KSKMAHANADIPOWER COMPANYLTD. 6x600MWCoal BasedThermalPowerPlant)At Nariyara–Village,Janjgir- Champa-District.,Chhattisgarh SIX MONTHLY COMPLIANCE REPORT OF SPECIFIC CONDITIONS 13012/44/082007-A.II(T) Dated 19th Oct, 2009 FOR PERIOD: FOR PERIOD: FOR PERIOD: FOR PERIOD: JUNE,2013 TO JUNE,2013 TO JUNE,2013 TO JUNE,2013 TO NOV ,2013 NOV ,2013 NOV ,2013 NOV ,2013
62

KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

Jul 29, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSKMAHANADIPOWER

COMPANYLTD.6x600MWCoal

BasedThermalPowerPlant)At

Nariyara–Village,Janjgir-

Champa-District.,Chhattisgarh

SIX MONTHLY COMPLIANCE REPORT OF SPECIFIC CONDITIONS

13012/44/082007-A.II(T) Dated 19th Oct, 2009

FOR PERIOD: FOR PERIOD: FOR PERIOD: FOR PERIOD:

JUNE,2013 TO JUNE,2013 TO JUNE,2013 TO JUNE,2013 TO

NOV ,2013NOV ,2013NOV ,2013NOV ,2013

Page 2: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 1 of 61

S.

No. Condition Compliance

1 Two tri-flue stacks of 275 m height

should be provided.

Noted and is being complied.

Tri Flue Chimney No.1: Flue-can, for

discharge of flue gas from Unit No.1,is

commissioned ; erection of balance flue cans

is under progress.(275mtr.-Ht.)

Tri-flue Chimney No.2: Flue-can, for

discharge of flue gas from Unit No.2,is ready

to get commisioned ; erection of balance flue

cans are under progress.(275mtr.-Ht.)

2

COC of 5 shall be maintained

Being maintained

3 To utilize fly ash generation from power

plant, the proponent should explore the

possibility of setting up either its own

cement plant /grinding unit and/or a

brick manufacturing unit of

50,000/1,00,000 bricks/day capacity,

and explore other possibilities of utilizing the fly ash in full form the

stipulated period.

Dry Fly ash is being supplied to cement

industries in closed bulkers.

4

For post project monitoring, the

proponent should set up piezometric

monitoring station around the ash pond.

Installation of Piezometer’s is under progress.

5 From 4th year onwards, the

transportation of coal should be through

rail only.

Coal procurement and transportation through

railway has started from November 2013.

6

The green belt to be provided should be

of canopy type with three tiers.

A green belt of 5/6 tiers, in 100 mtr.s width is

being developed, along the periphery of the

plant boundary.

Species selection has been made on the basis

of local Climatological factors and soil

characteristics. (i.e. Sisam, Peltofaorm, Satvan, Karanj, Siras,

Simarua, Neem, Ganga emili, Pepal, Kadam,

Kesia Samia, Chinour, Arjuna, Mango, Bargad,

Jamun, Amla, Gulmohar are being used in

rows to maintain canopy type and strata)

Till date total 1,25,000 number of saplings

have been planted in 69.0 hectares of project

land and further plantation is in progress.

For FY 2013-14, 50,000 no. of sapling

plantation have been targeted. Photos of the Greenbelt developed at site is

attached as Annexure-I.

7

An amount of 64 crore as capital and

Rs. 10 crore/annum as recurring should

be earmarked for the activities to be

taken up under CSR by the above

Details of CSR activities undertaken is

enclosed as Annexure-II

Page 3: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 2 of 61

S.

No. Condition Compliance

proponent. Details of activities to be

undertaken in this regard should be

submitted.

8 High efficiency of Electrostatic

Precipitator (ESP) with spare fields shall

be installed to ensure that particulate

emission does not exceed 50 mg/Nm3.

High efficiency ESP + Fabric Filter

combination, with 99.9% efficiency is being

installed.

Note: ESP +FF combination is ready to get

commissioned, along with commissioning of Unit-3 (1 x 600MW)

9

Space provision shall be kept for

retrofitting of FGD system, if required at

a later date.

Space provision has been kept for retrofitting

of FGD system in Project lay out.

10 Adequate dust extraction such as cyclones/bag filters and water spray

system in dusty areas such as in coal

handling and ash handling points,

transfer areas and other vulnerable

dusty areas shall be provided.

Following provisions have been made to control the dust:

� 8 no’s of Pulse Jet type bag –filters will

be installed at Transfer-points meant

for Coal transport from CHP area to

boiler area.

� Water spray system is under

installation for Coal yard area.

� Fly ash silo top is mounted with 2 No’s

of Bag filters to arrest fugitive dust

11

A Sewage treatment plant shall be

provided and the treated sewage shall

be used for raising greenbelt/plantation.

STP having capacity of 27m3/Hr, is ready for

its commissioning for treating Domestic waste

water.

The treated waste water will be reused for

green belt and horticulture purpose.

12

Rainwater harvesting should be

adopted. Central Ground Water

Authority/board is consulted for

finalization of appropriate rain water

harvesting technology within a period of

three months from the date of clearance

and details shall be furnished.

Rain water harvesting structures have been

constructed as per approved plan of CGW

Rainwater harvesting pond has been created

wih a capacity of 60 CUM, abandoned bore

wells have been converted in to rain water

recharge wells and percolation structures have

been constructed in low lying areas

13

Adequate safety measures shall be provided in the plant area to check

/minimize spontaneous fires in coal

yard, especially during summer season.

Adequate provision for dust suppression system-water sprinkling arrangement has

been incorporated in the project in all dust

vulnerable areas including coal storage yard.

