It all began with the stadium. To be continued…
Gdańsk, 17.03.2015 r.
Air
line
con
nec
tio
ns
fro
m G
dań
sk a
irp
ort
to o
ver
50
des
tin
atio
nsGetting by car from the stadium to:
• City Centre 5 min.• Wrzeszcz, Oliwa 10 min.• Beach 10 min. • Airport 20 min.• Sopot 15 min.• Gdynia 25 min.
Perfect location
A stimulus to revitalization of Letnica district
Multipurpose
Each year we are hosting:
• ~ 20-25 stadium events
• over 100 corporate events
• stadium tours for more than 50 thousand visitors
Since 2012, we have been developing leisure services:
• over 15 attractions: Escaperooms / NoGravity trampolines/ Zoltar
Apokalipsa paintball / PitStop – electric and Diesel gokarts / a scenic overlook /
zip line rides / bungee jumping / Baltic Games skatepark / a roller rink /
CycloSpot Tour motion trainers / snooker-darts zone / arcade games and
simulators / Lechia Gdańsk Museum / Racing Cafe / Restaurant & Sport Pub T29
• since VI 2014, after FUN ARENA opened – ~ 5 thousand visitors each month
Focusing on leisure & recreation
4.66 ha – land for new
developments
FUNARENA
Leisure & Sports Centre
4.66 ha – land for new developments
An idea outlined at the designing stage…
2008-2012
…is turning into a new plan to develop the land next to the stadium
2015
A multi-phased project supported by private investors
2015
The concept of function and architectural design
Aquatic park
4,250 m2
Tropical garden
2,100 m2
Fun park
3,450 m2
Fitness / physiotherapy
6,000 m2
Hotel6,000 m2
area (m2)
estimated cost (PLN m)
stages of development
27 800 198-260 3 stages
Aquatic park 4 250 58-78 I – a swimming pools with slides, a wave pool, a cascade, a tropical garden, a ropes course, indoor surfing, bodyflying, a sauna complex, a variety of water attractions.
Tropical garden 2 100 22-28
Fun park 3 450 43-53
Fitness / Physiotherapy
6 000 27-38
II – sports medicine services: physiotherapy, rehabilitation, etc., professional care provided by sports medicine physicians and psychotherapists, medical massage, wellness & spa, a gym with professional trainers, saunas
Hotel 12 000 48-63
III – over 120 single-double rooms, a spacious hotel lobby from the PGE Arena stadium side, restaurants, bars, conference rooms, a green atrium.
Basic data
• Initial arrangements - ~ 12 up to 18 months
Consultations and workshop activities – according to Gdańsk 2030 plus Development Strategy
• IV-VI.2015 – Consultations with PGE ARENA Gdańsk neighbours
• V-VII.2015 – A cycle of social workshops for residents of Gdańsk
Activities to promote the project and attract investors
• III.2015 - Project presentation – MIPIM, The international real estate show, Cannes, France
• III.2015 - A visit to the potential investor – Yumble Indoor Park, Roermond, Holland
• III.2015 - Project presentation – New Trends in Tourism, Gdańsk, Poland
• IV.2015 - Project presentation – Nordic Venue Forum, Aarhus, Denmark
• IV.2015 - Project presentation – Festival of Tourism and Leisure, Gdańsk, Polska
• IV-V.2015 - Expert debate – Warsaw, Gdańsk
• VI.2015 - Project presentation – Stadium Business Summit, Barcelona, Spain
• X.2105 - Project presentation – Euro Attraction Show, Stockholm, Sweden
• X.2015 - Project presentation – Smartmetropolia, Leisure Metropolis, Gdańsk, Poland
• Design and construction - ~ 48 up to 54 months
Project total duration - ~ 5 up to 6 years
Preliminary schedule of the project
Poland’s Leisure Centre
Contact:Tomasz [email protected]@arenagdansk.com