO/LSHS shall be made
in the plant area where risk is minimum
to the storage facilities. Disaster
Disaster Management Plan has been prepared as part of EIA report and the same will be
implemented during operation of the power
plant.
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 3 of 61
S.
No. Condition Compliance
Management Plan shall be prepared to
meet any eventuality in case of an
accident taking place. Sulphur content
in the liquid fuel not exceed 0.5%
16 Regular monitoring of ground water in
and around ash pond area including heavy metals (Hg,Cr,As,Pb) shall be
carried out, records maintained and six
monthly reports shall be furnished to
the Regional Office of this Ministry.
The data so obtained should be
compared with the baseline data so as
to ensure that the ground water quality
is not adversely affected due to the
project.
Regular Monitoring of ground water is being
done ,to have check on ingress of Heavy metals, in and around ash pond area.
17 A greenbelt of adequate width and
density shall be developed around the
plant periphery covering 1/3 rd of the
project area with local species.
A green belt of 5/6 tiers, in 100 mtr.s width is
being developed, along the periphery of the
plant boundary.
Species selection has been made on the basis
of local Climatological factors and soil
characteristics.
(i.e. Sisam, Peltraforms, Satvan, Karanj,
Siras, Simarua, Neem, Ganga emali, Pipal,
Kadam, Kesia Samia, Chinour, Kahua, Mango,
Bargad, Jamun, Amla, Gulmohar are being
used in rows to maintain canopy type
strata)
Till date total 1,25,000 no’s of saplings have
been planted in 69.0 hectares of project land
and further plantation is in progress.
For FY 2013-14, 50,000 no. of sapling
plantation have been targeted.
Photos of the Greenbelt developed at site is
attached as Annexure-I.
18 First Aid and sanitation arrangements
shall be made available for the drivers
and other contract workers during
construction phase.
Adequate arrangement for first aid, sanitation
and safe drinking water has been provided for
all drivers and contractor workers during
construction activities.
19 Regular monitoring of ground level
concentration of SO2, NOx, Hg, SPM and
RSPM shall be carried out in the impact
zone and records maintained. If at any
stage these levels are found to exceed
the prescribed limits, necessary control
measures shall be provided
immediately. The location of the
monitoring stations and frequency of
monitoring shall be decided in
Regular ambient air quality monitoring of
ground level concentration of SO2, NOx, Hg,
SPM and RSPM shall be carried out in the
impact zone as the units come under
operation. However, environmental monitoring
is in progress for construction stage.
Ambient air quality data for the period of June
to Nov.2013 is enclosed as Annexure-III.
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 4 of 61
S.
No. Condition Compliance
consultation with SPCB. Periodic reports
shall be submitted to the Regional Office
of this Ministry. The data shall also be
put on the website of the company.
20 The project proponent shall advertise in
at least two local newspapers widely
circulated in the region around the
project, one of which shall be in the vernacular language of the locality
/office of Municipal Corporation /Gram
Panchayat concerned and on the
company’s web site within seven days
from the date of this clearance letter,
informing that the project has been
accorded environmental clearance and
copies of clearance letter are available
with the State Pollution Control
Board/Committee and may also be seen
at Website of the Ministry of
Environment and Forests at
http://envfor.nic.in.
The Public Notice of Environmental Clearance
has been given in two newspapers namely,
The Haribhumi and Danik Bhaskar on
23.10.09 which are widely circulated in the region.
A copy of the same is enclosed as
Annexure-IV.
21 A copy of the clearance letter shall be
sent by the proponent to concerned
Panchayat, Zila Parisad / Municipal
Corporation, urban local Body and the
Local NGO, if any, from whom
suggestions/representations, if any,
received while processing the proposal.
The clearance letter shall also be put on the website of the Company by the
proponent.
Complied
Environmental Clearance letter has been
placed in the website of the company.
22 The proponent shall upload the status of
compliance of the stipulated EC
conditions, including results of
monitoring data on their website and
shall update the same periodically. It
shall simultaneously be sent to the
Regional Office of MoEF, the respective Zonal office of CPCB and the SPCB. The
criteria pollutant levels namely; SPM,
RSPM, SO2, NOx (ambient levels as well
as stack emissions) shall be monitored
and displayed at a convenient location
near the main gate of the company in
the public domain.
Status of compliance of EC conditions has
been uploaded as stipulated and is being
updated regularly on Six monthly bases.
Display board has been incorporated in the
project scheme and shall be complied after
commissioning of the plant.
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 5 of 61
S.
No. Condition Compliance
23
The project proponent shall also submit
six monthly reports on the status of
compliance of the stipulated EC
conditions including results of monitored
data (both in hard copies as well by e-
mail) to the respective Regional Office
of MOEF, the respective Zonal Office of
CPCB and the SPCB.