All safety measures will be adopted to check /

minimize any incidents of fire and especially in

summer season. Two full-fledged fire tenders

are available at site.

14 Storage facilities for auxiliary liquid fuel such as LDO/HFO/LSHS shall be made

in the plant area where risk is minimum

to the storage facilities. Disaster

Disaster Management Plan has been prepared as part of EIA report and the same will be

implemented during operation of the power

plant.

Page 4: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 3 of 61

S.

No. Condition Compliance

Management Plan shall be prepared to

meet any eventuality in case of an

accident taking place. Sulphur content

in the liquid fuel not exceed 0.5%

16 Regular monitoring of ground water in

and around ash pond area including heavy metals (Hg,Cr,As,Pb) shall be

carried out, records maintained and six

monthly reports shall be furnished to

the Regional Office of this Ministry.

The data so obtained should be

compared with the baseline data so as

to ensure that the ground water quality

is not adversely affected due to the

project.

Regular Monitoring of ground water is being

done ,to have check on ingress of Heavy metals, in and around ash pond area.

17 A greenbelt of adequate width and

density shall be developed around the

plant periphery covering 1/3 rd of the

project area with local species.

A green belt of 5/6 tiers, in 100 mtr.s width is

being developed, along the periphery of the

plant boundary.

Species selection has been made on the basis

of local Climatological factors and soil

characteristics.

(i.e. Sisam, Peltraforms, Satvan, Karanj,

Siras, Simarua, Neem, Ganga emali, Pipal,

Kadam, Kesia Samia, Chinour, Kahua, Mango,

Bargad, Jamun, Amla, Gulmohar are being

used in rows to maintain canopy type

strata)

Till date total 1,25,000 no’s of saplings have

been planted in 69.0 hectares of project land

and further plantation is in progress.

For FY 2013-14, 50,000 no. of sapling

plantation have been targeted.

Photos of the Greenbelt developed at site is

attached as Annexure-I.

18 First Aid and sanitation arrangements

shall be made available for the drivers

and other contract workers during

construction phase.

Adequate arrangement for first aid, sanitation

and safe drinking water has been provided for

all drivers and contractor workers during

construction activities.

19 Regular monitoring of ground level

concentration of SO2, NOx, Hg, SPM and

RSPM shall be carried out in the impact

zone and records maintained. If at any

stage these levels are found to exceed

the prescribed limits, necessary control

measures shall be provided

immediately. The location of the

monitoring stations and frequency of

monitoring shall be decided in

Regular ambient air quality monitoring of

ground level concentration of SO2, NOx, Hg,

SPM and RSPM shall be carried out in the

impact zone as the units come under

operation. However, environmental monitoring

is in progress for construction stage.

Ambient air quality data for the period of June

to Nov.2013 is enclosed as Annexure-III.

Page 5: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 4 of 61

S.

No. Condition Compliance

consultation with SPCB. Periodic reports

shall be submitted to the Regional Office

of this Ministry. The data shall also be

put on the website of the company.

20 The project proponent shall advertise in

at least two local newspapers widely

circulated in the region around the

project, one of which shall be in the vernacular language of the locality

/office of Municipal Corporation /Gram

Panchayat concerned and on the

company’s web site within seven days

from the date of this clearance letter,

informing that the project has been

accorded environmental clearance and

copies of clearance letter are available

with the State Pollution Control

Board/Committee and may also be seen

at Website of the Ministry of

Environment and Forests at

http://envfor.nic.in.

The Public Notice of Environmental Clearance

has been given in two newspapers namely,

The Haribhumi and Danik Bhaskar on

23.10.09 which are widely circulated in the region.

A copy of the same is enclosed as

Annexure-IV.

21 A copy of the clearance letter shall be

sent by the proponent to concerned

Panchayat, Zila Parisad / Municipal

Corporation, urban local Body and the

Local NGO, if any, from whom

suggestions/representations, if any,

received while processing the proposal.

The clearance letter shall also be put on the website of the Company by the

proponent.

Complied

Environmental Clearance letter has been

placed in the website of the company.

22 The proponent shall upload the status of

compliance of the stipulated EC

conditions, including results of

monitoring data on their website and

shall update the same periodically. It

shall simultaneously be sent to the

Regional Office of MoEF, the respective Zonal office of CPCB and the SPCB. The

criteria pollutant levels namely; SPM,

RSPM, SO2, NOx (ambient levels as well

as stack emissions) shall be monitored

and displayed at a convenient location

near the main gate of the company in

the public domain.

Status of compliance of EC conditions has

been uploaded as stipulated and is being

updated regularly on Six monthly bases.

Display board has been incorporated in the

project scheme and shall be complied after

commissioning of the plant.

Page 6: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 5 of 61

S.

No. Condition Compliance

23

The project proponent shall also submit

six monthly reports on the status of

compliance of the stipulated EC

conditions including results of monitored

data (both in hard copies as well by e-

mail) to the respective Regional Office

of MOEF, the respective Zonal Office of

CPCB and the SPCB.

Half yearly report for the period of Nov,2012

to May,2013 has been submitted vide letter

no. MoE&F, BHPL/RJST/1500108/1110

Dt: 21.05.2013.

A copy of the letter is attached for as

Annexure-V.

24 The environment statement for each

financial year ending 31st March in

Form-V as is mandated to be submitted

by the project proponent to the

concerned State Pollution Control Board

as prescribed under the Environment

(Protection) Rules, 1986, as amended

subsequently, shall also be put on the

website of the company along with the

status of compliance of EC conditions

and shall also be sent to the respective

Regional Offices of MOEF by e-mail.

