Annexure: ADETAILS OF CONTRACTS PLACED BY OPEN TENDER
(For Civil Engg. /Elect. Engg. /S & T/Mech. etc works)(Status for the Month of APRIL 2014 – MARCH 2015)
Works Awarded : APRIL 2014
S. N.
Tender No.
Date of opening
Description of Item/ WorkLOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/
Estimated Cost (For
Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For Engg./Elect./S&T/Me
ch. etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 IRCON/1032/ DMRC Ph.III CT-4/
TENDER/ SLEEPER
(HAR)/ Dated
11.01.2014
04.02.2014 Manufacturing, Supply, Transportation and Delivery of Pre-Stressed Concrete Sleepers for Standard Gauge (1435mm) Plain Line, Level Crossing, 1 in 7 Turnout, 1 in 7 Scissor's Crossover(4.50 m track centre) and 1 in 7 derailing switch, suitable to UIC 60 kg rails for DMRC works as per relevant RDSO and Indian Railway specifications for phase- III CT-4 contract of DMRC at Ajronda Depot, Faridabad (Haryana)
IRCON/1032/DMRC Ph.III
CT-4/ TENDER/ SLEEPER (HAR)/ 86
Dated 01.04.2014
M/s Engipress Industries
Limited, Vijaya Bank Building, Jayendre Ganj Gwalior-474009
Item Rate/` 77,49,000/-
Item Rate/ ` 79,75,639/-
` 79,75,639/- 31.08.2014
2 IRCON/ 1032/ DMRC Ph.III CT-4/
TENDER/Ballast (HAR)/ Dated
09.01.2014
07.02.2014 Supply and Stacking of machine crushed stone ballast (hard Stone) conforming to the RDSO specifications for Track Ballast IRS-GE-1 with all correction Slip uptodate, for Phase-III CT-4 Contract of DMRC at Ajronda Depot, Faridabad, Haryana
IRCON/1032/DMRC Ph.III CT-4/TENDER/Ballast (HAR)/85
dated 01.04.2014
M/s B. B. Constructions, 12, Naya Ganj,
Khurja, (UP)
10500 Cum.
` 1,13,40,000/-
` 1049/- + 2% CST /
` 1,12,34,790/-
` 1,12,34,790/- 31.07.2014
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
3 IRCON/ JK Cell
/JAT/1014/17/G/ Support
Services/ SS-3R/ 344 (A), 28.02.2014
21.03.2014 Providing Support Services for IRCON's office and Guest Houses and other locations at USBRL Project office and establishments at Jammu. (Package: SS-3R)
IRCON/JK Cell/JAT/1014/17/
G/Support Services/SS-3R/344 (A),
Dated:01.04.2014
M/s Gh. Nabi Giri & Sons, Main Bazar,
Banihal, Distt. Ramban (J&K)
` 24.04 Lacs 0.02% below ` 29.42 Lacs 12 months from the date
of issue of LOA
4 IRCON/MECH/1029/RCF-RBL-
II/77 dt. 28.08.2013
17.09.2013 Power Saw (2 Nos.) IRCON/MECH/1029/RCF-RBL-
II/77 Dtd.02.04.2014
M/s ITL Industries,
111, Sector-B, Sanwar Road, Industrial Area, Indore-452015
` 18.34 Lacs ` 10.14 Lacs ` 10.14 Lacs 2 months from issue of
Purchase Order
5 IRCON/MECH/1029/RCF-RBL-II/90/RET-I
Dt.19.10.2013
12.11.2013 High Pressure Water Jet Cleaning Equipment (1 No.)
IRCON/MECH/1029/RCF-RBL-II/90/RET-I Dtd.
02.04.2014
M/s Ventilair Engineers,
Plot No. 179, F-3, Sector 16,
Rohini, New Delhi-85
` 28.12 Lacs ` 26.82 Lacs ` 26.82 Lacs 120 days from the date of
issue of LOA
6 IRCON/MECH/1029/RCF-RBL-II/ 225/RET Dtd.09.11.2013
10.12.2013 Scrap Bins (37 Nos.) IRCON/MECH/ 1029/RCF-RBL-
II/225/RET Dtd. 05.04.2014
M/s Zaam Tools, M-12, ITI,
Ancilliary State, Sultanpur Road,
Rae Bareli-229040
` 51.00 Lacs ` 40.62 Lacs ` 40.62 Lacs 3 months from date of
sample approval
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
7 IRCON/1032/
DMRC CT-4/RE-
TENDER/ CRANE Dated
13.03.2014
25.03.2014 Providing, operating and maintaining one no. 40 MT capacity hydraulic, tyre mounted crane with telescopic boom of 30-35 mtr. length on monthly hire charges basis for loading/Unloading of 18 mt. long rails, Shuttering plates etc. at various locations and Providing services for shifting of Mobile Flash Butt welding machine and machine bed including lifting & lowering by providing adequate capacity of crane with telescopic boom and trailers on job basis along the alignment of Contract CT-4 of DMRC : Badarpur Border to YMCA Chowk, Faridabad (Haryana) and Jhangirpuri to Badli (Delhi)
IRCON/1032/DMRC Ph.III
CT-4/RE-TENDER/ CRANE/102
Dated 07.04.2014
M/s Premier Services, 183, Surya Niketan, Delhi-100092
` 95,26,000/- ` 77,75,041/- ` 77,75,041/- 06.03.2015
8 IRCON/ CC/TN/JBRLP-2050/14/ 707 Dtd.
30.01.2014
21.02.2014 Consultancy Works for Preparation of GAD, Detailed Design & Drawing including Proof Checking of foundation, sub-structure and superstructure of Major Bridges from Km 27+775 to Km 52+336 in connection with Construction of New Broad Gauge Rail Line From Jaynagar (India) to Bardibas (Nepal) PKG: Consultancy – 03 (Nepal)
IRCON/2050/Bgl.JBB/Tender/
Consultancy(Nepal)-03/85 Dt. 10.04.2014
M/s Prof. D.D.Desai’s Associated Engineering
Consultants & Analysts Pvt. Ltd,
A/14, 3rd Floor, Divya Prakash, Dadabhai Cross
Road No-1, Andheri, West
Mumbai-400058
` 6.17 Lacs 8 % below ` 5.68 lacs 4 months from the date
of issue of LOA
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
9 IRCON/1032/DMRC
Ph.III CT-4/
TENDER/BLT PKG-1
(HAR) Date:
22.02.2014
17.03.2014 Installation of Ballastess Track including various types of Turnouts for Standard Gauge (1435 mm) Railway Track including Plinth Casting with M-35 Grade of Concrete over the Viaduct for Phase- III Corridors of DMRC from Badarpur to YMCA in Faridabad (Haryana) in connection with Contract CT-4 of DMRC (PKG-1)
IRCON/1032/DMRC Ph.III
CT-4/TENDER/ BLT Pkg-1 (HAR)/100
Dated 11.04.2014
M/s Pee Pee Mandal Projects Pvt. Ltd., Unit No 28,CSC-3, DDA
Market, Sector-5, Rohini, Delhi-
110085
` 5,44,61,000/- ` 4,70,96,650/- ` 4,70,96,650/- 10.01.2015
10 IRCON/1032/
DMRC Ph.III CT-4/TENDER/BT (HAR),
Dated 15.02.2014
19.03.2014 Laying and linking of ballasted track including turnouts, Scissor crossover for Standard gauge (1435mm) railway track on PSC sleepers, installation of Standard Gauge track on steel column, ballastless track for the washable apron & embedded track at Ajronda Depot in Faridabad (Haryana) in connection with contract CT-4 of DMRC
IRCON/1032/DMRC Ph.III
CT-4/TENDER/ BT (HAR),/112
Dated 15.04.2014
M/s Pee Pee Mandal Projects Pvt. Ltd., Unit No 28,CSC-3, DDA
Market, Sector-5, Rohini, Delhi-
110085
` 53,56,000/- ` 71,96,717/- ` 71,96,717/- 14.12.2014
11 IRCON/CC/TN/JBRLP-2050/14/
706 Dated30.01.2014
21.02.2014 Consultancy Works for Architectural and structural design and Other Services Related to the Construction of Station Building, Staff Quarters, OH Water Tank and miscellaneous works in connection with Construction of New Broad Gauge Rail Line From Jaynagar (India) to Bardibas (Nepal) PKG: Consultancy – 02 (Nepal)
IRCON/2050/Bgl.JBB/Tender/
Consultancy-02 (Nepal)/91
Dtd. 21.04.2014
M/s Srijan Architects Private
Ltd.65 C, Express
View Apartment, Sector 93, NOIDA,
Gautam Budh Nagar, U.P., India
- 201304
` 10.26 Lacs 35 % below ` 6.67 lacs 4 months from the date
of issue of LOA
Contd.../-
Works Awarded : MAY 2014
S. N.
Tender No.
Date of opening
Description of Item/ WorkLOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/
Estimated Cost (For
Engg./Elect. /S&T/ Mech. etc
Works)
Rate (for supply contract)/
Tendered Cost (For
Engg./Elect./S&T/Mech. etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 IRCON/CGRLP/ Tender
EC6/14/GT Works Km 10-74/ Dt.
10.03.2014
09.04.2014 “Conducting Geo- Technical Investigations including drilling Of Boreholes, collecting test samples & laboratory testings in connection with construction of New BG Electrified Rail Corridor, East Corridor – From Kharsia-Dharamjaygarh (Km 10 To 74) In Raigarh district of Chhattisgarh State”.
