arches
Norridgewock Bridge, Norridgewock, ME
Construction analysis for erection of the new arch
structure, erection plans & procedures
as well as development & design of temporary arch shoring.
McNary Bergeron & Associates has now been serving the complex Bridge market for 10 years! We have enjoyed working with the premiere Owners, Contractors and Engineers in the world helping build some amazing bridges. Here are 10 highlighted projects that show how we have assisted our clients over the years.
colorado565 Burbank Street, Suite ABroomfield, CO 80020tel 303 450 6900
coNNecticut220 Old Boston Post RoadOld Saybrook, CT 06475tel 860 388 2267
www.mcnarybergeron.com
lowry (Cover) Minneapolis, MN
3D Time-Dependentconstruction analysis, phased geometry control and erection
procedures, design of falsework and temporary works for backspans, mainspan
and arch erection.
steel
PawtucketPawtucket, RI
McNary Bergeron & Associates developed and designed the erection
plans, procedures, temporary works and heavy lifts for erection of the arches, as well as the upper structural steel
works and precast deck panels. We also developed and designed the arch “roll-in”
scheme.
cables
Hoover dam ByPassBoulder City, NV
McNary Bergeron & Associates provided construction
engineering services for the arch construction. This includes
the structural design for the temporary stay cable system
(anchorages, towers and cable connections at the arch ribs) as well as arch rib shop drawings and an independent review of
the formtraveler design.
equipment
Port maNNVancouver, BC Canada
Provided an independent check of the launching gantry designed
by DEAL for use in erection of the balanced cantilever and span-by-span approaches.
segmental
Nalley valley WA
McNary Bergeron & Associates assisted the contractor in procuring the contract by
redesigning two expensive steel bridges to be more economical
concrete structures. McNary Bergeron redesigned the bridge
from a steel tub-girder bridge to a precast segmental box
girder bridge, a change that also suited the owner because of the
extended design life and reduced maintenance. Construction
engineering services were also provided for the redesigned
structure through the casting and erection processes.
DRB/ExpERt
maiN street BridgeColumbus, OH
Scott McNary, of McNary Bergeron & Associates is a
member of the Dispute Review Board (DRB)
SubStructure
route 36Washington
McNary Bergeron & Associates provided construction engineering
services including the design of precast cofferdams and support system for footing construction,
integrated shop drawings for precast column and superstructure
segments, construction analysis, step-by-step erection procedures,
development and design of falsework, cantilever stability
system, lifting assemblies and rigging, and misc temporary works, and geometry control
system, including casting software for column and superstructure
segments.
Heavy Lift
Heavy Lift
lowryMinneapolis, MN
McNary Bergeron & Associates provided construction engineering
services to Lunda Construction for this unique basket-handle arch bridge. Our services included 3D time-dependent
construction analysis, phased geometry control and erection procedures,
design of falsework and temporary works for backspans, mainspan and arch
erection,design of lifting beams & equipment for
precast edge beam erection and arch rib lifting, and 2D and 3D integrated
shop drawings and working drawings for footings, piers, and superstructure
backspans and mainspan.
AccelerAted Bridge construction
cHesaPeakeAnnapolos, MD
McNary Bergeron & Associates provided construction engineering
services including, construction analysis for the replacement
of the suspension span deck through truss deck, erection
plans & procedures, geometry control systems, integrated shop
drawings for the precast deck units, development and design of lifting and handling systems
and the design of marine access system and trestle.
Bridges toProsPerity
Bridges toProsPerity
el BosQue El Salvador
Two communities are served by this bridge when traveling from their homes to the main road in
order to get anywhere, including town, city, markets, and doctors.
The third community is set on the road side of the river but the school is on the other side. This
bridge allowed the children of this community the opportunity
to get safely to their school all year around.
colorado565 Burbank Street, Suite ABroomfield, CO 80020tel 303 450 6900
coNNecticut220 Old Boston Post RoadOld Saybrook, CT 06475tel 860 388 2267
www.mcnarybergeron.com