Half yearly report for the period of Nov,2012
to May,2013 has been submitted vide letter
no. MoE&F, BHPL/RJST/1500108/1110
Dt: 21.05.2013.
A copy of the letter is attached for as
Annexure-V.
24 The environment statement for each
financial year ending 31st March in
Form-V as is mandated to be submitted
by the project proponent to the
concerned State Pollution Control Board
as prescribed under the Environment
(Protection) Rules, 1986, as amended
subsequently, shall also be put on the
website of the company along with the
status of compliance of EC conditions
and shall also be sent to the respective
Regional Offices of MOEF by e-mail.
Shall be complied after commissioning of the
power plant.
25 A separate environment management
cell with qualified staff shall be set up
for implementation of the stipulated
environmental safeguards.
An Environment Management cell has been
setup, headed by Sr. General Manager.
26
Regional Office of the Ministry of
Environment & Forests located at
Bhopal will monitor the implementation
of the stipulated conditions. A complete
set of documents including
Environmental Impact Assessment
Report, Environment Management Plan
along with the additional information
submitted from time to time shall be
forwarded to the Regional Office for
their use during monitoring.
A complete set of documents has been
submitted to Regional Office of the Ministry
vide ref Ref: MOE&F, BHPL /AGRY /1160201
/1147 Dated 09.12.2009.
A copy of the letter is attached
Annexure-VI.
27 Separate funds shall be allocated for
implementation of environmental
protection measures along with item-
wise break-up. These cost shall be
included as part of the project cost. The
funds earmarked for the environment
protection measures shall not be
diverted for other purposes and year-
wise expenditure should be reported to
the Ministry.
As submitted in the EIA report separate fund
of Rs 1246 Cr has been provided for pollution
control, treatment and monitoring systems.
28
The project authorities shall inform the
Regional Office as well as the Ministry
regarding the date of financial closure
and final approval of the project by the
concerned authorities and the dates of
start of land development work and
• Date of financial closure: Feb,2010.
• Date of start of land development
work: Nov, 2009.
• Unit No.-1 (1 x 600 MW) is under
operation.
• Unit No.-2 (1 x 600 MW) is under
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 6 of 61
S.
No. Condition Compliance
commissioning of plant. commissioning.
• Work is in progress on fast track basis
for balance units
29 Full cooperation shall be extended to
the Scientists /Officers from the Ministry
/Regional Office of the Ministry at
Bangalore/the CPCB/ the SPCB who
would be monitoring the compliance of Environmental status.
Shall be complied as per the requirements of
CPCB and CECB Raipur, Chattisgarh
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 7 of 61
Annexure-I
NEEM TREE TO POWERMAKE CAMP-E
Y-JUNCTION TO ROGDA PATCH-NW
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 8 of 61
SE- BOUNDARY
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 9 of 61
CSR UPDATES Annexure-II
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 10 of 61
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 11 of 61
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 12 of 61
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 13 of 61
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 14 of 61
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 15 of 61
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 16 of 61
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 17 of 61
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 18 of 61
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 19 of 61
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 20 of 61
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 21 of 61
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 22 of 61
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 23 of 61
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 24 of 61
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 25 of 61
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 26 of 61
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 27 of 61
\
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 28 of 61
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 29 of 61
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 30 of 61
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 31 of 61
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 32 of 61
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 33 of 61
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 34 of 61
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 35 of 61
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 36 of 61
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 37 of 61
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 38 of 61
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 39 of 61
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 40 of 61
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 41 of 61
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 42 of 61
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 43 of 61
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 44 of 61
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 45 of 61
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 46 of 61
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 47 of 61
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 48 of 61
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 49 of 61
Annexure-III Ambient Air Quality Monitoring.
KSK Mahanadi Power Company Limited is regularly carrying out the environmental monitoring in and around plant site, as it is a requirement under consent for Establishment from CECB, Chhattisgarh. KSK Mahanadi Power Company Limited entrusted the job of regular environmental monitoring to M/s. Vimta Lab Ltd, Hyderabad.
AMBIENT AIR QUALITY MONITORING LOCATIONS
Monitored values of key environmental parameters as per National Ambient air quality Norm is mentioned in the subsequent section of this report.
PM2.5 µµµµg/m3
PM10 µµµµg/m3
SO2
µµµµg/m3 NOx
µµµµg/m3 CO
µµµµg/m3
Limits as per NAAQS
60 100 ? ? ?
Test Methods Gravimetric Method Improved West & Geake
Modified Jacob &
Hochheiser Method
NDIR spectroscopy method
Teflon filter paper was used in PM2.5 & Whatman filter paper for PM10 weighed in Mettler electronic balance and computed as per standard methods PM2.5, PM10, SO2, NOx is monitored on 24 hrs. Basis ,while CO is monitored on 8 hours basis (The values are expressed in µg/m3 ) The results of the monitored data indicate that the ambient air quality of the region in general is conformity with respect to norms of National Ambient Air Quality standards of CPCB, at all locations monitored.