IRCON/CGRLP/ LOA EC6/ 14
/GT Works Km 10-74/177
Dated06.05.2014
M/s C.E.Testing Pvt. Ltd.124-A,
NSC Bose Road, Kolkatta - 92
`46.66 Lacs ` 46.66 Lacs ` 44.32 Lacs 04.09.2014
2 e-tender IRCON/ JK Cell/ JAT/ 14/ 1014/
DQ/ Balance work- 80 bedded
RPF/OB-3R1/ 276, 13.03.14
17.04.2014 Construction of balance works of 80 Bedded RPF Barracks, Boundary Walls and other allied works at Banihal Yard under Dharam - Qazigund Section of J&K New Rail Link Project. (Package: OB-3R1)
IRCON/1014/JK-DQ/14/
Balance Works-80 Bedded RPF/OB-
3R1/276, Dated: 12.05.2014
M/s R. S. Industries,
C-30 Industrail Estate, Barzulla, Sannat Nagar, Srinagar (J&K)
`149.55 Lacs 12.50% above ` 168.24 Lacs 04 months from the date
of issue of LOA
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
3 IRCON/ MECH/102
9/RCF-RBL-II/247
Dtd. 16.04.2013
07.05.2014 Work of Furnishing of Admn. Bldg Furniture (Left Wing Phase-I)
IRCON/MECH/1029/RCF-RBL-II/247
Dtd. 26.05.2014
M/s Durian Industries, New Delhi
` 395.00 Lacs ` 235.00 Lacs ` 235.00 Lacs 4 & 10 weeks from the date
of issue of LOA
4 e-tender IRCON/ JK Cell/ JAT/ 14/
1014/ DQ/ POT-PTFE- Elasto
Bearings/ BR-13/
277/ 18.02.14
19.03.2014 Manufacturing & Supplying of POT/POT-PTFE and Elastomeric Bearings for 45.70m, 30.50m and 24.40m span Open Web Normal Plate Girders including packing plates, etc., complete as per BOQ and approval drawing including loading, transportation, stacking and unloading at Consignee Depot/Ircon's Godown at Banihal under DQ Section of USBRL New Rail Link Project (J&K) (Package: BR-13)
IRCON/J&K-DQ/1014/
Bridge/POT-PTFE-Elasto Bearings/BR-
13/6799, Dated:
29.05.2014
M/s J.Sons Engineering Corp. (India)
J. Sons House, Garh Road, Meerut –
250 002 (UP)
` 24.45 Lacs 15.5% above ` 28.24 Lacs 05 months from the date
of issue of LOA
Contd.../-
Works Awarded : JUNE 2014
S. N.
Tender No.
Date of opening
Description of Item/ WorkLOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/
Estimated Cost (For
Engg./Elect. /S&T/ Mech. etc
Works)
Rate (for supply contract)/
Tendered Cost (For
Engg./Elect./S&T/Mech. etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 IRCON/MECH/
1029/RCF-RBL-II/154
Dtd. 08.08.13
03.09.2013 Hand & Power Tools and D/E Bench Grinder
IRCON/MECH/1029/RCF-RBL-
II/154 Dtd. 04.06.2014
M/s Machinery Marketing Pvt. Ltd.
2E/24, Jhandewalan
Extn., New Delhi-55
` 16.00 Lacs ` 8.96 Lacs ` 8.96 Lacs 1 month from the date of issue of Purchase Order
2 Ircon/Elect/5022/R-APDRP-
Jammu/10 MVA
Transformers/4A Dtd. 08.05.14
29.05.2014 33/11kV, 3 Ph. 10 MVA Power Transformers
Ircon/Elect/5022/R-APDRP-
Jammu Left/10 MVA
Transformer/4A/ 228
Dtd. 04.06.2014
Continental Transformers,
Village Kainthpur, Salmeri, PO: Jakh,
Dist: Samba, Jammu-181134
3 nos ` 44,61,526/- ` 1,33,81,986/- 3 months from the date of LOA
3 IRCON/ MECH/
1029/RCF-RBL-II/
130/RET-I Dtd.
27.09.2013
24.10.2013 Grinding and Polishing Machine (1 No.)
IRCON/MECH/1029/RCF-RBL-
II/130/RET-I Dtd. 11.06.2014
M/s Censico, 5A, Mahatma Gandhi Road, Agra-121005
` 10.00 Lacs ` 6.10 Lacs ` 6.10 Lacs 3 months from the date of issue of Purchase order
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
4 IRCON/ ADMN/ SAKET/ HOUSE
KEEPING/ 14-15 Dated
17.4.2014
10.06.2014 Service contract for upkeep, maintenance and other operations at IRCON’s Corporate office building at Saket
IRCON/ ADMN/ SAKET/ HOUSE KEEPING/14-15
16.06.2014
M/s Sun operation &
Maintenance Engg. Pvt.Ltd., C-134, 1st Floor, Shankar Road Market, New Delhi-110060
` 75.43 Lacs 3.69% below
` 72.65 Lacs 15.06.2015
5 IRCON/J&K-
Cell/JAT/14/1014/
DQ/T-49B/304
Dtd. 20.03.2014
06.05.2014 J&K Rail Link Project Dharam-Qazigund Section : Construction of Tunnel T-49 (Part Tunnel) and side Adits, Tunnel T-50, Bridge 4, Bridge 5 and earthwork at Arpinchala (between Km 116.600 & 125.00 approx) on Dharam – Qazigund section of Udhampur – Srinagar – Baramulla new BG Railway Line project (Package – T-49B)
IRCON/J&K-Cell/JAT/14/1014/
DQ/T-49B/304/596
Dtd. 17.06.2014
M/s Afcons Infrastructures Ltd.AFCONs House,
16, Shah Industrial Estate,
Veera Desai Road, Azad Nagar,P.O.11978,Andheri (W),
Mumbai -400 053
` 59194.95 Lacs
0.2% below ` 59078.96 Lacs
48 months from the date of iisue
of LOA
6 IRCON/ 2055/ROB-
Bihar/ Gaya-Manpur/
2014/06 Dtd. 21.02.2014
28.03.2014 Construction of Road over Bridge both railway span and adjacent approach span including Reinforced Earth wall/ Retaining Wall at railway Km-465/7-10 between station Manpur Junction-Gaya Junction at CH:1.00 Manpur by pass at Manpur of SH-04 in Gaya District, Bihar
IRCON/2055/ROB-BIHAR/GAYA-MANPUR/LOA/4
2/ 125 Dtd.18.06.2014
M/s GPT Infraprojects
Limited,GPT Center,
JC-25, Sector-III,Salt Lake City,
Kolkata-700 098
Schedule
“A”`269.99 Lacs
Schedule
“B”`4055.43
Lacs
Schedule “A”
10.60% Above
Schedule “B”
10.60% Above
Schedule “A”
`298.61 Lacs
Schedule
“B”`4485.30
Lacs
Total `47,83,91,907.
00
15-months including
monsoon period from the date of
issue of LOA
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)7 IRCON/
9032/ SLR.S&T/TOOLS/124
(R)
03.04.2014 Tender for Supply of Tools & Test Equipment for Sri Lanka Railways
IRCON/9032/SLR.S&T/TOO
LS/124 (R) Dated 24.06.14
M/s. Aishwarya Telecom Limited, 1-3-1026 & 1027,
Singadikunta, Kawadiguda, Hyderabad - 500080 (AP)Ph: +91-040-
27531324 Fax: +91-040-
27535423
`20,46,417/- ` 19,75,000.00 ` 19,75,000.00 2 month from the date of LOA
8 IRCON/ADMN/STP/
14-15 Dtd. 04.04.2014
25.06.2014 Annual Operation and comprehensive maintenance contract for 2 Nos. STP in IRCON’s Corporate Office at C-4, District Centre, Saket, New Delhi-17
IRCON/Admn./STP/2014-15
Dtd.30.06.2014
M/s Fontus water Pvt. Ltd. ,
AI/152, Neb Sarai, IGNOU
Road, New Delhi-110068
` 10.71 Lacs 9.24% below
` 9.72 Lacs 30.06.2016
9 IRCON/1032/D
MRC Ph.III CT-
4/TENDER/BLT PKG-2
(HAR) Date:
16.05.2014
06.06.2014 Installation of Ballastless Track including various types of Turnouts for Standard Gauge (1435 mm) Railway Track including Plinth Casting with M-35 Grade of Concrete over the Viaduct for Phase – III Corridors of DMRC from Badarpur To YMCA in Faridabad (Haryana) in connection with Contract CT-4 of DMRC (PKG-2)
IRCON/1032/DMRC Ph.III
CT-4/TENDER/ BLT PKG-2 (HAR)/206
Dated 30.06.2014
M/s Pee Pee Mandal Projects Pvt. Ltd., Unit No 28,CSC-3, DDA
Market, Sector-5, Rohini, Delhi-
110085
` 5,79,58,000/- ` 5,20,51,100/- ` 5,20,51,100/- 29.03.2015
Contd.../-
Works Awarded : JULY 2014
S. N.
Tender No.
Date of opening
Description of Item/ WorkLOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For
Engg./Elect./S&T/Mech. etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 IRCON/3016/SSTPP/EW
& P.Way/pkg.2/
02 dated 07.03.14
21.04.2014 Construction of private Railway siding for coal transportation system for NTPC/Solapur between ch.2.400 to ch.6.00 and p.way works in entire siding system
IRCON/3016/SSTPP/EW&
P.way/Pkg.2/02/121
Dtd. 02. 07.14
M/s ISC Project Pvt. Ltd,
Pune
61.403Cr `568342425.39 ` 577176423.03 15 months from the date of
award
2 IRCON/ELECT/5022/RAPDRP-
JAMMU/Tubular Steel Poles/12
Dt.09.04.14
13.05.2014 Steel Tubular Poles IRCON/ELECT/5022/RAPDRP-JAMMU/Tubular Steel Poles/12 Dtd. 03.07.2014
M/s Pragan Balaji Infrastructures, 31-A/C, Gandhi Nagar, Jammu-
181004
11 Mtr Long-10213 Mtr Long-5789 Mtr Long-159
` 9,899/-` 18,499/-` 6,539/-
`1,30,50,561/- 6 months from the date of LOA
3 IRCON/ELECT/5022/RAPDRP-JAMMU/LT
Power Cable/07
dt.24.04.14
19.05.2014 LT Power Cable IRCON/ELECT/5022/RAPDRP-
JAMMU/LT Power Cable/07 Dtd. 07.07.2014
M/s Genus Electrotech
Survey No.43, Meghpar Borichi, Galpadar Road, Gandhidham,
Distt. Kutch (Guj)-370 110
Various rating cables
` 91.60/ Mtr to ` 349.58/Mtr
`1,07,75,857/- 6 months from the date of LOA
4 IRCON/ ELECT/
5022/RAPDRP-JAMMU / 11 kV Power
Cable/10 Dt.d.