Shall be complied after commissioning of the

power plant.

25 A separate environment management

cell with qualified staff shall be set up

for implementation of the stipulated

environmental safeguards.

An Environment Management cell has been

setup, headed by Sr. General Manager.

26

Regional Office of the Ministry of

Environment & Forests located at

Bhopal will monitor the implementation

of the stipulated conditions. A complete

set of documents including

Environmental Impact Assessment

Report, Environment Management Plan

along with the additional information

submitted from time to time shall be

forwarded to the Regional Office for

their use during monitoring.

A complete set of documents has been

submitted to Regional Office of the Ministry

vide ref Ref: MOE&F, BHPL /AGRY /1160201

/1147 Dated 09.12.2009.

A copy of the letter is attached

Annexure-VI.

27 Separate funds shall be allocated for

implementation of environmental

protection measures along with item-

wise break-up. These cost shall be

included as part of the project cost. The

funds earmarked for the environment

protection measures shall not be

diverted for other purposes and year-

wise expenditure should be reported to

the Ministry.

As submitted in the EIA report separate fund

of Rs 1246 Cr has been provided for pollution

control, treatment and monitoring systems.

28

The project authorities shall inform the

Regional Office as well as the Ministry

regarding the date of financial closure

and final approval of the project by the

concerned authorities and the dates of

start of land development work and

• Date of financial closure: Feb,2010.

• Date of start of land development

work: Nov, 2009.

• Unit No.-1 (1 x 600 MW) is under

operation.

• Unit No.-2 (1 x 600 MW) is under

Page 7: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 6 of 61

S.

No. Condition Compliance

commissioning of plant. commissioning.

• Work is in progress on fast track basis

for balance units

29 Full cooperation shall be extended to

the Scientists /Officers from the Ministry

/Regional Office of the Ministry at

Bangalore/the CPCB/ the SPCB who

would be monitoring the compliance of Environmental status.

Shall be complied as per the requirements of

CPCB and CECB Raipur, Chattisgarh

Page 8: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 7 of 61

Annexure-I

NEEM TREE TO POWERMAKE CAMP-E

Y-JUNCTION TO ROGDA PATCH-NW

Page 9: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 8 of 61

SE- BOUNDARY

Page 10: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 9 of 61

CSR UPDATES Annexure-II

Page 11: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 10 of 61

Page 12: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 11 of 61

Page 13: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 12 of 61

Page 14: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 13 of 61

Page 15: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 14 of 61

Page 16: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 15 of 61

Page 17: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 16 of 61

Page 18: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 17 of 61

Page 19: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 18 of 61

Page 20: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 19 of 61

Page 21: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 20 of 61

Page 22: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 21 of 61

Page 23: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 22 of 61

Page 24: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 23 of 61

Page 25: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 24 of 61

Page 26: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 25 of 61

Page 27: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 26 of 61

Page 28: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 27 of 61

\

Page 29: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 28 of 61

Page 30: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 29 of 61

Page 31: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 30 of 61

Page 32: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 31 of 61

Page 33: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 32 of 61

Page 34: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 33 of 61

Page 35: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 34 of 61

Page 36: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 35 of 61

Page 37: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 36 of 61

Page 38: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 37 of 61

Page 39: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 38 of 61

Page 40: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 39 of 61

Page 41: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 40 of 61

Page 42: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 41 of 61

Page 43: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 42 of 61

Page 44: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 43 of 61

Page 45: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 44 of 61

Page 46: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 45 of 61

Page 47: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 46 of 61

Page 48: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 47 of 61

Page 49: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 48 of 61

Page 50: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 49 of 61

Annexure-III Ambient Air Quality Monitoring.

KSK Mahanadi Power Company Limited is regularly carrying out the environmental monitoring in and around plant site, as it is a requirement under consent for Establishment from CECB, Chhattisgarh. KSK Mahanadi Power Company Limited entrusted the job of regular environmental monitoring to M/s. Vimta Lab Ltd, Hyderabad.

AMBIENT AIR QUALITY MONITORING LOCATIONS

Monitored values of key environmental parameters as per National Ambient air quality Norm is mentioned in the subsequent section of this report.

PM2.5 µµµµg/m3

PM10 µµµµg/m3

SO2

µµµµg/m3 NOx

µµµµg/m3 CO

µµµµg/m3

Limits as per NAAQS

60 100 ? ? ?

Test Methods Gravimetric Method Improved West & Geake

Modified Jacob &

Hochheiser Method

NDIR spectroscopy method

Teflon filter paper was used in PM2.5 & Whatman filter paper for PM10 weighed in Mettler electronic balance and computed as per standard methods PM2.5, PM10, SO2, NOx is monitored on 24 hrs. Basis ,while CO is monitored on 8 hours basis (The values are expressed in µg/m3 ) The results of the monitored data indicate that the ambient air quality of the region in general is conformity with respect to norms of National Ambient Air Quality standards of CPCB, at all locations monitored.