Location Code
Location Name Direction w.r.t Plant
Distance from Plant (Km)
Inside the Premises A1 Plant Site - -
Outside the Premises A2 Jhalmaladar Village S 2.2 A3 Akaltara Village N 4.6 A4 Amora Village W 4.0 A5 Akirari Village E 3.1
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 50 of 61
Geographical location of the Plant
CHHATTISG
Plant Site
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 51 of 61
Topographic features & AAQM-Stations
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 52 of 61
1. PLANT SITE (Admin. Building) – AAQM-1: Monitoring Date
PM2.5 µµµµg/m3 PM10 µµµµg/m3
SO2
µµµµg/m3 NOx
µµµµg/m3 CO
µµµµg/m3
I II III
29.04.2013 22.9 58.6 11.2 12.5 241 261 236
30.04.2013 23.3 59.6 12.3 13.6 236 258 234
06.05.2013 22.5 56.3 11.6 12.4 238 251 230
07.05.2013 24.5 61.2 10.8 11.9 232 264 238
13.05.2013 22.0 59.3 11.2 12.5 235 259 234
14.05.2013 24.8 62.7 10.9 11.8 229 262 229
20.05.2013 21.7 57.3 10.7 11.5 234 259 236
21.05.2013 22.6 60.4 11.5 12.6 230 257 240
27.05.2013 22.7 59.3 12.2 13.4 236 260 234
03.06.2013 24.3 62.3 11.8 12.9 233 256 228
04.06.2013 23.8 60.7 12.6 13.5 234 267 241
10.06.2013 23.5 58.9 12.2 13.1 232 259 236
11.06.2013 25.4 63.4 11.4 12.6 241 262 231
17.06.2013 22.7 61.2 11.1 12.4 243 268 248
18.06.2013 24.1 60.8 12.3 13.5 232 259 236
24.06.2013 21.7 57.2 11.7 12.6 238 264 245
25.06.2013 22.2 59.3 11.2 12.4 244 272 251
01.07.2013 22.1 59.4 12.4 13.7 239 260 234
02.07.2013 21.3 57.6 11.8 12.5 237 271 238
08.07.2013 23.1 60.2 11.4 12.3 235 263 233
09.07.2013 22.9 61.4 13.1 14.3 244 267 239
15.07.2013 24.3 62.1 13.3 14.6 246 275 243
16.07.2013 21.2 56.3 12.7 13.8 238 266 239
22.07.2013 23.4 59.5 12.9 14.1 243 268 241
23.07.2013 20.9 56.8 12.5 13.6 249 265 246
05.08.2013 22.3 56.4 12.5 14.1 222 264 231
06.08.2013 21.9 52.7 11.6 12.8 237 271 227
12.08.2013 18.4 48.6 10.4 11.6 214 262 235
13.08.2013 17.6 46.5 13.2 14.9 229 251 243
19.08.2013 16.8 40.2 11.7 12.7 237 273 238
20.08.2013 19.4 43.6 10.6 11.6 241 266 246
26.08.2013 20.4 42.2 12.4 13.7 228 246 237
27.08.2013 19.6 40.8 13.6 14.6 236 259 228
02.09.2013 18.6 49.3 10.9 13.1 226 259 228
03.09.2013 19.9 51.1 12.3 13.9 239 274 231
09.09.2013 21.3 54.7 13.1 14.4 217 265 229
10.09.2013 20.7 56.5 11.4 12.9 233 254 236
16.09.2013 19.1 44.8 12.9 14.2 239 278 234
17.09.2013 22.5 57.1 13.8 15.3 243 261 241
23.09.2013 17.8 40.3 10.5 11.8 231 249 239
24.09.2013 18.5 41.6 10.7 12.2 240 264 232
02.10.2013 19.2 48.5 11.8 13.6 241 264 235
03.10.2013 20.1 50.8 10.8 12.7 236 270 244
07.10.2013 22.2 55.8 12.6 14.8 234 261 238
08.10.2013 21.6 54.2 12.8 14.5 238 258 228
16.10.2013 19.8 45.6 11.6 13.4 246 271 250
17.10.2013 21.4 52.1 12.4 14.3 238 266 243
23.10.2013 18.5 41.4 10.7 12.5 234 259 240
24.10.2013 19.4 43.6 12.3 14.6 240 268 248
04.11.2013 19.6 50.2 11.8 12.9 251 275 245
05.11.2013 19.0 48.6 11.8 13.5 234 267 241
11.11.2013 21.5 53.7 12.7 14.2 254 283 258
