Technical Drawing Portfolio
Clayton Albert Lent HBAS
PROPOSED ELEMENTARY SCHOOLBINJITIWAABIK ZAAGING ANISHINAABEK
Over three consecutive work terms (two four month, one eight) I worked for the small four person firm H.Bradford Green Architect in Thunder Bay. This allowed me to develop my technical architectural skills through a multitude of small projects and allowed me to see through the design & construction of a small elementary school for the Biinjitiwaabik Zaaging Anishinaabek First Nation in Rocky Bay, Ontario. The site was distinctly rural, set just below Lake Nipigon, with standard road access.
The design brief was as follows:The Biinjitiwaabik Zaaging Anishinaabek First Nation is undertaking to hire a Consultant to provide professional architectural and engineering design services, as outlined in their Terms of Reference dated May 18, 2010, to provide the community with an elementary school facility, in conformance with INAC Space Accommodation Standards, which will accommodate appropriate programs for students ranging from kindergarten though grade 8. The design will reflect both the educational philosophy and goals of the Biinjitiwaabik Zaaging Anishinaabek First Nation while allowing for potential expansion to accommodate future growth of the community.
My duties included: -Preparation of construction drawings with the aid of one technician
-Coordination of Architectural drawings with HVAC, Electrical and Plumbing
-Sourcing some of the required products
-Preparation of some of the specifications
-Preparation of presentation imagery
Co-op 2009-2011: H. Bradford Green Architect Inc.Biinjitiwaabik Zaaging Anishinaabek First Nation Elementary School
Final Proposal Vignette, Looking North
My duties included: -Preparation of construction drawings with the aid of one technician
-Coordination of Architectural drawings with HVAC, Electrical and Plumbing
-Sourcing some of the required products
-Preparation of some of the specifications
-Preparation of presentation imagery
3
5
7
9
11
13
15
17
While working with H.Bradford Green Architect I was fortunate to have the opportunity to work with Walter Kimbel, a mechanical engineer, on a small residential project. My duties included:
-Preparation of required drawings
-Coordination of supply/return ducts and vents with on-site contractor
Co-op: H. Bradford Green Architect Inc. Anthes Residence Pool Wing HVAC
Saddle Installation
Hang unit with suspended rodsand "U" channel members.
Threaded rod and U channel
Vibration Isolators
19
21
While working with H.Bradford Green Architect I also worked on several small projects. One typical was a small project for the installation of a direct access entrance for St. Josephs Health Centre in Thunder Bay. The additional entrance was required in order to allow the services patients to enter at different times than the regular hours of Victoriaville Mall, which houses the medical facility. My duties included:
-Preparation of required drawings
-Recording of existing conditions
-Sourcing required products
View of Existing Window-Wall
Co-op: H. Bradford Green Architect Inc. St.Josephss Health Centre New Entrance
23
Under the guidance of Robert Sims (associate-in-charge) of KPMB Architects I worked for 2 months on various elements of the Telus Centre. I worked on change orders for the main lobby stair-case and the basement level percussion room.
My duties included:
-Revision of drawings to match new intentions/requirements
-Coordination of drawings with shop drawings
Co-op: Kuwubara Payne Mckenna Blumberg ArchitectsRoyal Conservatory TELUS Centre for Performance and Learning
25
27
29
31
No. 330EXISTING1 STOREY
24'-0" (7.32m)
9'-1
1/2
" (2
.78m
)
24'-0
" (7
.32m
)16
'-4 1
/2"
(4.9
9m)
EE
O.H.
(SEPERATE SETOF DWG.S)
NEW GARAGE
NEW DECK(THIS SETOF DWG.S)
8" RETAINING WALL
LEGEND
LOT LINES
ENTRANCE/EXIT
10'-0" OVERHEAD GARAGE DOOR
O.H.
E
EXISTING APROX. 15'TALL CEDAR
EXISTING FENCE
PROPERTY LINE
MO
NTC
LAIR
STR
EE
T
49'-6
" (1
5.09
m)
124'-0" (37.80m)
19'-9 3/8" (6.03m) 24'-0" (7.32m) 24'-2 5/8" (7.38m)
12'-6
1/4
" (3
.82m
)11
'-0"
(3.3
5m)
17'-0
" (5
.18m
)
3'-0" (0.91m)
8'-1
1 3/
4" (
2.74
m)
E
O.H.
24'-0" (7.32m) 8'-0" (2.44m)
33'-0
" (1
0.06
m)
(LO
T 15
0)33
'-0"
(10.
06m
) (L
OT
151)
16' (
4.88
m)
WID
E L
AN
E
6'-0
" (1
.83m
)
30'-0" (9.14m)
3'-0" DIA. x 4'-0"DEEP DRY WELL
SITE PLAN1/8"=1'-0"
1SP1
DECK ADDITION
330 MONTCLAIR ST.THUNDER BAY, ONOWNER:JEFFREY LENT
DATE:06/21/10
N
SP1
LINE OF EXISTING HOUSE
6"X6" COLUMN, SEE DETAIL 1/A4, TYP.
DN5T @ 10"6R @ 7"
DN
4T @ 10"
5R @ 7"
DN
4T @
10"
5R @
7"
DN
1T @ 10"2R @ 7"
(4)
2"X
8" B
EA
M
(4) 2"X8" BEAM
(4)
2"X
8" B
EA
M
(4)
2"X
8" B
EA
M
(4) 2"X8" BEAM
(4) 2"X8" BEAM
(4) 2"X8" BEAM
(4) 2"X10" BEAM
(4) 2"X8" BEAM
2"X12" CARRIAGE STRINGER BELOW
(2) 2"X8" JOIST, TYP.