Location Code

Location Name Direction w.r.t Plant

Distance from Plant (Km)

Inside the Premises A1 Plant Site - -

Outside the Premises A2 Jhalmaladar Village S 2.2 A3 Akaltara Village N 4.6 A4 Amora Village W 4.0 A5 Akirari Village E 3.1

Page 51: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 50 of 61

Geographical location of the Plant

CHHATTISG

Plant Site

Page 52: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 51 of 61

Topographic features & AAQM-Stations

Page 53: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 52 of 61

1. PLANT SITE (Admin. Building) – AAQM-1: Monitoring Date

PM2.5 µµµµg/m3 PM10 µµµµg/m3

SO2

µµµµg/m3 NOx

µµµµg/m3 CO

µµµµg/m3

I II III

29.04.2013 22.9 58.6 11.2 12.5 241 261 236

30.04.2013 23.3 59.6 12.3 13.6 236 258 234

06.05.2013 22.5 56.3 11.6 12.4 238 251 230

07.05.2013 24.5 61.2 10.8 11.9 232 264 238

13.05.2013 22.0 59.3 11.2 12.5 235 259 234

14.05.2013 24.8 62.7 10.9 11.8 229 262 229

20.05.2013 21.7 57.3 10.7 11.5 234 259 236

21.05.2013 22.6 60.4 11.5 12.6 230 257 240

27.05.2013 22.7 59.3 12.2 13.4 236 260 234

03.06.2013 24.3 62.3 11.8 12.9 233 256 228

04.06.2013 23.8 60.7 12.6 13.5 234 267 241

10.06.2013 23.5 58.9 12.2 13.1 232 259 236

11.06.2013 25.4 63.4 11.4 12.6 241 262 231

17.06.2013 22.7 61.2 11.1 12.4 243 268 248

18.06.2013 24.1 60.8 12.3 13.5 232 259 236

24.06.2013 21.7 57.2 11.7 12.6 238 264 245

25.06.2013 22.2 59.3 11.2 12.4 244 272 251

01.07.2013 22.1 59.4 12.4 13.7 239 260 234

02.07.2013 21.3 57.6 11.8 12.5 237 271 238

08.07.2013 23.1 60.2 11.4 12.3 235 263 233

09.07.2013 22.9 61.4 13.1 14.3 244 267 239

15.07.2013 24.3 62.1 13.3 14.6 246 275 243

16.07.2013 21.2 56.3 12.7 13.8 238 266 239

22.07.2013 23.4 59.5 12.9 14.1 243 268 241

23.07.2013 20.9 56.8 12.5 13.6 249 265 246

05.08.2013 22.3 56.4 12.5 14.1 222 264 231

06.08.2013 21.9 52.7 11.6 12.8 237 271 227

12.08.2013 18.4 48.6 10.4 11.6 214 262 235

13.08.2013 17.6 46.5 13.2 14.9 229 251 243

19.08.2013 16.8 40.2 11.7 12.7 237 273 238

20.08.2013 19.4 43.6 10.6 11.6 241 266 246

26.08.2013 20.4 42.2 12.4 13.7 228 246 237

27.08.2013 19.6 40.8 13.6 14.6 236 259 228

02.09.2013 18.6 49.3 10.9 13.1 226 259 228

03.09.2013 19.9 51.1 12.3 13.9 239 274 231

09.09.2013 21.3 54.7 13.1 14.4 217 265 229

10.09.2013 20.7 56.5 11.4 12.9 233 254 236

16.09.2013 19.1 44.8 12.9 14.2 239 278 234

17.09.2013 22.5 57.1 13.8 15.3 243 261 241

23.09.2013 17.8 40.3 10.5 11.8 231 249 239

24.09.2013 18.5 41.6 10.7 12.2 240 264 232

02.10.2013 19.2 48.5 11.8 13.6 241 264 235

03.10.2013 20.1 50.8 10.8 12.7 236 270 244

07.10.2013 22.2 55.8 12.6 14.8 234 261 238

08.10.2013 21.6 54.2 12.8 14.5 238 258 228

16.10.2013 19.8 45.6 11.6 13.4 246 271 250

17.10.2013 21.4 52.1 12.4 14.3 238 266 243

23.10.2013 18.5 41.4 10.7 12.5 234 259 240

24.10.2013 19.4 43.6 12.3 14.6 240 268 248

04.11.2013 19.6 50.2 11.8 12.9 251 275 245

05.11.2013 19.0 48.6 11.8 13.5 234 267 241

11.11.2013 21.5 53.7 12.7 14.2 254 283 258

12.11.2013 19.7 51.3 14.1 15.3 243 264 233

Page 54: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 53 of 61

18.11.2013 17.6 47.4 13.0 14.4 249 275 254

19.11.2013 19.6 49.5 12.3 13.8 245 274 250

25.11.2013 18.2 48.1 13.2 14.6 242 268 248

26.11.2013 15.6 42.3 12.3 13.7 252 281 260

Max. 25.4 61.2 13.6 15.4 252 283 260

Min. 17.6 40.2 10.4 11.5 231 251 231

Average 21.08 53.35 12.01 13.34 237.33 264.43 238.77

2. JHALMALADAR –AAQM-2

Monitoring Date

PM2.5 µµµµg/m3 PM10 µµµµg/m3

SO2

µµµµg/m3 NOx

µµµµg/m3 CO

µµµµg/m3

I II III

29.04.2013 20.2 47.6 12.2 13.3 234 258 231

30.04.2013 22.7 51.9 11.6 12.8 239 267 236