12.11.2013 19.7 51.3 14.1 15.3 243 264 233
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 53 of 61
18.11.2013 17.6 47.4 13.0 14.4 249 275 254
19.11.2013 19.6 49.5 12.3 13.8 245 274 250
25.11.2013 18.2 48.1 13.2 14.6 242 268 248
26.11.2013 15.6 42.3 12.3 13.7 252 281 260
Max. 25.4 61.2 13.6 15.4 252 283 260
Min. 17.6 40.2 10.4 11.5 231 251 231
Average 21.08 53.35 12.01 13.34 237.33 264.43 238.77
2. JHALMALADAR –AAQM-2
Monitoring Date
PM2.5 µµµµg/m3 PM10 µµµµg/m3
SO2
µµµµg/m3 NOx
µµµµg/m3 CO
µµµµg/m3
I II III
29.04.2013 20.2 47.6 12.2 13.3 234 258 231
30.04.2013 22.7 51.9 11.6 12.8 239 267 236
06.05.2013 24.6 54.3 11.8 12.9 235 253 239
07.05.2013 23.1 50.8 11.3 12.5 231 257 233
13.05.2013 21.3 49.3 10.9 11.7 229 250 235
14.05.2013 20.6 46.2 11.7 12.6 234 254 223
20.05.2013 21.7 48.2 10.8 11.4 238 256 237
21.05.2013 23 51.1 12.4 13.1 236 252 230
27.05.2013 21.6 49.6 11.2 12.5 228 249 234
03.06.2013 21.0 49.6 11.8 12.7 230 263 238
04.06.2013 23.3 53.4 12.4 13.3 235 260 241
10.06.2013 23.6 52.1 12.9 13.6 244 265 234
11.06.2013 23.4 51.6 11.7 12.9 240 269 245
17.06.2013 22.8 52.8 11.3 12.5 240 263 235
18.06.2013 22.2 49.7 12.2 13.3 242 267 247
24.06.2013 23.1 51.3 11.6 12.7 235 262 239
25.06.2013 24.2 53.8 12.1 13.3 240 268 248
01.07.2013 19.6 47.5 13.1 14.4 239 267 236
02.07.2013 21.9 49.8 12.8 13.9 238 264 243
08.07.2013 22.2 50.4 12.6 13.7 249 271 241
09.07.2013 20.5 49.6 12.5 13.4 244 273 239
15.07.2013 20.9 51.1 12.9 14.1 247 268 243
16.07.2013 23.4 52.4 12.7 13.8 245 270 246
22.07.2013 20.7 48.6 13.0 14.3 241 267 240
23.07.2013 21.3 50.7 11.9 13.1 244 271 241
05.08.2013 20.4 46.8 12.2 13.3 235 255 233
06.08.2013 21.7 44.7 13.4 14.6 231 272 241
12.08.2013 16.9 40.2 11.8 12.4 246 264 253
13.08.2013 17.9 39.8 10.9 11.6 233 259 238
19.08.2013 18.5 41.2 12.7 13.8 254 246 246
20.08.2013 19.2 37.8 11.6 12.9 248 272 238
26.08.2013 20.1 42.3 12.5 13.2 239 249 244
27.08.2013 18.8 39.9 13.6 14.7 244 263 239
02.09.2013 18.6 42.7 10.6 11.4 238 256 234
03.09.2013 20.1 45.3 11.3 12.2 235 275 243
09.09.2013 19.3 44.5 12.9 14.1 242 268 257
10.09.2013 21.5 46.9 11.7 12.6 237 261 234
16.09.2013 20.8 45.6 10.8 11.5 245 257 239
17.09.2013 20.3 44.9 13.4 14.7 241 266 235
23.09.2013 17.6 40.2 13.8 14.9 243 258 242
24.09.2013 19.1 44.1 12.5 13.8 247 275 245
02.10.2013 19.5 43.2 11.2 12.9 235 269 243
03.10.2013 21.8 44.6 10.8 12.6 239 265 246
07.10.2013 20.5 43.7 11.4 13.2 252 274 242
08.10.2013 21.4 45.8 12.6 14.4 231 259 236
16.10.2013 21.8 44.3 11.2 13.2 249 273 244
17.10.2013 20.3 42.4 12.4 14.8 239 264 242
23.10.2013 18.7 41.3 11.7 13.4 241 269 246
24.10.2013 19.5 42.7 10.8 12.8 239 266 241
04.11.2013 18.1 42.7 11.6 13.3 230 263 238
05.11.2013 17.3 39.6 12.4 13.7 249 276 256
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 54 of 61
11.11.2013 20.1 44.5 13.4 14.5 259 281 248
12.11.2013 19.7 43.3 13.5 15.1 233 261 238
18.11.2013 18.1 41.9 12.0 13.2 244 267 238
