Short Case Study On HKL SCACCShort case study on Hospital Kuala Lumpur Specialist Complex & Ambulatory Care
Centre (HKL SCACC)- The first IBS70 government hospital project in Malaysia
Table Of Contents
1 IBS construction technology in action
2 Summing up the IBS score
3 IBS in construction procurement & costing
4 IBS in contract management considerations
1. IBS construction technology in action
Keywords About IBS
Standardization / Penyeragaman
8/13/2019 IBS Seminar Notes Yeap 1.0 - QS Perspective on HKL SCACC 10Dec13
http://slidepdf.com/reader/full/ibs-seminar-notes-yeap-10-qs-perspective-on-hkl-scacc-10dec13 2/18
Sr Yeap Soon Kiat Dec 2010 Kuala Lumpur [email protected] Page | 18
Component Size
Industry Standard (Specification)
Component Code
Modular
Basic Module
Modular Coordination / Dimension Coordination
Basic Unit
Malaysian Standard MS 1064
Off -Site Assembly
Prefabrication
Precast
IBS Scoring
On-Site Installation
Delivery & Hoisting
Specialized Workers
Higher Cost
Implementation Of IBS System For Government Projects
Surat Pekeliling Perbendaharaan - 31 Oktober 2008
Pengunaan Sistem Terbuka Melalui Modular Kordinasi MS 1064
Keperluan 70% Kandungan Komponen IBS dalam Projek Kerajaan
8/13/2019 IBS Seminar Notes Yeap 1.0 - QS Perspective on HKL SCACC 10Dec13
http://slidepdf.com/reader/full/ibs-seminar-notes-yeap-10-qs-perspective-on-hkl-scacc-10dec13 3/18
8/13/2019 IBS Seminar Notes Yeap 1.0 - QS Perspective on HKL SCACC 10Dec13
http://slidepdf.com/reader/full/ibs-seminar-notes-yeap-10-qs-perspective-on-hkl-scacc-10dec13 4/18
Sr Yeap Soon Kiat Dec 2010 Kuala Lumpur [email protected] Page | 18
Site Location
8/13/2019 IBS Seminar Notes Yeap 1.0 - QS Perspective on HKL SCACC 10Dec13
http://slidepdf.com/reader/full/ibs-seminar-notes-yeap-10-qs-perspective-on-hkl-scacc-10dec13 5/18
Sr Yeap Soon Kiat Dec 2010 Kuala Lumpur [email protected] Page | 18
Site Plan
8/13/2019 IBS Seminar Notes Yeap 1.0 - QS Perspective on HKL SCACC 10Dec13
http://slidepdf.com/reader/full/ibs-seminar-notes-yeap-10-qs-perspective-on-hkl-scacc-10dec13 6/18
Sr Yeap Soon Kiat Dec 2010 Kuala Lumpur [email protected] Page | 18
Project Brief
Items Location Descriptions Quantity Remarks
1 All Departments CE Rooms 184
2 OT Operating Theater 9+1
3 2nd to 4th floor Carparks 300 bays
4 The Specialist Clinics and Other Non-clinical Departments
Level 0 (Ground Floor)
01) Orthopaedics
02) Medical Imaging
03) Clinical Laboratory
04) Outpatient Pharmacy 1
Level 1
05) General Medicine Specialist Clinic
06) General Surgery Specialist Clinic
07) Dental Specialist Clinic
08) Social Services Unit
Level 2
09) Haemodialysis Clinic
10) Nephrology Specialist Clinic
11) Urology Specialist Clininc
Level 3
12) Psychiatric Specialist Clinic
Level 4
13) Neurosurgery Specialist Clinic
14) Neurology Specialist Clinic
Level 5
15) ENT Specialist Clininc
16) Opthalmology Specialist Clinic
17) Oncology Specialist Clinic & Day Care
18) Plastic Surgery Specialist Clinic
19) Dermatology Specialist Clinic
4 Level 6