06.05.2013 24.6 54.3 11.8 12.9 235 253 239

07.05.2013 23.1 50.8 11.3 12.5 231 257 233

13.05.2013 21.3 49.3 10.9 11.7 229 250 235

14.05.2013 20.6 46.2 11.7 12.6 234 254 223

20.05.2013 21.7 48.2 10.8 11.4 238 256 237

21.05.2013 23 51.1 12.4 13.1 236 252 230

27.05.2013 21.6 49.6 11.2 12.5 228 249 234

03.06.2013 21.0 49.6 11.8 12.7 230 263 238

04.06.2013 23.3 53.4 12.4 13.3 235 260 241

10.06.2013 23.6 52.1 12.9 13.6 244 265 234

11.06.2013 23.4 51.6 11.7 12.9 240 269 245

17.06.2013 22.8 52.8 11.3 12.5 240 263 235

18.06.2013 22.2 49.7 12.2 13.3 242 267 247

24.06.2013 23.1 51.3 11.6 12.7 235 262 239

25.06.2013 24.2 53.8 12.1 13.3 240 268 248

01.07.2013 19.6 47.5 13.1 14.4 239 267 236

02.07.2013 21.9 49.8 12.8 13.9 238 264 243

08.07.2013 22.2 50.4 12.6 13.7 249 271 241

09.07.2013 20.5 49.6 12.5 13.4 244 273 239

15.07.2013 20.9 51.1 12.9 14.1 247 268 243

16.07.2013 23.4 52.4 12.7 13.8 245 270 246

22.07.2013 20.7 48.6 13.0 14.3 241 267 240

23.07.2013 21.3 50.7 11.9 13.1 244 271 241

05.08.2013 20.4 46.8 12.2 13.3 235 255 233

06.08.2013 21.7 44.7 13.4 14.6 231 272 241

12.08.2013 16.9 40.2 11.8 12.4 246 264 253

13.08.2013 17.9 39.8 10.9 11.6 233 259 238

19.08.2013 18.5 41.2 12.7 13.8 254 246 246

20.08.2013 19.2 37.8 11.6 12.9 248 272 238

26.08.2013 20.1 42.3 12.5 13.2 239 249 244

27.08.2013 18.8 39.9 13.6 14.7 244 263 239

02.09.2013 18.6 42.7 10.6 11.4 238 256 234

03.09.2013 20.1 45.3 11.3 12.2 235 275 243

09.09.2013 19.3 44.5 12.9 14.1 242 268 257

10.09.2013 21.5 46.9 11.7 12.6 237 261 234

16.09.2013 20.8 45.6 10.8 11.5 245 257 239

17.09.2013 20.3 44.9 13.4 14.7 241 266 235

23.09.2013 17.6 40.2 13.8 14.9 243 258 242

24.09.2013 19.1 44.1 12.5 13.8 247 275 245

02.10.2013 19.5 43.2 11.2 12.9 235 269 243

03.10.2013 21.8 44.6 10.8 12.6 239 265 246

07.10.2013 20.5 43.7 11.4 13.2 252 274 242

08.10.2013 21.4 45.8 12.6 14.4 231 259 236

16.10.2013 21.8 44.3 11.2 13.2 249 273 244

17.10.2013 20.3 42.4 12.4 14.8 239 264 242

23.10.2013 18.7 41.3 11.7 13.4 241 269 246

24.10.2013 19.5 42.7 10.8 12.8 239 266 241

04.11.2013 18.1 42.7 11.6 13.3 230 263 238

05.11.2013 17.3 39.6 12.4 13.7 249 276 256

Page 55: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 54 of 61

11.11.2013 20.1 44.5 13.4 14.5 259 281 248

12.11.2013 19.7 43.3 13.5 15.1 233 261 238

18.11.2013 18.1 41.9 12.0 13.2 244 267 238

19.11.2013 19.5 43.6 11.7 12.9 241 266 246

25.11.2013 18.1 40.2 11.7 13.1 231 258 236

26.11.2013 19.9 44.1 12.4 13.8 247 275 254

Max. 24.6 54.3 13.8 14.9 259 276 256

Min. 17.6 41.3 11.3 11.4 228 250 231

Average 20.66 46.28 12.06 13.27 239.89 255.11 240.50

3. AKIRARI VILLAGE – AAQM-3 : Monitoring Date

PM2.5 µµµµg/m3 PM10 µµµµg/m3

SO2

µµµµg/m3 NOx

µµµµg/m3 CO

µµµµg/m3

I II III

29.04.2013 20.2 46.3 10.6 11.8 233 268 237

30.04.2013 20.3 49.2 11.9 12.7 231 259 226

06.05.2013 21.3 50.7 11.2 12.4 228 254 230

07.05.2013 19.8 49.3 10.8 11.6 230 262 234

13.05.2013 22.2 51.1 11.1 12.3 237 258 238

14.05.2013 20.9 48.6 12.3 13.4 229 253 236

20.05.2013 18.7 46.3 11.7 12.5 238 264 226

21.05.2013 18.5 44.9 11.3 12.6 236 261 230

27.05.2013 19.2 45.2 10.7 11.8 229 255 234

03.06.2013 21.1 48.5 11.3 12.5 235 262 242

04.06.2013 19.0 47.3 12.2 13.1 228 255 233

10.06.2013 21.3 51.6 11.7 12.6 236 261 241

11.06.2013 20.3 47.2 11.6 12.4 234 257 229

17.06.2013 21.4 50.9 12.2 13.3 225 252 230

18.06.2013 21.2 51.4 11.4 12.6 239 259 229

24.06.2013 21.4 49.3 11.2 12.4 228 260 235

25.06.2013 21.3 52.7 10.9 12.1 233 258 239

01.07.2013 19.7 46.5 12.1 13.3 238 266 237

02.07.2013 21.1 48.3 11.8 12.9 232 259 231

08.07.2013 20.4 49.6 12.4 13.5 239 264 236