19.11.2013 19.5 43.6 11.7 12.9 241 266 246
25.11.2013 18.1 40.2 11.7 13.1 231 258 236
26.11.2013 19.9 44.1 12.4 13.8 247 275 254
Max. 24.6 54.3 13.8 14.9 259 276 256
Min. 17.6 41.3 11.3 11.4 228 250 231
Average 20.66 46.28 12.06 13.27 239.89 255.11 240.50
3. AKIRARI VILLAGE – AAQM-3 : Monitoring Date
PM2.5 µµµµg/m3 PM10 µµµµg/m3
SO2
µµµµg/m3 NOx
µµµµg/m3 CO
µµµµg/m3
I II III
29.04.2013 20.2 46.3 10.6 11.8 233 268 237
30.04.2013 20.3 49.2 11.9 12.7 231 259 226
06.05.2013 21.3 50.7 11.2 12.4 228 254 230
07.05.2013 19.8 49.3 10.8 11.6 230 262 234
13.05.2013 22.2 51.1 11.1 12.3 237 258 238
14.05.2013 20.9 48.6 12.3 13.4 229 253 236
20.05.2013 18.7 46.3 11.7 12.5 238 264 226
21.05.2013 18.5 44.9 11.3 12.6 236 261 230
27.05.2013 19.2 45.2 10.7 11.8 229 255 234
03.06.2013 21.1 48.5 11.3 12.5 235 262 242
04.06.2013 19.0 47.3 12.2 13.1 228 255 233
10.06.2013 21.3 51.6 11.7 12.6 236 261 241
11.06.2013 20.3 47.2 11.6 12.4 234 257 229
17.06.2013 21.4 50.9 12.2 13.3 225 252 230
18.06.2013 21.2 51.4 11.4 12.6 239 259 229
24.06.2013 21.4 49.3 11.2 12.4 228 260 235
25.06.2013 21.3 52.7 10.9 12.1 233 258 239
01.07.2013 19.7 46.5 12.1 13.3 238 266 237
02.07.2013 21.1 48.3 11.8 12.9 232 259 231
08.07.2013 20.4 49.6 12.4 13.5 239 264 236
09.07.2013 19.3 46.2 12.7 13.9 237 261 233
15.07.2013 19.9 47.7 11.6 12.8 229 256 227
16.07.2013 19.1 46.0 12.3 13.1 243 262 240
22.07.2013 20.2 47.3 12.9 14.0 231 264 229
23.07.2013 18.8 45.9 11.8 13.2 237 261 235
05.08.2013 22.6 46.6 12.3 13.9 241 255 238
06.08.2013 20.4 47.5 13.1 14.5 236 268 241
12.08.2013 19.3 41.2 12.4 13.8 228 271 254
13.08.2013 18.5 40.8 11.6 12.7 231 264 239
19.08.2013 17.6 38.9 10.8 11.2 242 253 246
20.08.2013 18.8 41.3 11.6 12.9 239 249 253
26.08.2013 20.6 40.6 12.4 13.7 219 261 248
27.08.2013 19.9 48.4 13.1 14.6 225 254 237
02.09.2013 18.6 42.7 10.6 11.4 238 256 234
03.09.2013 20.1 45.3 11.3 12.2 235 275 243
09.09.2013 19.3 44.5 12.9 14.1 242 268 257
10.09.2013 21.5 46.9 11.7 12.6 237 261 234
16.09.2013 20.8 45.6 10.8 11.5 245 257 239
17.09.2013 20.3 44.9 13.4 14.7 241 266 235
23.09.2013 17.6 40.2 13.8 14.9 243 258 242
24.09.2013 19.1 44.1 12.5 13.8 247 275 245
02.10.2013 19.3 42.6 12.1 14.3 232 259 239
03.10.2013 22.2 49.6 10.8 12.3 239 267 244
07.10.2013 17.8 40.1 12.1 14.4 247 273 252
08.10.2013 20.5 45.4 12.3 14.4 256 281 251
16.10.2013 21.7 43.2 11.8 13.1 248 277 253
17.10.2013 18.4 41.2 12.4 14.4 248 269 238
23.10.2013 20.4 43.7 11.7 13.6 240 274 248
24.10.2013 21.8 44.1 10.9 12.4 255 282 261
04.11.2013 17.9 41.2 12.1 13.5 234 261 241
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 55 of 61
05.11.2013 19.2 47.9 11.4 12.7 248 277 253
11.11.2013 17.3 42.0 12.0 13.2 259 286 264
12.11.2013 19.9 46.3 13.3 14.6 246 270 241
18.11.2013 19.2 45.6 12.1 13.5 236 264 241
19.11.2013 15.9 38.7 11.9 12.9 251 273 241
25.11.2013 19.1 44.1 12.7 14.5 235 269 243
26.11.2013 19.3 47.8 12.8 14.2 247 274 254
