It all began with the stadium. To be continued… Gdańsk, 17.03.2015 r.
Aug 19, 2015
It all began with the stadium. To be continued…
Gdańsk, 17.03.2015 r.
Air
line
con
nec
tio
ns
fro
m G
dań
sk a
irp
ort
to o
ver
50
des
tin
atio
nsGetting by car from the stadium to:
• City Centre 5 min.• Wrzeszcz, Oliwa 10 min.• Beach 10 min. • Airport 20 min.• Sopot 15 min.• Gdynia 25 min.
Perfect location
A stimulus to revitalization of Letnica district
Multipurpose
Each year we are hosting:
• ~ 20-25 stadium events
• over 100 corporate events
• stadium tours for more than 50 thousand visitors
Since 2012, we have been developing leisure services:
• over 15 attractions: Escaperooms / NoGravity trampolines/ Zoltar
Apokalipsa paintball / PitStop – electric and Diesel gokarts / a scenic overlook /
zip line rides / bungee jumping / Baltic Games skatepark / a roller rink /
CycloSpot Tour motion trainers / snooker-darts zone / arcade games and
simulators / Lechia Gdańsk Museum / Racing Cafe / Restaurant & Sport Pub T29
• since VI 2014, after FUN ARENA opened – ~ 5 thousand visitors each month
Focusing on leisure & recreation
4.66 ha – land for new
developments
FUNARENA
Leisure & Sports Centre
4.66 ha – land for new developments
An idea outlined at the designing stage…
2008-2012
…is turning into a new plan to develop the land next to the stadium
2015
A multi-phased project supported by private investors
2015
The concept of function and architectural design
Aquatic park
4,250 m2
Tropical garden
2,100 m2
Fun park
3,450 m2
Fitness / physiotherapy
6,000 m2
Hotel6,000 m2
area (m2)
estimated cost (PLN m)
stages of development
27 800 198-260 3 stages
Aquatic park 4 250 58-78 I – a swimming pools with slides, a wave pool, a cascade, a tropical garden, a ropes course, indoor surfing, bodyflying, a sauna complex, a variety of water attractions.
Tropical garden 2 100 22-28
Fun park 3 450 43-53
Fitness / Physiotherapy
6 000 27-38
II – sports medicine services: physiotherapy, rehabilitation, etc., professional care provided by sports medicine physicians and psychotherapists, medical massage, wellness & spa, a gym with professional trainers, saunas
Hotel 12 000 48-63
III – over 120 single-double rooms, a spacious hotel lobby from the PGE Arena stadium side, restaurants, bars, conference rooms, a green atrium.
Basic data
• Initial arrangements - ~ 12 up to 18 months
Consultations and workshop activities – according to Gdańsk 2030 plus Development Strategy
• IV-VI.2015 – Consultations with PGE ARENA Gdańsk neighbours
• V-VII.2015 – A cycle of social workshops for residents of Gdańsk
Activities to promote the project and attract investors
• III.2015 - Project presentation – MIPIM, The international real estate show, Cannes, France
• III.2015 - A visit to the potential investor – Yumble Indoor Park, Roermond, Holland
• III.2015 - Project presentation – New Trends in Tourism, Gdańsk, Poland
• IV.2015 - Project presentation – Nordic Venue Forum, Aarhus, Denmark
• IV.2015 - Project presentation – Festival of Tourism and Leisure, Gdańsk, Polska
• IV-V.2015 - Expert debate – Warsaw, Gdańsk
• VI.2015 - Project presentation – Stadium Business Summit, Barcelona, Spain
• X.2105 - Project presentation – Euro Attraction Show, Stockholm, Sweden
• X.2015 - Project presentation – Smartmetropolia, Leisure Metropolis, Gdańsk, Poland
• Design and construction - ~ 48 up to 54 months
Project total duration - ~ 5 up to 6 years
Preliminary schedule of the project