09.07.2013 19.3 46.2 12.7 13.9 237 261 233

15.07.2013 19.9 47.7 11.6 12.8 229 256 227

16.07.2013 19.1 46.0 12.3 13.1 243 262 240

22.07.2013 20.2 47.3 12.9 14.0 231 264 229

23.07.2013 18.8 45.9 11.8 13.2 237 261 235

05.08.2013 22.6 46.6 12.3 13.9 241 255 238

06.08.2013 20.4 47.5 13.1 14.5 236 268 241

12.08.2013 19.3 41.2 12.4 13.8 228 271 254

13.08.2013 18.5 40.8 11.6 12.7 231 264 239

19.08.2013 17.6 38.9 10.8 11.2 242 253 246

20.08.2013 18.8 41.3 11.6 12.9 239 249 253

26.08.2013 20.6 40.6 12.4 13.7 219 261 248

27.08.2013 19.9 48.4 13.1 14.6 225 254 237

02.09.2013 18.6 42.7 10.6 11.4 238 256 234

03.09.2013 20.1 45.3 11.3 12.2 235 275 243

09.09.2013 19.3 44.5 12.9 14.1 242 268 257

10.09.2013 21.5 46.9 11.7 12.6 237 261 234

16.09.2013 20.8 45.6 10.8 11.5 245 257 239

17.09.2013 20.3 44.9 13.4 14.7 241 266 235

23.09.2013 17.6 40.2 13.8 14.9 243 258 242

24.09.2013 19.1 44.1 12.5 13.8 247 275 245

02.10.2013 19.3 42.6 12.1 14.3 232 259 239

03.10.2013 22.2 49.6 10.8 12.3 239 267 244

07.10.2013 17.8 40.1 12.1 14.4 247 273 252

08.10.2013 20.5 45.4 12.3 14.4 256 281 251

16.10.2013 21.7 43.2 11.8 13.1 248 277 253

17.10.2013 18.4 41.2 12.4 14.4 248 269 238

23.10.2013 20.4 43.7 11.7 13.6 240 274 248

24.10.2013 21.8 44.1 10.9 12.4 255 282 261

04.11.2013 17.9 41.2 12.1 13.5 234 261 241

Page 56: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 55 of 61

05.11.2013 19.2 47.9 11.4 12.7 248 277 253

11.11.2013 17.3 42.0 12.0 13.2 259 286 264

12.11.2013 19.9 46.3 13.3 14.6 246 270 241

18.11.2013 19.2 45.6 12.1 13.5 236 264 241

19.11.2013 15.9 38.7 11.9 12.9 251 273 241

25.11.2013 19.1 44.1 12.7 14.5 235 269 243

26.11.2013 19.3 47.8 12.8 14.2 247 274 254

Max. 21.7 51.4 13.8 14.5 259 286 264

Min. 17.3 38.7 10.8 11.8 228 253 226

Average 19.88 45.68 11.93 13.17 237.36 263.64 240.09

4. Amora Village – AAQM-4

Monitoring Date

PM2.5 µµµµg/m3 PM10 µµµµg/m3

SO2

µµµµg/m3 NOx

µµµµg/m3 CO

µµµµg/m3

Particulate Matter

I II III

29.04.2013 21.2 48.6 12.1 13.3 250 280 246

03.05.2013 23.4 52.1 11.6 12.7 245 275 252

06.05.2013 21.2 47.6 11.9 13.1 243 281 254

10.05.2013 21.6 49.3 11.4 12.6 252 279 247

13.05.2013 21.2 45.8 12.3 13.5 249 286 245

17.05.2013 23.2 51.2 11.5 12.8 238 272 243

20.05.2013 21.4 48.3 11.8 13.0 246 281 248

24.05.2013 22.1 49.2 11.6 12.7 241 279 239

27.05.2013 20.9 46.3 11.1 12.4 247 284 242

31.05.2013 21.9 50.3 11.6 12.6 243 272 241

03.06.2013 22.2 49.6 11.9 13.1 241 269 244

07.06.2013 22.9 51.2 11.6 12.9 248 277 251

10.06.2013 23.4 53.4 12.3 13.4 240 271 242

14.06.2013 22.5 48.6 11.4 12.6 245 275 253

17.06.2013 20.9 46.3 11.9 13.3 252 285 251

21.06.2013 21.8 49.2 11.5 12.7 239 276 244

24.06.2013 23.1 51.4 11.3 12.5 244 283 236

28.06.2013 22.3 45.3 12.2 14.6 238 268 246

01.07.2013 20.7 43.7 11.7 13.4 246 274 251

05.07.2013 21.1 46.2 12.3 14.3 237 266 249

08.07.2013 22.6 41.6 11.8 13.7 244 281 238

12.07.2013 20.7 42.1 10.6 12.2 236 269 243

15.07.2013 19.5 40.5 12.7 14.9 249 274 257

19.07.2013 20.7 41.3 12.3 14.2 247 279 253

22.07.2013 18.9 39.7 11.9 14.1 244 282 262

02.08.2013 21.8 40.3 13.1 15.2 241 272 239

05.08.2013 22.6 38.1 12.4 14.5 264 254 241

09.08.2013 20.7 39.8 10.5 11.6 257 264 237

12.08.2013 18.6 40.5 13.7 14.8 241 246 229

16.08.2013 17.5 38.2 12.4 13.9 239 255 246

19.08.2013 19.4 36.3 11.9 12.6 251 238 234

23.08.2013 20.2 39.8 10.2 11.7 237 278 243

26.08.2013 16.7 38.5 11.4 12.3 245 269 237

30.08.2013 18.4 39.7 10.6 12.2 243 275 241

02.09.2013 16.9 38.9 11.9 12.7 251 264 247

06.09.2013 19.3 41.5 13.3 14.5 249 270 243

09.09.2013 21.7 42.8 12.1 13.3 245 254 238