Max. 21.7 51.4 13.8 14.5 259 286 264
Min. 17.3 38.7 10.8 11.8 228 253 226
Average 19.88 45.68 11.93 13.17 237.36 263.64 240.09
4. Amora Village – AAQM-4
Monitoring Date
PM2.5 µµµµg/m3 PM10 µµµµg/m3
SO2
µµµµg/m3 NOx
µµµµg/m3 CO
µµµµg/m3
Particulate Matter
I II III
29.04.2013 21.2 48.6 12.1 13.3 250 280 246
03.05.2013 23.4 52.1 11.6 12.7 245 275 252
06.05.2013 21.2 47.6 11.9 13.1 243 281 254
10.05.2013 21.6 49.3 11.4 12.6 252 279 247
13.05.2013 21.2 45.8 12.3 13.5 249 286 245
17.05.2013 23.2 51.2 11.5 12.8 238 272 243
20.05.2013 21.4 48.3 11.8 13.0 246 281 248
24.05.2013 22.1 49.2 11.6 12.7 241 279 239
27.05.2013 20.9 46.3 11.1 12.4 247 284 242
31.05.2013 21.9 50.3 11.6 12.6 243 272 241
03.06.2013 22.2 49.6 11.9 13.1 241 269 244
07.06.2013 22.9 51.2 11.6 12.9 248 277 251
10.06.2013 23.4 53.4 12.3 13.4 240 271 242
14.06.2013 22.5 48.6 11.4 12.6 245 275 253
17.06.2013 20.9 46.3 11.9 13.3 252 285 251
21.06.2013 21.8 49.2 11.5 12.7 239 276 244
24.06.2013 23.1 51.4 11.3 12.5 244 283 236
28.06.2013 22.3 45.3 12.2 14.6 238 268 246
01.07.2013 20.7 43.7 11.7 13.4 246 274 251
05.07.2013 21.1 46.2 12.3 14.3 237 266 249
08.07.2013 22.6 41.6 11.8 13.7 244 281 238
12.07.2013 20.7 42.1 10.6 12.2 236 269 243
15.07.2013 19.5 40.5 12.7 14.9 249 274 257
19.07.2013 20.7 41.3 12.3 14.2 247 279 253
22.07.2013 18.9 39.7 11.9 14.1 244 282 262
02.08.2013 21.8 40.3 13.1 15.2 241 272 239
05.08.2013 22.6 38.1 12.4 14.5 264 254 241
09.08.2013 20.7 39.8 10.5 11.6 257 264 237
12.08.2013 18.6 40.5 13.7 14.8 241 246 229
16.08.2013 17.5 38.2 12.4 13.9 239 255 246
19.08.2013 19.4 36.3 11.9 12.6 251 238 234
23.08.2013 20.2 39.8 10.2 11.7 237 278 243
26.08.2013 16.7 38.5 11.4 12.3 245 269 237
30.08.2013 18.4 39.7 10.6 12.2 243 275 241
02.09.2013 16.9 38.9 11.9 12.7 251 264 247
06.09.2013 19.3 41.5 13.3 14.5 249 270 243
09.09.2013 21.7 42.8 12.1 13.3 245 254 238
13.09.2013 19.1 41.0 13.8 15.1 244 258 241
16.09.2013 22.4 42.5 10.4 11.9 237 261 230
20.09.2013 18.2 40.4 11.8 13.1 241 276 238
23.09.2013 20.8 42.1 12.5 13.8 249 278 244
04.10.2013 19.5 38.5 11.2 13.2 245 278 242
05.10.2013 17.2 37.6 10.8 12.4 255 266 249
09.10.2013 18.5 40.5 12.3 14.8 248 275 245
10.10.2013 20.8 39.6 11.8 13.9 242 258 240
14.10.2013 19.7 40.2 13.2 15.4 246 260 242
15.10.2013 21.4 41.7 11.5 13.1 238 262 232
21.10.2013 19.5 38.4 10.9 12.5 248 272 240
22.10.2013 20.5 41.9 11.4 13.4 247 279 241
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 56 of 61
06.11.2013 15.9 36.5 12.9 14.3 249 273 244
07.11.2013 18.0 40.2 11.7 12.9 243 278 251
13.11.2013 17.7 39.6 14.2 15.7 256 286 261
14.11.2013 18.1 41.3 13.1 14.3 248 269 238
20.11.2013 16.6 35.8 13.6 15.1 255 281 260
21.11.2013 18.4 40.7 12.5 13.9 244 273 249
27.11.2013 16.2 36.6 13.0 14.4 251 278 258
28.11.2013 17.1 38.2 12.4 13.8 253 282 261
Max. 22.9 52.1 14.2 15.7 256 282 258
Min. 16.2 36.3 11.1 12.4 237 258 229
Average 20.18 42.98 11.97 13.45 245.71 271.92 244.77