(cont.) 20) IT Area
21) Medical Records
22) Specialist Office Complex
8/13/2019 IBS Seminar Notes Yeap 1.0 - QS Perspective on HKL SCACC 10Dec13
http://slidepdf.com/reader/full/ibs-seminar-notes-yeap-10-qs-perspective-on-hkl-scacc-10dec13 7/18
Sr Yeap Soon Kiat Dec 2010 Kuala Lumpur [email protected] Page | 18
Items Location Descriptions Quantity Remarks
23) Skill Lab
24) Anaesthetic & Pain Specialist Clinic
25) Day Care ( Endoscopy Suite )
Level 7
26) Respiratory & Haemodynamic Equipment Unit
27) Theatre Sterile Supplies Department (TSSD)
28) Day Care
29) Cytotoxic Drug Unit
30) Operation Theatre
5 DIAGNOSTIC IMAGING EQUIPMENT
X-Ray, General, c/w Chest Stand 4
X-ray Fluoro w 90/15 w ERCP Table 1
X-ray Fluoro w 90/15 endo-uro table 38cm II 1
Extracorporeal Shock Wave Litho. (ESWL) 1
Digital Orthopantomography (OPG) 1
CR System complete w Laser Printer 2
CT Scan, 16 slices 1
X-Ray C-Arm, 9" II with 2 Mon. 2
6 OPERATING THEATRE (LIGHTS& TABLES)
Light, Op, Ceiling, Main 110K + Sat. 80K Lux 8
Light, Exam, Ceiling, 30k lux 41
Table, Operating, General, Elec. cw Accs. 3
Table, Operating, Ortho, Elec. cw Accs. 2
Table, Operating, ENT, Elec. cw Accs. 1
Table, Operating, Urology, Elec. cw Accs. 1
Table, Operating, Opth, Elec. c/w Accs. 1
7 CSSD
Autoclave, Pass through, 30ft 2
Cabinet, Drying, Pass through 1
Sterilizing Basket ss 575x280x130mm 70
Sterilizing Basket ss 575x280x260mm 70
Shelf Wire CSSD ss 900(36")X1200(48")X63"(WLH)mm - Group 1 42
Distribution/Collection Trolley, ss 1195x695x975mm 10
Loading/Unloading Trolley, for Washer Disinfector/Dryer 6
8/13/2019 IBS Seminar Notes Yeap 1.0 - QS Perspective on HKL SCACC 10Dec13
http://slidepdf.com/reader/full/ibs-seminar-notes-yeap-10-qs-perspective-on-hkl-scacc-10dec13 8/18
Sr Yeap Soon Kiat Dec 2010 Kuala Lumpur [email protected] Page | 18
Items Location Descriptions Quantity Remarks
Hatch, Pass Through ~ open: 600X 600 mm 1
Loading/Unloading Trolley for Steam Sterillizer 4
Reverse Osmosis Water System, 1
Barrier Panelling, Sterillization, ss 1
Barrier Panelling, Cleaning & Disinfection, ss 1
Steriliser, Hydrogen Peroxide, ~ 100L 1
Washer / Disinfector, Pass Through 3
Endoscope Washer Disinfector 12
Endoscope Sterilizer -Group 1 1
Washer/Sanitiser, Bedpan 3
Stainless Steel Gauze Cutting Table 2
Stainless Steel Mobile Work Table 4
Stainless Steel Packing Table 6
Stainless Steel Paper Trolley 3
Workstation for Heat Sealer, ss 2
Worktable s/s Mobile, 1080x500x800mm 4
Stainless Steel Linen Inspection Table 2
8 DENTAL
Suction Machine (12 Chairs) 2
Air Compressor w Dryer (12 Chairs) 2
Chair Dental Treatment Unit (Officer) 5
Chair Dental Treatment Unit (Specialist) 4
Dental Technologist Workstation Set 8
9 LAB
Fume cupboard 4 ft 1
Fume cupboard 6 ft 1
Cabinet, Cytotoxic Drug w UV Lamp 1
10 Others
RO System, w Piping, UV Light & Tank 1
IBS Component In Use (Structural & Architectural)
Precast Hollow Core SlabPrefab Steel Roof
8/13/2019 IBS Seminar Notes Yeap 1.0 - QS Perspective on HKL SCACC 10Dec13
