Master Plan Study Update

OKI Regional Planning Forum

February 24, 2012

Page 2: OKImasterplanstudyupdatefinal (2)

8/3/2019 OKImasterplanstudyupdatefinal (2)

http://slidepdf.com/reader/full/okimasterplanstudyupdatefinal-2 2/17

Get here. Get there. Get home. 

Agenda

• Master Plan Process

• Forecast Review

•Terminal Area Alternatives Discussion

• Next Steps

2DRAFT for Discussion 

Page 3: OKImasterplanstudyupdatefinal (2)

8/3/2019 OKImasterplanstudyupdatefinal (2)

http://slidepdf.com/reader/full/okimasterplanstudyupdatefinal-2 3/17

Get here. Get there. Get home. 

Forecast Discussion

• Baseline Forecast used for financial planning while

Multi-Carrier Forecast used for facility planning

• Planning Activity Levels (PALS) will be defined as

triggers for growth – Actual activity levels can be easily monitored and

compared to PALs to project when facilities may be

needed

 – Activity levels are reached at different years in the variousforecasts

 – Use of PALs allows flexibility to act as demand materializes

3DRAFT for Discussion 

Page 4: OKImasterplanstudyupdatefinal (2)

8/3/2019 OKImasterplanstudyupdatefinal (2)

http://slidepdf.com/reader/full/okimasterplanstudyupdatefinal-2 4/17

Get here. Get there. Get home. 

Enplanements Forecast

-

2,000

4,000

6,000

8,000

10,000

12,000

14,000

1991 1998 2005 2012 2019 2026 2033

CVG Enplanements - Historical and Forecast1991 - 2035 (thousands)

Historical Originating Historical ConnectingDominant Carrier + LCC Enplanements Multi-Carrier EnplanementsHistorical Trend Enplanements Enplanements - Baseline Derivation2007 MPU 2011 TAF

Market stimulationincreases O&D trafficin near term

2007 MPU Forecast

DRAFT for Discussion  4

Page 5: OKImasterplanstudyupdatefinal (2)

8/3/2019 OKImasterplanstudyupdatefinal (2)

http://slidepdf.com/reader/full/okimasterplanstudyupdatefinal-2 5/17

Get here. Get there. Get home. 

Passenger Aircraft Departures

2007 MPU Forecast

0

50,000

100,000

150,000

200,000

250,000

        1        9        9        1

        1        9        9        2

        1        9        9        3

        1        9        9        4

        1        9        9        5

        1        9        9        6

        1        9        9        7

        1        9        9        8

        1        9        9        9

        2        0        0        0

        2        0        0        1

        2        0        0        2

        2        0        0        3

        2        0        0        4

        2        0        0        5

        2        0        0        6

        2        0        0        7

        2        0        0        8

        2        0        0        9

        2        0        1        0

        2        0        1        1

        2        0        1        2

        2        0        1        3

        2        0        1        4

        2        0        1        5

        2        0        1        6

        2        0        1        7

        2        0        1        8

        2        0        1        9

        2        0        2        0

        2        0        2        1

        2        0        2        2

        2        0        2        3

        2        0        2        4

        2        0        2        5

        2        0        2        6

        2        0        2        7

        2        0        2        8

        2        0        2        9

        2        0        3        0

        2        0        3        1

        2        0        3        2

        2        0        3        3

        2        0        3        4

        2        0        3        5

CVG Passenger Aircraft Departures - Historical and Forecast1991 - 2035 (thousands)

International Passenger Departures Domestic Passenger Departures Dominant + LCC Departures

Multi-Carrier Departures Baseline Departures Departures - Regression Derivation

2007 MPU 2011 TAF

DRAFT for Discussion -5

Page 6: OKImasterplanstudyupdatefinal (2)

8/3/2019 OKImasterplanstudyupdatefinal (2)

http://slidepdf.com/reader/full/okimasterplanstudyupdatefinal-2 6/17

Get here. Get there. Get home. 

Key Attributes of CVG in 2035• Cost-sensitive development which allows for expansion

of air service

 – Timely rehab/replacement of assets/facilities

 – Re-use of facility if functional & meets customer service goals

• High Customer Service – Close-in gates

 – Adequately sized facilities

 – Walk-able parking and rental car facility

• Emphasis and focus on local passengers

• Terminal area development preserves maximum

flexibility and opportunity for west commercial area

6DRAFT for Discussion 

Page 7: OKImasterplanstudyupdatefinal (2)

8/3/2019 OKImasterplanstudyupdatefinal (2)

http://slidepdf.com/reader/full/okimasterplanstudyupdatefinal-2 7/17Get here. Get there. Get home. 

Summary of Requirements• Airside

 – Gate count meets future demand, but facility condition and cost of 

operation may drive replacement/rehab

 – Terminal 3 passenger processing space adequate to meet passenger

demand - functionality/customer service also considered

• Landside – Parking demand exceeds future capacity / Close-in rental car facility

incorporated

 – Some improvements required for roadway access/curb front changes

• Other

 – Land use and west commercial development area will be evaluated in

next steps

7DRAFT for Discussion 

Page 8: OKImasterplanstudyupdatefinal (2)

8/3/2019 OKImasterplanstudyupdatefinal (2)

http://slidepdf.com/reader/full/okimasterplanstudyupdatefinal-2 8/17Get here. Get there. Get home. 

