© 2015 Bentley Systems, Incorporated
Innovation Showcase – Bentley’s AssetWise Optram MEED Rail and Metro Summit 2015
Steve Cockerell, Industry Marketing Director – Rail, Bentley Systems
3 | WWW.BENTLEY.COM | © 2015 Bentley Systems, Incorporated
The Cost of not being Pro-Active or Strategic
Unnecessary
materials and labour $ Too Much
Too Early Scheduled / Planned
Minimum $ to
ensure reliability
The Right Work
at the Right Time Pro-Active / Strategic
Type of work
Downtime
- highest repair $ Too Little
Too Late Reactive / Worst-First
Result Cost
4 | WWW.BENTLEY.COM | © 2015 Bentley Systems, Incorporated
Rail and Transit Asset Management Challenges
Complex intersections
and locations need to be
modeled
The networks that assets
are located against
constantly change
Linear assets have
changing values
along their length
Multimodal transport
sharing the same
space / networks
5 | WWW.BENTLEY.COM | © 2015 Bentley Systems, Incorporated 5 | WWW.BENTLEY.COM | © 2015 Bentley Systems, Incorporated
Linear Asset Decision Support / Optram Network Rail
6 | WWW.BENTLEY.COM | © 2015 Bentley Systems, Incorporated
• Poor decisions on where to renew and maintain track
• Right information not available to right people at the right time
• Create a single asset management and decision support system
– Presents data in one place
– Accurately align all asset data
– Provides predictive insight into deterioration and intervention requirements
• Do more for less through right work, right place, right time!
The Challenge
7 | WWW.BENTLEY.COM | © 2015 Bentley Systems, Incorporated
Optram: Sample screen
Track Layout
Designed &
Measured Curve
Work History
Defect History
Geometry History
Mile/KM Post
Roughness History
8 | WWW.BENTLEY.COM | © 2015 Bentley Systems, Incorporated
Optram: Data Sources
• Track geometry
• OLE
• Ground Penetrating Radar
• Maintenance
• Inspections
• Asset data
• Trends and predictions
• Network definition
9 | WWW.BENTLEY.COM | © 2015 Bentley Systems, Incorporated
Optram: Links to documents
Bentley’s Navigator Mobile
.DGN / .DOC / .PDF / etc…
10 | WWW.BENTLEY.COM | © 2015 Bentley Systems, Incorporated
Optram: Links to external systems, mapping and video
Courtesy of Track Access Services, UK
12 | WWW.BENTLEY.COM | © 2015 Bentley Systems, Incorporated
•Bentley’s AssetWise Optram is the foundation of Network Rail’s Linear Asset Decision Support system (LADS)
•LADS is part of Offering Rail Better Information Services (ORBIS)
– Quality asset information at heart of decisions
– Will deliver US$ 1.1 billion benefits over 10 years
“Transforms Network Rail’s track infrastructure maintenance availability” Chairman Institution of Engineering Technology (IET) Judging Panel
The Solution
13 | WWW.BENTLEY.COM | © 2015 Bentley Systems, Incorporated
Network Rail LADS Benefits
LADS is improving the planning of track
maintenance by enabling better decisions
in the office and in the field, with the
objective of saving GBP 125 million by
the end of Network Rail’s financial and
planning Control Period 5 in March 2019.
15 | WWW.BENTLEY.COM | © 2015 Bentley Systems, Incorporated
Optram – Part of Bentley’s AssetWise Platform
• Provides comprehensive integration
• Combines proven technologies
• Deployed via hybrid cloud-services
• Improves Information Mobility
• Adherence to asset management standards
• Maximizes asset performance
• The Right Work, in the Right Place, at the Right Time!
16 | WWW.BENTLEY.COM | © 2015 Bentley Systems, Incorporated 16 | WWW.BENTLEY.COM | © 2015 Bentley Systems, Incorporated
Thank you for your time!