http://slidepdf.com/reader/full/ibs-seminar-notes-yeap-10-qs-perspective-on-hkl-scacc-10dec13 9/18
Sr Yeap Soon Kiat Dec 2010 Kuala Lumpur [email protected] Page | 18
Precast Wall
Precast Beams
Precast Cornice & MouldingPrecast Staircase
Aluminium System Formwork
Speed Of Progress Of Work
Estimated at 1 month 1 floor for structure framing
Estimated at 1 month 1 floor for precision blockwork
8/13/2019 IBS Seminar Notes Yeap 1.0 - QS Perspective on HKL SCACC 10Dec13
http://slidepdf.com/reader/full/ibs-seminar-notes-yeap-10-qs-perspective-on-hkl-scacc-10dec13 10/18
8/13/2019 IBS Seminar Notes Yeap 1.0 - QS Perspective on HKL SCACC 10Dec13
http://slidepdf.com/reader/full/ibs-seminar-notes-yeap-10-qs-perspective-on-hkl-scacc-10dec13 11/18
Sr Yeap Soon Kiat Dec 2010 Kuala Lumpur [email protected] Page | 18
Wall system (max 30%) - widely available in the market
Others Simplified Saving Construction Solution (max 20%) - standard
components MS1064; repetition; 3D components; etc
Structural system
Points are awarded based structural system used
Allocation based on % floor area that utilises the structural system
Sub-structure works (elements) are not taken into account in the
calculation e.g. Piling, ground beam, ground slab, underground car parketc)
The construction area includes car porch but excluding driveway, apron
and landscaped areas
For structural system using Load Bearing wall, whether precast or in-situ
the factor can be determined from the table by treating the wall as widecolumn
The factor for tunnel formwork system is 0.6
This is for structural without floor. For other structural systems not
mentioned in the table please refer to CIDB for the factor
IBS Factor For Structural Systems
SYSTEM FLOOR
COLUMN /BEAM
(5) (6)
Precastconcrete
slab(1)
In-situconcrete on
permanent
metalformwork
In-situconcrete
using
reusable(3)system
formwork
In-situconcrete
using
timber(4)formwork
Steelflooring
system
Timberframe
flooring
system
Precast columnand beams
1.0 0.9 0.7 0.6 1.0 1.0CONCRETE
Precast column
and in-situ
beams usingreusable(3)
system
0.9 0.8 0.6 0.5 0.9 0.9
8/13/2019 IBS Seminar Notes Yeap 1.0 - QS Perspective on HKL SCACC 10Dec13
http://slidepdf.com/reader/full/ibs-seminar-notes-yeap-10-qs-perspective-on-hkl-scacc-10dec13 12/18
Sr Yeap Soon Kiat Dec 2010 Kuala Lumpur [email protected] Page | 18
SYSTEM FLOOR
COLUMN
/BEAM
(5) (6)
Precast
concrete
slab(1)
In-situ
concrete on
permanentmetal
formwork
In-situ
concrete
usingreusable(3)
system
formwork
In-situ
concrete
usingtimber(4)
formwork
Steel
flooring
system
Timber
frame
flooringsystem
formwork
Precast columnand in-situ
beams using
timber(4)
formwork
0.8 0.7 0.5 0.4 0.8 0.8
Precast beams
and in-situ
columns withreusable(3)
system
formwork
0.9 0.8 0.6 0.5 0.9 0.9
Precast beams
and in-situ
columns using
timber(4)formwork
0.8 0.7 0.5 0.4 0.8 0.8
In-situ column
and beams usingreusablesystem(3)
formwork
0.7 0.6 0.5 0.3 0.7 0.7
In-situ columnand beams using
timber(4)
formwork
0.6 0.5 0.3 0.0 0.6 0.6
STEEL Steel columnsand beams
1.0 0.9 0.7 0.6 1.0 1.0