5. SONSARI VILLAGE – AAQM5
Monitoring Date
PM2.5 µµµµg/m3 PM10 µµµµg/m3
SO2
µµµµg/m3 NOx
µµµµg/m3 CO
µµµµg/m3
I II III
29.04.2013 22.0 48.6 11.1 12.3 250 285 247
03.05.2013 20.5 45.9 12.2 13.4 255 293 250
06.05.2013 22.4 51.3 11.6 12.5 251 281 243
10.05.2013 21.7 49.4 10.9 11.8 257 286 251
13.05.2013 21.1 47.6 11.4 12.5 249 282 255
17.05.2013 22.7 50.3 11.6 12.9 253 294 249
20.05.2013 21.1 48.2 12.1 13.4 256 290 256
24.05.2013 21.3 47.6 11.8 12.6 248 286 252
27.05.2013 23.1 51.2 12.5 13.7 251 289 248
31.05.2013 23.5 51.8 11.7 12.7 245 281 242
03.06.2013 23.7 53.2 12.1 13.1 250 286 246
07.06.2013 20.9 47.9 11.6 12.9 248 279 249
10.06.2013 22.1 50.3 10.3 11.4 252 282 244
14.06.2013 22.8 51.4 11.2 12.2 246 276 250
17.06.2013 21.9 48.5 12.3 13.3 251 291 243
21.06.2013 22.1 50.5 11.7 12.9 253 295 249
24.06.2013 22.2 49.6 11.9 13.3 244 280 247
28.06.2013 21.3 47.8 12.3 14.6 251 279 251
01.07.2013 22.4 44.6 11.8 13.9 246 267 244
05.07.2013 21.8 43.5 11.4 13.2 253 272 239
08.07.2013 20.6 45.8 12.7 14.8 247 264 242
12.07.2013 19.8 41.8 11.6 13.3 238 274 257
15.07.2013 21.3 46.2 13.2 14.9 241 288 239
19.07.2013 20.4 41.5 12.7 14.5 237 281 243
22.07.2013 20.7 42.8 12.5 14.2 234 283 252
02.08.2013 20.8 42.5 13.2 14.9 266 281 264
05.08.2013 19.8 39.6 10.4 11.3 271 273 240
09.08.2013 20.7 41.2 12.5 13.6 258 266 238
12.08.2013 16.3 40.7 13.6 14.1 246 257 257
16.08.2013 18.5 36.7 12.7 13.9 238 274 249
19.08.2013 17.3 37.5 11.9 12.4 259 268 266
23.08.2013 18.8 35.4 10.8 11.8 248 258 237
26.08.2013 19.4 39.2 12.5 14.6 233 255 245
30.08.2013 17.4 38.6 11.5 12.4 245 278 269
02.09.2013 21.1 41.8 12.9 14.3 258 276 246
06.09.2013 19.5 40.3 10.7 11.9 261 283 255
09.09.2013 18.3 39.7 11.3 12.1 239 253 241
13.09.2013 19.9 40.6 13.6 14.8 244 279 252
16.09.2013 20.3 41.4 12.4 13.9 251 270 267
20.09.2013 17.9 38.9 11.7 12.5 245 261 239
23.09.2013 16.7 36.5 13.2 14.5 239 261 251
04.10.2013 18.5 39.6 12.4 14.6 248 280 271
05.10.2013 20.9 42.5 11.9 12.9 255 272 248
09.10.2013 18.8 41.3 11.4 13.5 265 285 259
10.10.2013 19.4 38.5 12.4 14.5 240 252 248
14.10.2013 20.4 39.4 12.8 14.9 242 281 256
15.10.2013 21.3 42.5 11.4 13.4 256 272 268
21.10.2013 18.6 37.5 10.2 12.7 241 266 242
22.10.2013 17.4 38.4 11.9 13.4 245 264 257
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 57 of 61
06.11.2013 16.8 37.1 13.0 14.2 243 278 251
07.11.2013 18.0 40.3 12.7 13.7 256 283 262
13.11.2013 15.8 36.5 11.6 13.1 259 281 248
14.11.2013 18.1 41.1 13.7 15.2 258 289 264
20.11.2013 16.9 38.2 12.9 14.1 250 274 244
21.11.2013 18.5 40.9 12.6 13.6 253 279 258
27.11.2013 16.8 38.3 13.9 15.3 254 283 258
28.11.2013 16.6 37.2 12.5 13.9 248 277 256
Max. 22.8 45.8 13.9 15.3 266 289 262
Min. 15.8 36.4 10.2 11.8 234 252 239
Average 19.88 43.10 12.07 13.44 249.47 276.71 250.77
6. NARIYARA VILLAGE- AAQM-6
Monitoring Date
PM2.5 µµµµg/m3
PM10 µµµµg/m3
SO2
µµµµg/m3 NOx
µµµµg/m3 CO
µµµµg/m3
I II III