13.09.2013 19.1 41.0 13.8 15.1 244 258 241

16.09.2013 22.4 42.5 10.4 11.9 237 261 230

20.09.2013 18.2 40.4 11.8 13.1 241 276 238

23.09.2013 20.8 42.1 12.5 13.8 249 278 244

04.10.2013 19.5 38.5 11.2 13.2 245 278 242

05.10.2013 17.2 37.6 10.8 12.4 255 266 249

09.10.2013 18.5 40.5 12.3 14.8 248 275 245

10.10.2013 20.8 39.6 11.8 13.9 242 258 240

14.10.2013 19.7 40.2 13.2 15.4 246 260 242

15.10.2013 21.4 41.7 11.5 13.1 238 262 232

21.10.2013 19.5 38.4 10.9 12.5 248 272 240

22.10.2013 20.5 41.9 11.4 13.4 247 279 241

Page 57: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 56 of 61

06.11.2013 15.9 36.5 12.9 14.3 249 273 244

07.11.2013 18.0 40.2 11.7 12.9 243 278 251

13.11.2013 17.7 39.6 14.2 15.7 256 286 261

14.11.2013 18.1 41.3 13.1 14.3 248 269 238

20.11.2013 16.6 35.8 13.6 15.1 255 281 260

21.11.2013 18.4 40.7 12.5 13.9 244 273 249

27.11.2013 16.2 36.6 13.0 14.4 251 278 258

28.11.2013 17.1 38.2 12.4 13.8 253 282 261

Max. 22.9 52.1 14.2 15.7 256 282 258

Min. 16.2 36.3 11.1 12.4 237 258 229

Average 20.18 42.98 11.97 13.45 245.71 271.92 244.77

5. SONSARI VILLAGE – AAQM5

Monitoring Date

PM2.5 µµµµg/m3 PM10 µµµµg/m3

SO2

µµµµg/m3 NOx

µµµµg/m3 CO

µµµµg/m3

I II III

29.04.2013 22.0 48.6 11.1 12.3 250 285 247

03.05.2013 20.5 45.9 12.2 13.4 255 293 250

06.05.2013 22.4 51.3 11.6 12.5 251 281 243

10.05.2013 21.7 49.4 10.9 11.8 257 286 251

13.05.2013 21.1 47.6 11.4 12.5 249 282 255

17.05.2013 22.7 50.3 11.6 12.9 253 294 249

20.05.2013 21.1 48.2 12.1 13.4 256 290 256

24.05.2013 21.3 47.6 11.8 12.6 248 286 252

27.05.2013 23.1 51.2 12.5 13.7 251 289 248

31.05.2013 23.5 51.8 11.7 12.7 245 281 242

03.06.2013 23.7 53.2 12.1 13.1 250 286 246

07.06.2013 20.9 47.9 11.6 12.9 248 279 249

10.06.2013 22.1 50.3 10.3 11.4 252 282 244

14.06.2013 22.8 51.4 11.2 12.2 246 276 250

17.06.2013 21.9 48.5 12.3 13.3 251 291 243

21.06.2013 22.1 50.5 11.7 12.9 253 295 249

24.06.2013 22.2 49.6 11.9 13.3 244 280 247

28.06.2013 21.3 47.8 12.3 14.6 251 279 251

01.07.2013 22.4 44.6 11.8 13.9 246 267 244

05.07.2013 21.8 43.5 11.4 13.2 253 272 239

08.07.2013 20.6 45.8 12.7 14.8 247 264 242

12.07.2013 19.8 41.8 11.6 13.3 238 274 257

15.07.2013 21.3 46.2 13.2 14.9 241 288 239

19.07.2013 20.4 41.5 12.7 14.5 237 281 243

22.07.2013 20.7 42.8 12.5 14.2 234 283 252

02.08.2013 20.8 42.5 13.2 14.9 266 281 264

05.08.2013 19.8 39.6 10.4 11.3 271 273 240

09.08.2013 20.7 41.2 12.5 13.6 258 266 238

12.08.2013 16.3 40.7 13.6 14.1 246 257 257

16.08.2013 18.5 36.7 12.7 13.9 238 274 249

19.08.2013 17.3 37.5 11.9 12.4 259 268 266

23.08.2013 18.8 35.4 10.8 11.8 248 258 237

26.08.2013 19.4 39.2 12.5 14.6 233 255 245

30.08.2013 17.4 38.6 11.5 12.4 245 278 269

02.09.2013 21.1 41.8 12.9 14.3 258 276 246

06.09.2013 19.5 40.3 10.7 11.9 261 283 255

09.09.2013 18.3 39.7 11.3 12.1 239 253 241

13.09.2013 19.9 40.6 13.6 14.8 244 279 252

16.09.2013 20.3 41.4 12.4 13.9 251 270 267

20.09.2013 17.9 38.9 11.7 12.5 245 261 239

23.09.2013 16.7 36.5 13.2 14.5 239 261 251

04.10.2013 18.5 39.6 12.4 14.6 248 280 271

05.10.2013 20.9 42.5 11.9 12.9 255 272 248

09.10.2013 18.8 41.3 11.4 13.5 265 285 259

10.10.2013 19.4 38.5 12.4 14.5 240 252 248

14.10.2013 20.4 39.4 12.8 14.9 242 281 256

15.10.2013 21.3 42.5 11.4 13.4 256 272 268

21.10.2013 18.6 37.5 10.2 12.7 241 266 242

22.10.2013 17.4 38.4 11.9 13.4 245 264 257

Page 58: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 57 of 61

06.11.2013 16.8 37.1 13.0 14.2 243 278 251

07.11.2013 18.0 40.3 12.7 13.7 256 283 262

13.11.2013 15.8 36.5 11.6 13.1 259 281 248

14.11.2013 18.1 41.1 13.7 15.2 258 289 264

