Top Banner
© 2015 Bentley Systems, Incorporated Innovation Showcase – Bentley’s AssetWise Optram MEED Rail and Metro Summit 2015 Steve Cockerell, Industry Marketing Director – Rail, Bentley Systems
16

Innovation Showcase – Bentley’s AssetWise Optram

Apr 14, 2017

Download

Engineering

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Innovation Showcase – Bentley’s AssetWise Optram

© 2015 Bentley Systems, Incorporated

Innovation Showcase – Bentley’s AssetWise Optram MEED Rail and Metro Summit 2015

Steve Cockerell, Industry Marketing Director – Rail, Bentley Systems

Page 2: Innovation Showcase – Bentley’s AssetWise Optram

2 | WWW.BENTLEY.COM | © 2015 Bentley Systems, Incorporated

Page 3: Innovation Showcase – Bentley’s AssetWise Optram

3 | WWW.BENTLEY.COM | © 2015 Bentley Systems, Incorporated

The Cost of not being Pro-Active or Strategic

Unnecessary

materials and labour $ Too Much

Too Early Scheduled / Planned

Minimum $ to

ensure reliability

The Right Work

at the Right Time Pro-Active / Strategic

Type of work

Downtime

- highest repair $ Too Little

Too Late Reactive / Worst-First

Result Cost

Page 4: Innovation Showcase – Bentley’s AssetWise Optram

4 | WWW.BENTLEY.COM | © 2015 Bentley Systems, Incorporated

Rail and Transit Asset Management Challenges

Complex intersections

and locations need to be

modeled

The networks that assets

are located against

constantly change

Linear assets have

changing values

along their length

Multimodal transport

sharing the same

space / networks

Page 5: Innovation Showcase – Bentley’s AssetWise Optram

5 | WWW.BENTLEY.COM | © 2015 Bentley Systems, Incorporated 5 | WWW.BENTLEY.COM | © 2015 Bentley Systems, Incorporated

Linear Asset Decision Support / Optram Network Rail

Page 6: Innovation Showcase – Bentley’s AssetWise Optram

6 | WWW.BENTLEY.COM | © 2015 Bentley Systems, Incorporated

• Poor decisions on where to renew and maintain track

• Right information not available to right people at the right time

• Create a single asset management and decision support system

– Presents data in one place

– Accurately align all asset data

– Provides predictive insight into deterioration and intervention requirements

• Do more for less through right work, right place, right time!

The Challenge

Page 7: Innovation Showcase – Bentley’s AssetWise Optram

7 | WWW.BENTLEY.COM | © 2015 Bentley Systems, Incorporated

Optram: Sample screen

Track Layout

Designed &

Measured Curve

Work History

Defect History

Geometry History

Mile/KM Post

Roughness History

Page 8: Innovation Showcase – Bentley’s AssetWise Optram

8 | WWW.BENTLEY.COM | © 2015 Bentley Systems, Incorporated

Optram: Data Sources

• Track geometry

• OLE

• Ground Penetrating Radar

• Maintenance

• Inspections

• Asset data

• Trends and predictions

• Network definition

Page 9: Innovation Showcase – Bentley’s AssetWise Optram

9 | WWW.BENTLEY.COM | © 2015 Bentley Systems, Incorporated

Optram: Links to documents

Bentley’s Navigator Mobile

.DGN / .DOC / .PDF / etc…

Page 10: Innovation Showcase – Bentley’s AssetWise Optram

10 | WWW.BENTLEY.COM | © 2015 Bentley Systems, Incorporated

Optram: Links to external systems, mapping and video

Courtesy of Track Access Services, UK

Page 11: Innovation Showcase – Bentley’s AssetWise Optram

11 | WWW.BENTLEY.COM | © 2015 Bentley Systems, Incorporated

Optram: Analytical Results

Page 12: Innovation Showcase – Bentley’s AssetWise Optram

12 | WWW.BENTLEY.COM | © 2015 Bentley Systems, Incorporated

•Bentley’s AssetWise Optram is the foundation of Network Rail’s Linear Asset Decision Support system (LADS)

•LADS is part of Offering Rail Better Information Services (ORBIS)

– Quality asset information at heart of decisions

– Will deliver US$ 1.1 billion benefits over 10 years

“Transforms Network Rail’s track infrastructure maintenance availability” Chairman Institution of Engineering Technology (IET) Judging Panel

The Solution

Page 13: Innovation Showcase – Bentley’s AssetWise Optram

13 | WWW.BENTLEY.COM | © 2015 Bentley Systems, Incorporated

Network Rail LADS Benefits

LADS is improving the planning of track

maintenance by enabling better decisions

in the office and in the field, with the

objective of saving GBP 125 million by

the end of Network Rail’s financial and

planning Control Period 5 in March 2019.

Page 14: Innovation Showcase – Bentley’s AssetWise Optram

14 | WWW.BENTLEY.COM | © 2015 Bentley Systems, Incorporated

Page 15: Innovation Showcase – Bentley’s AssetWise Optram

15 | WWW.BENTLEY.COM | © 2015 Bentley Systems, Incorporated

Optram – Part of Bentley’s AssetWise Platform

• Provides comprehensive integration

• Combines proven technologies

• Deployed via hybrid cloud-services

• Improves Information Mobility

• Adherence to asset management standards

• Maximizes asset performance

• The Right Work, in the Right Place, at the Right Time!

Page 16: Innovation Showcase – Bentley’s AssetWise Optram

16 | WWW.BENTLEY.COM | © 2015 Bentley Systems, Incorporated 16 | WWW.BENTLEY.COM | © 2015 Bentley Systems, Incorporated

Thank you for your time!

[email protected]