03.04.2014
07.05.2014 11 kV HT Power Cable IRCON/ELECT/5022/RAPDRP-JAMMU/11 kV
Power Cable/10 Dtd. 10.07.2014
M/s Dynamic Cables,
F 260, Road, No-13,
V.K.I. Area, Jaipur-302013
Rajasthan INDIA
Various rating cables
`10,90,21,465/-`10,90,21,465/- 6 months from the date of LOA
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
5 IRCON/J&K-Cell/ JAT/15/ 1014/ T-80/
COMC Dtd.
23.04.2014
23.05.2014 Comprehensive Operations & Annual Maintenance of 11kV, Ventilation, Electro Mechanical (E&M), Telecontrol (SCADA) and Telecom System for Pir Panjal Tunnel T-80 on Dharam – Qazigund section of USBRL project (J&K) (Package – T-80, COMC)
IRCON/J&K-Cell/JAT/15/101
4/T-80/COMC/708 Dtd. 11.07.2014
M/s Savronik Sistem India Pvt.
Ltd.507, Bhikaji Cama Place,
New Delhi110 065
`494.93 Lacs 7.90% Above ` 534.03 Lacs 12 months from the date of issue
of LOA
6 IRCON/ MECH/
1029/RCF-RBL-II/252
Dtd. 03.05.2014
27.05.2014 Medical Furniture (8 types)
IRCON/MECH/ 1029/RCF-RBL-
II/252 Dtd. 14.07.2014
M/s Royal Safe Co. (KB), Plot
No. 4, Furniture Block, Kirti nagar,
N. Delhi-15
` 29.23 Lacs ` 17.97 Lacs ` 17.97 Lacs 6 weeks from the date of
issue of LOA
7 IRCON/ELECT/5022/RAPDRP-JAMMU LEFT (CLUSTER-I,II &IV)/ Power
Transformer/4 Dtd. 26.03.2014
17.04.2014 33/11kV, 3 Ph. 10 MVA Power Transformers
Ircon/Elect/5022/R-APDRP-
Jammu Left/10 MVA
Transformer/4Dtd. 15.07.2014
Continental Transformers,
Village Kainthpur, Salmeri, PO: Jakh,
Dist: Samba, Jammu-181134
11 Nos ` 43,83,999/- ` 4,82,23,989/- 6 months from the date of LOA
8 IRCON/ MECH/ 1029/RCF-RBL-
II/248 Dtd. 15.04.2014
09.05.2014 Pallets Storage System for Paint Shop Stores (1086 Nos.)
IRCON/MECH/ 1029/RCF-RBL-
II/248 Dtd. 16.07.2014
M/s Saraswati Engineering, D12,
Site 1, Panki Industrial Area, Kanpur-280022
` 46.33 Lacs ` 51.20 Lacs ` 51.20 Lacs 3 months from LOA or 2 months from Purchase
Order/GAD whichever is later
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
9 IRCON/9038/
SLR.S&T/LPD/123
20.06.2014 Tender for Supply of Lightning Protection Devices for Sri Lanka Protection Devices for Sri Lanka Railway
IRCON/9038/SLR.S&T/LPD/
123 Dated 21.07.14
M/s. General Auto Electric Corpn. D/207, Ansa
Industrial Estate, Saki Vihar Road,
Saki Naka, Andheri (East), Mumbai –
4000072 (Maharashtra)
Ph. +91-22-66923194-95 Fax: +91-22-
66823196
` 77,36,400/- USD 1,12,665.00
USD 1,12,665.00
3 month from the date of LOA
10 IRCON/ MECH/
1029/RCF-RBL-II/
249 Dtd. 15.04.2013
13.05.2014 Racks for Storage System for Paint Shop Stores (181 Nos.)
IRCON/MECH/1029/RCF-RBL-
II/249 Dtd.25.07.2014
M/s Godrej & Boyce Mfg. Co.,
1, SIDCO, Industrial Area,
Ambattur, Chennai-600098
` 30.43 Lacs ` 17.62 Lacs ` 17.62 Lacs 3 months from LOA or 2 months from Purchase
Order/GAD whichever is later
11 IRCON/DMRC.S&T/CONSULTA
NCY/01
16.07.2014 Tender for Consultancy work for Evaluation of Assets installed by DAMEPL on Airport Express Line of Delhi MRTs
IRCON/DMRC.S&T/
CONSULTANCY/01 Dated 28.07.14
M/s. RAILSYS ENGINEERS PVT. LTD, 503, ‘B’ Wing, Trishla Apartment,
Dada Saheb Phalke Road,
Dadar (E) Mumbai – 400014
` 55,00,000/- ` 48,95,000.00 ` 48,95,000.00 12 weeks from the date
of LOA
Contd.../-
Works Awarded : AUGUST 2014
S. N.
Tender No.
Date of opening
Description of Item/ WorkLOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/
Estimated Cost (For
Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply
contract)/ Tendered Cost (For
Engg./Elect./S&T/Mech. etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 IRCON/ELECT/5022/RAPDRP-JAMMU/11
kV Swg.Pnl/5
Dtd.26.03.2014
08.05.2014 11 kV Indoor Switchgear panel IRCON/ELECT/5022/RAPDRP-JAMMU/11 kV
Swg.Pnl/5 Dtd.01.08.2014
M/s Megawin Switchgear Pvt.
Ltd Post Box No.434,
Perumal Malai Adivaram,
Alsgapurampost,Salem-636004,
Tamil Nadu (India)
40 Nos Panels
` 5.6 Lakhs each to `
17.61 Lakhs
` 5,07,18,540 6 months from the date of LOA
2 IRCON/ELECT/CO/CONSULT-
METRO EXP.LINE/01
16.07.2014 Consultancy services for Evaluation of Assets installed by DAMEPL on Airport Express Line of Delhi MRTs
IRCON/ELECT/CO/CONSULT-
METRO EXP.LINE/01
Dated 01.08.14
M/s Systra-MVA Consulting (I) Pvt.
Ltd., 5th Floor, Guru
Angad Bhawan, 71-Nehru Place,
New Dehi-99
Lump Sum ` 95,50,600.00 Plus S. Tax
` 95,50,600.00 Plus S. Tax
2 months from LOA
3 IRCON/ELECT/5023/RAPDRP-
JAMMU/DT/06 Dtd.
09.04.2014
09.05.2014 Distribution Transformer IRCON/ELECT/5023/RAPDRP-JAMMU/DT/06 Dtd.04.08.2014
Continental Transformers,
Village Kainthpur, Salmeri, PO: Jakh, Dist:
Samba, Jammu-181134
1084 Nos of différent
rating
` 39,227/- to ` 397,098/-
each
` 6,23,58,306 6 months from the date of LOA
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
4 IRCON/ PO/TN/
JAYNAGAR-2050/14/03
Dtd. 05.05.2014
28.05.2014 “Construction of Staff Quarters, Station Building, Services buildings, Platform, Roads, OH Water Tank & other structures at Khajuri Station (Nepal) in connection with “Gauge Conversion & Construction of New Broad Gauge Railway Line from JAYNAGAR (INDIA) To BARDIBAS (NEPAL)”, Pkg-Bld-02(Nepal)
IRCON/2050/ BGL.
JBB/Tender/ Pkg-Bld-02 (Nepal)/189
Dtd. 11.08.2014
M/s Roy Engineers,
Basant Vihar Colony,
Raghunath Path ,Near Plastic
Factory, , R.P.S. Road,
Danapur, Patna (Bihar)-801503
` 537.60 Lacs 17.5% above ` 631.68 Lacs 15-months including monsoon
period from the date of issue of
LOA
5 IRCON/ MECH/ 1029/RCF-RBL-
II/91 / RET-I Dtd. 15.04.2014
08.05.2014 Pin Welding Machines (4 Nos.)
IRCON/MECH/1029/RCF-RBL-
II/91/RET-I Dtd.12.08.2014
M/s Kukreja Transformers, 8-9, Wajirpur
Industrial Area,Delhi-52
` 9.11Lacs ` 7.54 Lacs ` 7.54 Lacs 3 months from the date
of issue of LOA
6 e-TenderJH-02-XI-
WB-IRCON-46A3
27.06.2014 Construction and Maintenance of Bridges:(1) SiddkiMore (T02) to Ghorighat on Sildaha Nallah(Total No.of Bridges: 01, Block: Pratappur, Dist: Chatra, State: Jharkhand)
IRCON/2054/ PMGSY-
JKR/LOA/JH-02-XI-WB-IRCON-
46A3/933 Date 13.08.2014
M/s Reasonable Enterprises,
Baralota, PO-GLA college,
Daltonganj, Distt-Palamau, Jharkhand
` 255.04Lacs ` 248.50 Lacs ` 247.24 Lacs 12.02.2016
7 e-Tender JH-02-XI-
WB-IRCON-46A4
27.06.2014 Construction and Maintenance of Bridges: (1) Birhu to Choupe on Angara Nallah (Total No. of Bridges: 01, Block: Simaria, Dist: Chatra, State: Jharkhand)
IRCON/2054/ PMGSY-
JKR/LOA/JH-02-XI-WB-IRCON-
46A4/934 Date 13.08.2014
M/s Pooja Enterprises,
Simariya, Chatra, Jharkhand
` 148.86Lacs ` 143.66 Lacs ` 138.49 Lacs 12.02.2016
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
8 e-Tender JH-02-XI-
WB-IRCON-48A
27.06.2014 Construction and Maintenance of Bridges :(1) Dumarwa to Aghara on Pakri nallah ( Total No. of Bridge: 01, Block : Pratappur, Dist: Chatra, Jharkhand
IRCON/2054/ PMGSY-
JKR/LOA/JH-02-XI-WB-IRCON-48A/935 Date
13.08.2014
M/s Reasonable Enterprises,
Baralota, PO-GLA college,
Daltonganj, Distt-Palamau, Jharkhand
` 297.21Lac ` 289.85 Lac ` 288.40Lac 12.02.2016
9 IRCON/ELECT/5022/
RAPDRP-JAMMU/
ACSR/ 15 Dtd.