29.04.2013 22.2 49.6 12.3 13.5 243 263 239
03.05.2013 20.5 45.3 11.9 12.6 240 255 245
06.05.2013 21.3 47.2 12.1 13.4 245 254 238
10.05.2013 22.7 50.6 11.4 12.5 248 259 243
13.05.2013 21.0 47.3 11.8 12.9 242 261 246
17.05.2013 22.4 49.6 12.4 13.6 246 268 237
20.05.2013 21.9 51.2 11.3 12.4 249 265 240
24.05.2013 22.6 49.6 11.7 13.6 243 262 246
27.05.2013 20.8 47.3 12.2 13.5 247 266 241
31.05.2013 22.9 51.3 11.1 12.4 248 261 244
03.06.2013 22.0 48.6 11.8 12.7 245 266 241
07.06.2013 23.7 52.4 12.0 13.1 241 258 235
10.06.2013 21.8 48.6 12.2 13.5 253 263 248
14.06.2013 22.7 51.2 11.5 12.4 244 257 242
17.06.2013 21.5 47.6 11.9 13.2 256 263 249
21.06.2013 20.7 48.2 12.2 13.4 252 261 247
24.06.2013 22.9 50.3 11.6 12.7 249 259 243
28.06.2013 23.4 52.1 11.8 13.4 252 267 248
01.07.2013 22.6 49.3 12.1 14.6 246 264 264
05.07.2013 22.7 48.6 11.9 13.8 251 251 244
08.07.2013 23.5 51.1 12.7 14.3 262 256 253
12.07.2013 20.6 46.6 11.5 13.3 247 272 259
15.07.2013 22.3 48.9 12.4 14.2 243 269 243
19.07.2013 20.8 43.4 12.1 14.3 239 264 241
22.07.2013 21.1 45.2 11.9 13.9 261 257 252
02.08.2013 21.6 45.6 12.6 14.9 266 258 254
05.08.2013 20.8 39.8 13.4 15.3 244 263 263
09.08.2013 22.4 41.3 11.8 12.7 256 249 271
12.08.2013 19.6 39.5 10.9 11.5 238 251 264
16.08.2013 18.4 36.7 14.6 15.1 247 267 244
19.08.2013 17.6 35.9 13.5 14.8 249 253 268
23.08.2013 20.6 36.4 12.4 13.4 268 249 233
26.08.2013 19.4 33.7 13.3 14.2 271 273 246
30.08.2013 19.8 40.3 10.9 11.7 254 263 249
02.09.2013 21.6 41.5 12.4 13.6 248 267 261
06.09.2013 17.9 36.8 13.6 14.9 259 274 264
09.09.2013 18.4 38.2 12.8 13.8 244 278 251
13.09.2013 20.1 40.7 11.2 12.6 238 263 245
16.09.2013 22.5 41.9 13.1 15.1 244 266 250
20.09.2013 18.2 37.9 14.3 15.9 253 270 241
23.09.2013 21.1 39.5 11.4 13.2 258 279 253
04.10.2013 20.1 41.2 11.4 13.7 258 271 250
05.10.2013 19.5 40.6 10.8 12.4 247 269 265
09.10.2013 16.5 38.8 12.7 14.6 260 272 263
10.10.2013 19.7 39.6 11.8 13.2 242 280 255
14.10.2013 21.2 41.7 12.9 14.2 239 269 242
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 58 of 61
15.10.2013 19.7 38.5 12.5 14.7 241 262 258
21.10.2013 21.1 36.4 11.4 13.8 251 274 247
22.10.2013 22.3 40.2 12.7 14.8 260 280 251
06.11.2013 17.1 38.2 12.8 14.3 245 273 252
07.11.2013 18.4 40.6 12.6 13.6 256 286 261
13.11.2013 16.2 35.9 13.8 15.1 252 278 257
14.11.2013 16.7 37.2 12.4 13.7 265 291 260
20.11.2013 17.3 39.1 12.5 13.5 256 286 261
21.11.2013 18.4 40.6 13.5 14.9 255 277 245
27.11.2013 16.4 38.2 13.0 14.3 249 284 257
28.11.2013 18.0 39.4 13.3 14.6 248 275 255
Max. 22.9 51.2 14.3 15.1 268 284 268
Min. 16.2 35.5 10.9 12.4 238 251 240
Average 20.51 43.38 12.28 13.70 250.05 266.50 250.54
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 59 of 61
ANNEXURE-IV
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 60 of 61
ANNEXURE-V
KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.
Environmental compliance report 2013 Page 61 of 61