Alternative A1 Features• Airside

 – Reconstructs Concourse A

 – Renovates Terminal 3 and Concourse B

 – Removes portion of Conc. B but requires continued use of 

tunnel for passengers and bags

• Landside

 – Renovates T3 Garage, replaces T1 and T2 Garages with new

public parking, consolidated rental car facility (CONRAC) and

quick turn around area (QTA)

 – Retains main terminal roads, but provides new rental

car/commercial vehicle access

• Balances capital with O&M costs

8DRAFT for Discussion 

Page 9: OKImasterplanstudyupdatefinal (2)

8/3/2019 OKImasterplanstudyupdatefinal (2)

http://slidepdf.com/reader/full/okimasterplanstudyupdatefinal-2 9/17Get here. Get there. Get home. 9

Alternative A1: 2035

DRAFT for Discussion 

Page 10: OKImasterplanstudyupdatefinal (2)

8/3/2019 OKImasterplanstudyupdatefinal (2)

http://slidepdf.com/reader/full/okimasterplanstudyupdatefinal-2 10/17Get here. Get there. Get home. 

Alternative A2 Features• Airside

 – Eliminates Conc. B with new & expanded Conc. A in new location

 – Passengers use above-grade connection (optional), but have

increased walking distance to end of Concourse

 –Good aircraft movement

• Landside

 – Renovates & expands T3 Garage, replaces T1 and T2 Garages

with new public parking, CONRAC and QTA

 – Reconfigures main terminal roads and up-ramp to provide accessto terminal and rental car facility

• Higher capital costs, but reduces O&M

10DRAFT for Discussion 

Page 11: OKImasterplanstudyupdatefinal (2)

8/3/2019 OKImasterplanstudyupdatefinal (2)

http://slidepdf.com/reader/full/okimasterplanstudyupdatefinal-2 11/17Get here. Get there. Get home. 11

Alternative A2: 2035

2700’ long concourse 

DRAFT for Discussion 

Page 12: OKImasterplanstudyupdatefinal (2)

8/3/2019 OKImasterplanstudyupdatefinal (2)

http://slidepdf.com/reader/full/okimasterplanstudyupdatefinal-2 12/17Get here. Get there. Get home. 

Alternative E Features

• Airside

 – Retains and renovates Conc. A & B, with portion of Conc. A

being demolished

• Landside – Renovates T3 Garage, replaces T1 and T2 Garages with

new public parking, CONRAC and QTA

 – Retains main terminal roads, but provides new rental

car/commercial vehicle access

• Minimizes capital costs, but significant O&M and

renovation costs for older facilities

12DRAFT for Discussion 

Page 13: OKImasterplanstudyupdatefinal (2)

8/3/2019 OKImasterplanstudyupdatefinal (2)

http://slidepdf.com/reader/full/okimasterplanstudyupdatefinal-2 13/17Get here. Get there. Get home. DRAFT For Discussion 13

Alternative E: 2035

Page 14: OKImasterplanstudyupdatefinal (2)

8/3/2019 OKImasterplanstudyupdatefinal (2)

http://slidepdf.com/reader/full/okimasterplanstudyupdatefinal-2 14/17Get here. Get there. Get home. 

New “V” Alternative Features 

• Sketched in workshops – layout to be refined

• Airside

 – Shorter passenger walking distances

 – Good aircraft circulation and access

 – Allows customs to be relocated closer to terminal

• Landside

 – Can pair with best landside alternative

• Higher capital, but reduces O&M

14DRAFT for Discussion 

Page 15: OKImasterplanstudyupdatefinal (2)

8/3/2019 OKImasterplanstudyupdatefinal (2)

http://slidepdf.com/reader/full/okimasterplanstudyupdatefinal-2 15/17Get here. Get there. Get home. 

“V” Alternative 

15DRAFT for Discussion 

Pair with best landsidealternative

Two concourses 

allow incremental expansion to meet 

demand 

Page 16: OKImasterplanstudyupdatefinal (2)

8/3/2019 OKImasterplanstudyupdatefinal (2)

http://slidepdf.com/reader/full/okimasterplanstudyupdatefinal-2 16/17Get here. Get there. Get home. 

Next Steps

Define the V Alternative in terms of layout, costs,phasing, and landside

• Address plan for short term: now through 2015

•Refine other terminal area alternatives based onfeedback from workshop

 – Cost – both capital cost and O&M

 – Phasing to minimize disruption, coordinate with

near-term facility demo, and reduce temporary

construction

 – Evaluate in terms of goals and objectives

16DRAFT for Discussion 

Page 17: OKImasterplanstudyupdatefinal (2)

8/3/2019 OKImasterplanstudyupdatefinal (2)

http://slidepdf.com/reader/full/okimasterplanstudyupdatefinal-2 17/17Get here Get there Get home

Next Steps Continued

•Develop coordinated CIP

• Plan remaining MPU elements• Airfield requirements

• Land development/land use

•West service area uses

• Schedule next set of workshops to:

 – Review and evaluate terminal alternatives to select

preferred concept

 – Review work on remaining MPU elements

• Complete financial plan, e-ALP, implementation plan

• Public Meetings

17DRAFT for Discussion 