TIMBERTimber frame
system1.0
Prefab timberroof truss
1.0ROOFSYSTEM
Prefab metal1.0
8/13/2019 IBS Seminar Notes Yeap 1.0 - QS Perspective on HKL SCACC 10Dec13
http://slidepdf.com/reader/full/ibs-seminar-notes-yeap-10-qs-perspective-on-hkl-scacc-10dec13 13/18
Sr Yeap Soon Kiat Dec 2010 Kuala Lumpur [email protected] Page | 18
SYSTEM FLOOR
COLUMN
/BEAM
(5) (6)
Precast
concrete
slab(1)
In-situ
concrete on
permanentmetal
formwork
In-situ
concrete
usingreusable(3)
system
formwork
In-situ
concrete
usingtimber(4)
formwork
Steel
flooring
system
Timber
frame
flooringsystem
roof truss
Timber(4) roof
trusses
0.0
Wall System
Points are awarded based wall system used
Allocation based on % length of the wall system used
External basement wall for earth retaining purposes and toilet cubicle
partition walls are excluded from the calculation
For cavity wall, consider the two separate skins as a wall
Parapet and corridor must be counted in the calculation
IBS Factor For Wall Systems
NO WALL SYSTEM (7) IBS FACTOR
1 Precast Concrete Panel (1) 1.0
2 Metal Cladding 1.0
3 Prefabricated Timber panel 1.0
4 Full height Glass panel (2) 1.0
5 Dry Wall system (3) 1.0
8/13/2019 IBS Seminar Notes Yeap 1.0 - QS Perspective on HKL SCACC 10Dec13
http://slidepdf.com/reader/full/ibs-seminar-notes-yeap-10-qs-perspective-on-hkl-scacc-10dec13 14/18
8/13/2019 IBS Seminar Notes Yeap 1.0 - QS Perspective on HKL SCACC 10Dec13
http://slidepdf.com/reader/full/ibs-seminar-notes-yeap-10-qs-perspective-on-hkl-scacc-10dec13 15/18
Sr Yeap Soon Kiat Dec 2010 Kuala Lumpur [email protected] Page | 18
IBS SCORE
PERCENTAGE OF USAGE
No DESCRIPTION
UNIT 50% ≤≤≤≤ x <75%, 75% ≤≤≤≤ x ≤≤≤≤100%
vi) Windows(3) Nos 1 2
REPETITION OF STRUCTURAL
LAYOUT
a) For building more than 2 storeys
i) Repetition of floor to floor height storey 1 2
ii) Vertical repetition of structural floor
layoutm2 1 3
b) For building 1 or 2 storeys
2
Horizontal repetition of structural floor
layoutm2 2 5
OTHER PREFABRICATED
COMPONENTS AND LABOUR
SAVING SOLUTIONS
i) Prefab Toilet Units Nos 0.5 1
ii) Prefab Staircases Nos 0.5 1
iii) Prefab Lift-Shafts Nos 0.5 1
iv) Spray plaster(4) m2 0.5 1
3
v) Other Labour Saving Product /Solution(5)
Nos orm2
0.5 1
3. IBS in Construction Procurement & Costing
2 Steps In Estimating IBS Construction Cost
Identify the key cost elements of construction elements with IBS systems
Pre-cast Concrete Framing
Pre-cast Concrete Panel
Pre-cast Concrete Floor
Steel Formwork Systems
8/13/2019 IBS Seminar Notes Yeap 1.0 - QS Perspective on HKL SCACC 10Dec13
http://slidepdf.com/reader/full/ibs-seminar-notes-yeap-10-qs-perspective-on-hkl-scacc-10dec13 16/18
Sr Yeap Soon Kiat Dec 2010 Kuala Lumpur [email protected] Page | 18
Structural Steel
Blockwork
Approaches for establishing the IBS project cost
Elemental Measurement
Detail Measurement
Production Cost Estimation
Precast Hollow Core Slab Costing ExamplePRECAST CONCRETEThe design, supply, delivery and
installation of precast component:-
Hollow Core Slabs
Supply and delivery of Precast
