Performance Based CleanupsPerformance Based CleanupsFlorida Department of Environmental ProtectionFlorida Department of Environmental Protection

Bureau of Petroleum Storage SystemsBureau of Petroleum Storage Systems

Ferda YilmazFerda Yilmaz

The 17th Annual UST/LUST National Conference March 2005

Page 2: Performance Based Cleanups - NEIWPCC
Page 3: Performance Based Cleanups - NEIWPCC
Page 4: Performance Based Cleanups - NEIWPCC

• Streamlined Site Assessment (StSA)

• Streamlined Remediation– Performance Based Cleanups (PBCs)

Streamlined ProcessesStreamlined Processes

• Streamlined Site Assessment (StSA)

• Streamlined Remediation– Performance Based Cleanups (PBCs)

Page 5: Performance Based Cleanups - NEIWPCC

Total Number of Agreements 356Total Value $70,000 KAvg. Cleanup Cost Tier-1 $355 KAvg. Cleanup Cost Tier-2 $215 KSite Closures 57Time to Closure 2-6 yrs

PBC OverviewPBC Overview

Total Number of Agreements 356Total Value $70,000 KAvg. Cleanup Cost Tier-1 $355 KAvg. Cleanup Cost Tier-2 $215 KSite Closures 57Time to Closure 2-6 yrs

Page 6: Performance Based Cleanups - NEIWPCC

• What is PBC?

• How do we price PBCs?

• How do we negotiate PBCs?

• How do we finalize PBCs?

Performance Based Cleanups (PBCs)Performance Based Cleanups (PBCs)• What is PBC?

– How do we get there?– What are the proposal requirements?

• How do we price PBCs?– Team approach

• How do we negotiate PBCs?– Team approach

• How do we finalize PBCs?

Page 7: Performance Based Cleanups - NEIWPCC

• Simplified

• Major Categories Only

• Line items for major costs

• No T&M detail

Cost Breakdown RequirementsPBC ProposalPBC Proposal

• Simplified

• Major Categories Only

• Line items for major costs

• No T&M detail

Cost Breakdown Requirements

Page 8: Performance Based Cleanups - NEIWPCC

• Baseline Sampling• Remedial Action Plan• Remedial Action Implementation• Operation & Maintenance (O&M)• Post Remedial Monitoring (PRM)• Site Closure

Basic Proposal Elements

PBC Proposal PBC Proposal

• Baseline Sampling• Remedial Action Plan• Remedial Action Implementation• Operation & Maintenance (O&M)• Post Remedial Monitoring (PRM)• Site Closure

Basic Proposal Elements

Page 9: Performance Based Cleanups - NEIWPCC

• Baseline Sampling

– Required if Data > 9 months old

– Include Key & Perimeter wells

– Include all contaminants

PBC Proposal ElementsPBC Proposal Elements

• Baseline Sampling

– Required if Data > 9 months old

– Include Key & Perimeter wells

– Include all contaminants

Page 10: Performance Based Cleanups - NEIWPCC

• Remedial Action Plan

– May be included in PBC

– Pilot test is optional

– Consider level of effort for design

– FDEP review requirements different

PBC Proposal ElementsPBC Proposal Elements

• Remedial Action Plan

– May be included in PBC

– Pilot test is optional

– Consider level of effort for design

– FDEP review requirements different

Page 11: Performance Based Cleanups - NEIWPCC

•Trailer unit •Fenced treatment compound

•Trenching length•Materials

•Number of people •Number of days

• Remedial Action Plan Implementation

– Equipment:

– Construction:

– Labor:

PBC Proposal ElementsPBC Proposal Elements

• Remedial Action Plan Implementation

– Equipment:

– Construction:

– Labor:

•Trailer unit •Fenced treatment compound

•Trenching length•Materials

•Number of people •Number of days

Page 12: Performance Based Cleanups - NEIWPCC

• Operation & Maintenance– Number of years in O&M

– Key & Perimeter well sampling plan– Reporting frequency

– Utilities– Permits– Repairs

PBC Proposal ElementsPBC Proposal Elements

• Operation & Maintenance– Number of years in O&M

– Key & Perimeter well sampling plan– Reporting frequency

– Utilities– Permits– Repairs

Page 13: Performance Based Cleanups - NEIWPCC

• Post Remedial Monitoring

– Key & perimeter well sampling plan

– Reporting frequency

– Consider rebounds

PBC Proposal ElementsPBC Proposal Elements

• Post Remedial Monitoring

– Key & perimeter well sampling plan

– Reporting frequency

– Consider rebounds

Page 14: Performance Based Cleanups - NEIWPCC

• Site Closure

– Well abandonment

– Equipment demobilization

PBC Proposal ElementsPBC Proposal Elements

• Site Closure

– Well abandonment

– Equipment demobilization

Page 15: Performance Based Cleanups - NEIWPCC

Pricing & Negotiation TeamPricing & Negotiation Team

Distribution

Team Member A Team Member B Team Member C

Key & Perimeter Wells Sampling Parameters Sampling Frequency Cleanup Time Reporting Frequency

Cost Estimate Range

Exchange Comments

Teleconference/Meeting

15 Days Review Time

Proposal Received

Page 16: Performance Based Cleanups - NEIWPCC

• By e-mail• Copy e-mail to team members• Lay out changes

• Number of key & perimeter wells• Sampling frequency• Sampling parameters• Reporting frequency