28.04.2014
20.05.2014 ACSR Conductors IRCON/ELECT/ 5022/RAPDRP-JAMMU/ACSR/
15 Dtd. 14.08.2014
M/s Dynamic Cables Pvt Ltd.,F-260, Dynamic Cables, Road No 13, V K I
Area, Jaipur
232 Sqmm Panther - 41 Kms
150Sqmm Wolf - 139
Kms100 Sqmm
Dog-368 Kms
` 122,800/-` 91,400/-` 56,000/-
` 4,40,46,150/- 6 months from the date of
LOA
10 IRCON/CC/e-TN/
JBRLP-2050/14/71
2 Dtd.: 15.04.2014
22.05.2014 Construction of Civil work including Embankment, Blanketing, Bridges and other ancillary works in Nepal from KM 27+775 near Kapileshwar Mahuwa Village to KM 52+336 Sitapur Bangha (Bijalpura yard) in connection with Gauge Conversion & Construction of New Broad Gauge Railway Line from JAYNAGAR (INDIA) to BARDIBAS (NEPAL)
IRCON/2050/ BJL.JBB/Embkt/Km27+775 to Km 52+336/16 (Vol.-
III)/1968 Dtd. 14.08.2014
KALIKA-RAMAN JOINT VENTURE,
Janakpur-9, Dhanusha, NepalFAX: +977-041-
526333 (Janakpur),
+977-01-4490147 (Kathmandu)
` 51.28 Cr +9.5% above over Basic
cost of tender i.e. ` 51.13 Cr
` 55.99 Cr 18 (Eighteen) months
excluding monsoon period
of 1st July to 30th September from the date of
issue of LOA
11 IRCON/ MECH/1029/RCF-RBL-II/259 Dtd. 27.05.2014
24.06.2014 Canteen Custom Built Equipments with GN Pans (61 + 12 items)
IRCON/MECH/1029/RCF-RBL-II/259
Dtd.14.08.2014
M/s Mod Kitchen Equipment P.Ltd., 3A, Street No. 4, Block-RZ, Anand Parbat industrial
Area,New Delhi-05
` 40.50 Lacs ` 37.14 Lacs ` 37.14 Lacs 4 weeks from LOA
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
12 e-Tender JH-07-XI-
WB-IRCON-
38A1
27.06.2014 Construction and Maintenance of Bridges(1) Kamat to Jatarbhajanri on Banki river(Total No.Of Bridges: 01, Block: Majhigawn, Dist: Garhwa, State: Jharkhand)
IRCON/2054/PMGSY-
JKR/LOA/JH-07-XI-WB-IRCON-
38A1/936 Date 14.08.2014
M/s. Nawal Kishor Roy, 208T, Dhanauti,
Choti Marai, Hazipur, Bihar
` 311.35Lacs ` 308.12 Lacs ` 304.81Lacs 13.02.2016
13 IRCON/ELECT/5022/
RAPDRP-JAMMU/33 kV VCB/8
Dtd.03.04.2014
25.04.2014 33 kV Vaccum Circuit Breaker IRCON/ELECT/5022/RAPDRP-JAMMU/33 kV
VCB/8 Dtd.22.08.2014
M/s Crompton Greaves, 3rd Floor,
Express Building, New Delhi-110 002
45 Nos ` 1,73,000/- ` 91,56,843/- 6 months from the date
of LOA
14 IRCON/ELECT/5022/
RAPDRP-JAMMU/
33 kV Control &
Relay Panel/9
Dtd. 11.04.2014
21.05.2014 33 kV Control & Relay Panels IRCON/ELECT/5022/RAPDRP-JAMMU/33 kV
Control & Relay Panel/9
Dtd.22.08.2014
M/s Stelmec Limited
Sea Queen, 43 - A, H. K. Bhabha
Road, Band Stand,
Bandra (W), Mumbai - 400 050
25 Sets15 Sets
` .83,500/-` 2,45,800/-
` 67,52,056/- 6 months from the date
of LOA
15 IRCON/ K-RO/ TN/ KASBA/
14/4 Dated 30.06.2014
22.07.2014 Construction of G+I Storied Office Building for IRCON INTERNATIONAL LTD. at Prantik Pally, Kasba, Kolkata, West Bengal.
IRCON/ 953A/ KASBA-
OFF.BLDG/ CE/25367/ 321A Dated 22.08.2014
M/s. Construct Engineering, P-
539, Raja Basanta Roy
Road, Kolkata – 700029
`75.00 Lacs `75.00 Lacs ` 78,47,021/- 9 months
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
16 IRCON/S&T/1029/RCF-RBL/EPABX/TENDER/
02
18.07.2014 Provision of fully non-blocking IP server based Electronic Telephone Exchanges, and termination of telecom cables. Supply, Installation and Commissioning of entire system including networking, SDH equipment etc. at Rail Coach Factory, Raebareli
IRCON/S&T/ 1029/RCF-
RBL/EPABX/TENDER/
02/400 Dated 25.08.2014
M/s. Datacom Products India) Pvt. Ltd. 214, Champakal
Udyog Bhawan, 105, Sion
Koliwada Road, Sion (E),
Mumbai-22 Fax: 2406 1100
E-mail: [email protected]
n
` 6,85,34,747/-` 6,17,32,702/- ` 6,00,00,008.58 6 months from the date of LOA
17 IRCON/ PO/TN/
JAYNAGAR -2050/14/08
Dtd.16.06.2014
09.07.2014 “Construction of Staff Quarters, Station Buildings, Services buildings, OH Water Tank & other structures at Inarwa Station (Nepal) in connection with “Gauge Conversion & Construction of New Broad Gauge Railway Line from Jaynagar (India) to Bardibas (Nepal)”, Pkg. - Bld-01(Nepal)
IRCON/2050/ BGL.JBB/
Tender/Pkg-Bld-01
(Nepal)/194 Dtd. 26.08.2014
M/s Shrestha Construction
Company (Hetauda) Pvt.
Ltd.P.O. Box: 3828,
Banasthali, Balaju,
Kathmandu, Nepal
` 404.58 Lacs 16.5 % above ` 471.34 Lacs 15-months including
monsoon period from the date of
issue of LOA
18 IRCON/ ELECT/ 5022/
RAPDRP-JAMMU/LA/
13 Dtd.16.04.2014
03.06.2014 Lightning Arresters IRCON/ELECT/5022/RAPDRP-JAMMU/LA/13 Dtd.28.08.2014
M/s Raychem RPG Ltd,Janak Puri, New Delhi
33kV-42 Nos11 kV-111 Nos
11kV -3044 Nos
11kV for DT-67 Nos
` 22,143/-` 4,137/-` 1,710/-` 1,710/-
` 76,82,234/- 6 months from the date of LOA
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
19 e-Tender JH-02-XI-
WB-IRCON-
46A6
27.06.2014 Construction and Maintenance of Bridges:(1)Satgharwa to Bari Bigha on BaribighaNallah(Total No. of Bridges: 01, Block: Hunterganj, Dist: Chatra, State: Jharkhand)
IRCON/2054/PMGSY-
JKR/LOA/JH-02-XI-WB-IRCON-
46A6/959 Date
30.08.2014
M/s Jai Maa Ambe
Enterprises, Bypass Ratu
Road, Second Dube Lodge,
Chatra, Jharkhand
` 75.75Lacs ` 72.21Lacs ` 67.87Lacs 29.02.2016
20 e-Tender JH-15-XI-
WB-IRCON-
33A2
27.06.2014 Construction and Maintenance of Bridges Over:Bridge over Dhoi River on Tiko to Chandu Path Phase vth road(Block: Kuru, District: Lohardaga)
IRCON/2054/ PMGSY-
JKR/LOA/JH-15-XI-WB-IRCON-
33A2/960 Date
30.08.2014
M/s Kashyap Construction,
Rajnagar, Near Durga Garrage, Police line road,
Sudna, Daltonganj,Jharkhand
` 101.53Lacs ` 101.05 Lacs ` 94.98Lacs 29.02.2016
21 IRCON/2055/Gaya-Manpur-
ROB/ e-Tender /
2014/23 Dated 12.07.2014
04.08.2014 Fabrication, assembly, erection and painting of Steel Bowstring girder in Railway span and staircase in connection to Construction of ROB at KM.1.000 of Manpur Bypass in state of Bihar
IRCON/2055/ GAYA-
MANPUR/ ROB/STEEL/
LOA/52 Dated
30.08.2014
M/s S.P. Developer and
Decorator#3195,
Paradise Enclave,
Sector-50-D, Chandigarh
` 232.15 Lacs 7.50% Above ` 249.56 Lacs 15-months including monsoon
period from the date of
issue of LOA
Contd.../-
Works Awarded : SEPTEMBER 2014
S. N.
Tender No.