DECKINGDIRECTION, TYP.
24'-0
"
24'-0"
9'-0
"6'
-0"
6'-0
"3'
-0"
3'-0" 6'-0"
10'-0"
6'-0" 3'-0"
4'-6
"
2'-8
1/2
"6'
-0"
12"Wx10"D CONC. STRIP FTG.
2"X12" CARRIAGE STRINGER BELOW
2"X12"CARRIAGESTRINGER
BELOW
10'-0"
4'-3"
6'-0"
4'-3"
DECK PLAN1/4"=1'-0"
1A1
DECK ADDITION
330 MONTCLAIR ST.THUNDER BAY, ONOWNER:JEFFREY LENT
DATE:06/21/10
N
A1
1A2
2A2
1A3
1A5
2A4
7 1/
4"
2A4
3A2
12" DIA. SONO TUBE, c/w FLARED END, TYP.
TYP. CONSTRUCTION:- 2"X6" DECKING- 2"X8" JOISTS @ 24" o.c.- (4)2"X8" BEAMS, AS INDICATED- MIN. 4" CLEAN GRAVEL- CONT. FILTER CLOTH
6'-9 3/4" 8'-11 7/8"8'-7 1/8"
3'-4 7/8" 3'-4 7/8"
3'-6
"2'
-10
3/4"
4'-6
"
5'-2 1/4" 3'-9 1/2"
DECK ADDITION
330 MONTCLAIR ST.THUNDER BAY, ONOWNER:JEFFREY LENT
DATE:06/21/10
SECTION A-A1/4"=1'-0"
1A1
A2
3'-6
"
4"
1"2"X6" RAILING, TYP.
2"X2" BALUSTERS @ 4" o.c., TYP.
2"X4", TYP.
3 3/
4"
1"
2"X12" RIBBON BOARD, TYP.
2"X8" RIM JOIST, TYP.
TYP. RAIL. SECTION1/4"=1'-0"
2A2
DECK ADDITION
330 MONTCLAIR ST.THUNDER BAY, ONOWNER:JEFFREY LENT
DATE:06/21/10
TYP. STAIR SECTION1/2"=1'-0"
1A1
A3
7"
10" 3'-6
"
3'-6
"3'
-6"
PRESSURE TREATED 6"X10" BEARING PLATE
(2) 2"X6" TREAD
1"X6" RISER
2"X12" HOUSED STRINGER
2A3
TYP. STAIR RAILING SECTION1/2"=1'-0"
2A3
3'-1
0"
2"X6" RAILING, TYP.
4"X4" POST BEYOND, TYP. BOTH ENDS OF RAIL.
2"X2" BALUSTERS @ 4" o.c., TYP.
2"X12" HOUSED STRINGER, TYP.2"X12" CARRAIGE STRINGER WHERE INDICATED, TYP.
DECK ADDITION
330 MONTCLAIR ST.THUNDER BAY, ONOWNER:JEFFREY LENT
DATE:06/21/10
SECTION DETAIL1/2"=1'-0"
1A1
A4
STEEL POST SADDLE, c/w 6" ANCHOR
6"X6" PRESSURE TREATED POST, TYP.
SIMPSON STRONG-TIE (MOD. HGUS7.25/10) BEAM HANGER,TYP.
(4)2"X8" BEAM,TYP.
(4)2"X8" BEAM
12" SONO TUBE, TYP.
SECTION DETAIL1/2"=1'-0"
1A1
Independant Design Work:My Parents Deck Work began in the summer of 2010 on my first independant de-sign project: a residential deck addition. The deck is reinforced to allow for the extra load of a 4 person hot tub in the centre.
Clayton Albert Lent HBAS (519) 501 4835 (807) 683 5875 [email protected] Education: University of Waterloo HBAS Cambridge, Ontario
Bachelor in Architectural Studies, Honours, Co-op program
Professional Experience: H. Bradford Green Architect Inc., Intern Thunder Bay, Ontario
Prepared architectural presentation drawings, schematic designs, proposal documents and detailed construction drawings Responsible for Local Code & Bylaw research, materials research, document checking & coordination Assisted with administration, contract & general project management
Kuwubara Payne Mckenna Blumberg Architects, Intern Toronto, Ontario
Worked together with a team to develop a proposal presentation and created design proposal images Designed key building elements through large scale modeling and construction detail drawings
Stevens Group Architects Inc., Intern Toronto, Ontario
Participated in a design team, contributing actively from early Design iterations to presentation preparation Assisted Architects and designers through production of iterative design element models and drawings Worked independently developing a comprehensive construction staging demonstration model
Lauren Services ULC., Scaffolder, 2nd Year Apprentice C.N.R.L. Plant (Fort Mckay), Alberta
Worked with a team to assemble and disassemble temporary structures in a heavy industrial setting, while ensuring all safety practices were in place.
Lawrence Wright Construction, Assistant Hardwood Flooring Specialist Thunder Bay, ON
Worked together with a team to efficiently install, sand, refinish, and stain hardwood flooring as well as wooden trim detailing
330 Montclair St. Thunder Bay, ON
P7A 1M4 September 2006- August 2011 June-September 2009 January-September 2010 January-April 2011 September-December 2008 January- April 2008
June-September, 2007 June- September, 2006
Skills: - Digital 3D modeling using AutoDeSys Form Z and Sketchup - CAD using Vectorworks and Autocad - Adobe Creative Suite - Fine woodworking experience - Effective and enthusiastic team member
Portfolio- http://www.architecture.uwaterloo.ca/portfolio/clent/Lent_Clayton.pdf
(References available upon request)
33