20.11.2013 16.9 38.2 12.9 14.1 250 274 244

21.11.2013 18.5 40.9 12.6 13.6 253 279 258

27.11.2013 16.8 38.3 13.9 15.3 254 283 258

28.11.2013 16.6 37.2 12.5 13.9 248 277 256

Max. 22.8 45.8 13.9 15.3 266 289 262

Min. 15.8 36.4 10.2 11.8 234 252 239

Average 19.88 43.10 12.07 13.44 249.47 276.71 250.77

6. NARIYARA VILLAGE- AAQM-6

Monitoring Date

PM2.5 µµµµg/m3

PM10 µµµµg/m3

SO2

µµµµg/m3 NOx

µµµµg/m3 CO

µµµµg/m3

I II III

29.04.2013 22.2 49.6 12.3 13.5 243 263 239

03.05.2013 20.5 45.3 11.9 12.6 240 255 245

06.05.2013 21.3 47.2 12.1 13.4 245 254 238

10.05.2013 22.7 50.6 11.4 12.5 248 259 243

13.05.2013 21.0 47.3 11.8 12.9 242 261 246

17.05.2013 22.4 49.6 12.4 13.6 246 268 237

20.05.2013 21.9 51.2 11.3 12.4 249 265 240

24.05.2013 22.6 49.6 11.7 13.6 243 262 246

27.05.2013 20.8 47.3 12.2 13.5 247 266 241

31.05.2013 22.9 51.3 11.1 12.4 248 261 244

03.06.2013 22.0 48.6 11.8 12.7 245 266 241

07.06.2013 23.7 52.4 12.0 13.1 241 258 235

10.06.2013 21.8 48.6 12.2 13.5 253 263 248

14.06.2013 22.7 51.2 11.5 12.4 244 257 242

17.06.2013 21.5 47.6 11.9 13.2 256 263 249

21.06.2013 20.7 48.2 12.2 13.4 252 261 247

24.06.2013 22.9 50.3 11.6 12.7 249 259 243

28.06.2013 23.4 52.1 11.8 13.4 252 267 248

01.07.2013 22.6 49.3 12.1 14.6 246 264 264

05.07.2013 22.7 48.6 11.9 13.8 251 251 244

08.07.2013 23.5 51.1 12.7 14.3 262 256 253

12.07.2013 20.6 46.6 11.5 13.3 247 272 259

15.07.2013 22.3 48.9 12.4 14.2 243 269 243

19.07.2013 20.8 43.4 12.1 14.3 239 264 241

22.07.2013 21.1 45.2 11.9 13.9 261 257 252

02.08.2013 21.6 45.6 12.6 14.9 266 258 254

05.08.2013 20.8 39.8 13.4 15.3 244 263 263

09.08.2013 22.4 41.3 11.8 12.7 256 249 271

12.08.2013 19.6 39.5 10.9 11.5 238 251 264

16.08.2013 18.4 36.7 14.6 15.1 247 267 244

19.08.2013 17.6 35.9 13.5 14.8 249 253 268

23.08.2013 20.6 36.4 12.4 13.4 268 249 233

26.08.2013 19.4 33.7 13.3 14.2 271 273 246

30.08.2013 19.8 40.3 10.9 11.7 254 263 249

02.09.2013 21.6 41.5 12.4 13.6 248 267 261

06.09.2013 17.9 36.8 13.6 14.9 259 274 264

09.09.2013 18.4 38.2 12.8 13.8 244 278 251

13.09.2013 20.1 40.7 11.2 12.6 238 263 245

16.09.2013 22.5 41.9 13.1 15.1 244 266 250

20.09.2013 18.2 37.9 14.3 15.9 253 270 241

23.09.2013 21.1 39.5 11.4 13.2 258 279 253

04.10.2013 20.1 41.2 11.4 13.7 258 271 250

05.10.2013 19.5 40.6 10.8 12.4 247 269 265

09.10.2013 16.5 38.8 12.7 14.6 260 272 263

10.10.2013 19.7 39.6 11.8 13.2 242 280 255

14.10.2013 21.2 41.7 12.9 14.2 239 269 242

Page 59: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 58 of 61

15.10.2013 19.7 38.5 12.5 14.7 241 262 258

21.10.2013 21.1 36.4 11.4 13.8 251 274 247

22.10.2013 22.3 40.2 12.7 14.8 260 280 251

06.11.2013 17.1 38.2 12.8 14.3 245 273 252

07.11.2013 18.4 40.6 12.6 13.6 256 286 261

13.11.2013 16.2 35.9 13.8 15.1 252 278 257

14.11.2013 16.7 37.2 12.4 13.7 265 291 260

20.11.2013 17.3 39.1 12.5 13.5 256 286 261

21.11.2013 18.4 40.6 13.5 14.9 255 277 245

27.11.2013 16.4 38.2 13.0 14.3 249 284 257

28.11.2013 18.0 39.4 13.3 14.6 248 275 255

Max. 22.9 51.2 14.3 15.1 268 284 268

Min. 16.2 35.5 10.9 12.4 238 251 240

Average 20.51 43.38 12.28 13.70 250.05 266.50 250.54

Page 60: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 59 of 61

ANNEXURE-IV

Page 61: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 60 of 61

ANNEXURE-V

Page 62: KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power … · 2014-06-30 · KSK MAHANADI POWER COMPANY LTD. 6 x 600 MW Coal Based Thermal Power Plant)At Nariyara –Village,

KSK MAHANADI POWER COMPANY LIMITED, NARIYARA, CHATTIGARH.

Environmental compliance report 2013 Page 61 of 61

ANNEXURE-VI