Date of opening
Description of Item/ WorkLOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/
Estimated Cost (For
Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply
contract)/ Tendered Cost (For
Engg./Elect./S&T/Mech. etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 IRCON/PO/ TN/
JAYNAGAR-2050/14/09
Dated 16.06.2014
09.07.2014 Construction of Staff Quarters, Station Building, Services buildings, Platform, Roads & other structures at Mahinathpur Halt (Nepal) in connection with “Gauge Conversion & Construction of New Broad Gauge Railway Line from JAYNAGAR(INDIA) To BARDIBAS(NEPAL)” Package No. : Bldg - 03 (Nepal)
IRCON/2050/ BGL.JBB/
Tender/Pkg-Bld-03 (Nepal)/198 Dtd. 01.09.2014
M/s B. K. Construction
Bihat, Paka Tola, Begusarai,
Bihar-851135
` 180.18 Lacs 15.80 % above ` 208.66 Lacs 15-months including
monsoon period from the date of
issue of LOA
2 IRCON/PO/ TN/
JAYNAGAR-2050/14/10
Dated 16.06.2014
09.07.2014 “Construction of Staff Quartes, Station Building, Services buildings, Platform, Roads & other structures at Baidehi Station (Nepal) in connections with “Gauge Conversion & Construction of New Broad Gauge Railway Line from JAYNAGAR(INDIA) To BARDIBAS(NEPAL)” Package No. : Bldg- 04 (Nepal)
IRCON/2050/ BGL.JBB/Tende
r/Pkg-Bld-04 (Nepal)/199
Dtd. 01.09.2014
M/s Shrestha Construction
Company (Hetauda) Pvt.
Ltd.P.O. Box: 3828,
Banasthali, Balaju,
Kathmandu, Nepal
` 434.90 Lacs 16.50 % above ` 506.66 Lacs 15-months including
monsoon period from the date of
issue of LOA
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
3 IRCON/MECH/1029/RCF-RBL-II/ Monitoring
System/254 Dated
14.05.2014
19.06.2014 04 Nos Multi Parameter Patient Monitor
IRCON/MECH/ 1029/RCF-RBL-
II/254/5041 Dated
02.09.2014
M/s SCHILLER Healthcare India (P)
Ltd. , Plot No. 84 and 85, 2nd Cross,
Reddyyarpallayam, Aziznagar,
Puducheery-605005
` 27 .00 Lacs ` 2.28 Lacs ` 9.11 Lacs 06 weeks from the date of
issue of LOA
4 IRCON/ MECH/1029/RCF-RBL-
II/254 Dated
14.05.2014
19.06.2014 02 Nos Defibrillator and 04 Nos ECG machines for Hospital at RCF/RBL
IRCON/MECH/ 1029/RCF-RBL-
II/254/5041 Dated
02.09.2014
M/s SCHILLER Healthcare India (P)
Ltd. , Plot No. 84 and 85, 2nd Cross,
Reddyyarpallayam, Aziznagar,
Puducheery-605005
` 27 .00 Lacs ` 10.82 Lacs ` 10.82 Lacs 06 weeks from the date of
issue of LOA
5 IRCON/1032/DMRC Ph.III
CT-4/ TENDER/ BLT (DLI)
Dtd. 02.06.2014
23.06.2014 Installation of Ballastless Track including various types of Turnouts for Broad Gauge Railway Track including Plinth Casting with M-35 Grade of Concrete over the Viaduct for Phase- III Corridors of DMRC from Jahangirpuri to Badli (Delhi) in connection with Contract CT-4 of DMRC
IRCON/1032/ DMRC Ph.III
CT-4/TENDER/ BLT(DLI)/278/1
Dated 02.09.2014
M/s Pee Pee Mandal Projects
Pvt. Ltd.,Unit No.: 28,
CSC-3, DDA Market,
Sector-5, Rohini,Delhi – 110 085
` 454.89 Lacs ` 436.52 Lacs ` 436.52 Lacs 01.06.2015
6 IRCON/CC/e-TN/DMRC EXPRESS
LINE/14/718 Dt.
06.08.2014
20.08.2014 Consultancy for evaluation of Civil Engineering assets installed by DAMEPL (Concessionaire) on Airport Express line of Delhi MRTS
IRCON/CC/e-TN/DMRC EXPRESS
LINE/14/718/1980 Date: 02.09.2014
M/s Urbane The Design Workshop
Pvt. Ltd., 5-Sri Aurobindo
Marg, South Apartment,
1st Floor, New Delhi-110016
Ph: 011-46636320/27
FAX: 011-46636321
Lump Sum ` 29.00 Lacs plus S. Tax
` 29.00 Lacs plus S. Tax
3 months from LOA
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
7 IRCON/ELECT/5022/
RAPDRP-JAMMU/SETC-
LINE/20
07.07.2014 Package-1: Supply, Erection, Testing, Commissioning of HT and LT Lines / Distribution System under Cluster-I, Jammu-Left of R-APDRP, Part-B Project, Jammu Province of JK PDD
IRCON/ELECT/5022/
RAPDRP-JAMMU/SETC-
LINE/20 Dtd.
05.09.2014
M/s Enforture Tech Pvt. Ltd.,
D-71, Sector -63, Noida-201307
Qty as per tender BOQ,
Estd cost `450.58 Lacs
Qty as per tender BOQ, Cost of LOA
award ` 479.87 Lacs
` 4,79,87,493/- 06 months
8 e-Tender JH-02-XI-
WB-IRCON-
46A5
27.06.2014 Construction and Maintenance of Bridges Over Brinda to Kabra on Brinda nallah(Total No.of Bridge : 01,Block: Tandwa, Dist: Chatra, State: Jharkhand)
IRCON/2054/PMGSY-
JKR/LOA/JH-02-XI-WB-IRCON-
46A5/977 Date 10.09.2014
M/s Pooja Enterprises,
Simariya, Chatra, Jharkhand
` 133.74 Lacs ` 133.74 Lacs ` 114.96 Lacs 10.03.2016
9 e-Tender JH-17-XI-
WB-IRCON-
53A1
27.06.2014 Construction and Maintenance of Bridges Over:(1)Kasmar to Jaspur in 2nd
km over LalBandh river(2) Kasmar to Jaspur in 3rd
km over Varvagadha river(3) Kasmar to Jaspur in 5th
km over Pichchdi river(Total No. of Bridges: 03nos., Block: Manatu, Dist:Palamau, Jharkhand)
IRCON/2054/PMGSY-
JKR/LOA/JH-17-XI-WB-IRCON-
53A1/976 Date 10.09.2014
M/s Reasonable Enterprises, Baralota,
PO-GLA College, Daltonganj,
Distt-Palamau, Jharkhand
` 324.33 Lacs ` 324.33 Lacs ` 312.52 Lacs 10.03.2016
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
10 e-Tender JH-17-XI-
WB-IRCON-52A2
27.06.2014 Construction and Maintenance of Bridges Over :(1) Patchrukhiya to
Lalgarha in 4th km overKhairdah river
(2) Patchrukhiya toLalgarha in 3th km overKhairdah river
(Total No. of Bridges: 02nos., Block: Manatu, Dist: Palamau, Jharkhand)
IRCON/2054/PMGSY-
JKR/LOA/JH-17-XI-WB-IRCON-
52A2/975 Date 10.09.2014
M/s Reyaj Ahmad Khan
Construction, Kund Mohallah,
Daltonganj, Distt-Palamau,
Jharkhand
` 207.26 Lac ` 207.26 Lac ` 201.01 Lac 10.03.2016
11IRCON/MECH/1029/RCF-RBL-II/ Stair Case Trolley with caster
wheels/100/RET Dated 17.09.2014
13.05.2014 Satire Case Trolley 01 MT - (20 Nos) and 03 MT - (03 Nos)
IRCON/MECH/ 1029/RCF-RBL-
II/ Stair Case Trolley with
caster wheels/100/RET
/ 5108 Dtd. 17.09.2014
M/s J S Industries,
Mathura Road, 16/2, Mathura
Road, Kharkhana Bag,
Faridabad - 121 002
` 11.5 Lacs ` 8.17 Lacs ` 8.17 Lacs 03 Months from the date of
issue of LOA
12 IRCON/ MECH/1029/RCF-RBL-II/ X-Ray 500
Ma/250 Dated
03.05.14
23.05.2014 01 Nos X-Ray Machine for Hospital at RCF/RBL
IRCON/MECH/ 1029/RCF-RBL-
II/ X-Ray 500 Ma/250/5110
Dated 18.09.2014
M/s Allengers Medical Systems
Ltd. SCO 212-213-214,
Sector 34-A,Chandigarh (UT-
160022)
` 30.00 Lacs ` 24.00 Lacs ` 24.00 Lacs 02 months from the date of
issue of LOA
13 IRCON/ELECT/5024/R-APDRP-
JAMMU/11/0.4kV
Distribution Transformers
/6
01.07.2014 Supply of 11/0.4kV Distribution Transformers for RAPDRP Part B Projects Jammu Province of JKPDD in the state of Jammu Kashmir
IRCON/ELECT/ 5024/R-APDRP-JAMMU/11/0.4k
V Distribution Transformers/6 Dtd. 19.09.14
M/s Continental Transformers,
Village Kainthpur, Salmeri, P.O. Jakh,
Dist. Samba, Jammu-181134
Qty as per tender BOQ,
Estd cost `237.1 Lakhs
Qty as per tender BOQ, Cost of LOA
award `238.08 Lakhs
`2,38,08,406/- 06 months
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
14 IRCON/ IT/ SOFTWARE/
160
08.07.2014 Supply and installation of New Licenses of STAAD Pro 8i or latest and up gradation of STAAD Pro and Bentley Rail Track latest version at IRCON’s Corporate Office at New Delhi
IRCON/ IT/ SOFTWARE/
160 Dtd.19.09.2014
M/s Microsharp Software
TechnologiesBasement, FA-41Abull Fazal Enclave
Jamia NagarNew Delhi-110025
2/5/1 New License
STAD Pro/ Upgradation of STAD Pro/
Rail Track
@ ` 149594/` 76090/-/ ` 303372/-
` 9. 83 Lacs 05.11.2015
15 IRCON/2049/ROB-II-
BIHAR/e-TENDER/2014/29 Dated
01.09.14
15.09.2014 Fabrication, assembly, erection and painting of Steel Composite girder in approach portion in connection to Construction of ROB at LC-23B at Khagaria in the state of Bihar
IRCON/2049/ ROB-II-
BIHAR/LC-23B/STEEL/LO
A/58/2482 Dated
19.09.2014
M/s Omega Engineers
Quiet Office No.7,Ground Floor,
Entry Back side,Sector-35 A,
Chandigarh-160 036
`1,15,21,771/- 18.00% below the tendered
amount
` 94,47,852/- 6-months from the date of
issue of LOA
16 IRCON/ 2049/ROB-II-BIHAR/LC-
53A/e-Tender/ 2014/25 Dated
09.08.14
29.08.2014 Strengthening of Diversion Road near ROB in lieu of L.C.-53A at Bihia in the state of Bihar
IRCON/2049/ ROB-II-
BIHAR/LC-53A/LOA/64/ 2562 Dated 29.09.2014
Vinay Kumar SinghNorth Mandiri,Chakkan Tola,P.S.- Budha
Colony,Patna – 800 001
`3,10,94,592/- 3.20% below the tendered
amount
` 3,00,99,565/- 6-months from the date of
issue of LOA
17 IRCON/J&K-Cell/JAT/14/1
014/D-Q/Banihal-Uti.
