Top Banner
It all began with the stadium. To be continued… Gdańsk, 17.03.2015 r.
13
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PGE_ARENA_Gdansk__Polands_Leisure_Centre__Presentation

It all began with the stadium. To be continued…

Gdańsk, 17.03.2015 r.

Page 2: PGE_ARENA_Gdansk__Polands_Leisure_Centre__Presentation

Air

line

con

nec

tio

ns

fro

m G

dań

sk a

irp

ort

to o

ver

50

des

tin

atio

nsGetting by car from the stadium to:

• City Centre 5 min.• Wrzeszcz, Oliwa 10 min.• Beach 10 min. • Airport 20 min.• Sopot 15 min.• Gdynia 25 min.

Perfect location

Page 4: PGE_ARENA_Gdansk__Polands_Leisure_Centre__Presentation

Multipurpose

Each year we are hosting:

• ~ 20-25 stadium events

• over 100 corporate events

• stadium tours for more than 50 thousand visitors

Since 2012, we have been developing leisure services:

• over 15 attractions: Escaperooms / NoGravity trampolines/ Zoltar

Apokalipsa paintball / PitStop – electric and Diesel gokarts / a scenic overlook /

zip line rides / bungee jumping / Baltic Games skatepark / a roller rink /

CycloSpot Tour motion trainers / snooker-darts zone / arcade games and

simulators / Lechia Gdańsk Museum / Racing Cafe / Restaurant & Sport Pub T29

• since VI 2014, after FUN ARENA opened – ~ 5 thousand visitors each month

Page 5: PGE_ARENA_Gdansk__Polands_Leisure_Centre__Presentation

Focusing on leisure & recreation

Page 6: PGE_ARENA_Gdansk__Polands_Leisure_Centre__Presentation

4.66 ha – land for new

developments

FUNARENA

Leisure & Sports Centre

4.66 ha – land for new developments

Page 7: PGE_ARENA_Gdansk__Polands_Leisure_Centre__Presentation

An idea outlined at the designing stage…

2008-2012

Page 8: PGE_ARENA_Gdansk__Polands_Leisure_Centre__Presentation

…is turning into a new plan to develop the land next to the stadium

2015

Page 9: PGE_ARENA_Gdansk__Polands_Leisure_Centre__Presentation

A multi-phased project supported by private investors

2015

Page 10: PGE_ARENA_Gdansk__Polands_Leisure_Centre__Presentation

The concept of function and architectural design

Aquatic park

4,250 m2

Tropical garden

2,100 m2

Fun park

3,450 m2

Fitness / physiotherapy

6,000 m2

Hotel6,000 m2

Page 11: PGE_ARENA_Gdansk__Polands_Leisure_Centre__Presentation

area (m2)

estimated cost (PLN m)

stages of development

27 800 198-260 3 stages

Aquatic park 4 250 58-78 I – a swimming pools with slides, a wave pool, a cascade, a tropical garden, a ropes course, indoor surfing, bodyflying, a sauna complex, a variety of water attractions.

Tropical garden 2 100 22-28

Fun park 3 450 43-53

Fitness / Physiotherapy

6 000 27-38

II – sports medicine services: physiotherapy, rehabilitation, etc., professional care provided by sports medicine physicians and psychotherapists, medical massage, wellness & spa, a gym with professional trainers, saunas

Hotel 12 000 48-63

III – over 120 single-double rooms, a spacious hotel lobby from the PGE Arena stadium side, restaurants, bars, conference rooms, a green atrium.

Basic data

Page 12: PGE_ARENA_Gdansk__Polands_Leisure_Centre__Presentation

• Initial arrangements - ~ 12 up to 18 months

Consultations and workshop activities – according to Gdańsk 2030 plus Development Strategy

• IV-VI.2015 – Consultations with PGE ARENA Gdańsk neighbours

• V-VII.2015 – A cycle of social workshops for residents of Gdańsk

Activities to promote the project and attract investors

• III.2015 - Project presentation – MIPIM, The international real estate show, Cannes, France

• III.2015 - A visit to the potential investor – Yumble Indoor Park, Roermond, Holland

• III.2015 - Project presentation – New Trends in Tourism, Gdańsk, Poland

• IV.2015 - Project presentation – Nordic Venue Forum, Aarhus, Denmark

• IV.2015 - Project presentation – Festival of Tourism and Leisure, Gdańsk, Polska

• IV-V.2015 - Expert debate – Warsaw, Gdańsk

• VI.2015 - Project presentation – Stadium Business Summit, Barcelona, Spain

• X.2105 - Project presentation – Euro Attraction Show, Stockholm, Sweden

• X.2015 - Project presentation – Smartmetropolia, Leisure Metropolis, Gdańsk, Poland

• Design and construction - ~ 48 up to 54 months

Project total duration - ~ 5 up to 6 years

Preliminary schedule of the project