Prestressed Hollow Core Slabs.(HCS:
WV6-205mm thick) M2 24,310
Precast prestressed hollow core slab;
265mm thick M2 19,101
Installation & grouting of hollow core
slabs & planks in thicknes:- 300mm &
below (labour only not inclusive
cranage) M2 24,310
Grouting works to precast system whichis HCS/ plank shearkey joint to: (E.mix)
WV6-205 (labour & material) M 20,258
Associated Concrete G30 to topping. M3 2,301
Associated concrete Grade 40 to beam
infill. M3 68
Associated rebar to topping Kg 18,496
Assoicated rebar to shearkey. Kg 5,651
Associated work of RD6 mesh to topping
measure nett, allow lap in rate. M2 27,128
Associated formwork to underside of hcs
at perimeter beam end M 1,786
Associated formwork to edge of topping M 1,880
Precast Beam Costing ExamplePC Beams
machinery LS --
Plant Construction LS --
Steel Work LS --
Steel Mould LS --
Runnin cost LS --
Dismantle LS --
8/13/2019 IBS Seminar Notes Yeap 1.0 - QS Perspective on HKL SCACC 10Dec13
http://slidepdf.com/reader/full/ibs-seminar-notes-yeap-10-qs-perspective-on-hkl-scacc-10dec13 17/18
Sr Yeap Soon Kiat Dec 2010 Kuala Lumpur [email protected] Page | 18
Material Cost LS --
Labour Cost LS --
Double Stock & Damanged Panel LS --Transportation LS --
Installation of precast beams and
grouting works:-
Steel Plate LS --
Ditto Transport LS --
Ditto Plumb Prop. No 2
Wire Rope Set 2
Small Tools LS --
Labour Cost Beam Erection/ Joint No 1,022
Labour Cost HCS Erection M2 31,093
Grouting Cost HCS Shear Key Joint M 25,910
Labour cost Erection/Joint No 96
Earthwork for passage LS --C/Run for Crane Passage M3 180
Ditto - Maintenance Mth 9
4. IBS in contract management considerations
Ideas To Increase IBS Score
By increase usage of
Precast Hollow Core Slab
Precast Half SlabPrecast Waffle Slab
Precast Plank
Prefab Steel RoofSteel Structure
Precast Wall
Precast BeamsPrecast Columns
Precast Cornice & Moulding
Precast BalconyPrecast Staircase
Offsite Barbending
3D toilet module (POD)
System Formwork (metal / aluminium / plastic)
Construction Considerations
Heavy lifting crainage / tower crain
8/13/2019 IBS Seminar Notes Yeap 1.0 - QS Perspective on HKL SCACC 10Dec13
http://slidepdf.com/reader/full/ibs-seminar-notes-yeap-10-qs-perspective-on-hkl-scacc-10dec13 18/18
Sr Yeap Soon Kiat Dec 2010 Kuala Lumpur yskiat@yahoo com Page | 18
More full time crainage
Different lifting contraption
Walky-talky
Sub-contracting
Limited IBS system / brands
Lack of connection / integration of IBS components
Required a lot of floor to floor & services by services planning & coordination
Allow for starter bars or connectors
Cost Considerations
Savings on formwork
Savings on timber scaffolding
Savings on construction period
Lower labor content
Less wastage
Higher cost of IBS
High initial / setup cost of IBS
Less competitive tender price
Need high tech contractors / sub-contractors
Alteration / Renovation Consideration
Difficult to accommodate, needs to be pre-planned upfront
Requires hacking
Structural elements cannot be hacked