Works/M-34/301 Dtd.
16.07.14
07.08.2014 Maintenance of IRCON's establishments (office & camp up keep and other misc.) and assisting IRCON's Engineers during supervision of works and survey works as required at various locations along the project alignment from Dharam to Banihal covering Ramban, Sangaldan, Sumber, Kohli, Dharam, Khari, Banihal, Qazigund, etc. in connection with Dharam – Qazigund section of USBRL project (Package – M 34)
IRCON/J&K-Cell/JAT/14/1014/D-Q/Banihal-Uti. Works/M-
34/301/992 Dtd. 30.09.2014
M/s Gh. Nabi Giri & Sons
Main Bazar,Banihal,
Distt. Ramban182 146
`165.28 Lacs 4.50% above ` 172.71 Lacs 12 months from the date
of issue of LOA
Works Awarded : OCTOBER 2014
S. N.
Tender No.
Date of opening
Description of Item/ WorkLOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/
Estimated Cost (For
Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply
contract)/ Tendered Cost (For
Engg./Elect./S&T/Mech. etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 IRCON/ELECT/5023/
RAPDRP-JAMMU/SE
TC/9
27.06.2014 Package 2 Supply, Erection, Testing, Commissioning and Other associated works including Civil works, complete in all respect for 33/11kV substations under Cluster_II, Jammu Right of RAPDRP, Part_B Project, Jammu Province of JK PDD
IRCON/ELECT/ 5023/RAPDRP-JAMMU/SETC/9 Dtd. 01.10.2014
M/s Enforture Tech Pvt. Ltd.,
D-71, Sector -63, Noida-
201307NOIDA
Qty as per tender BOQ, Estd Cost
`121.29 Lacs
Qty as per tender BOQ, Cost of LOA
award `140.05 Lakhs
`1,40,05,715/- 10 months
2 IRCON/ELECT/5022/
R-APDRP-JAMMU/
Composite Type
Insulators/25
27.08.2014 Supply of Composite type Insulators for R APDRP, Part B Projects Jammu Province of JKPDD in the state of Jammu and Kashmir
IRCON/ELECT/5022/R-APDRP-
JAMMU/Composite Type
Insulators/25 Dtd. 01.10.2014
M/s Yamuna Power,
Sardana Nagar, Ambala Road,
Jagadhiri, Yamuna Nagar
(Haryana)-135003
Qty as per tender BOQ,
Estd Cost` 79.32 Lacs
Qty as per tender BOQ, Cost of LOA
award `77.15 Lakhs
`77,15,929/- 06 months
3 e-tender IRCON/JK Cell/JAT/14/1014/DQ/Transportation- Coaches & Loco/TS-
28/28803.06.14
24.06.2014 Transportation of DEMU Power and Trailer Coaches and WDS4 Loco by Road, duly conducting feasibility study, from Udhampur Railway Station to Budgam Railway Station of USBRL New Rail Link Project. (J&K) (Package: TS-28)
IRCON/J&K-Cell/JAT/14/1014/D-Q/
Transportation -Coaches &
Loco/TS-28/288/ 4093
Dated: 09.10.2014
M/s ABC India Ltd
L-81,3RD Floor, Street No.-7, Mahipalpur
Extension, New Delhi-110037
`425.51 Lacs 5% below `425.30 Lacs 04 Months from the date of
issue of LOA
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
4 e-Tender JH-07-XI-
WB-IRCON-
36A2
27.06.2014 Construction and Maintenance ofBridges Over:1) Jhurkali to Rapura on Barwanallah(Total No.Of Bridges: 01,Block: Bhavanathpur,Dist: Garhwa, State: Jharkhand)
IRCON/2054/PMGSY-
JKR/LOA/JH-07-XI-WB-IRCON-
36A2/1007 Date 13.10.2014
M/s Nawal Kishore Roy,
208T at Dhanauti, Chhoti Marai,
Hajipur, Vaishali,
Bihar
`161.28 Lacs ` 161.28 Lacs ` 161.17 Lacs 13.04.2016
5 e-Tender JH-07-XI-
WB-IRCON-
83
27.06.2014 Construction and Maintenance ofBridges Over:(1)T04 to Sukhnadi onSukhnadi nallah(Total No. of Bridges: 01,Block: Majhigawn, Dist:Garhwa, State: Jharkhand)
IRCON/2054/PMGSY-
JKR/LOA/JH-07-XI-WB-IRCON-
83/1008 Date 13.10.2014
M/s Nawal Kishore Roy,
208T at Dhanauti, Chhoti Marai,
Hajipur, Vaishali,
Bihar
` 97.89 Lacs ` 97.89 Lacs ` 94.81 Lacs 13.04.2016
6 e-Tender JH-17-XI-
WB-IRCON-
51A1
27.06.2014 Construction and Maintenance of Bridges Over:(1) Gawahi to Goindi (5th K.M)
on Hazara Nallah(2) Gawahi to Goindi(7th K.M) on
Khari Nallah(3) Gawahi to Goindi(9th K.M) on
Jamuniyadih Nallah(Total No. of Bridges: 03 nos., Block: Manatu, Dist:Palamau, Jharkhand)Construction and Maintenance ofBridges Over : Jhurkali to Rapura on Duhannallah(Total No. of Bridge: 01, Block: Bhavnathpur, Dist: Garhwa, Jharkhand)
IRCON/2054/PMGSY-
JKR/LOA/JH-17-XI-WB-IRCON-
51A1/1012 Date 14.10.2014
M/s Sildilya Construction, Station road,
Redma, Ward No. 15, Daltonganj,
Distt-Palamau, Jharkhand
`539.52 Lacs ` 539.52 Lacs ` 523.80 Lacs 14.04.2016
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
7 e-Tender JH-17-XI-
WB-IRCON-
58A1
27.06.2014 Construction and Maintenance of Bridges Over:(1) BhiyaKhuraha toHotwar in 3rd km over Chako river(Total No. of Bridge: 01 no., Block: Panki, Dist: Palamau, Jharkhand)
IRCON/2054/PMGSY-
JKR/LOA/JH-17-XI-WB-IRCON-
58A1/1010 Date
14.10.2014
M/s Sildilya Construction, Station road, Redma, Ward
No. 15, Daltonganj, Distt-
Palamau, Jharkhand
`534.13 Lacs ` 534.13 Lacs ` 518.51 Lacs 14.04.2016
8 e-Tender JH-17-XI-
WB-IRCON-
52A1
27.06.2014 Construction and Maintenance of Bridges Over:(1) Gawahi to Goindi in12th Km over, Jhariba river(2) Gawahi to Goindi in 13thkm over ,Jhariba river(Total No. of Bridge: 02 nos., Block: Manatu, Dist: Palamau, Jharkhand)
IRCON/2054/PMGSY-
JKR/LOA/JH-17-XI-WB-IRCON-
52A1/1009 Date
14.10.2014
M/s Sildilya Construction, Station road, Redma, Ward
No. 15, Daltonganj, Distt-
Palamau, Jharkhand
`289.10 Lacs ` 289.10 Lacs ` 278.90 Lacs 14.04.2016
9 e-Tender JH-17-XI-
WB-IRCON-
54A2
27.06.2014 Construction and Maintenance of Bridges Over:(1) Sareya to Lapya in 3rd Km over Lapya river(Total No. of Bridge: 03 nos., Block: Hussainabad,Dist: Palamau, Jharkhand)
IRCON/2054/PMGSY-
JKR/LOA/JH-17-XI-WB-IRCON-
54A2/1011 Date
14.10.2014
M/s Abhoy Enterprises, Homidganj,
Daltonganj, Distt-Palamau, Jharkhand
`172.66 Lacs ` 172.66 Lacs ` 163.07 Lacs 14.04.2016
10 e-Tender JH-07-XI-
WB-IRCON-
36A1
27.06.2014 Construction and Maintenance of Bridges Over:(1) Jhurkali to Rapura onDuhannallah(Total No. of Bridge: 01, Block: Bhavnathpur,Dist: Garhwa, State: Jharkhand)
IRCON/2054/PMGSY-
JKR/LOA/JH-07-XI-WB-IRCON-
36A1/1030 Date
15.10.2014
M/s Nawal Kishore Roy,
208T at Dhanauti, Chhoti Marai,
Hajipur, Vaishali, Bihar
`119.88 Lacs ` 119.88 Lacs ` 119.80 Lacs 15.04.2016
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
11 IRCON/ELECT/5024/
RAPDRP-JAMMU/SET
C/5
07.07.2014 Package-3: Supply, Erection, Testing, Commissioning and Other associated works including Civil works, complete in all respect for 33/11 kV substations under Cluster-IV of R-APDRP, Part-B Project, Jammu Province of JK PDD
IRCON/ELECT/5024/RAPDRP-JAMMU/SETC/5 Dtd. 15.10.2014
M/s Enforture Tech Pvt. Ltd.,
D-71, Sector -63, Noida-