Negotiation TeamNegotiation Team

• By e-mail• Copy e-mail to team members• Lay out changes

• Number of key & perimeter wells• Sampling frequency• Sampling parameters• Reporting frequency

Page 17: Performance Based Cleanups - NEIWPCC

PBC Template

Target Levels: Groundwater GCTLs pursuant to 62-770Soil SCTLs pursuant to 62-770Free Product Free Product shall not be present Surface Water No Surface Water Body Affected by ContaminationOther N/A

Key Wells (list): MW-1, MW-7, MW-8, DMW-1

Sampling Frequency (in RA): Quarterly Parameters: BTEX + MTBE by EPA 8021

Perimeter Wells (list): MW-3, MW-4, MW-10, MW-12 Sampling Frequency (in RA): Quarterly

Parameters: BTEX + MTBE by EPA 8021Other Sampling Requirements:Other Analytical Requirements:

PBC Template

This is a cleanup to:

Target Levels: Groundwater GCTLs pursuant to 62-770Soil SCTLs pursuant to 62-770Free Product Free Product shall not be present Surface Water No Surface Water Body Affected by ContaminationOther N/A

Key Wells (list): MW-1, MW-7, MW-8, DMW-1 Sampling Frequency (in RA): Quarterly

Parameters: BTEX + MTBE by EPA 8021Perimeter Wells (list): MW-3, MW-4, MW-10, MW-12

Sampling Frequency (in RA): Quarterly Parameters: BTEX + MTBE by EPA 8021

Other Sampling Requirements:Other Analytical Requirements:

CTLs Tier 1/Elevated Target Levels

Page 18: Performance Based Cleanups - NEIWPCC

PBC TemplatePBC Template

Baseline Data:MW-1, MW-2, MW-3, MW-4, MW-7, MW-8, MW-10, BTEX + MTBE by EPA 8021, PAHs by EPA 8270, TR

Reduction Measurement:Reporting Frequency:Other Reporting:

Baseline Wells:Baseline Parameters:

BTEX + MTBE Other:Total Naphthalenes

Other:SemiannuallyQuarterly

To be collected within 30 days of contract execu Use Existing Data(data must be sent to site manager prior to next activity)

Page 19: Performance Based Cleanups - NEIWPCC

Agreement Ceiling Amount: $234,567.00Agreement Start Date: 8/1/2003

Payment Amt.Milestone 1: System Startup 45% $105,555.15

Milestone 2: 50% Reduction 10% $23,456.70

Milestone 3: 75% Reduction 10% $23,456.70

Milestone 4: 90% Reduction 10% $23,456.70

Milestone 5: Target Levels, all Contaminants, all Med 10% $23,456.70

Milestone 6: Maintain Target Levels 10% $23,456.70

Milestone 7: Site Rehabilitation Completion Order 5% $11,728.35

Milestone 8:

Milestone 9:

Milestone 10:

Total %: 100%

Payment %Milestones

PBC TemplatePBC TemplateAgreement Ceiling Amount: $234,567.00

Agreement Start Date: 8/1/2003Payment Amt.

Milestone 1: System Startup 45% $105,555.15

Milestone 2: 50% Reduction 10% $23,456.70

Milestone 3: 75% Reduction 10% $23,456.70

Milestone 4: 90% Reduction 10% $23,456.70

Milestone 5: Target Levels, all Contaminants, all Med 10% $23,456.70

Milestone 6: Maintain Target Levels 10% $23,456.70

Milestone 7: Site Rehabilitation Completion Order 5% $11,728.35

Milestone 8:

Milestone 9:

Milestone 10:

Total %: 100%

Payment %Milestones

Page 20: Performance Based Cleanups - NEIWPCC

T&M

WOs Inv

RAP 1 2RAC 1 4O&M 1 1 5O&M 2 1 5O&M 3 1 5PRM 1 5SC 1 2

_____________________________

Total 7 28

PBCWOs Inv

RAP 1 1RAC (startup) - 1O&M (50%) - 1O&M (75%) - 1O&M (90%) - 1CTLs - 1Main. CTLs - 1SC - 1Verification 1 1

_________________________________

Total 2 9

Administrative Overhead

T&M

WOs Inv

RAP 1 2RAC 1 4O&M 1 1 5O&M 2 1 5O&M 3 1 5PRM 1 5SC 1 2

_____________________________

Total 7 28

PBCWOs Inv

RAP 1 1RAC (startup) - 1O&M (50%) - 1O&M (75%) - 1O&M (90%) - 1CTLs - 1Main. CTLs - 1SC - 1Verification 1 1

_________________________________

Total 2 9

Page 21: Performance Based Cleanups - NEIWPCC

• Bidding

– Under State Lead Contracts

– No negotiation needed

More Streamlined ProcessMore Streamlined Process

• Bidding

– Under State Lead Contracts• Single site bidding

• Multiple site bidding

– No negotiation needed

Page 22: Performance Based Cleanups - NEIWPCC

• http://www.dep.state.fl.us/waste/categories/pcp/pages/pbc.htm

• Ferda Yilmaz - 850/245-8885

More InformationMore Information

• http://www.dep.state.fl.us/waste/categories/pcp/pages/pbc.htm

• Ferda Yilmaz - 850/245-8885

Page 23: Performance Based Cleanups - NEIWPCC

Questions?Questions?