201307NOIDA
Qty as per tender BOQ,
Estd Cost `125.74 Lacs
Qty as per tender BOQ, Cost of LOA award `149
Lakhs
`1,49,00,494.85 10 months
12 e-Tender JH-17-XI-
WB-IRCON-
61A
27.06.2014 Construction and Maintenance of Bridges Over:(1) P.W.D Nawa to Rajdiriya in 3rd km over Banki river(Total No. of Bridge: 01 no., Block: Bishrampur, Dist: Palamau, Jharkhand)
IRCON/2054/PMGSY-
JKR/LOA/JH-17-XI-WB-IRCON-
54A2/1034 Date
17.10.2014
M/s Kashyap Construction,
Rajnagar, Near Durga Garage,
Police Line Road, Sudna,
Daltonganj, Distt-Palamau, Jharkhand
` 231.65 Lacs ` 231.65 Lacs ` 208.25 Lacs 17.04.2016
13 IRCON/ 2049/ ROB-II-BIHAR/e-Tender/
2014/36/ 2563 Dated
29.09.2014
14.10.2014 Construction of 8 Nos. Type-II Railway Quarter in RCC Frame Structure buildings and other Misc. work in connection to Construction of ROB in lieu of LC-47B at Begusarai between Begusarai -Tilrath Section of EC Railway, Bihar
IRCON/2049/ ROB-II-
BIHAR/e-Tender/2014/36/
73/2694 Dtd.20.10.2014
M/s Geeta Prasad Sharma,
New Aitwarpur, Sipara,
Kurthol, Patna
`1,16,36,086/- 13% above the scheduled
amount
`1,31,48,777/- 6-months including monsoon
period from the date of issue of
LOA
14 e-tender IRCON/ J&K-
Cell/ JAT/14/1014/
DQ/Hiring Vehicle
Banihal/VH-12/287
21.08.2014
16.06.2014 Hiring of inspection vehicles for IRCON officers & staff in connection with the construction of D-Q section of USBRL New Rail Link Project (J&K) (Package: VH-12)
e-tender IRCON/ J&K-Cell/ JAT/14 /
1014/DQ/Hiring Vehicle
Banihal /VH-12/287, Dated:
28.10.2014
M/s Friends Sumo Taxi
Owners Union, Bus Stand,Banihal.
Distt. Ramban182 146
` 409.87 Lacs ` 426.51 Lacs 12 Months from the date of
issue of LOA
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
15 IRCON/J&K-Cell/ JAT/14/
1014/DQ/ Works
Contract Utility/ M-35,
17.07.2014
08.08.2014 Works contract for maintenance of IRCON’s office and guest houses and other miscellaneous works at Jammu in connection with USBRL Project (J&K) (Package: M-35)
IRCON/J&K-Cell/ JAT/14/1014/DQ/ Works Contract- Utility/M-35/302 /
1080, Dated: 29.10.2014
M/s BSS EnterprisesH.NO. 314,
Suraksha Vihar, Paloura Top,
Jammu-181124
` 36.88 Lacs 8% above ` 36.21 Lacs 12 Months from the date
of issue of LOA
16 e-Tender IRCON/
ELECT/5022/R-APDRP-
JAMMU/Pole DB/26
04/09/14 Supply of Pole Distribution Boxes for RAPDRP Part B Projects Jammu Province of JKPDD in the state of Jammu and Kashmir
Dtd. 29.10.14 M/s Star Rising, 75, Link Road, Opp New Grain
Mandi Sansar Chandra
Road Jaipur-302001
`1,97,70,370/-
17 IRCON/ J&K-Cell/ JAT/14/
1014/D-Q/ HiringVeh-
Jammu/VH-15
22.07.2014
12.08.2014 Hiring of vehicles for IRCON Officers and staff for J&K-Cell, Jammu in connection with USBRL Project Work (J&K). (Package: VH-15)
IRCON/J&K-Cell/ JAT/14/1014/
D-Q/Hiring Veh- Jammu/VH-15 /
1081, Dated: 31.10.2014
M/s Fair Deal Tour & Travels75, Last Mode, Gandhi Nagar,
Jammu
` 23.32 Lacs 2.54% above ` 23.91 Lacs 12 Months from the date
of issue of LOA
Works Awarded : NOVEMBER 2014
S. N.
Tender No.
Date of opening
Description of Item/ WorkLOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For
Engg./Elect./S&T/Mech. etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 IRCON/2059/CGRP/
e-Tender EC7/14/Maj
Br Date 08.08.2014
19.09.2014 Construction of Major Bridge sub-structures in connection with new B.G. Electrified double line in the state of Chhattisgarh over South East Central Railway between Kharsia and Dharmjaygarh
IRCON/2059/ CGRP/e-Tender EC7/Maj Br/220 Date 05.11.2014
M/s Gannon Dunkerley & Co.
Ltd., B-228, Okhla Phase-1,
New Delhi -110020
Qty as per tender BOQ ` 4466.27
Lacs
7.90% Above ` 4139.24 Lacs 05.05.2016
2 IRCON/ELECT/5022/
RAPDRP-JAMMU/Energy
Meter/24 Date:
04.07.2014
24.09.2014 Supply of 1 phase and 3 phase Energy Meters for R-APDRP, Part-B Projects, Jammu Province of JKPDD
IRCON/ELECT/5022/RAPDRP-JAMMU/Energy
Meter/24 Date:
13.11.2014
M/s Mohindra Brothers
Karan Bagh, Bhour Camp, Chatha Road,Near Airport,
Jammu-180009
Qty as per tender BOQ,
Estd cost `96.90 Lakhs
Qty as per tender BOQ, Cost of LOA
award `72.93 Lakhs
`72,93,446/- 4 months
3 e-tender IRCON/J&K-
Cell/JAT /15/1014/Package-
CSS-I/ 05.09.14
25.09.2014 Supply, Installation, Testing & Commissioning of 11/.433 KV 2x500 KVA Package type Sub-station along with HT Panel, LT Panel, APFC Panel Metering Panel, Automatic Servo stabilizer etc. and other auxiliary works for camp office at Sangaldhan on DQ Section of USBRL Project (J&K) (Package: CSS-I)
e-tender IRCON /J&K-Cell/JAT /
15/1014/ Package-CSS-I/
1108, Dated: 14.11.2014
M/s Hitech Erectors Pvt. Ltd.
303, Pragati Chamber,
Ranjeet Nagar Commercial Complex, New Delhi-110008
`139.63 Lacs 9.04% Above `152.25 Lacs 06 Months from the date
of issue of LOA
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
4 IRCON/ELECT/5022/
R-APDRP-JAMMU/ Gal.
Structural Steel/21A
30.09.2014 Supply of Fabricated Galvanised Structural Steel for 33/11KV Sub stations and overhead distribution electric lines of 33KV and 11KV for RAPDRP Part B Projects Jammu Province of JKPDD in the state of Jammu and Kashmir
IRCON/ELECT/5022/R-APDRP-
JAMMU/Gal. Structural
Steel/21A1 Dtd. 14.11.2014
M/s N L Engg Pvt Ltd.
C 114 INDUSTRIAL AREA PHASE
VII SAS NAGAR MOHALI
Qty as per tender BOQ,
Estd cost `760.64 Lakhs
Qty as per tender BOQ, Cost of LOA
award `821.20 Lakhs
` 8,21,20,786/- 6 months
5 IRCON/9038/SLR.S&T/
MACHINES/130
07.11.2014 Supply of machines for S&T Project of Sri Lanka Railway
IRCON/9038/ SLR.S&T/
MACHINES/130 Dated
19.11.2014
Quartz Technologies, K-36, Udyog
Nagar Rohtak Road, Near Peera
Garhi Chowk, Delhi 110041
` 50,30,386/- 0.61% lower than the
tender amount
` 49,99,500/- 2 months from date of issue of
LOAi.e. 18.01.2015
6 IRCON/MECH/1029/RCF-RBL-
II/Test Weight for
Weight Bridge/19A
Dated 02.08.2014
27.08.2014 Test Weight for weight bridge IRCON/MECH/ 1029/RCF-RBL-II/Test Weight
for Weight Bridge/19A/5291 Dated 20.11.2014
M/s Leotronic Scales Private
Ltd., 47, 1st Floor Hide
Floor,Amritsar-143001
` 20.92 Lacs ` 17.85 Lacs ` 17.85 Lacs 03 months from the date
of issue of LOA
7 IRCON/2049/ ROB-II-Bihar/
e-Tender/ 2014/ 30 Dtd. 02.09.2014
26.09.2014 Design Supply and Supervision for Construction of Gabion facia wall with height in range of 5m to 6m, to facilitate the construction of service road of Road Over Bridge in lieu of LC-35B, Danapur
IRCON/2049/ ROB-II-Bihar/
LC-35B/81/2879 Dtd.
21/22.11.2014
Maccaferri Environmental
Solutions Pvt. Ltd. Ground Floor,
128/27, Hazra Road,
Near Ashutosh Mukherjee College, Kolkata
` 66.52 Lacs 9.90% above the tendered amount in Bill of Quantities
` 73,10,106.20 05 months from the date
of issue of LOA
Contd.../-
Works Awarded : DECEMBER 2014
S. N.
Tender No.Date of opening
Description of Item/ WorkLOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For
Engg./Elect./S&T/Mech. etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 IRCON/9041/BD-S&T/SIG.EPM/14
20.10.2014 Supply of Electric Point Machines, Non Trailable, designed to operate on 110 V DC, having internal locking and detection with suitable ground connections for 11 stations in Ishurdi–Darshana section of Bangladesh Railway
IRCON/9041/BD-
S&T/SIG.EPM/ 14/1379/1826
Dated 01.12.14
M/s. Siemens Limited, R&D
Building, Kalwa Works, Thane
Belapur Road, Navi Mumbai 400708
` 64,97,540/- `64,97,540/- `1,08,47,649/- 9 months from date of
LoA i.e 30.09.15
2 IRCON/9038/SLR.
S&T/TOOL/ & TEST
EQUIPMENT/127
07.11.2014 Supply of Tools and Test Equipment for S&T project of Sri Lanka Railways
IRCON/9038/SLR.S&T/
TOOL/ & TEST EQUIPMENT/
127/01Dtd. 05.12.2014
M/s. Tirumala Seven Hills (P) Limited, 40,
Strand Road, 3rd
floor, Kolkata, 700001, WB
`10,96,480 /- `10,96,480/- `28,00,000/- 2 months from date of
LOA ie 18.01.2015
3 IRCON/9038/SLR.S&T/TOOL/ &
TEST EQUIPMENT/127
07.11.2014 Supply of Tools and Test Equipment for S&T project of Sri Lanka Railways
IRCON/9038/SLR.S&T/TOOL
/ & TEST EQUIPMENT/
127/03 Dtd 05.12.2014
M/s.Quartz Technology, K-36,
Udyog Nagar, Rohtak Road, Near Peera Garhi Chowk,
Delhi 110041
` 30,58,221/- `30,58,221/- `35,55,200/- 2 months from date of
LOA ie 18.01.15
4 IRCON/9038/SLR.S&T/TOOL/ &
TEST EQUIPMENT/127
07.11.2014 Supply of Tools and Test Equipment for S&T project of Sri Lanka Railways
IRCON/9038/SLR.S&T/TOOL
/ & TEST EQUIPMENT/
127/02 Dtd. 05.12.2014
Aishwarya Technologies and
Telecom Limited 1-3-1026 & 1027,
Kawadiguda, Behind Hotel MAriott
Courtyard, Hyderabad – 500080 Telanagana
`10,06,080/- `10,06,080/- `8,95,000/- 2 months from date of
LOA ie 18.01.15
Contd.../-
Works Awarded : JANUARY 2015
S. N.
Tender No.Date of opening
Description of Item/ WorkLOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/
Estimated Cost (For
Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply
contract)/ Tendered Cost (For
Engg./Elect./S&T/Mech. etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 IRCON/1034/PBTL/
Tenders/Consultancy/14
28.11.2014 Detailed project consultancy in connection with “Widening and Strengthening of existing Bikaner-Phalodi Section to Four lane from Km 4.200 to 55.250 and Two lane with paved Shoulder from Km 55.250 to Km 163.500 of NH-15 excluding ROBs on BOT (Toll) Basis in the State of Rajasthan”
IRCON/1034/ PBTL/Tenders/Consultancy/ 14/109, Dated 08.01.2015
Stup Consultants Pvt. Ltd.,
Plot No. 22-A,Sector 19-C,
Palm Beach Marg, Vashi, Navi Mumbai -
400705, India, Ph. : 022-40887777,
41224328, Fax; 022-27836240,
Email: [email protected]
`3,32, 00,000 11.4% above the tendered amount in Bill of Quantities
`3,70, 00,000 36 months from date of
LOA i.e 08.01.15
2 IRCON/ 2048/ISC-BEHALA/
REBARING/14/5 Dated 01.01.2015
15.01.2015 Rebaring of Reinforcement (various Dia) inside the existing old RCC Beams/ Columns/Slabs etc. by HILTI or equivalent method at Indoor Stadium Complex at Behala, Kolkata, West Bengal
IRCON/2048/ ISC-BEHALA/
REBARING/NC/ 27352/595
Dated 21.01.15
M/s. Namzee Construction, 24
Santoshpur Avenue, Kolkata – 700075
`21,92,000.00 `20,00,000.00 `26,79,740.00 30 days
Works Awarded : FEBRUARY 2015
S. N.
Tender No.
Date of opening
Description of Item/ WorkLOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/
Estimated Cost (For
Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/
Tendered Cost (For
Engg./Elect./S&T/Mech. etc Works)
Value of Contract
Scheduled completio
ndate
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 IRCON/PO/TN/Jaynagar-2050/14/15
Dtd. 133.11.2014
08.12.2014 “Construction of Bridge works & RCC drain in Indian portion of alignment at Jaynagar (Indian) from chainage Km 0.000 to 2.975 Km in connection with “Gauge Conversion & Construction of New Broad Gauge Railway Line from JAYNAGAR(INDIA) To BARDIBAS(NEPAL)” Package No. : Bridge - 01 (India)
IRCON/2050/BGL.JBB/Tender/Pkg.-Bridge-01(India)/43
Date: 06.02.2015
M/s ROY Engineers, Basant Vihar
Colony, Raghunath Path,
Near Plastic Factory, R.P.S Road,
Danapur, Patna - 801503
`3,12,94,176/- 1.3 % below `3,08,87,352.00 15 (fifteen)
months from the date of issue of
LOA
2 IRCON/9038/SLR.S&T/DW PLANT /
13205.12.2014
29.12.2014 Supply of Distilled water Plant for Sri Lanka Railways
IRCON/9038/SLR.S&T/DW PLANT /132 Dated 09.02.2015
Quartz Technologies, K-36, Udyog Nagar, Rohtak Road, Near
Peera Garhi CHowk, Delhi 14
` 5,76,250 `4,66,764.11
`4,66,764.11 08.04.2015
3 IRCON/9038/SLR.S&T/T
OOL/ & TEST
EQUIPMENT/127R
16.12.2014
08.01.2015 Supply of Tools and Test Equipment for S&T project of Sri Lanka Railways
IRCON/9038/SLR.S&T/TOOL/ & TEST
EQUIPMENT/127RDated 10.02.2015
M/s Tirumala Seven Hills (P) Limited, 40,
Strand Road, 3rd
floor, Kolkata, 700001, WB
`715,000 `7,65,000 `7,65,000 09.05.2015
4 IRCON/CC/e-TN/GGN-OFF_COMP
/14/722/ Dated :
17.11.2014
16.12.2014 Construction of Warm Shell structure for Office Blocks and Auditorium at Plot No. 16, Sector-32, Gurgaon (Haryana)”
IRCON/CC/e-TN/GGN-OFF
_COMP/14/722/30 / Dated: 19.02.2015
M/s CMM Infraprojects Ltd.,
108, Shalimar Corporate Centre, 8-B, South Tukoganj,
Indore-452001(M.P.)
Estimated cost in
Tender : Rs. 2547 Lacs
7.02 % above
`27,25,79,231.12 18.08.2016
Contd.../-
Works Awarded : FEBRUARY 2015
S. N.
Tender No.
Date of opening
Description of Item/ WorkLOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/
Estimated Cost (For
Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/
Tendered Cost (For
Engg./Elect./S&T/Mech. etc Works)
Value of Contract
Scheduled completio
ndate
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
5 IRCON/MECH/1029/RCF-RBL-II/CNC Shear
Centre/233/RET-I dated 01.102014( e-tender)
Supply Testing, Commissioningg & Prove Out of 01 No CNC Shear Center for RCF Re Bareli
IRCON/MECH/1029/RCF-RBL-II/CNC
Shear Centre/233/RET-I /5572 dated
26.02.2015
M/s Baykal Makine Sanayi Ve Tic. A.S.
( Manufacture) Organize Sanayi,
Bolgesi Lacivert Cad, P Box No.: 16140- No ¼ Bursa Turkey
` 5.4 Crores` 5.6 Crores ` 5.6 Crores 300 days
from LC Opening
Works Awarded : MARCH 2015
S. N.
Tender No.
Date of opening
Description of Item/ WorkLOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/
Estimated Cost (For
Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply
contract)/ Tendered Cost (For
Engg./Elect./S&T/Mech. etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 IRCON/MECH/1029/RCF.RBL-II/Various
Lab Items/274/
Sypply, Installation & Commissioning Various Lab Items for RCF Rae Bareli
IRCON/MECH/1029/RCF.RBL-II/Various Lab Items/274/5708
Dated 30.03.2015
M/s Banbros Engineering Pvt Ltd.
Ghaziabad U.P.
` 7,78,000/- ` 9,82,700/- ` 9,82,700/- 03 month from issue of
PO.
2 IRCON/MECH/1029/RCF.RBL-II/Various
Lab Items/274
Sypply, Installation & Commissioning Various Lab Items for RCF Rae Bareli
IRCON/MECH/1029/RCF.RBL-II/Various Lab Items/274/5709
Dated 30.03.2015
M/s Hytech Instruments &
Services Lucknow
` 8,93,000/- ` 4,38,825.00 ` 4,38,825.00 03 month from issue of
PO.